129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf
PDF 19 MB Posted
- Attached to
- Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
- Solicitation number
- 47PB0024R0049
View the file
Other files
Show 40 more
Latest 50 of 108 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOULTON, MAINE: LAND POINT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
Project No: LMEBIL01
OWNER:
US GENERAL SERVICES ADMINISTRATION
REGION: NEW ENGLAND REGION (REGION 1)
PROJECT STREET ADDRESS:
INTERSTATE 95 & US/CANADA BORDER, HOULTON, ME
AUGUST 5, 2024
EXHIBIT D
Base Bid Items: Main Port Building
Exterior Building Envelope
• Replace Existing Roof System
• Replace Existing Stone/Concrete Façade Panels
• Replace Existing Aluminum Storefront Windows & Entrances
• Remove and Replace Exterior Hollow Metal Doors & Frames & Building Sealants
Per MOD PS0002 dated 11/15/2003 Investigate and include Split face CMU Block in design (remove approx. 6,085 sqft (MPB) and 2,125 sqft. (2ndary Inspection Bldg.) split face CMU, replace with façade envelope system)
Life Safety & Fire Protection Systems
• Fire Alarm System
• Sprinkler System
• Fireproofing
• Firestopping
Accessibility
• Elevator Modernization
• Stair to Roof
Mechanical Systems
• Replace Heating System
• Replace Cooling and Ventilation System
• Replace Vehicle Inspection Bay Heating and Ventilation System
• Provide Building Automation System (BAS)
* Note: Scope includes site electrical upgrades as described in Exhibit F: MEP Preliminary Concept Basis of Design Narrative, dated Jan. 5, 2024 and submitted with Preliminary Concept Design
Plumbing Systems
• Replace Roof Drains
• Provide Water Service Isolation Valves
• Upgrade Domestic Hot Water System
• Upgrade Plumbing Fixtures to Low-Flow
Electrical Systems
• Upgrade Main Service—Main Switchboard
• Replace Branch Circuit Panelboards and Feeders
• Replace Remaining Fluorescent Fixtures with LED and Provide Controls
• Replace Site Fixtures on 80’ Poles with LED (*Note: site)
• Provide Lightening Protection System
• Provide EV Charging Stations (*Note: site electrical)
Bid Option 1 Items: Site
Water Supply
• The existing water line located south of the primary inspection lanes requires replacement at an increased depth.
• Fire Flow Water Storage
Bid Option 2 Items: Site
• Primary Emergency Generator
Bid Option 4 Items: FDA/GSA/APHIS Building
• Replace Existing Roof System
• Replace Existing Stone/Concrete Façade Panels
• Replace Existing Aluminum Storefront Windows & Entrances
• Remove and Replace Exterior Hollow Metal Doors & Frames & Building Sealants
• Per MOD PS0002 dated 11/15/2003 Investigate and include Split face CMU Block in design (remove approx. 2,686 sqft split face CMU, replace with façade envelope system)
Bid Option 5 Items: Commercial Inspection Building (CIB)
• Replace Existing Roof System
• Replace Existing Stone/Concrete Façade Panels
• Replace Existing Aluminum Storefront Windows & Entrances
• Remove and Replace Exterior Hollow Metal Doors & Frames & Building Sealants
• Per MOD PS0002 dated 11/15/2003 Investigate and include Split face CMU Block in design (remove approx. 2,686 sqft split face CMU, replace with façade envelope system)
Bid Option 6 Items: FDA/GSA/APHIS Building
• Fire Alarm System
• Sprinkler System
• Firestopping
Bid Option 7 Items: Commercial Inspection Building (CIB)
• Fire Alarm System
• Sprinkler System
• Firestopping
REFER TO STATEMENT OF WORK (SOW) FOR ARCHITECT-ENGINEER
(A/E) CONTRACT FOR CONSTRUCTION MANAGER-AS-CONTRACTOR
(CMC) DELIVERY METHOD FOR HOULTON, MAINE - LPOE PROJECT NO.
LMEBIL01 REVISED FEB. 26, 2024 FOR COMPLETE DESCRIPTION OF
SCOPE OF WORK
247PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
Section Title Scope of Work
Bid Option 3 Items: Site
• Secondary Emergency Generator
Concept Development for the Houlton ME. LPOE includes design options aligned with the project’s scope and the proposed design and alternatives for a major repair and alterations project as required by P-100 Appendix A.6—Life Cycle Cost Analysis Requirements. A summary of these design options is shown in the following table.
347PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
DESIGN ALTERNATES
EugeneRMozzoni Polygon
EugeneRMozzoni Polygon
EugeneRMozzoni Line
EugeneRMozzoni Line
EugeneRMozzoni Line
EugeneRMozzoni Line
EugeneRMozzoni Line
EugeneRMozzoni Polygon
BUILDING ENVELOPE
(Base Bid & Bid Option 3)
447PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
Section Title
DESIGN ALTERNATES
547PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
BUILDING ENVELOPE: DESIGN CONCEPT BASE
ARCHITECTURAL PRECAST + TIMBER CLAD RAINSCREEN
647PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
BUILDING ENVELOPE: DESIGN CONCEPT BASE
Architectural Pre-Cast Panels, utilizing stain and form liner, Henderson-Hopkins School, Baltimore, Marvel 2013 Project Ö, Finland, by Aleksi Hautamäki
The Luna Panel System is a product family that allows to create an original rhythm and texture by playing with the different widths and thicknesses of the products. The outlook of Luna Panel System is vivid and authentic, yet modern.
Luna Panel System -product family lunawood.com
Luna Panel System profiles of sustainable Nordic Pine, have a contemporary, straight edge. They create a sopihisticated 3 mm shadow line between the panels.
The consealed fastening completes the stylish result.
Luna Panel System can be installed horizontally and vertically. The products can be used indoors and outdoors.
Benefits of Luna Panel System
• Contemporary design with vivid Nordic Pine
• Five widths and three thicknesses give freedom to design own patterns
• Can be installed horizontally and vertically
• Suitable for both indoor and outdoor use
Thermally Modified Hem Fir Cladding, Luna Wood
747PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
BASE BID: BUILDING ENVELOPE: DESIGN CONCEPT BASE
847PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
BUILDING ENVELOPE: DESIGN CONCEPT Alt 1
UHPC CLAD RAINSCREEN + TERRACOTTA CLAD RAINSCREEN
947PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
TAKTL® KORSA™ Design Guide Doc. SP40-1 Rev. 2003
7 of 8230 Braddock Avenue, Turtle Creek, PA 15145 | TAKTL-LLC.COM | 412.486.1600 | info@taktl-llc.com
Project Examples
Interior/Exterior Cladding | KORSA Custom Panel (Base: Custom Gray)
Rainscreen Installation | KORSA Custom Panel (Base: Dune)
Rainscreen Installation | KORSA Standard Panel (Design Mix: A01, Base: Natural)
UHPC Panel, Taktl
Terracotta Rainscreen, Shildan
1047PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
1147PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
BUILDING ENVELOPE: DESIGN CONCEPT Alt 2
ARCHITECTURAL PRECAST + TERRACOTTA CLAD RAINSCREEN
1247PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
BUILDING ENVELOPE: DESIGN CONCEPT Alt 2
GLASS
All building envelope design options propose to use flat glass for all glazing assemblies that align with the IRA-LEC materials funding criteria. Glazing will be triple-glazed and Ballistic Resistant when within 8’ of exterior grade.
Thermal performance for glazed assemblies will be per IECC 2015 (Maine’s State Energy Code) or better, prescriptive levels per below:
U-Value
Fixed Fenestration = 0.29 BTU/h·ft²·°F
Operable Fenestration = 0.37 BTU/h·ft²·°F
Entrance Doors = 0.77 BTU/h·ft²·°F
SHGC: 0.45 or .30
ROOF ASSEMBLY
All building envelope design options propose to exceed IECC 2015 for roof thermal performance.
80 mil reinforced PVC roof membrane fully adhered to coverboard.
½ inch glass fiber faced gypsum cover board.
¼ inch per foot tapered polyisocyanurate board insulation with four-way tapered.
Base layer of polyisocyanurate board insulation Thickness: Minimum 8”.
Required Thermal Performance per IECC 2015: R-35.7 Proposed Thermal Performance: Minimum R-45.6 Fully adhered rubberized asphalt vapor barrier membrane.
EXTERIOR SOFFITS
Metal Soffit Panel
EXTERIOR FASCIA
UHPC Panels to match primary material finish
1347PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
BUILDING ENVELOPE: DESIGN CONCEPT Alt 2
BUILDING ENVELOPE: ALL ALTERNATES
FIN. FLR.
0' - 0"
9'
- 0
EXISTING CONCRETE
FOUNDATION WALL TO
REMAIN
EXISTING 2"RIGID
INSULATION TO REMAIN
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING EARTHEN BERM, WHERE OCCURS.
CONTRACTOR TO PULL EARTH BACK TO
EXPOSE EXTERIOR FACE OF FOUNDATION
WALL.
EXISTING 2 OZ. COOPER THRU
FLASHING TO BE REMOVED
EXISTING 3" THICK RIGID INSULATION
TO BE REMOVED
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING ALUMINUM FRAME
SPANDREL GLASS WINDOW TO BE
REMOVED
EXISTING 4"CMU SPLIT-RIB BLOCK TO
BE REMOVED EXISTING SUSPENDED
ACOUSTICAL TILE CEILING TO
REMAIN
EXISTING R-27 F6 BATT INSULATION
TO BE REMOVED IN ITS ENTIRETY
EXISTING STONE/CONCRETE
FASCIA PANEL AND FRAMING TO
BE REMOVED IN ITS ENTIRETY
EXISTING WATERPROOFING MEMBRANE AND
RIGID INSULATION TO BE REMOVED IN THEIR
ENTIRETY
EXISTING METAL DECK AND CONCRETE
TOPPING TO REMAIN
EXISTING STEEL BEAM AND BOND BEAM
TO REMAIN
EXISTING INTERIOR CMU WALL TO REMAIN
DM-350
DM-350
DM-350
FIN. FLR.
0' - 0"
EXISTING 4"CMU SPLIT-RIB BLOCK TO BE
REMOVED
EXISTING #15 FELT OM 1/2" THICK EXTERIOR WALL
SHEATHING TO BE REMOVED
EXISTING CONCRETE FOUNDATION WALL
TO REMAIN
EXISTING 2"RIGID INSULATION TO REMAIN
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING SUSPENDED
ACOUSTICAL TILE CEILING TO
REMAIN
EXISTING R-27 F6 BATT INSULATION TO
BE REMOVED IN ITS ENTIRETY
EXISTING STONE/CONCRETE FASCIA PANEL
AND FRAMING TO BE REMOVED IN ITS
ENTIRETY
EXISTING WATERPROOFING MEMBRANE AND
RIGID INSULATION TO BE REMOVED IN THEIR
ENTIRETY
EXISTING METAL DECK AND
CONCRETE TOPPING TO REMAIN
EXISTING STEEL BEAM TO
REMAIN
EXISTING EARTHEN BERM, WHERE OCCURS.
CONTRACTOR TO PULL EARTH BACK TO
EXPOSE EXTERIOR FACE OF FOUNDATION
WALL.
1. EXISTING CONDITIONS SURVEY WAS PERFORMED BY
HALEY WARD, INC. DURING NOVEMBER 2023
2. ADDITIONAL EXISTING CONDITIONS INFORMATION WAS
PROVIDED BY THE GSA.
3. DEMOLITION MAY REVEAL UNEXPECTED OR DIFFERING
CONDITIONS FROM THOSE SHOWN IN THESE
DOCUMENTS.
4. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN
WRITING OF ANY CONDITIONS DIFFEREING FROM THOSE
INDICATED IN THE PLANS, AND WAIT FOR WRITTEN
INSTRUCTIONS BEFORE PROCEEDING.
GENERAL SELECTIVE DEMOLITION SHEET NOTES
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
EXISTING TO REMOVE (DEMOLISH) (SECTION CUT, PLAN OR ELEVATION)
DEMOLITION GRAPHIC LEGEND
FIN. FLR.
0' - 0"
SECOND FLOOR
16' - 4"
EXISTING CIP 14"
EXISTING 4" CMU SPLIT-
RIB BLOCK TO BE
REMOVED
ALUMINUM FRAME GLASS
WINDOW TO BE REMOVED
GYPSUM BOARD WALL
CAVITY TO REMAIN
SUSPENDED ACOUSTICAL TILE CEILING
TO REMAIN
R-27 F6 BATT INSULATION TO
BE REMOVED IN ITS
ENTIRETY
EXTERIOR SOFFIT TO BE
REMOVED
EXISTING METAL DECK AND
CONCRETE TOPPING TO
REMAIN
#15 FELT ON 1/2" THICK EXTERIOR
WALL SHEATING TO REMAIN
GYPSUM BOARD WALL
CAVITY TO REMAIN
#15 FELT ON 1/2" THICK EXTERIOR
WALL SHEATING TO REMAIN
EXISTING 4" CMU SPLIT-
RIB BLOCK TO BE
REMOVED
0 2' 4' 3/4"=1'-0"
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
5:
:2
PM
DM-350
SELECTIVE DEMOLITION - WALL SECTIONS
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
07/19/2024
05/19/24Author
Checker
INTERSTATE 95 & US / CANADA BORDER
HOULTON / ME
LMEBIL01
FRED AMEY
ME0661BH
MAIN PORT BUILDING
2325_Houlton ME LPOE_BORDER PATROL-A
U.S. General Services Administration Interstate 95 & US / Canada Border, Houlton, ME
47PB0023F0129
3/4" = 1'-0"
DEMOLITION - WALL TYPE 2 - FASCIA & 4" SPLIT CMU OVER 8"CMU INTERIOR
WALL2
SELECTIVE DEMOLITION - GENERAL GROUND FLOOR PLAN WALL SECTION
LEGEND
3/4" = 1'-0"
DEMOLITION - WALL TYPE 1 - FASCIA & 4" SPLIT CMU OVER GYPSUM CAVITY
WALL1
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
3/4" = 1'-0"
DEMOLITION - WALL TYPE - 4"SPLIT CMU OVER GYPSUM CAVITY WALL
IMMIGRATION INSPECT4
Mark Date Description
MARVEL ARCHITECTS
FIN. FLR.
0' - 0"
SECOND FLOOR
16' - 4"
TOP OF ROOF
27' - 3"
3"
6"
EXISTING 6" METAL STUD
FRAMING TO BE REMOVED
EXISTING 3" THICK RIGID
INSULATION TO BE REMOVED
EXISTING FIBROUS ASPHALT
DAMPPROOFING ASSUME
EXISTING ALUMINUM FRAME
SPANDREL GLASS WINDOW TO BE
REMOVED
EXISTING 4"CMU SPLIT-RIB BLOCK
TO BE REMOVED
EXISTING R-27 F6 BATT INSULATION
TO BE REMOVED IN ITS ENTIRETY
EXISTING STONE/CONCRETE FASCIA
PANEL AND FRAMING TO BE REMOVED
IN ITS ENTIRETY
EXISTING WATERPROOFING MEMBRANE AND
RIGID INSULATION TO BE REMOVED IN THEIR
ENTIRETY
EXISTING METAL DECK AND CONCRETE
TOPPING TO REMAIN
EXISTING STEEL BEAM AND BOND BEAM TO
REMAIN
EXISTING INTERIOR 8" CMU
WALL TO REMAIN
WALL CAVITY
EXISTING
WATERPROOFING
MEMBRANE AND RIGID
INSULATION TO BE
REMOVED IN THEIR
ENTIRETY EXISTING STEEL BEAM AND BOND BEAM TO
REMAIN
DM-351
DM-351
SECOND FLOOR
16' - 4"
TOP OF ROOF
27' - 3"
EXISTING METAL PAN SNAP-IT
SOFFIT TO BE REMOVED
EXISTING ALUMINUM WINDOW FRAME
WITH INSULATED GLASS OR
SPANDREL GLASS TO BE REMOVED
EXISTING SUSPENDED ACOUSTICAL
TILE CEILING TO BE REMOVED
EXISTING R-27 F6 BATT INSULATION TO
BE REMOVED IN ITS ENTIRETY
EXISTING STONE/CONCRETE FASCIA
PANEL AND FRAMING TO BE REMOVED IN
ITS ENTIRETY
EXISTING WATERPROOFING
MEMBRANE AND RIGID INSULATION
TO BE REMOVED IN THEIR ENTIRETY
EXISTING METAL DECK AND CONCRETE
TOPPING TO REMAIN
EXISTING STONE/CONCRETE
FASCIA PANEL AND FRAMING TO
BE REMOVED IN ITS ENTIRETY
EXISTING R-27 F6 BATT INSULATION
TO BE REMOVED IN ITS ENTIRETY
EXISTING 3 1/2" METAL STUD FRAMING
TO BE REMOVED
EXISTING 6" METAL STUD
FRAMING TO BE REMOVED
EXISTING 2 OZ. COOPER THRU
FLASHING TO BE REMOVED
EXISTING STEEL FRAMING
TOREMAIN
1. EXISTING CONDITIONS SURVEY WAS PERFORMED BY
HALEY WARD, INC. DURING NOVEMBER 2023
2. ADDITIONAL EXISTING CONDITIONS INFORMATION WAS
PROVIDED BY THE GSA.
3. DEMOLITION MAY REVEAL UNEXPECTED OR DIFFERING
CONDITIONS FROM THOSE SHOWN IN THESE
DOCUMENTS.
4. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN
WRITING OF ANY CONDITIONS DIFFEREING FROM THOSE
INDICATED IN THE PLANS, AND WAIT FOR WRITTEN
INSTRUCTIONS BEFORE PROCEEDING.
GENERAL SELECTIVE DEMOLITION SHEET NOTES
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
EXISTING TO REMOVE (DEMOLISH) (SECTION CUT, PLAN OR ELEVATION)
DEMOLITION GRAPHIC LEGEND
0 2' 4' 3/4"=1'-0"
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
5:
:2
PM
DM-351
SELECTIVE DEMOLITION - WALL SECTIONS
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
07/19/2024
05/19/24Author
Checker
INTERSTATE 95 & US / CANADA BORDER
HOULTON / ME
LMEBIL01
FRED AMEY
ME0661BH
MAIN PORT BUILDING
2325_Houlton ME LPOE_BORDER PATROL-A
U.S. General Services Administration Interstate 95 & US / Canada Border, Houlton, ME
47PB0023F0129
3/4" = 1'-0"
DEMOLITION - WALL TYPE 5 - FASCIA & SPANDREL WINDOW OVER 8"CMU
INTERIOR WALL2
SELECTIVE DEMOLITION 2ND FLOOR PLAN - WALL SECTION LEGEND
3/4" = 1'-0"
DEMOLITION - WALL TYPE 4 - FASCIA & WINDOW WITH TRAFFIC LANES &
BOOTH UNDERNEATH1
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
Mark Date Description
MARVEL ARCHITECTS
FIN FLR. OLD. 464.75'
0' - 0"
T.O. WALL
18' - 8"
BOTTOM OF FOOTING
-5' - 0"
FIN. FLR. NEW 466.25'
1' - 6"
T.O. STEEL 482.5'
17' - 9"
Level 1 0' - 0"
ROOF
18' - 8"
EXISTING 2" RIGID
INSULATION
EXISTING 3" THICK
RIGID INSULATION
TO REMAIN
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING DAMPPROOFING
AT BERMS, WHEN OCCURS
EXISTING STONE/CONCRETE FASCIA PANEL
AND FRAMING TO BE REMOVED IN ITS
ENTIRETY
EXISTING WATERPROOFING MEMBRANE
AND RIGID INSULATION TO BE REMOVED
IN THEIR ENTIRETY
EXISTING METAL DECK AND CONCRETE
TOPPING TO REMAIN
EXISTING 8" CMU
SPLIT-RIB BLOCK TO
REMAIN
EXISTING SUSPENDED CEILING
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
EXISTING TO REMOVE (DEMOLISH) (SECTION CUT, PLAN OR ELEVATION)
DEMOLITION GRAPHIC LEGEND
FIN FLR. OLD. 464.75'
0' - 0"
SECOND FLOOR
10' - 0"
T.O. WALL
18' - 8"
BOTTOM OF FOOTING
-5' - 0"
FIN. FLR. NEW 466.25'
1' - 6"
T.O. STEEL 482.5'
17' - 9"
Level 1 0' - 0"
ROOF
18' - 8"
EXISTING 2" RIGID
INSULATION
EXISTING 3" THICK
RIGID INSULATION
TO REMAIN
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING DAMPPROOFING
AT BERMS, WHEN OCCURS
EXISTING ALUMINUM WINDOW FRAME
WITH INSULATED GLASS OR SPANDREL
GLASS TO BE REMOVEDEXISTING SUSPENDED CEILING
EXISTING STONE/CONCRETE FASCIA PANEL
AND FRAMING TO BE REMOVED IN ITS
ENTIRETY
EXISTING WATERPROOFING MEMBRANE
AND RIGID INSULATION TO BE REMOVED
IN THEIR ENTIRETY
EXISTING METAL DECK AND CONCRETE
TOPPING TO REMAIN
EXISTING 8" CMU
SPLIT-RIB BLOCK TO
REMAIN
1. EXISTING CONDITIONS SURVEY WAS PERFORMED BY
HALEY WARD, INC. DURING NOVEMBER 2023
2. ADDITIONAL EXISTING CONDITIONS INFORMATION WAS
PROVIDED BY THE GSA.
3. DEMOLITION MAY REVEAL UNEXPECTED OR DIFFERING
CONDITIONS FROM THOSE SHOWN IN THESE
DOCUMENTS.
4. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN
WRITING OF ANY CONDITIONS DIFFEREING FROM THOSE
INDICATED IN THE PLANS, AND WAIT FOR WRITTEN
INSTRUCTIONS BEFORE PROCEEDING.
GENERAL SELECTIVE DEMOLITION SHEET NOTES
0 2' 4' 3/4"=1'-0"
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
1:
:1
PM
DM-354
SELECTIVE DEMOLITION - WALL SECTIONS
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
07/19/2024
02/28/20Author
Checker
INTERSTATE 95 & US / CANADA BORDER
HOULTON / ME
LMEBIL01
FRED AMEY
ME0663BH
47PB0023F0129
CUSTOM INSPECTION BUILDING (CIB)
2325_Houlton ME LPOE_INSTECTION BUILDING-A
U.S. General Services Administration Interstate 95 & US / Canada Border, Houlton, ME
3/4" = 1'-0"
SELECTIVE DEMO - WALL SECTION TYPE 313/4" = 1'-0"
SELECTIVE DEMO - WALL SECTION TYPE 3 VARIATION3
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
Mark Date Description
MARVEL ARCHITECTS
1447PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
Section Title Building Envelope: Demolition Scope
MBPFDA/GSA/APHIS & CIB
FIN. FLR.
0' - 0"
EXISTING 4"CMU SPLIT-RIB BLOCK
TO BE REMOVED
EXISTING #15 FELT OM 1/2" THICK EXTERIOR
WALL SHEATHING TO BE REMOVED
EXISTING CONCRETE
FOUNDATION WALL TO REMAIN
EXISTING 2"RIGID
INSULATION TO REMAIN
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING SUSPENDED ACOUSTICAL TILE
CEILING TO BE REMOVED
EXISTING R-27 F6 BATT INSULATION
TO BE REMOVED IN ITS ENTIRETY
EXISTING STONE/CONCRETE FASCIA
PANEL AND FRAMING TO BE REMOVED IN
ITS ENTIRETY
EXISTING WATERPROOFING
MEMBRANE AND RIGID INSULATION
TO BE REMOVED IN THEIR ENTIRETY
EXISTING METAL DECK AND
CONCRETE TOPPING TO REMAIN
EXISTING STEEL BEAM TO REMAIN
EXISTING 5/8" GWB ON 6 MIL. VAPOR
BARRIER ON 6" 18 GA. "C"@ 24" O.C. W/
R-19 F6 BATT INSULATION BETWEEN
EXISTING SHEATHING AND METAL
FRAMING TO REMAIN
SEA LEVEL - ZERO
0' - 0"
FIN. FLR.
0' - 0"
EXISTING 2" RIGID INSULATION
SUSPENDED CEILING, WHEN
OCCURS
EXISTING 5/8" GWB ON 6 MIL. VAPOR
BARRIER ON 6" 18 GA. "C"@ 24" O.C. W/ R-19
F6 BATT INSULATION BETWEEN
5" PRECAST PANEL
3 1/2" MINERAL WOOL INSULATION
5/8" SHEATHING
RELEIVING ANGLE CONNECTION TO
EXISTING FOUNDATION WALL,
AS PER STRUCT
PRECAST PANEL ANCHOR TO ROOF
DIAPHRAM, AS PER STRUCTURAL
BATT INSULATION
1" AIR GAP AND CLIPS
VAPOR BARRIER
OVER 5/8" SHEATHING
COLD FORMED STEEL
FRAMING AS PER
STRUCTURAL
EXTERIOR GRADE OR
SIDEWALK, WHEN OCCURS
NEW ROOF ASSMBLY OVER
EXISTING METAL ROOF DECK
AND CONCRETE TOPPING
SEA LEVEL - ZERO
0' - 0"
RIDGID INSULATION
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
NEW CONSTRUCTION GRAPHIC LEGEND
• ROOF ASSEMBLY: (ALL ALTERNATES)
80 mil reinforced PVC roof membrane fully adhered to coverboard.
½ inch glass fiber faced gypsum cover board.
¼ inch per foot tapered polyisocyanurate board insulation with four-way tapered.
Base layer of polyisocyanurate board insulation.
Thickness: Minimum 8”.
Required Thermal Performance per IECC 2015: R-35.7 Proposed Thermal Performance: Minimum R-45.6
Fully adhered rubberized asphalt vapor barrier membrane.
• EXTERIOR WALL ASSEMBLY L1: CONVENTIONAL
ARCHITECTURAL PRECAST PANEL
A. 5" PRECAST CONCRETE PANEL (9' wide max.)
B. 3 1/2" MINERAL WOOL INSULATION
C. 1" AIR
D. 5/8" SHEATHING
• EXTERIOR WALL ASSEMBLY L2: UHPC RAINSCREEN PANEL
A. 5/8” (UHPC PANEL)
B. 1” (Air) C. 4” (Mineral Wool Insulation) D. 5/8” (Exterior Sheathing) E. 6” (Studs)
• EXTERIOR WALL ASSEMBLY L3: CONVENTIONAL
ARCHITECTURAL PRECAST PANEL W/ INCREASED
INSULATION
A. 5" PRECAST (9' WIDE MAX.)
B. 5" MINERAL WOOL INSULATION
C. 1" AIR
D. 5/8" SHEATHING
• EXTERIOR WALL ASSMEBLY U1: TIMBER PAINSCREEN
A. NO-O&M TIMBER SPECIES DIMENSIONAL
RAINSCREEN
B. 1” (AIR)
C. 4” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
• EXTERIOR WALL ASSMBLY U2: TERRACOTTA RAINSCREEN
PANEL
A. 1 1/2" TERRACOTTA CLADDING PANEL
B. 1 1/2” (AIR)
C. 4” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
• EXTERIOR WALL ASSEMBLY U3: TERRACOTTA
RAINSCREEN PANEL, WITH INCREASED INSULATION
A. (5/8") UHPC CLADDING PANEL
B. 1” (AIR)
C. 5” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
BUILDING ENVELOPE NOTES
0 2' 4' 3/4"=1'-0"
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
5:
:1
PM
A-350.1
EXTERIOR WALL SECTION TYPE 1 - OPTION L1
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
07/19/2024
05/19/24Author
Checker
INTERSTATE 95 & US / CANADA BORDER
HOULTON / ME
LMEBIL01
FRED AMEY
ME0661BH
MAIN PORT BUILDING
2325_Houlton ME LPOE_BORDER PATROL-A
U.S. General Services Administration Interstate 95 & US / Canada Border, Houlton, ME
47PB0023F0129
SELECTIVE DEMOLITION - GENERAL GROUND FLOOR PLAN WALL SECTION
LEGEND Copy 2
Note: Existing Conditions based on survey performed by Haley Ward in November, 2023 and additional drawings provided by the GSA as part of the contract.
Conditions found in field may vary. Contractor shall notify the architect of any significant discrepancies.
3/4" = 1'-0"
TYP. WALL TYPE 1 - FASCIA & 4" SPLIT CMU OVER GYPSUM CAVITY WALL -
SELECTIVE DEMOLITION13/4" = 1'-0"
TYP. WALL TYPE 1 - FASCIA & 4" SPLIT CMU OVER GYPSUM CAVITY WALL -
DESIGN OPTION 1, ARCHITECTURAL PRE-CAST PANEL2
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
Mark Date Description
DM-350
FIN. FLR.
0' - 0"
9'
- 0
EXISTING CONCRETE
FOUNDATION WALL TO
REMAIN
EXISTING 2"RIGID
INSULATION TO REMAIN
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING EARTHEN BERM, WHERE
OCCURS. CONTRACTOR TO PULL
EARTH BACK TO EXPOSE EXTERIOR
FACE OF FOUNDATION WALL.
EXISTING 2 OZ. COOPER THRU
FLASHING TO BE REMOVED
EXISTING 3" THICK RIGID
INSULATION TO BE REMOVED
EXISTING FIBROUS
ASPHALT DAMPPROOFING
EXISTING ALUMINUM FRAME
SPANDREL GLASS WINDOW TO
BE REMOVED
EXISTING 4"CMU
SPLIT-RIB BLOCK
TO BE REMOVED EXISTING SUSPENDED
ACOUSTICAL TILE CEILING
EXISTING R-27 F6 BATT
INSULATION TO BE
REMOVED IN ITS ENTIRETY
EXISTING STONE/CONCRETE
FASCIA PANEL AND FRAMING TO
BE REMOVED IN ITS ENTIRETY
EXISTING WATERPROOFING
MEMBRANE AND RIGID
INSULATION TO BE
REMOVED IN THEIR
ENTIRETY
EXISTING METAL DECK AND
CONCRETE TOPPING TO
REMAIN
EXISTING STEEL BEAM AND
BOND BEAM TO REMAIN
EXISTING INTERIOR
CMU WALL TO REMAIN
SEA LEVEL - ZERO
0' - 0"
FIN. FLR.
0' - 0"
EXISTING SUSPENDED ACOUSTICAL TILE
CEILING
EXISTING 8"CMU BLOCK
EXISTING 2" RIGID INSULATION
5" PRECAST PANEL
3 1/2" MINERAL WOOL INSULATION
5/8" SHEATHING
CONNECTION TO EXISTING
FOUNDATION FOOTING, WHEN
OCCURS AS PER STRUCT
CMU CONNECTION TO EXISTING
FOUNDATION WALL WHERE BERM
OCCURS, AS PER STRUCT
RIGID
INSULATION
PRECAST PANEL ANCHOR TO ROOF
DIAPHRAM, AS PER STRUCTURAL
BATT INSULATION
1" AIR GAP AND CLIPS
VAPOR BARRIER
OVER 5/8" SHEATHING
COLD FORMED STEEL
FRAMING AS PER
STRUCTURAL
EARTHEN BERM,
WHEN OCCURS
EXTERIOR
GRADE OR
SIDEWALK,
WHEN OCCURS
NEW ROOF ASSMBLY OVER
EXISTING METAL ROOF DECK
AND CONCRETE TOPPING
SEA LEVEL - ZERO
0' - 0"
RIGID
INSULATION
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
NEW CONSTRUCTION GRAPHIC LEGEND
• ROOF ASSEMBLY: (ALL ALTERNATES)
80 mil reinforced PVC roof membrane fully adhered to coverboard.
½ inch glass fiber faced gypsum cover board.
¼ inch per foot tapered polyisocyanurate board insulation with four-way tapered.
Base layer of polyisocyanurate board insulation.
Thickness: Minimum 8”.
Required Thermal Performance per IECC 2015: R-35.7 Proposed Thermal Performance: Minimum R-45.6
Fully adhered rubberized asphalt vapor barrier membrane.
• EXTERIOR WALL ASSEMBLY L1: CONVENTIONAL
ARCHITECTURAL PRECAST PANEL
A. 5" PRECAST CONCRETE PANEL (9' wide max.)
B. 3 1/2" MINERAL WOOL INSULATION
C. 1" AIR
D. 5/8" SHEATHING
• EXTERIOR WALL ASSEMBLY L2: UHPC RAINSCREEN PANEL
A. 5/8” (UHPC PANEL)
B. 1” (Air) C. 4” (Mineral Wool Insulation) D. 5/8” (Exterior Sheathing) E. 6” (Studs)
• EXTERIOR WALL ASSEMBLY L3: CONVENTIONAL
ARCHITECTURAL PRECAST PANEL W/ INCREASED
INSULATION
A. 5" PRECAST (9' WIDE MAX.)
B. 5" MINERAL WOOL INSULATION
C. 1" AIR
D. 5/8" SHEATHING
• EXTERIOR WALL ASSMEBLY U1: TIMBER PAINSCREEN
A. NO-O&M TIMBER SPECIES DIMENSIONAL
RAINSCREEN
B. 1” (AIR)
C. 4” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
• EXTERIOR WALL ASSMBLY U2: TERRACOTTA RAINSCREEN
PANEL
A. 1 1/2" TERRACOTTA CLADDING PANEL
B. 1 1/2” (AIR)
C. 4” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
• EXTERIOR WALL ASSEMBLY U3: TERRACOTTA
RAINSCREEN PANEL, WITH INCREASED INSULATION
A. (5/8") UHPC CLADDING PANEL
B. 1” (AIR)
C. 5” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
BUILDING ENVELOPE NOTES
0 2' 4' 3/4"=1'-0"
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
5:
:4
PM
A-351.1
EXTERIOR WALL TYPE 2 SECTIONS - OPTION L1
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
07/19/2024
05/19/24Author
Checker
INTERSTATE 95 & US / CANADA BORDER
HOULTON / ME
LMEBIL01
FRED AMEY
ME0661BH
MAIN PORT BUILDING
2325_Houlton ME LPOE_BORDER PATROL-A
U.S. General Services Administration Interstate 95 & US / Canada Border, Houlton, ME
47PB0023F0129
BASE BID - GENERAL GROUND FLOOR PLAN WALL SECTION LEGEND
3/4" = 1'-0"
TYP. WALL TYPE 2 - FASCIA & 4" SPLIT CMU OVER 8"CMU INTERIOR WALL -
SELECTIVE DEMOLITION1
Note: Existing Conditions based on survey performed by Haley Ward in November, 2023 and additional drawings provided by the GSA as part of the contract.
Conditions found in field may vary. Contractor shall notify the architect of any significant discrepancies.
3/4" = 1'-0"
TYP. WALL TYPE 2 - FASCIA & 4" SPLIT CMU OVER 8"CMU INTERIOR WALL -
DESIGN OPTION 1, ARCHITECTURAL PRE-CAST PANEL2
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
Mark Date Description
SECOND FLOOR
16' - 4"
TOP OF ROOF
27' - 3"
EXISTING METAL PAN SNAP-IT
SOFFIT TO BE REMOVED
EXISTING ALUMINUM WINDOW
FRAME WITH INSULATED GLASS
OR SPANDREL GLASS TO BE
REMOVED
EXISTING R-27 F6 BATT INSULATION TO
BE REMOVED IN ITS ENTIRETY
EXISTING STONE/CONCRETE FASCIA
PANEL AND FRAMING TO BE REMOVED
IN ITS ENTIRETY
EXISTING
WATERPROOFING
MEMBRANE AND RIGID
INSULATION TO BE
REMOVED IN THEIR
ENTIRETY
EXISTING METAL DECK AND CONCRETE
TOPPING TO REMAIN
EXISTING STONE/CONCRETE
FASCIA PANEL AND FRAMING
TO BE REMOVED IN ITS
ENTIRETY
EXISTING R-27 F6 BATT
INSULATION TO BE
REMOVED IN ITS
ENTIRETY
EXISTING 3 1/2" METAL STUD
FRAMING TO BE REMOVED
EXISTING 6" METAL STUD
FRAMING TO BE REMOVED;
CONDITION TO BE
ASSESSED
EXISTING 2 OZ. COOPER THRU
FLASHING TO BE REMOVED
EXISTING INSULATION TO BE
REMOVED
SECOND FLOOR
16' - 4"
NEW PUNCHED WINDOW, WHERE OCCURS
NEW EXTERIOR SOFFIT, MAINTAIN EXISTING
HEIGHT ABOVE GRADE OR HIGHER
NEW UNDERDECK INSULATION TO MEET OR
EXCEED IECC 2015
VERTICAL TIMBER CLADDING
VERTICAL TIMBER CLADDING
4" MINERAL WOOL INSULATION
1" MIN. AIR GAP AND CLIPS
VAPOR BARRIER
OVER 5/8" SHEATHING
COLD FORMED STEEL
FRAMING AS PER STRUCTURAL
NEW ROOF ASSMBLY OVER
EXISTING METAL ROOF DECK
AND CONCRETE TOPPING
VAPOR BARRIER
OVER 5/8" SHEATHING
COLD FORMED STEEL
FRAMING AS PER STRUCTURAL
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
NEW CONSTRUCTION GRAPHIC LEGEND
• ROOF ASSEMBLY: (ALL OPTIONS)
80 mil reinforced PVC roof membrane fully adhered to coverboard.
½ inch glass fiber faced gypsum cover board.
¼ inch per foot tapered polyisocyanurate board insulation with four-way tapered.
Base layer of polyisocyanurate board insulation.
Thickness: Minimum 8”.
Required Thermal Performance per IECC 2015: R-35.7 Proposed Thermal Performance: Minimum R-45.6
Fully adhered rubberized asphalt vapor barrier membrane.
• EXTERIOR WALL ASSEMBLY L1: CONVENTIONAL
ARCHITECTURAL PRECAST PANEL
A. 5" PRECAST CONCRETE PANEL (9' wide max.)
B. 3 1/2" MINERAL WOOL INSULATION
C. 1" AIR
D. 5/8" SHEATHING
• EXTERIOR WALL ASSEMBLY L2: UHPC RAINSCREEN PANEL
A. 5/8” (UHPC PANEL)
B. 1” (Air) C. 4” (Mineral Wool Insulation) D. 5/8” (Exterior Sheathing) E. 6” (Studs)
• EXTERIOR WALL ASSEMBLY L3: CONVENTIONAL
ARCHITECTURAL PRECAST PANEL W/ INCREASED
INSULATION
A. 5" PRECAST (9' WIDE MAX.)
B. 5" MINERAL WOOL INSULATION
C. 1" AIR
D. 5/8" SHEATHING
• EXTERIOR WALL ASSMEBLY U1: TIMBER PAINSCREEN
A. NO-O&M TIMBER SPECIES DIMENSIONAL
RAINSCREEN
B. 1” (AIR)
C. 4” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
• EXTERIOR WALL ASSMBLY U2: TERRACOTTA RAINSCREEN
PANEL
A. 1 1/2" TERRACOTTA CLADDING PANEL
B. 1 1/2” (AIR)
C. 4” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
• EXTERIOR WALL ASSEMBLY U3: TERRACOTTA
RAINSCREEN PANEL, WITH INCREASED INSULATION
A. (5/8") UHPC CLADDING PANEL
B. 1” (AIR)
C. 5” (MINERAL WOOL INSULATION)
D. 5/8” (EXTERIOR SHEATHING)
E. 6” (STUDS)
BUILDING ENVELOPE NOTES
SECOND FLOOR
16' - 4"
NEW PUNCHED WINDOW, WHERE OCCURS
NEW EXTERIOR SOFFIT, MAINTAIN EXISTING
HEIGHT ABOVE GRADE OR HIGHER
NEW UNDERDECK INSULATION TO MEET OR
EXCEED IECC 2015
VERTICAL TIMBER CLADDING
VERTICAL TIMBER CLADDING
4" MINERAL WOOL INSULATION
1" MIN. AIR GAP AND CLIPS
VAPOR BARRIER
OVER 5/8" SHEATHING
COLD FORMED STEEL
FRAMING AS PER STRUCTURAL
NEW ROOF ASSMBLY OVER
EXISTING METAL ROOF DECK
AND CONCRETE TOPPING
VAPOR BARRIER
OVER 5/8" SHEATHING
COLD FORMED STEEL
FRAMING AS PER STRUCTURAL
SECOND FLOOR
16' - 4"
NEW PUNCHED WINDOW, WHERE OCCURS
NEW EXTERIOR SOFFIT, MAINTAIN EXISTING
HEIGHT ABOVE GRADE OR HIGHER
NEW UNDERDECK INSULATION TO MEET OR
EXCEED IECC 2015
TERRACOTTA CLADDING
TERRACOTTA CLADDING
5" MINERAL WOOL INSULATION
1" MIN. AIR GAP AND CLIPS
VAPOR BARRIER
OVER 5/8" SHEATHING
COLD FORMED STEEL
FRAMING AS PER STRUCTURAL
NEW ROOF ASSMBLY OVER
EXISTING METAL ROOF DECK
AND CONCRETE TOPPING
VAPOR BARRIER
OVER 5/8" SHEATHING
COLD FORMED STEEL
FRAMING AS PER STRUCTURAL
0 2' 4' 3/4"=1'-0"
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
3:
:1
PM
A-352.1
EXTERIOR WALL TYPE 4 SECTIONS
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
07/19/2024
05/19/24Author
Checker
INTERSTATE 95 & US / CANADA BORDER
HOULTON / ME
LMEBIL01
FRED AMEY
ME0661BH
MAIN PORT BUILDING
2325_Houlton ME LPOE_BORDER PATROL-A
U.S. General Services Administration Interstate 95 & US / Canada Border, Houlton, ME
47PB0023F0129
3/4" = 1'-0"
TYP. WALL TYPE 4 - FASCIA & WINDOW WITH TRAFFIC LANES & BOOTH
UNDERNEATH - SELECTIVE DEMOLITION13/4" = 1'-0"
TYP. WALL TYPE 4 - FASCIA & WINDOW WITH TRAFFIC LANES & BOOTH
UNDERNEATH - DESIGN OPTION 1, TIMBER RAINSCREEN2
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
Note: Existing Conditions based on survey performed by Haley Ward in November, 2023 and additional drawings provided by the GSA as part of the contract.
Conditions found in field may vary. Contractor shall notify the architect of any significant discrepancies.
3/4" = 1'-0"
TYP. WALL TYPE 4 - FASCIA & WINDOW WITH TRAFFIC LANES & BOOTH
UNDERNEATH - DESIGN OPTION 2, TERRACOTTA RAINSCREEN33/4" = 1'-0"
TYP. WALL TYPE 4 - FASCIA & WINDOW WITH TRAFFIC LANES & BOOTH
UNDERNEATH - DESIGN OPTION 3, TERRACOTTA RAINSCREEN W/
INCREASED INSULATION4
Mark Date Description
MARVEL ARCHITECTS
1547PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
Building Envelope: MPB
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
NEW CONSTRUCTION GRAPHIC LEGEND
1. DEMOLITION MAY REVEAL UNEXPECTED OR DIFFERING
CONDITIONS FROM THOSE SHOWN IN THESE
DOCUMENTS.
2. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN
WRITING OF ANY CONDITIONS DIFFEREING FROM THOSE
INDICATED IN THE PLANS, AND WAIT FOR WRITTEN
INSTRUCTIONS BEFORE PROCEEDING.
3. DRAWINGS SHOW BUILDING ENVELOPE DESIGN OPTION 1.
PLEASE SEE PROJECT NARRATIVE FOR ALTERNATE
DESIGN OPTION DESCRIPTIONS.
GENERAL ELEVATION SHEET NOTES
• ROOF ASSEMBLY: (ALL OPTIONS)
80 mil reinforced PVC roof membrane fully adhered to coverboard.
½ inch glass fiber faced gypsum cover board.
¼ inch per foot tapered polyisocyanurate board insulation with four-way tapered.
Base layer of polyisocyanurate board insulation.
Thickness: Minimum 8”.
Required Thermal Performance per IECC 2015: R-35.7 Proposed Thermal Performance: Minimum R-45.6
Fully adhered rubberized asphalt vapor barrier membrane.
• EXTERIOR WALL ASSEMBLY L1: CONVENTIONAL
ARCHITECTURAL PRECAST PANEL
A. 6" PRECAST CONCRETE PANEL (10' wide max.)
B. 3 1/2" MINERAL WOOL INSULATION
C. 1" AIR
D. 5/8" SHEATHING
• EXTERIOR WALL ASSEMBLY L2: UHPC RAINSCREEN PANEL
A. 5/8” (UHPC PANEL)
B. 1” (Air) C. 4” (Mineral Wool Insulation) D. 5/8” (Exterior Sheathing) E. 6” (Studs)
• EXTERIOR WALL ASSEMBLY L3: CONVENTIONAL
ARCHITECTURAL PRECAST PANEL W/ INCREASED
INSULATION
A. 6" PRECAST CONCRETE PANEL (10' wide max.)
B. 5" MINERAL WOOL INSULATION
C. 1" AIR
D. 5/8" SHEATHING
BUILDING ENVELOPE NOTES
T.O. ROOF
18' - 8"
T.O. NEW SLAB
0' - 0"
T.O. EXIST. SLAB
4' - 0"
T.O. BOND BM.
18' - 0"
BOTTOM OF
FOOTING
-5' - 0"
EXISTING 8" CMU
SPLIT-RIB BLOCK TO
REMAIN
EXISTING 2" RIGID
INSULATION
EXISTING 3" THICK
RIGID INSULATION
TO REMAIN
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING SUSPENDED CEILING
EXISTING METAL DECK AND CONCRETE
TOPPING TO REMAIN
6" PRECAST PANEL
5" MINERAL WOOL INSULATION
PRECAST PANEL ANCHOR TO ROOF
DIAPHRAM, AS PER STRUCTURAL
1" AIR GAP AND CLIPS
NEW ROOF ASSMBLY OVER
EXISTING METAL ROOF DECK
AND CONCRETE TOPPING
RELEIVING ANGLE CONNECTION TO
EXISTING FOUNDATION WALL WHERE
OCCURS, AS PER STRUCT
EXISTING GRADE OR SIDEWALK,
WHERE OCCURS
RIGID INSULATION
T.O. ROOF
18' - 8"
T.O. NEW SLAB
0' - 0"
T.O. EXIST. SLAB
4' - 0"
T.O. BOND BM.
18' - 0"
BOTTOM OF
FOOTING
-5' - 0"
EXISTING 8" CMU
SPLIT-RIB BLOCK TO
REMAIN
EXISTING 2" RIGID
INSULATION
EXISTING 3" THICK
RIGID INSULATION
TO REMAIN
EXISTING FIBROUS ASPHALT
DAMPPROOFING
EXISTING SUSPENDED CEILING
EXISTING METAL DECK AND CONCRETE
TOPPING TO REMAIN
5/8" UHPC PANEL
5" MINERAL WOOL INSULATION
PRECAST PANEL ANCHOR TO ROOF
DIAPHRAM, AS PER STRUCTURAL
1" MIN AIR GAP AND CLIPS
NEW ROOF ASSMBLY OVER
EXISTING METAL ROOF DECK
AND CONCRETE TOPPING
RELEIVING ANGLE CONNECTION TO
EXISTING FOUNDATION WALL WHERE
OCCURS, AS PER STRUCT
EXISTING GRADE OR SIDEWALK,
WHERE OCCURS
RIGID INSULATION
0 2' 4' 3/4"=1'-0"
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
5:
:1
PM
A-353.2
BID OPTION 2 - WALL SECTIONS - TYP. WALL TYPE 3,
DESIGN OPT.S 2 & 3
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
07/19/2024
02/28/20Author
Checker
INTERSTATE 95 & US / CANADA BORDER
HOULTON / ME
LMEBIL01
FRED AMEY
ME0662BH
2325_HOULTON ME LPOE_FDA-GSA-AFIS-A
U.S. General Services Administration Interstate 95 & US / Canada Border, Houlton, ME
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
3/4" = 1'-0"
TYP. WALL TYPE 3 - 8"CMU EXTERIOR OVER 4"CMU INTERIOR - DESIGN
OPTION 3, ARCHITECTURAL PRECAST W/ INCREASED INSULATION2 3/4" = 1'-0"
TYP. WALL TYPE 3 - 8"CMU EXTERIOR OVER 4"CMU INTERIOR - DESIGN
OPTION 2, UHPC RAINSCREEN1
Mark Date Description
1647PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
Building Envelope: FDA/GSA/APHIS & CIB
IRA-LEC Compatable Life Span O&M Requirements Potential Manufacturer Pros Cons P-100 Baseline for Walls:
Replacement: 50 years Rehabilitation: 25 years
BPDL (USA + Canada) IRA-LEC Compatable More Complex Coordination with Existing Conditions (Can't be Field Cut)
SWBV Bénton (Canada) Durable & Low Maintenance Limits Window Sizes
Durable & Low Maintenance Less Complex Coordination with
Existing Conditions (Can be Field Cut)
Low Maintenance Not IRA-LEC Compatible Less Complex Coordination with
Existing Conditions (Can be Field Cut)
Will Weather ("gray") Naturally
Durable & Low Maintenance Less Complex Coordination with
Existing Conditions (Can be Field Cut)
Not IRA-LEC Compatible
Not IRA-LEC Compatible
No 30-50 years No or Minimal, if allowed to weather naturally
Taktl
Timber RainScreen
UHPC RainScreen
Terracotta RainScreen No 75-100 years No or Minimal Boston Valley Terracotta
Locally Sourced or Delta Millworks
50-100 yearsYesArchitectural Pre-Cast Panel joint rehabilitation: 20-25 years
No 50-75 years No or Minimal
1747PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
DESIGN Alternates - Building Envelope Wall Assemblies
(8300 CFM)
AHU
46x20 SA
20x10 OA x2
0S A
20x10 OAOA UP
(2) Propane / Electrical Backup
Boilers
(750 MBH)
4 FCUs (1 ton)
(2)HW pumps
(70 GPM)
(2) CHW Pumps
(144 GPM)
(2)HW pumps
(70 GPM)
2 FCUs (2.9 tons)
2 FCUs (2.9 tons)
2 FCUs (2.9 tons)
0 1000' 2000' 1"=1000'-0"
True North
Plan North
CHECKED BY
DRAWN BY
FLOOR NUMBER
SHEET TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
PROJECT NUMBER
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
24 X 36
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
:4 0:
A
M
M-101
HVAC - ASHP BASE BID OPTION - GROUND FLOOR PLAN
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
Issue Date
05/24/24Author
Checker
LMEBIL01
1 3
Owner Enter address here
ME0661BH
FRED AMEY
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/16" = 1'-0"
HVAC - ASHP BASE BID OPTION - GROUND FLOOR PLAN1
Mark Date Description
COOLING & PRIMARY HEATING
Cooling and heating will be provided by one (1) 91-ton, 4-pipe simultaneous air-source heat pump with three (3) modules located on the roof. The 4-pipe configuration will provide simultaneous hot water and chilled water for the Main Port building and Vehicle Inspection Bay. The heat pump will be provided with a louvered enclosure to mitigate snow accumulation and provide maintenance access during winter months.
Chilled water will be pumped via two (1 operating, 1 standby) variable speed chilled water pumps, each sized for 144 GPM and will distribute chilled water to the building. The speed of the chilled water pumps will be controlled based on the pressure differential between the chilled water supply and return piping. Heating hot water will be pumped via two (1 operating, 1 standby) variable speed hot water heating pumps, each sized for 70 GPM and will distribute heating hot water to the building to serve the DOAS, central station AHUs and perimeter fin tube radiators. The speed of the heating hot water pumps will be controlled based on the pressure differential between the heating hot water supply and return piping. Air source heat pump technology for heating currently has limitations to the heating capacity for ambient temperatures below 0 degrees F so backup heating sources will also be provided for this option.
BACKUP HEATING When ambient temperatures drop below 0 degrees F, the backup hot water heating system will be enabled. Two options are currently being evaluated for the backup heating hot water system, electric and propane. These proposed boilers and pumps will be located in the Main Port Mechanical Room on the Ground Floor.
1847PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
DESIGN ALTERNATES: ASHP
x2
0S A
60x20 SA x2
0S A
FCU (0.5 ton)
DOAS unit (2000 CFM)
20x10 OA duct DN
FCU (1 ton)
FCU (0.5 ton)
AHU
(13400 CFM)
0 1000' 2000' 1"=1000'-0"
True North
Plan North
CHECKED BY
DRAWN BY
FLOOR NUMBER
SHEET TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
PROJECT NUMBER
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
24 X 36
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
:4 0:
A
M
M-102
HVAC - ASHP BASE BID OPTION - SECOND FLOOR PLAN
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
Issue Date
05/24/24Author
Checker
LMEBIL01
2 3
Owner Enter address here
ME0661BH
FRED AMEY
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/16" = 1'-0"
HVAC - ASHP BASE BID OPTION - SECOND FLOOR PLAN1
Mark Date Description
1947PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
DN
A-355
A-354
______________2 A-355
A-352.1
A-354
A-301
A-300
A-301
A-300
A-301 1 A-301
A-302
A-300 1 A-300
A-302
A-300
A-301
A-350.1
A-350.1
______________2 A-350.2
A-350.2
A-351.1
______________3 A-351.2
______________1 A-351.2
A-352.1
LOUVERED HVAC UQUIPMENT SCREEN
ASHP PER MEP DESIGN OPTION 1
A-352.1
______________4 A-352.1
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
NEW CONSTRUCTION GRAPHIC LEGEND
1. DEMOLITION MAY REVEAL UNEXPECTED OR DIFFERING
CONDITIONS FROM THOSE SHOWN IN THESE
DOCUMENTS.
2. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN
WRITING OF ANY CONDITIONS DIFFEREING FROM THOSE
INDICATED IN THE PLANS, AND WAIT FOR WRITTEN
INSTRUCTIONS BEFORE PROCEEDING.
3. DRAWINGS SHOW BUILDING ENVELOPE DESIGN OPTION 1.
PLEASE SEE PROJECT NARRATIVE FOR ALTERNATE
DESIGN OPTION DESCRIPTIONS.
GENERAL PLAN SHEET NOTES
0 16' 32' 1/16"=1'-0"
True North
Plan North
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VIS
IO
N
BL
OC
K
GR
AP
HI
C
SC
AL
E
KE
Y P
LA
N
ST
AM
P O R
SE
AL
DE
SIG
NE
R
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
3:
:0
PM
A-103
ROOF PLAN
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
07/19/2024
06/13/24Author
Checker
INTERSTATE 95 & US / CANADA BORDER
HOULTON / ME
LMEBIL01
FRED AMEY
ME0661BH
MAIN PORT BUILDING
2325_Houlton ME LPOE_BORDER PATROL-A
U.S. General Services Administration Interstate 95 & US / Canada Border, Houlton, ME
47PB0023F0129
1/16" = 1'-0"
BASE BID - GENERAL ROOF PLAN1
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
ROOFTOP EQUIPMENT SHOWN AS PER HVAC DESIGN OPTION 1,
FOR OTHER DESIGN OPTIONS PLEASE REFER TO THE MEP DESIGN
NARRATIVE AND DRAWINGS.
Mark Date Description
MARVEL ARCHITECTS
July 19, 2024 Issued for Concept Development
OUTSIDE AIR INTAKE
2047PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
4 indoor VRF units (1 ton)
(2)HW pumps
(70 GPM)
2 indoor VRF units (2.9 tons)
2 indoor VRF units (2.9 tons)
2 indoor VRF units (2.9 tons)
14 indoor VRF units (2.9 tons)
(2) Propane / Electrical Backup
Boilers(0 CFM)(750 MBH)
20x10 OAOA UP
20x10 OA 20x10 OA
20x10 OA
0 1000' 2000' 1"=1000'-0"
True North
Plan North
CHECKED BY
DRAWN BY
FLOOR NUMBER
SHEET TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
PROJECT NUMBER
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
24 X 36
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
:4 1:
A
M
M-201
HVAC - VRF BASE BID OPTION - GROUND FLOOR PLAN
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
Issue Date
05/24/24Author
Checker
LMEBIL01
1 3
Owner Enter address here
ME0661BH
FRED AMEY
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/16" = 1'-0"
HVAC - VRF BASE BID OPTION - GROUND FLOOR PLAN1
Mark Date Description
COOLING & PRIMARY HEATING
Cooling and heating will be provided by a variable refrigerant flow (VRF) system which can provide simultaneous cooling and heating any time of year by transferring heat from one zone to another or rejecting it outside the building via refrigerant piping. In heating mode, the outdoor wet bulb temperature can be as low as -13 degrees F and as high as 60 degrees F. In cooling mode, the outdoor dry bulb temperature can be as low as 23 degrees F and as high as 115 degrees F. A backup heat source will be provided for when ambient temperatures drop below - 13 degrees F.
Horizontal ducted indoor VRF fan coil units will be provided local to the space that it serves.
Multiple indoor units are connected to an outdoor VRF condensing unit for heat dissipation. Two
(2) 15.3-ton outdoor VRF units are provided for the 27 (1-3 ton) indoor units and will be located on the roof. The VRF units will be provided with a louvered enclosure to mitigate snow accumulation and provide maintenance access during winter months. Two (2) 11.6-ton outdoor VRF units are provided for the (2) 4.4 ton DOAS VRF units located inside the building.
BACKUP HEATING When ambient temperatures drop below 0 degrees F, the backup hot water heating system will be enabled. Two options are currently being evaluated for the backup heating hot water system, electric and propane. These proposed boilers and pumps will be located in the Main Port Mechanical Room on the Ground Floor.
2147PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
DESIGN ALTERNATES: VRF
2 DOAS VRF units (4.4 ton, 2000 CFM)
20x10 OA duct DN
FCU (1 ton)
10 indoor VRF units
20x10 OA
20x10 OA
20x10 OA
16x8 OA
0 1000' 2000' 1"=1000'-0"
True North
Plan North
CHECKED BY
DRAWN BY
FLOOR NUMBER
SHEET TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
PROJECT NUMBER
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
24 X 36
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
7/
/2
:4 1:
A
M
M-202
HVAC - VRF BASE BID OPTION - SECOND FLOOR PLAN
HOULTON, MAINE - LAND PORT OF ENTRY (LPOE)
CONCEPT DEVELOPMENT
Issue Date
05/24/24Author
Checker
LMEBIL01
2 3
Owner Enter address here
ME0661BH
FRED AMEY
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/16" = 1'-0"
HVAC - VRF BASE BID OPTION - SECOND FLOOR PLAN1
Mark Date Description
2247PB00-23-F-0129 Houlton ME LPOE • August 5, 2024
DN
A-355
A-354
______________2 A-355
A-352.1
A-354
A-301
A-300
A-301
A-300
A-301 1 A-301
A-302
A-300 1 A-300
A-302
A-300
A-301
A-350.1
A-350.1
______________2 A-350.2
A-350.2
A-351.1
______________3 A-351.2
______________1 A-351.2
A-352.1
LOUVERED HVAC UQUIPMENT SCREEN
ASHP PER MEP DESIGN OPTION 1
A-352.1
______________4 A-352.1
EXISTING (AXON, PLAN OR ELEVATION - NOT CUT)
EXISTING (PLAN OR SECTION - CUT)
NEW CONSTRUCTION GRAPHIC LEGEND
1. DEMOLITION MAY REVEAL UNEXPECTED OR DIFFERING
CONDITIONS FROM THOSE SHOWN IN THESE
DOCUMENTS.
2. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN
WRITING OF ANY CONDITIONS DIFFEREING FROM THOSE
INDICATED IN THE PLANS, AND WAIT FOR WRITTEN
INSTRUCTIONS BEFORE PROCEEDING.
3. DRAWINGS SHOW BUILDING ENVELOPE DESIGN OPTION 1.
PLEASE SEE PROJECT NARRATIVE FOR ALTERNATE
DESIGN OPTION DESCRIPTIONS.
GENERAL PLAN SHEET NOTES
0 16' 32' 1/16"=1'-0"
True North
Plan North
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .