This is a solicitation notice for Construction-Manager as Constructor (CMc)/Construction Manager as Risk (CMAR) services for the U.S. Customs and Border Protection Land Port of Entry in Houlton, Maine. The notice (ID: 47PB0024R0049) is issued by GSA Public Buildings Service and includes both Design Phase services (firm-fixed price) and Construction Phase services (guaranteed maximum price).
The project has an estimated construction magnitude of $22-32 million and is funded through both the Bipartisan Infrastructure Law and Inflation Reduction Act. Proposals are due November 21, 2024 at 2:00 PM EST, with a pre-proposal conference scheduled for October 10, 2024 and site visit for October 17, 2024. While not set aside for small business, both small and large businesses can participate under NAICS code 236220 with a size standard of $39.5 million average annual receipts. Technical and price proposals must be submitted separately. Access to certain documents requires completion of Form B and a CBP Non-Disclosure Agreement. The solicitation includes 71 attachments covering various aspects of the project requirements, specifications, and submission guidelines.
View the file
Other files
Show 40 more
Latest 50 of 108 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Opportunity Details
Notice ID Related Notice Active/Inactive
47PB0024R0049 Active
Notice Status Department/Ind. Agency Sub-Tier
Published GENERAL SERVICES
ADMINISTRATION
PUBLIC BUILDINGS SERVICE
Office
PBS R1 ACQ MANAGEMENT DIVISION
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (PTAP).
General Information
Contract Opportunity Type Updated Published Date
Solicitation (Updated) Oct 31, 2024 08:22 PM
Date Offers Due Inactive Policy
Nov 21, 2024 02:00 PM EST 15 days after response/Contract Award Date
Inactive Date Initiative
Dec 06, 2024 None
Allow Vendors to Add/remove from Interested Vendors List
Allow Vendors to View Interested Vendors List
No No
Classification
Original Set Aside Product Service Code
C1AA-ARCHITECT AND ENGINEERING- CONSTRUCTION:
OFFICE BUILDINGS
Place of Performance
Houlton , ME USA
NAICS Code(s)
NAICS Code NAICS Definition
236220 Commercial and Institutional Building Construction
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
1Oct 31, 2024 08:22:59 PM GMT https://www.apexaccelerators.us https://www.aptac-us.org/ https://www.aptac-us.org/ https://www.apexaccelerators.us
Description
47PB0024R0049 Amendment 003 Added Attachments 33. A.7 GSA P-100 2021 with 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix v10 CMc 2021, 58. GSA Program Development Study 100% PDS Report 2021 02 08 (559), and 69. Roof Moisture Analysis Report Houlton 2020 06 23 (22) did not get posted on 10/04/2024. They are added under Amendment 0003.
Additionally, Attachment 98. RFI Site Visit Tracker is provided as the Government Response to RFI by Offerors.
47PB0024R0049 Amendment 002 Added Attachment 72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10. A courtesy copy was sent via email to people that were on the invitation list even if they did not attend the individual meetings. It it attached here so all contractors, whether they requested attendance or not, will know of the discussions.
Added clarifying Price Proposal language below:
Under Volume II - Price Proposal - Part 3 - Price Proposal "Other than Certified Cost and Pricing Data" Documentation. Uniformate II Classification Framework.
Under Volume II - Price Proposal
(1) Contents
· Price Proposal on SF-1442 (signed) â Solicitation, Offor, and Award. The Price Proposal shall consist of the SF-1442 and the Agreement. Indicate the Total Contract Price from the completed Contract Price Form in Block 17 of the SF 1442, which must be fully executed by the Offeror.
· A completed Contract Price Form included as part of the SF-1442 and in Section II of the Agreement.
· Other than Certified Cost and Pricing Dataâ Documentation. Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level.
The IRA designated CLINs shall be broken out separately from the remaining requirement.
Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97).
NOTE: The Price Proposal must be separately bound from the Phase II Technical Proposal.
IV.L. Requiring Certified Cost or Pricing Data [15.403-4] IV.L.A. FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (NOV 2021), Alternate IV (OCT 2010)
(a) Submission of certified cost or pricing data is not required.
(b) Provide data described below: Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g.
A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level.
The IRA designated CLINs shall be broken out separately from the remaining requirement.
Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97).
Added Attachment 75 Presolicitation in SAM 2024 08 27.
Added Attachment 76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17 Added Attachments 77 - 94 provide additional design information as requested.
77 Exhibit D_2325-GSA-Houlton ME LPOE_Design Options; 78 Exhibit D.1_LPOE Houlton Concept Development Design Package; 79 Exhibit E_ LPOE Houlton Concept Development Calculation Package; 80 Exhibit E.1_MPBRoof
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
2Oct 31, 2024 08:22:59 PM GMT
Structure; 81 Exhibit F_MEP Basis of Design Narrative; 82 Exhibit G_MEP Concept Development Design Alternates; 83 Exhibit G.1 MEPFP Equipment; 84 Exhibit H_Houlton LPOE_Facade Options & IRA LEC Materials_Concept Development MEMO; 85 Exhibit J Houlton LEED NC Scorecard; 86 Exhibit J.1_GSA Sustainable Buildings_Checklist;
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative; 88 Exhibit U_(CUI) Houlton ME DBT_MSR_FSL; 89 Exhibit V_Houlton LPOE Pre-Renovation RBM Survey Report 2024-06-25; 90 Exhibit X_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 92 Exhibit Z_(CUI) Passwords; 93 Exhibit AA_National Operational Excellence Checklists_Concept Development; and 94 Exhibit BB_Houlton ME LPOPE_Concept Development Specifications Table of Contents.
Several required a Completed Form B under Attachment 5 and a Completed CBP NDA Authorization Letter signed for access. If you have already submitted these to the Contracting Officer prior to October 24, 2024, just email again for access.
NOTE: The Facade - Precast Panels and Terracotta Rainscreen - colors will be selected in the next phase by the Architecture Engineering (AE) Design Firm Marvel Architectures. Additionally, HVAC - VRF, the A/E will select the vendor that meets most of the GSA requirements (HVAC and Controls).
Added Attachment 95 IRA Program Construction Solicitation Desk Guide - dated October 1, 2024. This is a revision of any previous Construction Solicitation Desk Guide that provides guidance for IRA-funded construction projects that contain low embodied carbon (LEC) materials, including pre-solicitation, solicitation, and agreement guidance, evaluation factor requirements, review and approval requirements, and post-award requirements. It also includes standard scope of work language for actions related to the construction project (design services, CMa, and CxP services) for LEC materials, high performance green buildings, and emerging and sustainable technology projects.
Added Attachment 96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs containing questions asked by Offeror's and official Government Responses for the Pre-Proposal Conference only.
Added Attachment 97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide reference above in Pricing Information area.
47PB0024R0049 Amendment 001 The following changes were made effective on 10/08/2024:
A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it.
B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it.
C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification:
1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am.
2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov.
3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024.
D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification:
1. The Site Visit will be held on October 17, 2024 at 1:00 PM.
2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov.
3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024.
E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28.
F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051
3Oct 31, 2024 08:22:59 PM GMT
A. The corrected Proposal Due Date is Thursday, November 21, 2024.
This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S.
Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services.
Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding.
This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein.
The Government will award the contract to the selected Offeror, subject to the conditions set forth herein.
The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.
Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding).
Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information.
This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal.
See the "A. Presolicitation in SAM 2024 08 27" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST.
For access to Public Building Services (PBS) General Services Administration (GSA) documents, see "B. FORM B - Request for Construction Documents 2024 08 07" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided.
Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See "6. CBP Non-Disclosure Agreement Form 2024 10 04" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP
4Oct 31, 2024 08:22:59 PM GMT
Documents are provided.
A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation "7. Pre-Proposal Conference 2024 10 04".
A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation "8. Pre-Proposal Site Visit 2024 10 04".
There are 71 attachments to this solicitation.
Attachment/Links
Attachments Document File Size Access Updated Date
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf
0.015625KB public 2024-10- 31T20:22:40.606+00:00
69. Roof Moisture Analysis Report Houlton 2020 06 23.pdf
0.015625KB controlled 2024-10- 31T20:22:40.606+00:00
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf
0.015625KB public 2024-10- 31T20:22:40.606+00:00
Solicitation Amendment 47PB0024R0049_0003.pdf
0.015625KB public 2024-10- 31T20:22:40.606+00:00
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf
0.015625KB public 2024-10- 31T20:22:40.606+00:00
78 Exhibit D1_LPOE Houlton Concept Development Design Package.pdf
0.015625KB controlled 2024-10- 25T19:41:46.638+00:00
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
79 Exhibit E_ LPOE Houlton Concept Development Calculation Package.pdf
0.015625KB controlled 2024-10- 25T19:41:46.638+00:00
77 Exhibit D_2325-GSA- Houlton ME LPOE_Design Options.pdf
0.015625KB controlled 2024-10- 25T19:41:46.638+00:00
91 Exhibit Y_Flood Level Diagram from 2024-07- 02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
75 Presolicitation in SAM 2024 08 27.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
81 Exhibit F_MEP Basis of Design Narrative.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
Solicitation Amendment 47PB0024R0049_0001.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
88 Exhibit U_(CUI) Houlton 2024-10-0.015625KB controlled
5Oct 31, 2024 08:22:59 PM GMT
ME DBT_MSR_FSL.pdf 25T19:41:46.638+00:00
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
80 Exhibit E.1_MPB Roof Structure.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
72 FINAL Houlton Pre- Proposal Meeting Presentation 2024 10 10.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx
0.015625KB public 2024-10- 25T19:41:46.638+00:00
Solicitation Amendment 47PB0024R0049_0002.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
92 Exhibit Z_(CUI) Passwords.pdf
0.015625KB controlled 2024-10- 25T19:41:46.638+00:00
83 Exhibit G.1_MEPFP_Equipment.pdf
0.015625KB public 2024-10- 25T19:41:46.638+00:00
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348- 0051.pdf
0.015625KB public 2024-10- 08T20:38:39.197+00:00
73. Contract Price Form Spreadsheet 2024 08 28.xlsx
0.015625KB public 2024-10- 08T20:38:39.197+00:00
5. Form B - Request for Construction Documents 2024 10 08.pdf
0.015625KB public 2024-10- 08T20:38:39.197+00:00
6Oct 31, 2024 08:22:59 PM GMT
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf
0.015625KB public 2024-10- 08T20:38:39.197+00:00
7. Pre-Proposal Conference R1 2024 10 08.pdf
0.015625KB public 2024-10- 08T20:38:39.197+00:00
8. Pre-Proposal Site Visit R1 2024 10 08.pdf
0.015625KB public 2024-10- 08T20:38:39.197+00:00
48. CBP Land Port of Entry Design Standard 2023 12 06.pdf
0.015625KB controlled 2024-10- 05T03:22:17.6+00:00
64. Hazardous Materials Assessment Report Houlton LPOE 2020 08 14.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
27. A.1 SOW AE for CMc Houlton LPOE Delivery Method Revised 2024 03 04.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
45 P.9 IRA Project Submittal Reporting Form 2024 09 04.xlsx
0.015625KB public 2024-10- 05T03:22:17.6+00:00
50. GSA Building Technologies Technical Reference Guide BTTRG V3 Redact Final 2024 05 01.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
65. Maine Industry Day CBP101 Updated 2023 2023 11 28.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
28. A.2 SOW CMa with Commissioning CxP Services for Houlton LPOE 2023 09 28.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
47. AE Concept Development Narrative 2024 07 19.pdf
0.015625KB controlled 2024-10- 05T03:22:17.6+00:00
59. GSA Regional BIM Standard V1.0 2022 06 10.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
49. CMa Commissioning Services Plan - Revision 0 2024 06 05.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
66. Maine Industry Day GSA CIPMO National Program Overview 2023 11 28.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
67. Maine Industry Day Maine APEX Accelerator Who We Are and What We Do - LPOE 2023 11 28.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
7Oct 31, 2024 08:22:59 PM GMT
53. GSA Data Normalization for Building Automation Systems_v25.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
56. GSA Maine LEC Materials Alternatives Market Research 2024 03 22.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
60. GSA Smart Building Implementation Guide V1 2022 04 22.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
51. GSA Commissioning Guide Final 2020 09 01.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
2. Presolicitation in SAM 2024 08 24.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
34. A.8 GSA P-120 Public Buildings Service Cost and Schedule Management Policy Requirements 2022 11 07.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
62. GSA Smart Buildings Program Guide V2 2022 04 22.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
14. Standard Form 1418 - Performance Bond for Other Than Construction Contracts 1999 02 01.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
44. P.8 IRA Project Submittal Form and Data Dictionary.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
13. Standard Form 1416 - Payment Bond for Other Than Construction Contracts 1998 10 01.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
12. Standard Form 24 - Bid Bond 2023 10 01.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
4. The Agreement - 47PB0024R0049 - Houlton CMc R1 Final 2024 10 04.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
3. The Solicitation - 47PB0024R0049 - Houlton CMc FINAL R4 2024 10 04.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
52. GSA Communications Plan Template LPOE Project 2024 04 18.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
26. A.0 SOW CMc Houlton LPOE Final 2024 08 02.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
17. PBS Past Performance Questionnaire 2024 08
0.015625KB public 2024-10- 05T03:22:17.6+00:00
8Oct 31, 2024 08:22:59 PM GMT
11.docx
32. A.6 GSA P-100 Appendix Life Cycle Cost Analysis Requirements.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
63. GSA Technology Policy for PBS-Owned Buildings Monitoring and Control Systems 2022 12 14.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
54. GSA Decision Resource RCP CMIP Houlton ME 2022 02 25.pdf
0.015625KB controlled 2024-10- 05T03:22:17.6+00:00
70. Safe Guarding Assets from the Observed and Expected Changes in Climate Submission Requirements 2022 02 26.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
46. P.10 IRA Source Selection Evaluation Criteria Planning Considerations 2024 09 26.xlsx
0.015625KB public 2024-10- 05T03:22:17.6+00:00
71. SOW Sustainability Language 2024 04 17.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
15. Davis Bacon Act Wage Determination for Aroostook County ME General Decision Number ME20240006 2024 08 23.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
55. GSA Design Excellence Policies and Procedures 2022 11 17.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
43. P.7 IRA Interpretation of Sections 60502 and 60503 2022 11 10.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
39. P.5b IRA Low Embodied Carbon Concrete Requirements 508 2023 12 12.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
16. Offeror Representations and Certifications Form 2024 05 01.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
10. Tips on Preparing a Subcontracting Plan 2024 10 03.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
57. GSA PBS CAD Standard 2021 03 10.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
42. P.6 IRA FAQs 2024-10-0.015625KB public
9Oct 31, 2024 08:22:59 PM GMT
Encyclopedia 2024 03 06.pdf 05T03:22:17.6+00:00
41. P.5d IRA Low Embodied Carbon Steel Requirements 508 2023 12 12.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
40. P.5c IRA Low Embodied Carbon Glass Requirements 508 2023 12 12.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
1. 47PB0024R0049 -
Standard Form 1442 - Solicitation Offer and Award 2024 10 04.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
38. P.5a IRA Low Embodied Carbon Asphalt Requirements 2023 12 23.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
61. GSA Smart Buildings 2021 12 16.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
29. A.3 SOW CMa COBie Services Houlton LPOE 2024 04 15.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
21. Supplemental Pricing and Invoicing Instructions for Projects Funded by the IRA of 2022 2023 05 22.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
30. A.4 SOW - 2023 LPOE
CBP Design Guide Comparison Revision 1 2024 02 10.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
18. Evaluation Factors Explained 2024 10 02.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
22. Small Business Participation Evaluation Factor Solicitation Instruction Examples 2022 08 01.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
25. Small Business Participation Evaluation Factor Solicitation Evaluation Examples 2022 08 01.pdf
0.015625KB public 2024-10- 05T03:22:17.6+00:00
68. Roof Map Houlton LPOE 2020 06 23.pdf
0.015625KB controlled 2024-10- 05T03:22:17.6+00:00
37. P.5 IRA Sustainability Factor Table 2024 08 25.xlsx
0.015625KB public 2024-10- 05T03:22:17.6+00:00
9. Individual Model Subcontracting Plan - Jan 2023 - Final 508 2024 08
0.015625KB public 2024-10- 05T03:22:17.6+00:00
10Oct 31, 2024 08:22:59 PM GMT
13.docx
19. Contract Price Form 2024 08 25.docx
0.015625KB public 2024-10- 05T03:22:17.6+00:00
20. CLIN Sheet 2024 08 24 0044.xlsx
0.015625KB public 2024-10- 05T03:22:17.6+00:00
23. Small Business Participation Commitment Document Template 2024 10 03.docx
0.015625KB public 2024-10- 05T03:22:17.6+00:00
24. Small Business Participation Compliance Report Template 2024 10 03.docx
0.015625KB public 2024-10- 05T03:22:17.6+00:00
Links Display Name Updated Date
Contact Information
Primary Point of Contact
Paul Murphy paul.murphy@gsa.gov
Secondary Point of Contact
Michele Valenza michele.valenza@gsa.gov
History
Contract Opportunity Type Updated Date
Solicitation (Updated) Oct 31, 2024 08:22 PM
Solicitation (Updated) Oct 25, 2024 07:41 PM
Solicitation (Updated) Oct 08, 2024 08:38 PM
Solicitation (Original) Oct 05, 2024 03:22 AM
Interested Vendors List
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
11Oct 31, 2024 08:22:59 PM GMT mailto:$%7Bcontact.email%7D mailto:$%7Bcontact.email%7D https://sam.gov/opp/d4cf39c2d8cc4cef98fe91e0f1bc361b/view https://sam.gov/opp/d5d0d921b8624d189fe303212db36e99/view https://sam.gov/opp/0bb8281a496f428ab639e2e86d85bfea/view
File details come from the government source that posted it. Updated .