116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf

PDF 570 KB Posted

Attached to
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
Solicitation number
47PB0024R0049
Issued by

About this file

This file is a P100 Performance Matrix for the Houlton, Maine Land Port of Entry (LPOE) project, detailing baseline and tiered performance requirements across multiple building systems and components. The matrix establishes performance criteria for sustainable features, urban planning, landscape, enclosure, interior finishes, structural elements, mechanical systems, lighting, and electrical systems.

The document specifies that the project will aim to be net-zero-ready for both energy and water within scope limitations. Key technical requirements include MERV 13 filtration, automated air sealing, compliance with ASHRAE 90.1-2019 standards for thermal performance, and baseline commissioning requirements. Interior finishes must meet minimum durability and environmental standards, while mechanical systems must maintain specific temperature ranges (24±2°C cooling, 22±2°C heating) and humidity controls. The matrix indicates that existing building structures will remain largely unmodified except for roof access stair additions, and new facades must be assessed for load transfer capabilities. Physical security requirements specific to LPOE facilities are referenced but details are marked as "LPOE" without further specification in this document.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf PDF
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
83 Exhibit G.1_MEPFP_Equipment.pdf PDF
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
73. Contract Price Form Spreadsheet 2024 08 28.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

swinslow Text Box

EXHIBIT K

Created March 2022 Page 1

Project Title: 47PB00-23-F-0129 Houlton ME LPOE Location: Houlton, Maine Current Phase: Concept Design Review Date: 11/22/2024 Project Manager: Kenneth Perez

2021 P100 Performance Matrix Place an X for each requirement

Attribute

B as el in e

Ti er

N /A

Notes (Describe how design meets performance or any waivers from a requirement)

1.9.1 Sustainable Performance Requirements

Energy

Energy Net Zero x Not in Contract (NIC), project will aim to be net-zero-ready in such that scope allows.

Water

Water Net Zero x NIC, project will aim to be net-zero-ready in such that scope allows.

High Performance Building Technologies

GSA Proving Ground x The A/E team recommends the use of Automated Air Sealing.

Construction Personnel

Green Credentialed x When appropriate the team will investigate project market for contractor and subcontractors certified by a green builder program recognized in the LEED rating system.

Fenestration

Created March 2022 Page 2

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Daylight and Views x NIC

2.1 Urban Planning and Public Use Performance Requirements

Sustainable Locations

Site Uses Existing Local Infrastructure Resources and Preserves Natural Resources x

NIC

Site Supports Neighborhood Connectivity, Walkability, and Transportation Access x

NIC

Design for Public Use

Interior x NIC

Exterior x NIC

2.4 Landscape Performance Requirements

Site Performance

Site Materials x NIC

Site Soils x NIC

Vegetation x NIC

Pollinators x NIC

3.1 Enclosure Performance Requirements

Envelope – Natural Hazard

Created March 2022 Page 3

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Seismic Resistance x

Windborne Debris Resistance x

Flood Resistance x Existing Building Locations to Remain, please also refer to Exhibit G

Envelope – Serviceability

Wind Resistance x

Water Penetration Resistance

Fenestration x

Roofing and Horizontal Waterproofing-Membrane System x

Roofing and Horizontal Waterproofing-Minimum Slope x

Roofing and Horizontal Waterproofing- Drainage x

Roofing and Horizontal Waterproofing-Green Roof x NIC

Roofing and Horizontal Waterproofing-Testing & Monitoring x

Ground Water Control x NIC

Below Grade Waterproofing x NIC

Moisture and Condensation Control

Moisture Control Opaque Assemblies x Note: Provision for vapor barrier under slab is not feasible as this is an existing building.

Created March 2022 Page 4

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Condensation Resistance Fenestration x

Air Tightness

Fenestration x

Enclosure Airtightness x

Thermal Performance

Thermal Performance x

Baseline thermal performance values require compliance with ASHRAE 90.1-2019 section 5.5. Proposed design will meet some of the requirements and deviate on other requirements as listed in ASHRAE 90.1. Regardless, proposed design will meet or exceed GSA energy performance requirements.

Reasons for deviations from ASHRAE 90.1 values are following:

- Thermal performance of proposed design uses IECC 2015 per Maine energy code to meet the requirements for “Modernization”. Some values differ from baseline ASHRAE 90.1 targets for climate zone 7. During Concept Phase Energy Modeling, this performance will be validated against required building energy performance and various options validated vis-à-vis the energy modeling and LCCA processes.

- For fixed glazing (windows, storefront) and glazed entrance doors, there is a requirement to meet the minimum FEBR performance. With the ballistic and forced entry requirements, feasible thermal performance is lower than recommended by

ASHRAE 90.1.

Created March 2022 Page 5

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Building Enclosure Commissioning

Building Enclosure Commissioning x Baseline commissioning is presumed acceptable, will evaluate with GSA.

Enclosure Acoustic Control

Acoustic Control Assuming NC-35 interior x Need GSA guidance implementation in field. Acoustic testing or engineering assessment.

Enclosure Service Life

Walls x

Roofs x

Fenestration x

3.4 Interior Performance Requirements

Solid Core Wood Doors

Construction x

Durability x

Hardware x

Frame x

Security x

Hollow Metal Doors Hollow metal doors will meet at a minimum the baseline requirements. Doors and frames shall be constructed of hot

Created March 2022 Page 6

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement) dipped zinc coated steel sheet, complying with ASTM A653, commercial steel, Type B, minimum A40 coating weight; factory primed. Anchors and accessories shall be zinc coated. Frames in masonry shall have bituminous back coating, plaster guards, and shall be grouted solid. Fire-rated openings shall comply with NFPA 80, and the requirements of the labeling authority.

Construction x

Durability x

Hardware x

Frame x

Security x

Glazed Aluminum Doors

Glazed aluminum doors will meet at a minimum the base line requirements. Swing-type aluminum doors and storefront frames should be sized and designed to withstand minimum design wind load, and with resulting design pressure determined in accordance with the International Building Code (IBC). Deflection shall be limited to not more than 1/175 times the length of the member, with a safety factor of not less than 1.65. The doors need glazing beads, moldings, and trim of not less than 0.050” nominal thickness. Doors should be complete with frames, framing members, subframes, transoms, adjoining sidelights, adjoining window wall, trim, and accessories. Windows should be made with insulating glass and thermal break to achieve no water penetration at a pressure of 8 pounds per square foot of fixed area, and air infiltration not to exceed 0.06 cubic feet per minute per square foot of fixed area at a test pressure of 6.24 pounds per square foot. The finish shall be Architectural Class I

Created March 2022 Page 7

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement) anodic coating or American Architectural Manufacturers Association (AAMA) 2605 organic coating.

Construction x

Durability x

Hardware x

Glazing x

Security x

All Glass Entrances

Construction x NIC

Durability x NIC

Hardware x NIC

Glazing x NIC

Security x NIC

Borrowed Lights

Glazing x

Wood Framed Interior Lights

Construction x NIC

Glazing x NIC

Created March 2022 Page 8

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Hollow Metal Framed Interior Lights

Construction x

Frame x

Glazing x

Aluminum Framed Interior Lights

Construction x

Frame x

Glazing x

Metal Stud Partitions

Construction LPOE

Durability LPOE

Height LPOE

Security LPOE

Environmental x

Masonry Partitions

Construction LPOE

Durability LPOE

Security LPOE

Created March 2022 Page 9

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Environmental x

Demountable Partitions

Construction x NIC

Operable Walls

Construction x NIC

Operation x NIC

Millwork and Cabinets

Construction x NIC

Durability x NIC

Quality x

Countertops

Construction LPOE x NIC

Durability LPOE x NIC

Quality LPOE x NIC

3.4 Interior Performance Requirements (cont.)

A minimum of interior finishes are expected to be required to complement the Houlton ME LPOE renovation scope. Interior finishes will at a minimum meet baseline requirements and/or be replaced in kind.

Broadloom/Carpet Tile

Created March 2022 Page 10

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Durability x

Durability (Fiber) x

Service Life x

Environmental x

Vinyl Composition Tile

Durability x

Static Load x

Maintenance x

Service Life x

Environmental x

Sheet Vinyl

Durability x

Static load x

Maintenance x

Service Life x

Environmental x

Rubber Tile

Durability x

Created March 2022 Page 11

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Static load x

Maintenance x

Service Life x

Environmental x

Linoleum

Durability x

Static Load x

Maintenance x

Service Life x

Environmental x

Luxury Vinyl Tile

Durability x

Static Load x

Maintenance x

Service Life x

Environmental x

Porcelain Tile

Created March 2022 Page 12

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Durability - Abrasion x

Durability - Water x

Durability - Breakage x

Maintenance - Stain x

Maintenance - Chemical x

Service Life x

Environmental x

Quarry Tile

Durability x

Durability - Abrasion x

Durability - Water x

Durability - Breakage x

Maintenance - Stain x

Maintenance - Chemical x

Service Life x

Environmental x

Mosaic Tile

Created March 2022 Page 13

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Durability - Abrasion x

Durability - Water x

Durability - Breakage x

Maintenance - Stain x

Maintenance - Chemical x

Service Life x

Environmental x

Limestone Tile

Durability x

Maintenance x

Slate Tile

Durability x

Maintenance x

Marble

Durability x

Maintenance x

Granite

Created March 2022 Page 14

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Maintenance x

Terrazzo

Durability x

Durability - Abrasion x

Maintenance x

Environmental x

Laminate Flooring

Durability x

Durability – Static Load x

Maintenance x

Service Life x

Environmental x

Environmental – Recycled Content x

Wood Flooring

Durability x

Maintenance x

Environmental x

Bamboo Flooring

Created March 2022 Page 15

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Durability x

Maintenance x

Environmental x

Glazed Wall Tile

Durability x

Durability - Absorption x

Maintenance x

Service Life x

Environmental x

Interior Architectural Coatings

Environmental x

Exterior Architectural Coatings

Durability x

Environmental x

Wall Covering – Type II

Durability x

Maintenance x

Environmental – Wall Covering x

Created March 2022 Page 16

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Environmental – Ceiling and Wall Assemblies x

Environmental – Adhesives and Sealants x

Wall Paneling Plastic/Laminate

Durability x

Durability - Abrasion x

Maintenance x

Service Life x

Environmental x

Environmental – Recycled Content x

Wall Paneling Wood

Durability x

Maintenance x

Environmental x

Wall Paneling/Composite Board

Durability x

Maintenance x

Environmental x

Environmental - BioPreferred x

Created March 2022 Page 17

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Wall Paneling Sculptural

Durability x

Maintenance x

Environmental x

Environmental - BioPreferred x

Wall Base

Durability x

Maintenance x

Service Life x

Environmental x

Acoustical Ceilings

Surface Texture x

Open Office NRC x

Open Office CAC x

Enclosed Office NRC x

Enclosed Office CAC x

Durability – Impact Resistance x

Durability – Moisture Resistance x

Created March 2022 Page 18

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Maintenance x

Service Life x

Environmental – Recycled Content x

Environmental – Recyclability x

Environmental – BioPreferred x

Environmental – Light Reflectance x

Environmental – Low Emitting x

Environmental – EPD x

Environmental – Ingredient Disclosure x

4.1 Structural Performance Requirements

Live Load

Uniform Floor Loading x NA

Seismic

Structure X

Existing structure will not be modified other than addition of roof access stair opening in Main Port Building. Existing facades to be replaced will be assessed for resistance and ability to transfer loads to superstructure as required by code. Proposed alterations will be designed to increase building lateral loads by less than 10% to avoid triggering building lateral upgrades.

Nonstructural X

Created March 2022 Page 19

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Wind

Structure X

Existing facades to be replaced will be assessed for resistance and ability to transfer loads to superstructure as required by code. Proposed bulkhead and screenwall additions will be designed to increase building lateral loads by less than 10% to avoid triggering building lateral upgrades.

Vibrations

Serviceability X

All structures are unmodified in their existing structure related to vibrations. Addition of interior stair access to roof level at Main Port Building is not expected to negatively affect existing vibration characteristics.

4.4 Physical Security Performance Requirements

Security

Physical Security Performance LPOE

4.6 Civil Performance Requirements

Flood

Flood Mitigation x

5.1 Mechanical Performance Requirements

Temperature

Performance x 24±2ºC (75±3ºF) cooling, 22±2ºC (72±3ºF) heating, Created March 2022 Page 20

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Allowance for unoccupied hour setup and setback optimized with re-occupancy pick-up and pull-down energy demands within a range of 13ºC to 28ºC (55ºF to 83ºF).

Thermal zones limited to 42 m2 (450 ft2) at the perimeter 5m

(15ft) (or no more than 3 private offices for the interior

Humidity Control

Performance x Maximum 55F dew point – occupied, 60F dew point – unoccupied

Air Movement

Performance x Less than 0.2 m/s (40 fpm) at occupied level

Pressure

Performance x Positive building pressure when occupied, and when outside dew point is higher than 8ºC (47ºF) when unoccupied.

Ventilation

Performance X Standard 62.1 Ventilation Rate Procedure only Air Flow Measurement Stations (AFMS) on VAV systems

Filtration

Performance x

Pleated MERV 13 filters for 100% recirculation air terminal units such as fan coil units (both Dx and hydronic), and fan powered boxes. Pleated MERV 8 prefilters, and bag MERV 13 final filters for all central air handling units and DOAS/ERVs with the exception of DOAS/ERVs units that have direct connections to air handlers with MERV 13 filters. Direct connect DOAS/ERV’s must

Created March 2022 Page 21

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement) have MERV 11 filters. UV Lights for all central air handling unit cooling coils, including DOAS units. For Locations where Operational Management and Design for Smoke Migration Risk from Wildfires are determined to be part of the project scope, the HVAC unit filter module must be ready capable for installation of carbon air filters and the outdoor air intake/ductwork must have permanent filter racks capable for installation of MERV 13 filters. See P100 section on Building Security Performance Requirements for the Interagency Security Committee (ISC) Standard filter requirements that supersede these requirements based on the building Facility Security Level.

HVAC Noise Control

Performance x Comply with ASHRAE Applications Chapter 48, Table 1

HVAC Operational Efficiency

Equipment Performance x Comply with ASHRAE 90.1-Minimum Efficiencies and FEMP

Fan Energy Performance x 5% Below ASHRAE 90.1-Fan System Power Limitation Requirements

HVAC Energy Metering x Install on 50% of HVAC Energy

Whole Building Metering x All major utilities

6.1 Lighting Performance Requirements

Lighting Quality – Interior

Luminance Balance x Design to meet min. 40:1 luminance ratio at task level using photometric calculation software.

Created March 2022 Page 22

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

CCT x Fixtures to be selected with color temperature of <4100K.

CRI x Fixtures to be selected with a color rendering index of 80 or greater.

Fidelity (Rf) x x Lighting color fidelity is N/A to baseline design.

Color Saturation (Rg) x x Lighting color saturation is N/A to baseline design.

Human Centric Lighting x x Human centric lighting design is N/A to baseline design.

Lighting Quality – Exterior

CCT x Fixtures to be selected with color temperature of <3500K.

CRI LPOE

Fixtures to be selected with a color rendering index of 70 or greater.

Light Pollution/Light Trespass x Lighting fixtures to be selected with BUG rating meeting zone code requirements.

Lighting Quantity - Interior

Illuminance – Horizontal x Lighting to be designed to meet IES handbook illuminance levels.

Illuminance – Vertical x Lighting to be designed to meet IES handbook illuminance levels.

Lighting Quantity – Exterior

Illuminance – Horizontal x Lighting to be designed to meet IES handbook illuminance levels.

Illuminance – Vertical x Lighting to be designed to meet IES handbook illuminance levels.

Lighting Energy Use – Interior

Created March 2022 Page 23

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Controls x Lighting controls to be designed to meet ASHRAE 90.1 requirements by utilizing automatic controls and sensors.

Energy Use x Lighting energy use to be demonstrated by project energy model.

Lighting Energy Use – Exterior

Controls x Lighting controls to be designed to meet ASHRAE 90.1 requirements by utilizing automatic controls, sensors, and time clock to dim fixture to 50% at nighttime setback.

Energy Use x Lighting energy use to be demonstrated by project energy model.

Power Quality

Power Factor (Full Light Output) x Fixtures to be selected with power factor of >0.90 at full light output.

Power Factor (Fully Dimmed) x Fixtures to be selected with power factor of >0.75 at fully dimmed.

Total Harmonic Distortion at the LED Driver (Full Light Output) x Fixtures to be selected with THD of <20% at full light output.

Total Harmonic Distortion at the LED Driver (Fully Dimmed) x Fixtures to be selected with THD of <30% at fully dimmed.

Wiring x System to be specified with separate neutral conductor for each branch circuit.

Maintenance

Equipment Life x Equipment to be specified with min. 5 yr warranty.

Created March 2022 Page 24

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Accessibility x Light fixtures will follow architect’s ceiling height design.

Diagnostics x x Diagnostics are N/A to baseline design.

6.4 Electrical Performance Requirements

Transformers

Efficiencies for Network and Substation Transformers x Network transformers will meet all utility company requirements but be designed to meet 10 CFR 431 Part 196 where possible.

Insulating Fluid x Network transformers will meet all utility company requirements but be designed to utilize65 degree biobased oil where possible.

Efficiencies for Low-Voltage Distribution x Transformers will be specified to meet 10 CFR 431 Part 196.

Impedance for Low-Voltage Distribution x Transformers will be specified to have an impedance of >4%

Harmonic Rated & Mitigating Transformers x Where harmonic rated transformers are used, they will be specified to be a zigzag construction and have an impedance of >4% with 3rd harmonic mitigation

Variable Frequency Drives

Up to 25 HP x VFD to be specified as 6-pulse width modulation (PWM) IGBT Drives, Passive Harmonic Filtration <5% THD Current at Drive Terminals.

30 to 100 HP x VFD to be specified as 6-pulse width modulation (PWM) IGBT Drives, Passive Harmonic Filtration <5% THD Current at Drive Terminals

Created March 2022 Page 25

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

125hp and larger x VFD to be specified as 12-pulse width modulation IGBT Drives with integral input phase shifting transformers (PWM), <= 5% THD Current at Drive Terminals

Metering/Monitoring

Metering/Monitoring x

Metering to be specified to meet ASHRAE 90.1 requirements. The power meter will be specified as pulse-type and digital networked and/or tied into any available Advanced Metering System.

Building Automation System

Electrical Meter Input x BAS interfaces will be specified to be MODBUS/TCP/IP Protocol Meters/BACnet/LonWorks protocol Meters to match BAS with twisted pair to BAS for monitoring where required.

PV System Input x There are no PV systems planned for this project.

Automatic Transfer Switches Input x x ATS requirements are N/A for a baseline design.

Standby Generator Input x x Generator BAS input requirements are N/A for a baseline design.

Uninterruptible Power Systems Input x x UPS BAS input requirements are N/A for a baseline design.

Variable Frequency Drives Input x x VFD BAS input requirements are N/A for a baseline design.

Motor Starters Input x x Motor starter BAS input requirements are N/A for a baseline design.

Additional Computer-Based BAS Interface x If additional BAS interface is required it will be specified to be DDC using BACnet or LonTalk open communication protocols.

Created March 2022 Page 26

Attribute

B as el

Notes (Describe how design meets performance or any waivers from a requirement)

Additional Computer-Based BAS Energy Management x Energy management & monitoring software to be specified by BAS designer if within project scope.