113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf

PDF 1 MB Posted

Attached to
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
Solicitation number
47PB0024R0049
Issued by

About this file

This is a mechanical, electrical, plumbing, fire alarm and fire protection design narrative document for the Houlton Land Port of Entry project, prepared by WSP in November 2024. The document outlines the technical approach and specifications for the MEP/FP systems, including applicable codes and standards compliance requirements.

The narrative details the design of mechanical systems using Variable Refrigerant Flow (VRF) for cooling and heating with backup hot water heating, electrical systems with new 1500kVA utility transformer and emergency power provisions, plumbing systems with new electric water heaters and low-flow fixtures, and fire protection systems including new sprinklers and fire alarm systems. Key technical specifications include maintaining space temperatures of 75°F for cooling and 72°F for heating, MERV 13 filtration, humidity control between 30-60%, and compliance with ASHRAE standards. The document includes detailed load calculations and equipment specifications for the main port building and other facilities on site. Design considerations account for the deep frost line (up to 9 feet) and extreme temperature conditions ranging from -16.8°F to 86°F.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf PDF
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf PDF
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
83 Exhibit G.1_MEPFP_Equipment.pdf PDF
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
73. Contract Price Form Spreadsheet 2024 08 28.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

swinslow Text Box

EXHIBIT J

LPOE HOULTON

GSA

FINAL CONCEPT DESIGN DEVELOPMENT BASIS OF DESIGN NARRATIVE

CUI

PROJECT NO.: B23.05092

DATE: NOVEMBER 22, 2024

WSP

ONE PENN PLAZA

250 WEST 34TH STREET, 2ND FLOOR

NEW YORK, NY 10119

TEL.: +1 212 465-5000

FAX: +1 212 465-5096

WSP.COM

Project No. B23.05092

GSA

WSP

November 22, 2024

Page ii

TABLE OF

CONTENTS

1 DESIGN APPROACH

1.1 General Mechanical, Electrical, Plumbing, Fire Alarm

and Fire Protection Narrative

1.1.1 Applicable Codes

1.1.2 Site Utilities

1.2 Mechanical Narrative

1.2.1 Base Bid Design Approach

1.2.2 Mechanical Performance Tier Design - Baseline

1.2.3 Base Bid

1.2.4 Bid Option 1

1.2.5 Bid Option 2

1.2.6 Bid Option 3

1.3 Electrical Narrative

1.3.1 Base Bid Design Approach

1.3.2 Bid Option 1

1.3.3 Bid Option 2

1.3.4 Bid Option 3

1.4 Plumbing Narrative

1.4.1 Base Bid Design Approach

1.4.2 Bid Option 1

1.4.3 Bid Option 2

1.4.4 Bid Option 3

1.5 Fire Alarm and Fire Protection Narrative

1.5.1 Base Bid Design Approach

1.5.2 Bid Option 1

1.5.3 Bid Option 2

1.5.4 Bid Option 3

Project No. B23.05092

GSA

WSP

November 22, 2024

1 DESIGN APPROACH

1.1 GENERAL MECHANICAL, ELECTRICAL, PLUMBING, FIRE ALARM

AND FIRE PROTECTION NARRATIVE

1.1.1 APPLICABLE CODES

The MEP/FP design approach for the proposed new Land Port of Entry will comply with required codes, regulations and standards, including but not limited to:

• International Building Code

• International Mechanical Code

• International Plumbing Code

• ASHRAE 90.1-2019 Energy Standard for Buildings Except Low Rise Residential. Specifically, Appendix G – Building Performance Rating Method

• ASHRAE 62.1-2019 Ventilation for Acceptable Indoor Air Quality

• ASHRAE Standard 55-Thermal Environmental Conditions for Human Occupancy

• IEEE: Institute of Electrical and Electronics Engineers

• IES: Illuminating Engineering Society of North America

• NEMA: National Electrical Manufacturers Association

• NETA: International Electrical Testing Association

• NFPA: National Fire Protection Association

• UL: Underwriter’s Laboratories

• Current local and state codes will be followed to the extent practicable.

• Utility provider requirements will be incorporated into the design where applicable

• LPOE Design Guide 2018

• P100 Standards 2022

1.1.2 SITE UTILITIES

The architectural concept includes separate site buildings. The multiple buildings on site have their utility connections fed from a single connection point in the main building and routed underground across the campus. Potential building specific utilities would include, but not limited to, propane, hot water systems, fire protection systems, electrical. Utility metering will be provided for these systems as required. The site condition has been reported as having a deep frost line that can penetrate as dep as 9 feet below grade or more. As a result, any site pipe utilities (e.g. water service) would need to be studied for preferred routing technique and burial depth. Existing water main service shall be buried below the frost line, refer to Bid Option 1.

Project No. B23.05092.

GSA

WSP

November 22, 2024

1.2 MECHANICAL NARRATIVE

1.2.1 BASE BID DESIGN APPROACH

The mechanical design will be studied, and design options will be developed in order to meet the indoor design conditions as required by the P100 and LPOE Design Standard while taking into account the outdoor design conditions and energy efficiency. The HVAC system will be designed with the goal of providing a minimum thirty percent reduction of energy consumption versus the standard ASHRAE Baseline Building. In compliance with several LEED prerequisites and credits, the HVAC systems will attempt to provide energy metering, enhanced refrigerant management, and enhanced outside air levels.

1.2.2 MECHANICAL DESIGN PARAMETERS

1.1 Outdoor ASHRAE Design Criteria

A. Outdoor Design Conditions per ASHRAE

1. Winter: -16.8°F Dry Bulb Temperature

2. Summer Dry Bulb: 86.0°F Dry Bulb Temperature

3. Summer Wet Bulb: 69.3°F Wet Bulb Temperature

1.2 Indoor Design Criteria

A. See Appendix A

1.3 Dew Point Analysis

A. See Appendix B

1.4 Load Calculations

A. See Appendix C

1.2.3 MECHANICAL PERFORMANCE TIER DESIGN - BASELINE

The HVAC systems & equipment will be capable of maintaining a space temperature of 75 deg. F (with a 3-degree deadband) with 55 deg. F dew point for cooling and 72 deg. F (with a 3 degree deadband) for heating for all occupied spaces in compliance with baseline temperature and humidity performance. Thermal zones will be limited to no more than three private offices or exterior zones.

The air distribution system will be designed for low velocity application with the air outlets adequately sized for supplying air to the space at a velocity of 40 fpm or less at the occupied level in compliance with baseline air movement performance.

Perimeter spaces will be maintained at a positive pressure with respect to outdoor in compliance with baseline pressure performance. The restrooms, janitor closets and other spaces per LPOE design guide will be negative pressure respect to adjacent spaces for moisture and odor management.

Outdoor air ventilation rates to all occupied spaces will comply with the ASHRAE 62.1 ventilation rates to meet baseline performance.

Pleated MERV 8 prefilters, and bag MERV 13 final filters will be provided for all air handling units. UV Lights for all air handling unit cooling coils, in compliance with filtration baseline performance.

HVAC noise control will meet ASHRAE Applications Chapter 48, table 1 in compliance with noise control baseline performance.

GSA

WSP

November 22, 2024

HVAC operational efficiency will meet ASHRAE 90.1 and IGCC 701.5 efficiencies in compliance with HVAC operational efficiency Tier 2 performance.

HVAC fan energy performance will meet five percent below ASHRAE 90.1 efficiencies in compliance with HVAC fan energy Tier 1 performance.

HVAC energy metering will be provided on all major HVAC systems in addition to electrical power and hot water BTU metering in compliance with HVAC energy metering Tier 1 performance. Whole building metering will be provided on all major utilities in compliance with whole building metering baseline performance.

1.2.4 BASE BID

MAIN PORT BUILDING - MECHANICAL SYSTEMS

VARIABLE REFRIGERANT FLOW (VRF) SYSTEM

COOLING & PRIMARY HEATING

Cooling and heating will be provided by a variable refrigerant flow (VRF) system which can provide simultaneous cooling and heating any time of year by transferring heat from one zone to another or rejecting it outside the building via refrigerant piping. In heating mode, the outdoor wet bulb temperature can be as low as -16.8 degrees F and as high as 43 degrees F. In cooling mode, the outdoor dry bulb temperature can be as low as 23 degrees F and as high as 95 degrees F. A backup heat source will be provided for when ambient temperatures drop below – 16.8 degrees F.

Horizontal ducted indoor VRF fan coil units will be provided local to the space that it serves. Multiple indoor units are connected to an outdoor VRF condensing unit for heat dissipation.

A total of four (4) outdoor VRF units ranging from 3.8 to 14-ton cooling / 30 to 77.4 MBH heating capacity are provided for the 38 (0.4 to 3.5 ton) indoor units and will be located on the roof. The VRF units will be provided with a louvered enclosure surrounding all four sides and open to above to mitigate snow accumulation and provide maintenance access during winter months. Heated walkway mats will be provided for snow melt to access and maintain the rooftop equipment during winter months. A total of five (5) outdoor VRF units 4-ton cooling / 30.3 MBH heating capacity outdoor VRF units are provided for the five (5) 4 ton DOAS VRF units located inside the building.

The VRF system is capable of required capacity turndown for minimum building load conditions.

BACKUP HEATING

When ambient temperatures drop below -16.8 degrees F, the VRF system will not be able to maintain heating temperatures. When the building temperature drops below the heating setpoint, the backup hot water heating system will be enabled. The backup heating system will be comprised of boilers serving perimeter fin tube radiators and backup hydronic heating coils in the DOAS unit. Two options are currently being evaluated for the backup heating hot water system. These proposed boilers and pumps will be located in the Main Port Mechanical Room on the Ground Floor. Water treatment, coupon rack and chemical pot feeders will be provided as required.

1. Electric Resistance Boilers – Heating hot water will be generated via two (1 operating, 1 standby) 341 MBH electric resistance boilers and will be pumped via two (1 operating, 1 standby) variable speed hot water heating pumps, each sized for 30 GPM and will distribute heating hot water to the building.

2. Propane fired boilers - Heating hot water will be generated via two (1 operating, 1 standby) 341 MBH propane fired boilers and will be pumped via two (1 operating, 1 standby) variable speed hot water heating pumps, each sized for 30 GPM and will distribute heating hot water to the building. One (1) 1000 gallon propane tank will be located outside the building as close to the mechanical room as possible. Flues and combustion air will be provided for each boiler and will extend up through the lower roof. Combustion air intake will be located 15 ft minimum distance from the flues which will discharge 10 ft above the roof.

GSA

WSP

November 22, 2024

Please refer to the life cycle cost analysis (LCCA) for additional information.

SUPPLEMENTAL AIR CONDITIONING SYSTEMS

Specialized rooms including Telecom, LAN, elevator machine rooms, etc. will be provided with dedicated year-round cooling-only VRF fan coil units. Each individual space will have its own system to ensure that any equipment failure will only affect a single space. Additional emergency provisions will be provided to allow for a heat release from these spaces.

VENTILATION AIR SYSTEMS

Fresh air for the building will be provided by (5) 3.6 to 4 ton cooling / 28 to 31 MBH heating capacity DOAS VRF units. The DOAS units will temper the air to 55 degrees F prior to distribution to the indoor evaporator VRF units to deliver fresh air to the building.

Fresh air intake will be located on the level 2 roof, high enough above the roof to avoid snow accumulation. A P100 wavier will be submitted as directed in RFI-012.

EXHAUST AIR SYSTEMS

A central toilet exhaust system will be provided for the Main Port building with discharge to the roof level, located a minimum of 15 feet from any fresh air intake.

A central relief air system will be provided for building pressurization for the Main Port building with discharge to the roof level, located a minimum of 15 feet from any fresh air intake.

ENERGY RECOVERY SYSTEMS

Energy recovery will be provided by Lossnay energy recovery ventilators (ERV) which preheat or precool the outside air depending on the time of year, with heat from the exhaust air via and internal exchange core that separates the air streams while allowing heat transfer between them.

BUILDING AUTOMATION SYSTEM (BAS)

A new building automation system (BAS) will be provided for the building in compliance with the GSA Smart Building, Data Normalization, Building Technology and Regional Graphics requirements. This system will be designed in accordance with all GSA network requirements. The system design will be free from proprietary equipment and protocols as required by GSA.

The system will be capable of GSA Link (Sky Spark) and will be a Niagara System

The BAS system will be utilized to control mechanical systems and also to monitor status of other major systems. The BAS system will be in compliance with the standards of PBS P100, GSA’s standardized National Computerized Maintenance Management System (NCMMS), and Construction Operations Building Information Exchange (COBie) format and will be provided with all required control points including, but not limited to points to tie into the fire alarm system for required HVAC points, water metering, energy metering, lighting control, etc. The system will be fully integrated with the various systems and monitoring devises within the facility. Electric heating walkway mats on the roof, Heat trace on roof drains, gutters, down spouts will be connected to the BAS and alarmed.

Through discussions with GSA during the Concept Design Review, it was noted that VRF systems are not able to fully comply with the Smart Building requirements. The VRF controller is able to connect to a secondary port (JACE) to communicate with the GSA Smart Building BAS. The manufacturer that is most compatible with Smart Building requirements is Trane and a P100 waiver will be issued to approve the VRF system.

The new BAS system head end equipment will be located in FDA/GSA/APHIS building BAS room to interconnect with the existing system as required.

EQUIPMENT REPLACEMENT

Large mechanical equipment is located on the roof and maintaining exterior equipment will range from the replacement of small parts (motors, piping, etc.) to the full replacement of rooftop equipment after the expected useful life is complete. For

GSA

WSP

November 22, 2024 all small part replacements, no specialty equipment will be required. For heavy maintenance jobs, a small mobile crane will be needed in order to lift the equipment on to the respective building’s roof.

FDA/ GSA/ APHIS BUILDING - MECHANICAL SYSTEMS

The existing BAS system is located in the FDA/GSA/APHIS building. The new BAS system head end equipment will be located in FDA/GSA/APHIS building BAS room to interconnect with the existing system as required. New underground cabling from the Main Port building to the FDA/GSA/APHIS building will be provided as required.

There is no additional scope for FDA/GSA/APHIS Building base bid.

COMMERCIAL INSPECTION BUILDING - MECHANICAL SYSTEMS

There is no scope for CIB base bid.

1.2.5 BID OPTION 1

There is no mechanical scope included in Bid Option 1.

1.2.6 BID OPTION 2

There is no mechanical scope included in Bid Option 2.

1.2.7 BID OPTION 3

• There is no mechanical scope for Bid Option 3 FDA/GSA/APHIS Building

• There is no scope for Bid Option 3 Commercial Inspection Building.

GSA

WSP

November 22, 2024

1.3 ELECTRICAL NARRATIVE

1.3.1 BASE BID DESIGN APPROACH

The electrical systems will be designed in coordination with the local utility to meet the requirements of Land Port of Entry, (LPOE), and provide adequate capacity to meet the mechanical, plumbing, IT, and other load requirements of all buildings on the site. The utility service connection and new utility transformer will be sized to provide the calculated site demand load, plus and addition 50% for future site expansion. While not within the scope of this contract, it is our recommendation as a best practice to include an estimated load allowance for all known future site loads where such future loads can be advised by GSA/CBP.

The existing utility transformer is insufficiently rated to serve the new estimated site load and will be removed and replaced with an adequately rated transformer. The new transformer is proposed to be located adjacent to the last overhead utility cable pole as the existing transformer location clashes with a planned site expansion project. To accommodate the new transformer, a new transformer vault and pad will be constructed, and new trenched service cables will be routed from the transformer to the new electrical room behind the CIB.

The incoming service is anticipated to be rated for 1500kVA with a 480/277V, 3-phase, 4 wire, 60 Hz secondary, terminating at new 2500A main switchboard with 2000A main circuit breaker in the new electrical room behind the CIB. The new switchboard will feed

(3) ATS for NEC 700, 701 and 702 loads. The NEC 702 ATS will be sized at 1600A and directly feed a new 1600A, 480/277V main switchboard. This will be used to refeed all existing-to-remain site loads via a new 300 kVA 480/208-120V transformer in the existing main electrical room. The NEC 702 main switchboard will also feed the new HVAC equipment in the Main Port Building (MPB), new NEC 702 equipment in the MPB, and electric vehicle charging at the southeast parking area.

The NEC 701 ATS will be sized at 400A, 480/277V, 3-phase, 4 wire, and will feed a new 200 kW UPS with 60 minute runtime. This will feed new NEC 701 panels in the main electrical room and levels 1 & 2 of the MPB.

The NEC 700 ATS will be sized at 300A, 480/277V, 3-phase, 4 wire, and will directly feed new 100A NEC 700 panelboards in the existing electrical room, MPB South Level 1, and MPB South Level 2. Connections will also be provided to existing emergency panelboards in the other buildings not included in this scope of work. Transformers will be provided to step these feeds down from 480/277V to 208/120V.

Individual branch circuit panelboards will be provided in the electrical closets. Large HVAC loads will be supplied directly at 480/277V from the nearest 480V mechanical panel with sufficient space. All new lighting and small 277V HVAC will be fed at 277V from the nearest 480/277V general panel, with each panel serving approximately 30,000 square feet. Other loads such as receptacles and IT equipment will also be supplied at 208/120V via panelboards. Each 208/120V receptacle panelboard will serve roughly 10,000 square feet. All existing 208V rated panels that are being retained and reused will have feeder cable routes reused where feasible.

The existing site main electrical room will have the existing switchgear and generator removed and the existing vestibule demolished to expand the area for both phasing and installation of new electrical equipment. A 2-hour fire rated room for the new automatic transfer switches (ATSs) will be created at the north end of the CIB, along with 1-hour rated rooms for the new UPS, new generator switchboard, and new normal power switchboard. Refer to the Mechanical-Electrical Resiliency package for options.

As a result of the site requirements for mechanical equipment, a large portion of the equipment is located a significant distance away from the electrical service. Therefore, we are proposing a 480V distribution to ensure that the system can meet all voltage drop requirements without substantially larger feeders, while also minimizing losses and reducing major equipment sizes. This has been coordinated across trades and is incorporated into this submission.

Due to the new utility transformer and the change in service conductor size, quantity, and length, the fault current rating of all new and existing electrical equipment will need to be assessed to ensure safe operation and replaced if necessary.

All panel bussing and conductors will be copper. Aluminum bussing and conductors will not be used unless specifically requested by GSA/CBP. All conductors will be run in conduit except for final connections to mechanical equipment, lighting, and similar loads. All conduit run above grade will be metallic; RMC will be used where conduit may be subject to physical impact, and EMT will be used in all other above-grade locations. All underground conduit will be Schedule 40 PVC in concrete duct banks. Buried cable routes will as

GSA

WSP

November 22, 2024 a minimum be buried at the depths stipulated by NFPA 70 but may need to be buried at a greater depth to be below the site frost line if required by GSA/CBP.

All panelboards serving IT, security, and other sensitive equipment will be provided with 200% neutral conductors and internally mounted surge protection devices fed from a circuit breaker within the panel. These will typically also be fed from NEC 701 panels unless specifically required otherwise.

All new interior and exterior lighting will be LED, with interior dimming and automatic control included as appropriate. A dimming system compliant with the P100 and energy code requirements will be provided.

Adequate spare capacity and working/dedicated electrical space will be provided in each location as per GSA P100, LPOE standard, and NFPA 70 requirements. Transformers and panelboards serving electrical distribution will be provided as per GSA P100 and LPOE standard requirements and latest industry standards.

A CBP critical systems UPS, ATS, and associated distribution equipment will be provided to supply back up power to critical systems in the event of an outage. The emergency power system consists of the site generator and the new UPS system which will combine to serve all CBP defined essential and critical systems in addition to all NEC Article 700 life safety loads and Article 701 legally required standby loads. The UPS will be designed to provide 1 hour of power to defined critical loads which will include but are not limited to: CBP designated computer systems, LAN Equipment, Lighting, Security System Controls, CCTV cameras, and HSDN Equipment.

As part of the base distribution scheme, a single 150 kW, 480/277V generator will be included to serve the required Article 700 life safety loads only. The existing generator is too small to feed the new estimated life safety demand load and is also approaching the end of its expected useful life span. The existing generator must also be moved from its present location to allow for installation of the new main switchgear; this work is not an optional scope item. The ATSs serving Article 701 and 702 loads will be installed but left without a secondary source to keep the site “generator-ready” for a future upgrade.

The overall hot water system will be replaced with new electric hot water heaters and associated hot water storage tanks with circulating pumps as the base option. Option 1 for the hot water heaters includes installing evacuated tube solar thermal for 30% of the domestic hot water capacity, which does not substantially impact the electrical service.

A new lightning protection system will be provided for the MPB. The system will be designed to be compliant with NFPA 780 and UL 96 Master Label requirements. The system will be comprised of a roof mounted air termination network, copper cable down conductors that link the air termination network to the grounding electrode, and a buried grounding electrode that will also be bonded with the electrical ground connection.

New electric vehicle, (EV), charging stations will be added to the Main Port building parking area. It is anticipated that two dual level 2 EV chargers (or four single level 2 EV chargers) will be added to the visitor parking area for use by CBP staff. Empty conduits for future visitor EV charging stations will also be installed. Final quantity and type of chargers is to be confirmed by GSA/CBP. The EV chargers will each be fed from a dedicated 480V 2-pole or 3-pole circuit that originates from a distribution panel at the south end of the MPB. Circuit routes will be trenched from the west end of the Main Port building to the charger locations and provided with a local disconnect switch.

EQUIPMENT REPLACEMENT

Maintaining exterior equipment will range from the replacement of small parts to the full replacement of rooftop equipment after the expected useful life is complete. For all small part replacements, no specialty equipment will be required. For heavy maintenance jobs, a small mobile crane will be needed to lift the equipment onto the respective building’s roof.

1.3.2 BID OPTION 1

There is no electrical scope included in Bid Option 1.

GSA

WSP

November 22, 2024

1.3.3 BID OPTION 2

As an optional scope item, a new on-site diesel engine generator system is proposed to support the full facility load, in lieu of the Article 700 life safety generator in the base building scheme. The two options for the new generator system are to provide either a single genset rated for 150% of the calculated demand load, or two generators, both rated for 150% of the calculated demand load in an N+1 arrangement. The option for two generators in this N+1 arrangement requires the installation of an integrated generator MTS, which would be installed in the generator distribution room and would have much lower associated cost than parlalleling switchgear. To make room for 2 generators, the shed outside of the CBP building will need to be relocated. In either generator option, the paralleling switchgear or generator switchboard will require (3) dedicated individual feeders to feed 700, 701, & 702 loads via automatic transfer switches (ATSs).

The anticipated rating of each generator is 1500kVA at 480/277V, 3 phase, 4 wire, 60 Hz. The generators will be within separate dedicated walk-in enclosures. The generator enclosures will be acoustically treated and will be heated to prevent the engine from freezing.

As the generators are anticipated to be larger than 350kW each, diesel fuel will be utilized for the generators with a minimum storage capacity of 4 days of fuel.

The emergency generator enclosures will be located in the landscaped area behind the CIB. This option would require a new buried service route from the generator enclosures to the nearby generator switchboard room, but the buried route would not cross the main vehicle routes which would minimize construction disruption to the site operation. The containerized option would also allow for the generator to be raised up above flood water level on a supporting structure if required.

1.3.4 BID OPTION 3

Bid option 3 would include the replacement of the fire alarm system and devices within the FDA, GSA, APHIS, and Commercial Inspection buildings. The new fire alarm devices and loop cabling would be connected to the main port building fire alarm system using existing or new buried service routes.

1.4 PLUMBING NARRATIVE

1.4.1 BASE BID DESIGN APPROACH

MAIN PORT BUILDING – PLUMBING SYSTEM

The plumbing systems will be designed in coordination with the local utilities to meet the Land Port of Entry (LPOE) and local Plumbing Code and Building Code requirements.

Existing building is supplied with domestic water from local utility at a pressure of 84 Psi. The water supply shall be replaced with new at an increased depth (below frostline) to ensure the service does not freeze during winter months. Water isolation valves will be replaced/provided to all buildings and additional isolation valves will be provided throughout the buildings to make repairs simpler. A domestic water booster pump will not be required.

New electric water heaters with associated hot water storage and circulating pumps will be provided for the main port building.

Options for 30% supplementary hot water generation include solar thermal and air sources heat pumps.

The solar thermal option would require a total of 10 panels to be installed on the first-floor roof to accommodate the required domestic water load. The air to water heat pump option would include the air to water heat pump to be installed on the second floor roof and will have water piping routed from the roof to the heat exchanger located in the first floor mechanical room.

All cold water, hot water and hot water return piping will be insulated to be incompliance with local plumbing and energy codes.

GSA

WSP

November 22, 2024

All existing plumbing fixtures shall be replaced with new low flow fixtures in compliance with PBS P100 fixture requirements. Parts of the existing sanitary system serving the fixtures may need to be replaced to accommodate the decrease in flow fixture flow rate and to ensure proper pipe pitch to allow the system to function.

Roof drains shall be replaced with new and will be coordinated with new roofing system. All roof drains will be heat traced and all horizontal storm piping will be insulated.

EQUIPMENT REPLACEMENT

Maintaining exterior equipment will range from the replacement of small parts (motors, piping, etc.) to the full replacement of rooftop equipment after the expected useful life is complete. For all small part replacements, no specialty equipment will be required. For heavy maintenance jobs, a small mobile crane will be needed in order to lift the equipment on to the respective building’s roof.

1.4.2 BASE BID DESIGN APPROACH

MAIN PORT BUILDING – PLUMBING CALCULATIONS

DOMESTIC WATER LOAD

Fixture Type COUNT WSFU Value LOAD VALUES IN WATER SUPPLY FIXTURE UNITS (wsfu)

WC 9 10 90

UR 2 10 20

LAV 9 2 18

HB 2 2 4

PSK 4 4 16

SS 1 3 3

DF 1 0.25 0.25

WSFU TOTAL 151.25

o Water Velocity- 4 ft/sec o Presumed Friction: 3 psi/100 ft o Anticipated GPM Demand: 79 GPM (IPC Table E103.3(3) to convert to GPM)

DOMESTIC HOT WATER LOAD

Fixture Type COUNT WSFU Value LOAD VALUES IN WATER SUPPLY FIXTURE UNITS (wsfu)

LAV 9 2 18

PSK 4 4 16

SS 1 3 3

WSFU TOTAL 37

o Water Velocity- 4 ft/sec o Presumed Friction: 3 psi/100 ft o Anticipated GPM Demand: 44 GPM (IPC Table E103.3(3) to convert to GPM)

GSA

WSP

November 22, 2024

DOMESTIC HOT WATER HEATER CALCULATIONS

1.4.3 BID OPTION 1

There is no plumbing scope included in Bid Option 1.

1.4.4 BID OPTION 2

There is no plumbing scope included in Bid Option 2.

1.4.5 BID OPTION 3

There is no plumbing scope included in Bid Option 3.

1.5 FIRE ALARM AND FIRE PROTECTION NARRATIVE

1.5.1 BASE BID DESIGN APPROACH

MAIN PORT BUILDING – FIRE PROTECTION SYSTEM

The main port building does not currently have an existing sprinkler system. For this building a new sprinkler system will be added in compliance with NFPA 13 and local fire protection codes. Sprinkler water will be supplied by local utility at a pressure of 84 psi, a sprinkler water tank and pump will not be required. Sprinkler water piping from the utility will run underground (below frost line) to the main port building. A local DCDA will be provided in each building.

The existing fire alarm systems within the main port building will be removed and replaced with a new addressable, combined fire alarm and voice emergency system. The new fire alarm system will also interface with the planned new BAS.

All existing fire alarm detection devices, notification devices, and system cabling will be replaced with new and reconfigured to suit the new architectural layouts and MEP systems.

Existing fire alarm devices in site buildings not within the scope of this project will require new interface devices to allow the existing devices to be connected to the new main fire alarm system.

1.5.2 BID OPTION 1

There is no fire alarm and protection scope included in Bid Option 1.

Fixture Type Count GPH Total

GPH

Demand Factor

Demand

(GPH)

Storage Factor Storage (GALLONS)

LAV 9 6 54 0.3 16.2 2 32.4

MS/SS 1 20 20 0.3 6 2 12

PSK 4 10 40 0.3 12 2 24

GALLONS TOTAL - - - - 34.2 - 68.4

GSA

WSP

November 22, 2024

1.5.3 BID OPTION 2

There is no fire alarm and protection scope included in Bid Option 2.

1.5.4 BID OPTION 3

FDA/GSA/APHIS/COMMERCIAL INSPECTION BUILDINGS – FIRE PROTECTION SYSTEM

Several existing buildings do not currently have an existing sprinkler system. For these buildings a new sprinkler system will be added in compliance with NFPA 13 and local fire protection codes. Sprinkler water will be supplied by local utility at a pressure of 84 Psi. s sprinkler water tank and pump are not required. Sprinkler water piping from the utility will run underground (below frost line) to each building that is currently not sprinklered. A local DCDA (double check detector assembly) will be provided in each building.

The FDA/GSA/APHIS building currently has a sprinkler system that will need to be upgraded to be in compliance with NFPA 13 standards.

The existing fire alarm systems within the FDA/GSA/APHIS Building and Commercial Inspection Building will be removed and replaced with a new addressable, combined fire alarm and voice emergency system. The new fire alarm system will also interface with the planned new BAS.

All existing fire alarm detection devices, notification devices, and system cabling will be replaced with new and reconfigured to suit the new architectural layouts and MEP systems.

Existing fire alarm devices in site buildings not within the scope of this project will require new interface devices to allow the existing devices to be connected to the new main fire alarm system.

GSA

WSP

November 22, 2024

APPENDIX A: INDOOR DESIGN CRITERIA

Type of Area

Summer

Temperature

(deg F)

Winter

Temperature

(deg F)

Humidity Ventilation Pressurization

Vestibule 90 55 30%-60% ASHRAE N/A

Waiting Area 75 72 30%-60% ASHRAE Negative to non-public

Counter Staff 75 72 30%-60% ASHRAE N/A

Inspection 75 72 30%-60% ASHRAE N/A

Corridor 75 72 30%-60% ASHRAE N/A

Enforce Workstation 75 72 30%-60% ASHRAE N/A

Holding 75 72 30%-60%

10 Air

Changes per Hour

Negative, 100% Exhaust

Office (GSA) 75 72 30%-60% ASHRAE N/A

Port Director 75 72 30%-60% ASHRAE N/A

Custodial Office 75 72 30%-60% ASHRAE N/A

Conference 75 72 30%-60% ASHRAE N/A

Storage 75 72 30%-60% ASHRAE N/A

Break Room 75 72 30%-60% ASHRAE N/A

Female Restroom 75 72 N/A

10 Air

Changes per Hour

Negative, 100% Exhaust

Male Restroom 75 72 N/A

10 Air

Changes per Hour

Negative, 100% Exhaust

Janitor Closet 75 72 30%-60%

10 Air

Changes per Hour

Negative, 100% Exhaust

Electrical 95 55 N/A N/A Negative

UPS 95 55 N/A N/A N/A

Emergency Generator 95 55 N/A N/A Negative

Fire Protection 75 72 N/A N/A N/A

Mechanical 75 72 50%-60% Filtered

Exhaust Negative

Enclosed Government

Parking 85 65 N/A 0.75 cfm/sf N/A

Enclosed Secondary

Inspection 85 65 N/A 0.75 cfm/sf N/A

GSA

WSP

November 22, 2024

APPENDIX B: DEW POINT ANALYSIS

GSA

WSP

November 22, 2024

APPENDIX C: LOAD CALCULATIONS

Room Checksums By WSP

01 BREAK RM 11

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:7 / 4Mo/Hr:7 / 4Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: -15OADB:65 / 63 / 83OADB/WB/HR:Outside Air: 55.0 78.0

Ra Plenum 75.5 69.1

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 75.5 69.1 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 68.1 74.0

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.1Fn BldTDEnvelope Loads

0.0 0.2Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 11.83-438 0 0 0 5 265 265

0.00 3,105Glass Solar 0 0 62 3,105 57 3,105 0 -165Glass/Door Cond -1,509 40.80-1,509-3-165-3-165 0

AIRFLOWS

HeatingCooling 219Wall Cond 19.19-710-449 4 219 6 346 127

0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

71.82 3,159Sub Total ==> -2,657-1,958 63 3,159 65 3,551 392

230Return 230

Internal Loads

16 16Exhaust

403Lights 0.00 0 0 8 403 7 403 0

0 0Rm Exh

531People 0.00 0 6 295 10

0 0Auxiliary

1,151Misc 0.00 0 0 23 1,151 21 1,151 0

2,085Sub Total ==> 0.00 0 0 37 1,849 38 2,085 0

24Ceiling Load 0.000-48 0 24 0 0-24 0Ventilation Load 7.12-263 0 0 0-5-265 0

Sup. Fan Heat 1 68

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 7.0 7.0

Duct Heat Pkup 0 0 0 1.36 1.36cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

422.64cfm/ton

Exhaust Heat

-0.42 16 0-8

310.45ft²/ton

-21.93 38.65Btu/hr·ft²

1.2No. People 5,268Grand Total ==> 100.00-3,699-2,006100.00 5,032100.00 5,431 360

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 169 Main Htg -2.5 230 68.1 78.0 0.5 5.4 5.1 230 74.1 59.9 55.6 54.8 51.3 51.8Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.1 1.1 0.5 16 85.3 74.0 111.1 54.3 54.0 62.8Opt Vent

Roof 169 0 0 Wall 234 62 26

Humidif 0.0 0 0.0 0.0 0.5 6.5Total Opt Vent -1.2 55.0-14.6 16

-3.7Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-1,222

33.03

-11.54

0.00 0.00

-8

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0.00 0.00 0.00 0.00

0 0

0 0 0

0.00 0.00

0.00 0.00 0.00 0.00

0 0.00

0 0.00

0 531 0

Int Door 1

Ext Door 0 0 0

7.0/1000 ft²

TRACE® 700 v6.3.5 calculated at 02:51 PM on 11/12/2024Project Name: LPOE HOULTON

Dataset Name: Alternative - 1 System Checksums Report Page 1 of 632024_LPOE_HOULTON_final.TRC

02 COMM AND TECS 112

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:9 / 2Mo/Hr:9 / 2Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: -15OADB:59 / 58 / 71OADB/WB/HR:Outside Air: 55.0 79.1

Ra Plenum 75.6 68.5

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 75.6 68.5 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 68.2 75.1

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.1Fn BldTDEnvelope Loads

0.0 0.2Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 23,927Glass Solar 0 0 101 23,927 102 23,927 0 -1,816Glass/Door Cond -10,526 70.44-10,526-8-1,816-8-1,816 0

AIRFLOWS

HeatingCooling 0Wall Cond 0.57-86 0 0 0 0 31 31 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

71.02 22,111Sub Total ==> -10,611-10,526 94 22,111 94 22,142 31

1,078Return 1,078

Internal Loads

26 26Exhaust

1,052Lights 0.00 0 0 4 1,052 4 1,052 0

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

376Misc 0.00 0 0 2 376 2 376 0

1,428Sub Total ==> 0.00 0 0 6 1,428 6 1,428 0

81Ceiling Load 0.000-213 0 81 0 0-81 0Ventilation Load 2.91-434 0 0 0-2-354 0

Sup. Fan Heat 1 319

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 2.5 2.5

Duct Heat Pkup 0 0 0 2.45 2.45cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

510.92cfm/ton

Exhaust Heat

-0.30 44 0-17

208.72ft²/ton

-33.94 57.49Btu/hr·ft²

0.0No. People 23,619Grand Total ==> 100.00-14,942-10,738100.00 23,619100.00 23,518-66

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 440 Main Htg -12.9 1,078 68.2 79.1 2.0 23.5 23.3 1,078 75.2 58.6 48.2 54.8 50.4 48.2Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.2 1.8 0.9 26 85.3 74.0 111.1 54.3 54.0 62.8Opt Vent

Roof 0 0 0 Wall 451 430 95

Humidif 0.0 0 0.0 0.0 2.1 25.3Total Opt Vent -2.0 55.0-14.6 26

-14.9Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-1,926

-2,015

13.48

12.89

0.00 0.00

-17

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0.00 0.00 0.00 0.00

0 0

0 0 0

0.00 0.00

0.00 0.00 0.00 0.00

0 0.00

0 0.00

1,078

1,078 1,078

1,078

1,078 1,078

0 0 0

Int Door 1

Ext Door 0 0 0

0.0/1000 ft²

Dataset Name: Alternative - 1 System Checksums Report Page 2 of 632024_LPOE_HOULTON_final.TRC

03 COAT 18

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:7 / 1Mo/Hr:7 / 15Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: -15OADB:84 / 74 / 111OADB/WB/HR:Outside Air: 55.0 73.6

Ra Plenum 75.0 68.5

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 75.0 68.5 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 55.3 55.5

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.1Fn BldTDEnvelope Loads

0.0 0.2Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond 0 0.00 0 0 0 0 0 0

AIRFLOWS

HeatingCooling 0Wall Cond 0.00 0 0 0 0 0 0 0 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

0.00 0Sub Total ==> 0 0 0 0 0 0 0

2Return 2

Internal Loads

2 2Exhaust

31Lights 0.00 0 0 89 31 0 31 0

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

0Misc 0.00 0 0 0 0 0 0 0

31Sub Total ==> 0.00 0 0 89 31 0 31 0

0Ceiling Load 0.000-6 11 4 0 0 0 0Ventilation Load 16.99-26 0 0 0 0-33 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 97.5 97.5

Duct Heat Pkup 0 0 0 0.12 0.12cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

177.75cfm/ton

Exhaust Heat

-1.72 3 0 0

1,444.94ft²/ton

-11.62 8.30Btu/hr·ft²

0.0No. People 31Grand Total ==> 100.00-153-6100.00 35100.00-1 0

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 13 Main Htg 0.0 2 55.3 73.6 0.0 0.0 0.0 2 55.6 54.5 62.8 54.8 54.0 62.2Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.0 0.1 0.1 2 85.3 74.0 111.1 54.3 54.0 62.8Opt Vent

Roof 0 0 0 Wall 0 0 0

Humidif 0.0 0 0.0 0.0 0.0 0.1Total Opt Vent -0.1 55.0-14.6 2

-0.2Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-9

-120

78.81

5.92

0.00 0.00

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0.00 0.00 0.00 0.00

0 0

0 0 0

0.00 0.00

0.00 0.00 0.00 0.00

0 0.00

0 0.00

0 0 0

Int Door 1

Ext Door 0 0 0

0.0/1000 ft²

Dataset Name: Alternative - 1 System Checksums Report Page 3 of 632024_LPOE_HOULTON_final.TRC

04 CONTROL BOOTH 9

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:6 / 19Mo/Hr:7 / 19Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: -15OADB:78 / 71 / 106OADB/WB/HR:Outside Air: 55.0 76.9

Ra Plenum 75.4 68.7

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 75.4 68.7 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 66.1 71.5

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.1Fn BldTDEnvelope Loads

0.0 0.2Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond 0 0.00 0 0 0 0 0 0

AIRFLOWS

HeatingCooling 307Wall Cond 28.28-845-758 13 320 14 342 35

0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

28.28 307Sub Total ==> -845-758 13 320 14 342 35

112Return 112

Internal Loads

22 22Exhaust

546Lights 0.00 0 0 22 546 23 546 0

0 0Rm Exh

719People 0.00 0 16 399 30

0 0Auxiliary

1,169Misc 0.00 0 0 47 1,169 49 1,169 0

2,433Sub Total ==> 0.00 0 0 86 2,114 103 2,433 0

29Ceiling Load 0.000-92 1 30 0 0-29 0Ventilation Load 11.93-356 0 0 0-18-430 0

Sup. Fan Heat 1 33

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 19.3 19.3

Duct Heat Pkup 0 0 0 0.49 0.49cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

351.10cfm/ton

Exhaust Heat

-1.01 30 0-10

713.18ft²/ton

-13.08 16.83Btu/hr·ft²

1.6No. People 2,769Grand Total ==> 100.00-2,986-850100.00 2,464100.00 2,369-3

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 228 Main Htg -1.3 112 66.1 76.9 0.2 2.4 2.0 112 71.6 60.0 60.4 54.8 52.5 56.4Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.1 1.5 0.7 22 85.3 74.0 111.1 54.3 54.0 62.8Opt Vent

Roof 0 0 0 Wall 204 0 0

Humidif 0.0 0 0.0 0.0 0.3 3.8Total Opt Vent -1.7 55.0-14.6 22

-3.0Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-162

-1,654

55.38

5.41

0.00 0.00

-10

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0.00 0.00 0.00 0.00

0 0

0 0 0

0.00 0.00

0.00 0.00 0.00 0.00

0 0.00

0 0.00

0 719 0

Int Door 1

Ext Door 0 0 0

7.0/1000 ft²

Dataset Name: Alternative - 1 System Checksums Report Page 4 of 632024_LPOE_HOULTON_final.TRC

05 CONTROL BOOTH 12

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:6 / 19Mo/Hr:7 / 1Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: -15OADB:67 / 64 / 87OADB/WB/HR:Outside Air: 55.0 73.6

Ra Plenum 75.5 69.1

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 75.5 69.1 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 66.2 71.3

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.1Fn BldTDEnvelope Loads

0.0 0.2Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 23.62-740 0 0 0 17 540 540

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond 0 0.00 0 0 0 0 0 0

AIRFLOWS

HeatingCooling 56Wall Cond 19.43-608-444 9 249 2 75 20

0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

43.05 56Sub Total ==> -1,348-444 9 249 20 615 560

132Return 132

Internal Loads

27 27Exhaust

679Lights 0.00 0 0 23 679 22 679 0

0 0Rm Exh

895People 0.00 0 17 497 29

0 0Auxiliary

1,456Misc 0.00 0 0 50 1,456 47 1,456 0

3,030Sub Total ==> 0.00 0 0 91 2,632 97 3,030 0

47Ceiling Load 0.000-80 1 21 0 0-47 0Ventilation Load 14.18-444 0 0 0-17-542 0

Sup. Fan Heat 1 39

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 20.4 20.4

Duct Heat Pkup 0 0 0 0.47 0.47cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

320.23cfm/ton

Exhaust Heat

-0.84 26 0-15

687.72ft²/ton

-11.01 17.45Btu/hr·ft²

2.0No. People 3,133Grand Total ==> 100.00-3,131-524100.00 2,902100.00 3,127 497

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 284 Main Htg -1.1 132 66.2 73.6 0.3 3.1 2.7 132 71.4 60.0 60.7 54.8 51.6 52.8Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.2 1.8 0.9 27 85.3 74.0 111.1 54.3 54.0 62.8Opt Vent

Roof 285 0 0 Wall 147 0 0

Humidif 0.0 0 0.0 0.0 0.4 5.0Total Opt Vent -2.1 55.0-14.6 27

-3.1Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-2,060

65.79

-22.18

0.00 0.00

-15

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0.00 0.00 0.00 0.00

0 0

0 0 0

0.00 0.00

0.00 0.00 0.00 0.00

0 0.00

0 0.00

0 895 0

Int Door 1

Ext Door 0 0 0

7.0/1000 ft²

Dataset Name: Alternative - 1 System Checksums Report Page 5 of 632024_LPOE_HOULTON_final.TRC

06 CORRIDOR 129

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:7 / 1Mo/Hr:7 / 1Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: -15OADB:67 / 64 / 87OADB/WB/HR:Outside Air: 55.0 73.6

Ra Plenum 76.0 68.5

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.0 68.5 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 61.9 65.8

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.1Fn BldTDEnvelope Loads

0.0 0.2Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 41.87-521 0 0 0 58 382 382

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond 0 0.00 0 0 0 0 0 0

AIRFLOWS

HeatingCooling 0Wall Cond 0.00 0 0 0 0 0 0 0 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

41.87 0Sub Total ==> -521 0 0 0 58 382 382

25Return 25

Internal Loads

12 12Exhaust

484Lights 0.00 0 0 89 484 74 484 0

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

0Misc 0.00 0 0 0 0 0 0 0

484Sub Total ==> 0.00 0 0 89 484 74 484 0

62Ceiling Load 0.000-98 11 62 0 0-62 0Ventilation Load 16.04-200 0 0 0-31-204 0

Sup. Fan Heat 1 7

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 48.7 48.7

Duct Heat Pkup 0 0 0 0.12 0.12cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

201.77cfm/ton

Exhaust Heat

-1.63 20 -2-13

1,639.39ft²/ton

-6.15 7.32Btu/hr·ft²

0.0No. People 546Grand Total ==> 100.00-1,245-98100.00 546100.00 657 307

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 202 Main Htg -0.3 25 61.9 73.6 0.1 0.7 0.6 25 65.8 57.6 59.0 54.8 47.6 38.4Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.1 0.8 0.4 12 85.3 74.0 111.1 54.3 54.0 62.8Opt Vent

Roof 202 0 0 Wall 0 0 0

Humidif 0.0 0 0.0 0.0 0.1 1.5Total Opt Vent -0.9 55.0-14.6 12

-1.3Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-926

74.40

-30.68

0.00 0.00

-13

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0.00 0.00 0.00 0.00

0 0

0 0 0

0.00 0.00

0.0…