94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf

PDF 208 KB Posted

Attached to
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
Solicitation number
47PB0024R0049
Issued by

About this file

This document is a Specifications Table of Contents for the Houlton, Maine Land Port of Entry (LPOE) construction project, Contract Number 47PB00-23-F-0129. The project is being managed by the U.S. General Services Administration, New England Region (Region 1). The project includes requirements across divisions such as general requirements, existing conditions, concrete, masonry, metals, wood/plastics/composites, thermal/moisture protection, openings, finishes, equipment, conveying equipment, plumbing, HVAC, and electronic safety and security.

The related federal contract opportunity is for Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for the Houlton LPOE project. The solicitation number is 47PB0024R0049. The magnitude of construction is estimated between $22,000,000 and $32,000,000, which includes potential Inflation Reduction Act (IRA) funding. The solicitation is not set aside for small businesses, but small and large businesses are encouraged to participate. Technical and price proposals are due by November 11, 2024 at 2:00 PM EST. A pre-proposal conference and site visit are scheduled for October 10th and 17th, 2024 respectively.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf PDF
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf PDF
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
83 Exhibit G.1_MEPFP_Equipment.pdf PDF
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
73. Contract Price Form Spreadsheet 2024 08 28.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Houlton, ME Land Port of Entry | CUI | Contract Number 47PB00-23-F-0129 | Page 1 of 6

Houlton, Maine: Land Point of Entry (LPOE)

Exhibit BB

Specifications Table of Contents

July 19, 2024

OWNER: US GENERAL SERVICES ADMINISTRATION

PROJECT NO.: LMEBIL01

REGION: NEW ENGLAND REGION (REGION 1)

PROJECT STREET ADDRESS:

INTERSTATE 95 & US / CANADA BORDER, HOULTON, ME

(CUI)

Houlton, ME Land Port of Entry | CUI | Contract Number 47PB00-23-F-0129 | Page 2 of 6

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

000101 PROJECT TITLE PAGE

000107 SEALS PAGE

000110 TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY

011400 WORK RESTRICTIONS

012100 ALLOWANCES

012300 ALTERNATES

012400 OPTIONS

012500 SUBSTITUTION PROCEDURES

012700 UNIT PRICES

012900 PAYMENT PROCEDURES

013000 PROJECT MANAGEMENT SYSTEM

013100 PROJECT MANAGEMENT AND COORDINATION

013110 CRITICAL PATH METHOD (CPM) SCHEDULING

013110 CRITICAL PATH METHOD (CPM) SCHEDULING FOR PROSPECTUS

PROJECTS

013200 CONSTRUCTION PROGRESS DOCUMENTATION

013220 PHOTOGRAPHIC DOCUMENTATION

013300 SUBMITTAL PROCEDURES

013600 CONSTRUCTION-OPERATIONS BUILDING INFORMATION EXCHANGE

(COBIE)

014000 QUALITY ASSURANCE AND CONTROL REQUIREMENTS

014025 QUALITY CONTROL TESTING FOR AIR BARRIER SYSTEMS

014050 SYSTEM QUALITY CONTROL

014100 STRUCTURAL TESTING LABORATORY SERVICES

014200 GENERAL REFERENCES

015000 TEMPORARY FACILITIES AND CONTROLS

015639 TREE AND PLANT PROTECTION

015930 SECURITY REGULATIONS

015950 SAFETY AND HEALTH

016000 PRODUCT REQUIREMENTS

017000 EXECUTION REQUIREMENTS

017310 CUTTING AND PATCHING

017320 SELECTIVE DEMOLITION

017350 FIRE PREVENTION PRECAUTIONS FOR HOT WORK

Houlton, ME Land Port of Entry | CUI | Contract Number 47PB00-23-F-0129 | Page 3 of 6

017410 CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT

017419 CONSTRUCTION NONHAZARDOUS WASTE MANAGEMENT AND

DISPOSAL

017700 CLOSEOUT PROCEDURES

018111 SUSTAINABLE DESIGN REQUIREMENTS

019113 GENERAL COMMISSIONING REQUIREMENTS

DIVISION 02 - EXISTING CONDITIONS

020100 MAINTENANCE OF EXISTING CONDITIONS

021000 PROTECTION OF EXISTING UTILITIES

024119 SELECTIVE DEMOLITION

028200 ASBESTOS ABATEMENT

028300 MANAGEMENT OF LEAD CONTAINING PAINT

028713 MOLD REMEDIATION

028416 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBS

AND MERCURY

DIVISION 03 - CONCRETE

034500 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

040511 MASONRY MORTARING AND GROUTING

042000 UNIT MASONRY

DIVISION 05 - METALS

051200 STRUCTURAL STEEL FRAMING

054000 COLD-FORMED METAL FRAMING

055100 METAL STAIRS

055213 PIPE AND TUBE RAILINGS

055305 METAL GRATINGS AND FLOOR PLATES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

070150.19 PREPARATION FOR RE-ROOFING

070543 CLADDING SUPPORT SYSTEMS

072100 THERMAL INSULATION

072129 SPRAYED INSULATION

072500 WEATHER BARRIERS

074213.19 INSULATED METAL WALL PANELS

074229.11 TERRACOTTA RAINSCREEN WALL PANELS

074623 WOOD SIDING

075419 POLYVINYL-CHLORIDE ROOFING

076200 SHEET METAL FLASHING AND TRIM

077100 ROOF SPECIALTIES

078400 FIRESTOPPING

Houlton, ME Land Port of Entry | CUI | Contract Number 47PB00-23-F-0129 | Page 4 of 6

079200 JOINT SEALANTS

DIVISION 08 - OPENINGS

080671 DOOR HARDWARE SCHEDULE

081113 HOLLOW METAL DOORS AND FRAMES

081116 ALUMINUM DOORS AND FRAMES

083100 ACCESS DOORS AND PANELS

084313 ALUMINUM-FRAMED STOREFRONTS

085113 ALUMINUM WINDOWS

087100 DOOR HARDWARE

088000 GLAZING

088723 SAFETY AND SECURITY FILMS

088800 SPECIAL FUNCTION GLAZING

089100 LOUVERS

089200 LOUVERED EQUIPMENT ENCLOSURES

DIVISION 09 - FINISHES

090000.01 FINISHES SCHEDULE

090561 COMMON WORK RESULTS FOR FLOORING PREPARATION

090561 SUBSTRATE PREPARATION FOR FLOORING INSTALLATION- USG

092116 GYPSUM BOARD ASSEMBLIES

093000 TILING

095100 ACOUSTICAL CEILINGS

095423 LINEAR METAL CEILINGS

099000 PAINTING AND COATING - LEED V4.1/GREEN PRODUCT GUIDE SPEC -

PPG

099113 EXTERIOR PAINTING

099123 INTERIOR PAINTING

DIVISION 11 - EQUIPMENT

111136 VEHICLE CHARGING EQUIPMENT

118129 FACILITY FALL PROTECTION

DIVISION 14 - CONVEYING EQUIPMENT

142400 HYDRAULIC ELEVATORS

DIVISION 22 – PLUMBING & PIPING SPECIALTIES

22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22 05 18 ESCUTCHEONS FOR PLUMBING PIPING

22 05 19 METERS AND GAUGES FOR PLUMBING PIPING (CONTROLLED)

22 05 23 VALVES (CONTROLLED)

22 05 29 HANGERS, SUPPORTS, ANCHORS AND GUIDES (CONTROLLED)

22 05 30 DISINFECTING OF WATER SUPPLY SYSTEM

22 05 33 HEAT TRACING FOR PLUMBING PIPING

22 05 35 BACKFLOW PREVENTION

22 05 48 VIBRATION ISOLATION

Houlton, ME Land Port of Entry | CUI | Contract Number 47PB00-23-F-0129 | Page 5 of 6

22 05 53 IDENTIFICATION OF PLUMBING PIPING AND EQUIPMENT

(CONTROLLED)

22 05 80 ACCESS DOORS IN GENERAL CONSTRUCTION (CONTROLLED)

22 05 90 TESTING

22 07 19 INSULATION

22 08 00 COMMISSIONING OF PLUMBING SYSTEM (BY CX AGENT, NOT WSP)

(CONTROLLED)

22 11 16 DOMESTIC WATER PIPING AND FITTING MATERIALS (CONTROLLED)

22 11 19 DOMESTIC WATER SPECIALTIES

22 13 16 SANITARY WASTE AND VENT PIPING AND FITTING MATERIALS

22 13 19 SANITARY WASTE PIPING SPECIALTIES

22 13 23 SANITARY WASTE INTERCEPTORS

22 14 13 STORM DRAIN PIPING AND FITTING MATERIALS

22 14 23 STORM DRAINAGE SPECIALTIES

22 14 29 SUMP PUMPS (CONTROLLED)

22 16 01 NATURAL GAS AND LIQUID PETROLEUM PIPING SYSTEM

(CONTROLLED)

22 33 00 ELECTRIC DOMESTIC WATER HEATERS (CONTROLLED)

22 34 00 FUEL FIRED DOMESTIC WATER HEATERS (CONTROLLED)

22 42 00 COMMERCIAL PLUMBING FIXTURES AND TRIM (CONTROLLED)

DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 00 02 HEATING, VENTILATION, AND AIR CONDITIONING GENERAL

CONDITIONS

23 00 03 ACCESS DOORS IN GENERAL CONSTRUCTION (CONTROLLED)

23 02 00 FIRESTOPPING

23 05 13 ELECTRIC MOTORS (CONTROLLED)

23 05 17 SLEEVES AND ESCUTCHEONS FOR HVAC PIPING

23 05 19 METERS AND GAUGES FOR HVAC PIPING AND DUCTWORK

(CONTROLLED)

23 05 23 VALVES (CONTROLLED)

23 05 29 HANGERS, ANCHORS AND SUPPORTS (CONTROLLED)

23 05 40 ACOUSTICS

23 05 48 VIBRATION ISOLATION

23 05 53 SYSTEMS IDENTIFICATION (CONTROLLED)

23 05 93 TESTING, ADJUSTING AND BALANCING

23 07 00 INSULATION

23 08 00 COMMISSIONING OF HVAC SYSTEMS (BY CX AGENT, NOT

WSP) (CONTROLLED)

23 09 23 BUILDING MANAGEMENT AND CONTROL SYSTEM (BMCS)

(CONTROLLED)

23 11 13 SHEET METAL, DUCTWORK, AND ACCESSORIES

(CONTROLLED)

23 21 23 PUMPS (CONTROLLED)

Houlton, ME Land Port of Entry | CUI | Contract Number 47PB00-23-F-0129 | Page 6 of 6

23 25 00 PIPE CLEANING AND CHEMICAL WATER TREATMENT

23 26 00 WATER SPECIALTIES

23 33 13 DAMPERS (CONTROLLED)

23 36 10 AIR OUTLETS AND INLETS (CONTROLLED)

23 41 00 AIR FILTERS AND CLEANERS (CONTROLLED)

23 51 00 VENTS, STACKS AND BREECHING

23 52 10 PIPING AND ACCESSORIES (CONTROLLED)

23 52 39 CONDENSING BOILERS (CONTROLLED)

23 53 00 FUEL HANDLING SYSTEMS (CONTROLLED)

23 57 00 HEAT EXCHANGERS (CONTROLLED)

23 57 20 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS

(CONTROLLED)

23 62 10 AIR COOLED AIR CONDITIONING UNITS (CONTROLLED)

23 73 00 FACTORY ASSEMBLED AIR HANDLING UNITS (CONTROLLED)

23 73 05 FANS (CONTROLLED)

23 82 16 COILS (CONTROLLED)

23 84 40 SPACE HEATING UNITS (CONTROLLED)

23 85 00 VARIABLE FREQUENCY CONTROLLERS (CONTROLLED)

23 86 00 ELECTRIC MOTOR CONTROLLERS (CONTROLLED)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

283110 BUILDING INTRUSION DETECTION

DIVISION 31 - EARTHWORK

310000 EARTHWORK

311000 SITE CLEARING, REMOVALS, AND PREPARATION

312300 EXCAVATION AND FILL

312319 DEWATERING

312513 EROSION AND SEDIMENT CONTROL

315000 SUPPORT OF EXCAVATION AND PROTECTION

319000 TRENCH EXCAVATION AND BACKFILL

DIVISION 32 - EXTERIOR IMPROVEMENTS

321723 PAVEMENT MARKINGS

322000 PAVEMENT RESTORATION

DIVISION 33 - UTILITIES

331000 WATER UTILITIES

331100 WATER UTILITY DISTRIBUTION PIPING