8. Pre-Proposal Site Visit R1 2024 10 08.pdf
PDF 307 KB Posted
- Attached to
- Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
- Solicitation number
- 47PB0024R0049
About this file
This document is a Pre-Proposal Site Visit letter for Solicitation 47PB0024R0049 Construction Manager as Constructor (CMc) Contract for Repairs and Alterations to the Houlton Land Port of Entry (LPOE) in Houlton, Maine. The letter provides details on the site visit scheduled for October 17, 2024 at 1:00 PM EST, which will cover key aspects of the solicitation including the Presolicitation, Solicitation, Agreement, required forms, evaluation factors, and technical requirements. Proposals are due November 21, 2024 by 2:00 PM EST, with an estimated contract award on February 28, 2025. The Magnitude of Construction is estimated between $22,000,000 and $32,000,000, and technical factors are more important than price factors. This is not a small business set-aside, but both small and large businesses are encouraged to participate.
View the file
Other files
Show 40 more
Latest 50 of 108 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 47PB0024R0049 Construction Manager as Constructor (CMc) Contract, Repairs and Alterations
Houlton Land Port of Entry (LPOE), Houlton, Maine 04730
PRE-PROPOSAL SITE VISIT
Thursday, October 17, 2024, at 01:00 PM EST
Paul Murphy, Senior Contracts Specialist, will conduct the Pre-proposal Site Visit on behalf of GSA. This project is for a CMc contractor to complete the work required in the Scope of Work for the Construction Manager as Constructor (CMc), Repairs and Alterations, Houlton Land Port of Entry (LPOE), Houlton, Maine 04730
A site walk through will be held on Thursday, October 17, 2024, at 1:00 PM EST and will be held at Houlton Land Port of Entry, Interstate 95 & US/Canada Border, 27 Customs Loop, Houlton, ME 04730.
Personnel in attendance were advised to register via email with the names of individuals attending to Paul Murphy. Names will be forwarded to Kenneth Perez. The following items will be discussed; however, this list may not be all inclusive:
1. Attendees are advised that any remarks and/or explanations made during this virtual meeting shall not change the terms of the solicitation. The terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing by the Contracting Officer. All amendments have to be signed by the Offeror and provided upon delivery of their proposal.
2. The following items will be discussed; however, this list may not be all inclusive. The attachments have been grouped into somewhat logical locations so that Subject Matter Experts may find it easier to locate documents that best suits their expertise.
Total Pages of a document are placed in parenthesis (##).
a. The Presolicitation, “The Solicitation”, and “The Agreement” provide the most detail for submitting your proposal. The number preceding an entry is the attachment reference.
i. 2. Presolicitation in SAM 2024 08 24 (9). This is provided rather than repasting the original Presolicitation. Changes and important requirements/reminders are highlighted and added in the Solicitation for additional clarity.
ii. 3. “The Solicitation” - Houlton CMc FINAL R4 2024 10 04 (61); and
4. “The Agreement” - Houlton CMc Final 2024 10 04 (76).
iii. 5. Form B - Request for Construction Documents 2024 08 07 (2) will be attached to the Solicitation and is for “Other Sensitive But Unclassified (SBU)” documents. Each Offeror will not be able to
Docusign Envelope ID: B64919F3-E520-4386-8E57-6D364BCDA0B7 view the documents until GSA receives a completed Form B Document Security via email sent to paul.murphy@gsa.gov. Paul Murphy will send confirmation of receipt for every email received.
The Form B is not needed prior to the Pre-Proposal Conference as this virtual meeting is to help prepare each Offeror for submitting their Proposal and there is limited notice of this virtual meeting.
iv. 6. CBP Non-Disclosure Agreement Form 2024 10 04 (4) will be attached to the Solicitation and is for “Protected Critical Infrastructure Information (PCII)”, “Sensitive Securing Information (SSI)”, and “Other Sensitive But Unclassified (SBU)” documents. Each Offeror will not be able to view the documents until we receive a completed S CBP Non-Disclosure Agreement Form via email sent to both lawrence.a.comiskey@cbp.dhs.gov and paul.murphy@gsa.gov. Only Paul Murphy will send confirmation of receipt for every email received. This is not needed prior to the Pre-Proposal Conference as this virtual meeting is to help prepare each Offeror for submitting their Proposal. This NDA is much more restrictive due to the security requirements of the Land Port of Entry Facility and U.S. Customs and Border Protection personnel safety.
b. Evaluations: 18. Evaluation Factors Explained 2024 10 02 (8) will be very helpful to ensuring the Offeror provides a comprehensive technical and price proposal.
c. Technical: 26. A.0 SOW CMc Houlton LPOE Final 2024 08 02 (50); 27. A.1 SOW AE for CMc Houlton LPOE Delivery Method Revised 2024 03 04 (63);
28. A.2 SOW CMa with Commissioning CxP Services for Houlton LPOE 2023 09 28 (39); 29. A.3 SOW CMa COBie Services Houlton LPOE 2024 04 15 (8); 30. A.4 SOW - 2023 LPOE CBP Design Guide Comparison Revision 1 2024 02 10 (3); 45 P.9 IRA Project Submittal Reporting Form 2024 09 04 (89); 48. CBP Land Port of Entry Design Standard 2023 12 06 (751); 49. CMa Commissioning Services Plan - Revision 0 2024 06 05 (62); 52. GSA Communications Plan Template LPOE Project 2024 04 18 (39); 53. GSA Data Normalization for Building Automation Systems V25 (91); 57. GSA PBS CAD Standard 2021 03 10 (5); 58. GSA Program Development Study 100% PDS Report 2021 02 08 (559); 59. GSA Regional BIM Standard V1.0 2022 06 10 (50); 63. GSA Technology Policy for PBS-Owned Buildings Monitoring and Control Systems 2022 12 14 (25); 64. Hazardous Materials Assessment Report Houlton LPOE 2020 08 14 (77); 68. Roof Map Houlton LPOE 2020 06 23 (1); 69. Roof Moisture Analysis Report Houlton 2020 06 23 (22); and 71. SOW Sustainability Language 2024 04 17 (1).
d. Guidance: 31. A.4 GSA P-100 Final 2024 05 01 (368); 332. A.6 GSA P-100
Appendix Life Cycle Cost Analysis Requirements (10); 33. A.7 GSA P-100 2021 with 2022 Addendum Final (326); 34. A.8 GSA P-120 Public Buildings
Docusign Envelope ID: B64919F3-E520-4386-8E57-6D364BCDA0B7 mailto:paul.murphy@gsa.gov mailto:lawrence.a.comiskey@cbp.dhs.gov mailto:paul.murphy@gsa.gov
Service Cost and Schedule Management Policy Requirements 2022 11 07 (81); 35. D.4 P100 Submittal Matrix v10 CMc 2021 (263); 35. D.4 P100 Submittal Matrix v10 CMc 2021 (58); 50. GSA Building Technologies Technical Reference Guide V3 Redact Final 2024 05 01 (125); 51. GSA Commissioning Guide Final 2020 09 01 (66); 54. GSA Decision Resource RCP CMIP Houlton ME 2022 02 25 (5); 55. GSA Design Excellence Policies and Procedures 2022 11 17 (48); 56. GSA Maine LEC Materials Alternatives Market Research 2024 03 22 (56); 60. GSA Smart Building Implementation Guide V1 2022 04 22 (25); 61. GSA Smart Buildings 2021 12 16 (7); 62.
GSA Smart Buildings Program Guide V2 2022 04 22 (26); and 70. Safe Guarding Assets from the Observed and Expected Changes in Climate Submission Requirements 2022 02 26 (5).
3. This acquisition is for a CMc contractor to complete the work required in the Scope of
Work for the Construction Manager as Constructor (CMc), Repairs and Alterations, Houlton Land Port of Entry (LPOE), Houlton, Maine 04730.
4. Proposals are due November 21, 2024, at 2:00 pm EST via email (unless extended in writing by the Contracting Officer by an Amendment to the Solicitation). Documents to be submitted include technical submittals, separate from the Cost Proposal, Standard Form 24 - Bid Bond, Small Business Subcontracting Plan (if the Offeror is a large business), Offeror Representations and Certifications Form, GSA Form 527 Contractor's Qualifications and Financial Information, Past Performance Questionnaire (PPQ), and 47PB0024R0049 - Standard Form 1442 - Solicitation Offer and Award 2024 10 04. This list is not inclusive. It is the responsibility of the Offeror to ensure all requirements are met. Proposal’s received after 2:00 PM EST will be determined late and will be rejected.
NOTE: The price proposal needs to be broken down to Uniformat Level 2.
NOTICE: Keep in mind when submitting your proposal, that your email and attachments cannot exceed 25 MB, or it will not arrive to paul.murphy@gsa.gov. If necessary, send a second email to paul.murphy@gsa.gov with the remaining attachments. It is the Offeror’s responsibility to ensure each email containing documents have been confirmed receipt, if confirmation of receipt is delayed or not received in a timely manner.
A completed proposal, if multiple emails, needs to adhere to the November 21, 2024, at 2:00 pm EST deadline to be considered.
5. The Magnitude of Construction has an estimated price range for the Project is between
$22,000,000 and $32,000,000. Offerors are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations.
This range does include potential Inflation Reduction Act (IRA) funding.
The CMc Contingency Allowance (CCA) is three percent (3%) of the Estimated Cost
Docusign Envelope ID: B64919F3-E520-4386-8E57-6D364BCDA0B7 of the Work (ECW), as defined in the Agreement.
The Contract contemplated by this Solicitation provides for fifty percent (50%) shared savings, as defined in the Agreement.
6. Technical Factors are considerably more important than Price Factors, however, make sure to fully address each Technical (Non-price Factors) as stated in the solicitation.
A document named Evaluation Factors Explained 2024 10 02 is attached to the Solicitation to assist each Offeror in the development of their individual proposal.
7. Request for clarification/information to the Pre-Proposal Site Visit needs to be submitted in writing no later than October 25, 2024, seven (7) calendar days after the Site Visit. GSA will respond in writing no later than November 1, 2024, via an amendment posted on SAM.gov. All questions, whether technical or administrative, are to be submitted in writing to paul.murphy@gsa.gov. Paul Murphy will send confirmation of receipt for every email received.
8. A Pre-proposal Conference will be held on Thursday, October 17, 2024, at 1:00 PM
EST and will be a virtual meeting. The specifics of this Pre-Proposal Conference were much more detailed than cursory discussions. The site visit is intended to be more technical in nature. prior to the actual site visit.
9. Award will be made to the Offeror that represents the best value to the Government, based on the criteria set forth in the solicitation. We anticipate contract award on or about February 28, 2025. A Kick-Off Meeting will be held at a date to be determined later. The Notice to Proceed (NTP) may be issued at that time as determined by the Contracting Officer.
10. Let me know if you have any questions pertaining to this document at paul.murphy@gsa.gov.
Paul Murphy Contracts Specialist Acquisition Management Division Public Building Service New England Region
Docusign Envelope ID: B64919F3-E520-4386-8E57-6D364BCDA0B7
10/8/2024 mailto:paul.murphy@gsa.gov mailto:paul.murphy@gsa.gov
| 2024-10-08T07:45:33-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .