Attachment 6 Seed Project FXSB 21-1058 Price Schedule.pdf
PDF 800 KB Posted
- Attached to
- JBER MACC Federal contract opportunity
- Solicitation number
- FA500021R0023
About this file
This price schedule document outlines the costs for renovating two restrooms in building 13373 at Joint Base Elmendorf-Richardson in Alaska under solicitation number FA500021R0023. The contractor will replace all fixtures, plumbing, and convert an existing closet into a third restroom facility. The total construction cost is a single line item to be provided by the bidder. The work must start within 10 days of receiving the notice to proceed and be completed within 120 days, including time for administrative tasks, submittals, material ordering, and physical construction. The proposal will remain valid until the date specified on the signature page. The solicitation was issued by the Department of the Air Force Pacific Air Forces for the JBER MACC, a multiple award IDIQ construction contract to conduct repair, alteration, and new construction projects at Joint Base Elmendorf-Richardson.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
FXSB 21-1058 TWCF Refurbish Restrooms at AGE Storage Building 13373
CONTRACTOR ORGANIZATION ADDRESS
The Contractor shall renovate the restrooms in building 13373 on JBER, Alaska, and convert the existing closet in the southwest corner of the building closet into a restroom. The contractor shall furnish all design, plant, labor, equipment, supplies, materials, appliances, transportation and perform all work (including work of an incidental nature), in strict accordance with the Statement of Work (SOW) and subject to the terms and conditions of the contract.
UNIT TOTAL
ITEM DESCRIPTION QUANTITY UNIT PRICE COST
0001 Need to replace all fixtures plumbing, when complete needs to be two restrooms.
(Project FXSB 21-1058)
1 EA $__________ $ ___________
Perform all of the above described work complete per the SOW, specifications, and drawing.
TOTAL CONSTRUCTION COST $_______________
Work shall start within 10 days after date of the receipt of the Notice to Proceed, and shall be completed within 120 days. This performance period includes administrative time, submittal time, material ordering time, and physical construction time.
TECHNICAL SPECIFICATIONS: FXSB 21-1058
PROPOSAL VALID THROUGH (DATE) ________________________
SIGNATURE DATE SIGNED
For Official Use Only
FA500021R0023-JBER MACC
Attachment 6 - Seed Proj FXSB 21-1058
For Official Use Only 1
File details come from the government source that posted it. Updated .