76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf

PDF 171 KB Posted

Attached to
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
Solicitation number
47PB0024R0049
Issued by

About this file

This document is a Pre-Proposal Site Visit Attendance Sheet for a Construction Manager as Constructor (CMc) services contract solicitation (Solicitation Number: 47PB0024R0049) for the Houlton Land Port of Entry repair and alteration project in Houlton, Maine.

The solicitation is for CMc/CMAR services, including design and construction phase services, for a Facilities Repair and Alterations project at the Houlton, Maine Land Port of Entry. The project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. The magnitude of construction is estimated between $22-$32 million. The solicitation is not set aside for Small Businesses, but both Small and Large Businesses are encouraged to participate. Proposals are due by November 11, 2024 at 2:00 PM EST. A pre-proposal conference was held on October 10, 2024 and a pre-proposal site visit was held on October 17, 2024, as documented by this attendance sheet.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf PDF
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf PDF
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
83 Exhibit G.1_MEPFP_Equipment.pdf PDF
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
73. Contract Price Form Spreadsheet 2024 08 28.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Site Visit Attendance Sheet

Construction Manager as Constructor (CMc), Repairs and Alterations - 47PB0024R0049

27 Customs Loop, Houlton, ME 04730

Thursday, October 17, 2024, at 1:00 PM EST

Government

Name Organization Phone Email

Murphy, Paul GSA – 1PQE (617) 513-6954 paul.murphy@gsa.gov

Perez, Kenneth GSA – 1PCTA (617) 531-2644 kenneth.perez@gsa.gov

Schaefer, Brian Schaefer GSA - 1PSK (207) 694-3808 brian.schaefer@gsa.gov

Contractors

Name Organization Phone Email

Bell, Jamie SFE Construction Services (207) 540-0668 jamie@sfemfg.com

Bishop, James SFE Construction Services (207) 902-0438 james@sfemfg.com

Bouchard, Jeff SFE Construction Services (207) 227-8692 jeff@sfemfg.com

Cartier, Jocelyn Phoenix Welding (207) 747-9518 jcartier@phoenixwelding.com

Cummings, Bruce AZ Corp, a Cianbro Company (207) 416-9589 BCUMMING@cianbro.com

Desmarais, Todd AZ Corp, a Cianbro Company (207) 614-4342 TDESMARA@cianbro.com mailto:paul.murphy@gsa.gov mailto:kenneth.perez@gsa.gov mailto:brian.schaefer@gsa.gov mailto:jamie@sfemfg.com mailto:james@sfemfg.com mailto:jeff@sfemfg.com mailto:jcartier@phoenixwelding.com mailto:BCUMMING@cianbro.com mailto:TDESMARA@cianbro.com

Contractors (Continued)

Name Organization Phone Email

Dubay, Patrick Sargent (207) 478-9422 pdubay@sargent.us

Grzynkowicz, Chris William Charles Construction (224) 220-6618 Chris.Grzynkowicz@williamcharles.com

Hallett, Jeffery AZ Corp, a Cianbro Company (207) 907-7509 JHALLETT@cianbro.com

Harriman, Michael LJV Construction Mgmt Services (617) 594-3725 michael@ljvdevelopment.com

Loughman, Shawn Perini Mgt Svs Inc. (508) 846-1112 sloughman@perini.com

Morrell, Doug SFE Construction Services (207) 227-7747 doug@sfemfg.com

Sareault, Steven AZ Corp, a Cianbro Company (603) 801-3023 ssareault@a-zcorp.com

Todd, Tim RL Todd & Son Electrical (207) 496-1671 tim@rltodd.com

I can confirm that the following personnel attended the Houlton Pre-proposal Site Visit held on October 17, 2024.

Paul Murphy Contracts Specialist mailto:pdubay@sargent.us mailto:Chris.Grzynkowicz@williamcharles.com mailto:JHALLETT@cianbro.com mailto:michael@ljvdevelopment.com mailto:sloughman@perini.com mailto:doug@sfemfg.com mailto:ssareault@a-zcorp.com mailto:tim@rltodd.com

File details come from the government source that posted it. Updated .