116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf
PDF 570 KB Posted
- Attached to
- Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
- Solicitation number
- 47PB0024R0049
About this file
This file is a P100 Performance Matrix for the Houlton, Maine Land Port of Entry (LPOE) project, detailing baseline and tiered performance requirements across multiple building systems and components. The matrix establishes performance criteria for sustainable features, urban planning, landscape, enclosure, interior finishes, structural elements, mechanical systems, lighting, and electrical systems.
The document specifies that the project will aim to be net-zero-ready for both energy and water within scope limitations. Key technical requirements include MERV 13 filtration, automated air sealing, compliance with ASHRAE 90.1-2019 standards for thermal performance, and baseline commissioning requirements. Interior finishes must meet minimum durability and environmental standards, while mechanical systems must maintain specific temperature ranges (24±2°C cooling, 22±2°C heating) and humidity controls. The matrix indicates that existing building structures will remain largely unmodified except for roof access stair additions, and new facades must be assessed for load transfer capabilities. Physical security requirements specific to LPOE facilities are referenced but details are marked as "LPOE" without further specification in this document.
View the file
Other files
Show 40 more
Latest 50 of 108 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
swinslow Text Box
EXHIBIT K
Created March 2022 Page 1
Project Title: 47PB00-23-F-0129 Houlton ME LPOE Location: Houlton, Maine Current Phase: Concept Design Review Date: 11/22/2024 Project Manager: Kenneth Perez
2021 P100 Performance Matrix Place an X for each requirement
Attribute
B as el in e
Ti er
N /A
Notes (Describe how design meets performance or any waivers from a requirement)
1.9.1 Sustainable Performance Requirements
Energy
Energy Net Zero x Not in Contract (NIC), project will aim to be net-zero-ready in such that scope allows.
Water
Water Net Zero x NIC, project will aim to be net-zero-ready in such that scope allows.
High Performance Building Technologies
GSA Proving Ground x The A/E team recommends the use of Automated Air Sealing.
Construction Personnel
Green Credentialed x When appropriate the team will investigate project market for contractor and subcontractors certified by a green builder program recognized in the LEED rating system.
Fenestration
Created March 2022 Page 2
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Daylight and Views x NIC
2.1 Urban Planning and Public Use Performance Requirements
Sustainable Locations
Site Uses Existing Local Infrastructure Resources and Preserves Natural Resources x
NIC
Site Supports Neighborhood Connectivity, Walkability, and Transportation Access x
NIC
Design for Public Use
Interior x NIC
Exterior x NIC
2.4 Landscape Performance Requirements
Site Performance
Site Materials x NIC
Site Soils x NIC
Vegetation x NIC
Pollinators x NIC
3.1 Enclosure Performance Requirements
Envelope – Natural Hazard
Created March 2022 Page 3
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Seismic Resistance x
Windborne Debris Resistance x
Flood Resistance x Existing Building Locations to Remain, please also refer to Exhibit G
Envelope – Serviceability
Wind Resistance x
Water Penetration Resistance
Fenestration x
Roofing and Horizontal Waterproofing-Membrane System x
Roofing and Horizontal Waterproofing-Minimum Slope x
Roofing and Horizontal Waterproofing- Drainage x
Roofing and Horizontal Waterproofing-Green Roof x NIC
Roofing and Horizontal Waterproofing-Testing & Monitoring x
Ground Water Control x NIC
Below Grade Waterproofing x NIC
Moisture and Condensation Control
Moisture Control Opaque Assemblies x Note: Provision for vapor barrier under slab is not feasible as this is an existing building.
Created March 2022 Page 4
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Condensation Resistance Fenestration x
Air Tightness
Fenestration x
Enclosure Airtightness x
Thermal Performance
Thermal Performance x
Baseline thermal performance values require compliance with ASHRAE 90.1-2019 section 5.5. Proposed design will meet some of the requirements and deviate on other requirements as listed in ASHRAE 90.1. Regardless, proposed design will meet or exceed GSA energy performance requirements.
Reasons for deviations from ASHRAE 90.1 values are following:
- Thermal performance of proposed design uses IECC 2015 per Maine energy code to meet the requirements for “Modernization”. Some values differ from baseline ASHRAE 90.1 targets for climate zone 7. During Concept Phase Energy Modeling, this performance will be validated against required building energy performance and various options validated vis-à-vis the energy modeling and LCCA processes.
- For fixed glazing (windows, storefront) and glazed entrance doors, there is a requirement to meet the minimum FEBR performance. With the ballistic and forced entry requirements, feasible thermal performance is lower than recommended by
ASHRAE 90.1.
Created March 2022 Page 5
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Building Enclosure Commissioning
Building Enclosure Commissioning x Baseline commissioning is presumed acceptable, will evaluate with GSA.
Enclosure Acoustic Control
Acoustic Control Assuming NC-35 interior x Need GSA guidance implementation in field. Acoustic testing or engineering assessment.
Enclosure Service Life
Walls x
Roofs x
Fenestration x
3.4 Interior Performance Requirements
Solid Core Wood Doors
Construction x
Durability x
Hardware x
Frame x
Security x
Hollow Metal Doors Hollow metal doors will meet at a minimum the baseline requirements. Doors and frames shall be constructed of hot
Created March 2022 Page 6
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement) dipped zinc coated steel sheet, complying with ASTM A653, commercial steel, Type B, minimum A40 coating weight; factory primed. Anchors and accessories shall be zinc coated. Frames in masonry shall have bituminous back coating, plaster guards, and shall be grouted solid. Fire-rated openings shall comply with NFPA 80, and the requirements of the labeling authority.
Construction x
Durability x
Hardware x
Frame x
Security x
Glazed Aluminum Doors
Glazed aluminum doors will meet at a minimum the base line requirements. Swing-type aluminum doors and storefront frames should be sized and designed to withstand minimum design wind load, and with resulting design pressure determined in accordance with the International Building Code (IBC). Deflection shall be limited to not more than 1/175 times the length of the member, with a safety factor of not less than 1.65. The doors need glazing beads, moldings, and trim of not less than 0.050” nominal thickness. Doors should be complete with frames, framing members, subframes, transoms, adjoining sidelights, adjoining window wall, trim, and accessories. Windows should be made with insulating glass and thermal break to achieve no water penetration at a pressure of 8 pounds per square foot of fixed area, and air infiltration not to exceed 0.06 cubic feet per minute per square foot of fixed area at a test pressure of 6.24 pounds per square foot. The finish shall be Architectural Class I
Created March 2022 Page 7
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement) anodic coating or American Architectural Manufacturers Association (AAMA) 2605 organic coating.
Construction x
Durability x
Hardware x
Glazing x
Security x
All Glass Entrances
Construction x NIC
Durability x NIC
Hardware x NIC
Glazing x NIC
Security x NIC
Borrowed Lights
Glazing x
Wood Framed Interior Lights
Construction x NIC
Glazing x NIC
Created March 2022 Page 8
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Hollow Metal Framed Interior Lights
Construction x
Frame x
Glazing x
Aluminum Framed Interior Lights
Construction x
Frame x
Glazing x
Metal Stud Partitions
Construction LPOE
Durability LPOE
Height LPOE
Security LPOE
Environmental x
Masonry Partitions
Construction LPOE
Durability LPOE
Security LPOE
Created March 2022 Page 9
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Environmental x
Demountable Partitions
Construction x NIC
Operable Walls
Construction x NIC
Operation x NIC
Millwork and Cabinets
Construction x NIC
Durability x NIC
Quality x
Countertops
Construction LPOE x NIC
Durability LPOE x NIC
Quality LPOE x NIC
3.4 Interior Performance Requirements (cont.)
A minimum of interior finishes are expected to be required to complement the Houlton ME LPOE renovation scope. Interior finishes will at a minimum meet baseline requirements and/or be replaced in kind.
Broadloom/Carpet Tile
Created March 2022 Page 10
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Durability x
Durability (Fiber) x
Service Life x
Environmental x
Vinyl Composition Tile
Durability x
Static Load x
Maintenance x
Service Life x
Environmental x
Sheet Vinyl
Durability x
Static load x
Maintenance x
Service Life x
Environmental x
Rubber Tile
Durability x
Created March 2022 Page 11
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Static load x
Maintenance x
Service Life x
Environmental x
Linoleum
Durability x
Static Load x
Maintenance x
Service Life x
Environmental x
Luxury Vinyl Tile
Durability x
Static Load x
Maintenance x
Service Life x
Environmental x
Porcelain Tile
Created March 2022 Page 12
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Durability - Abrasion x
Durability - Water x
Durability - Breakage x
Maintenance - Stain x
Maintenance - Chemical x
Service Life x
Environmental x
Quarry Tile
Durability x
Durability - Abrasion x
Durability - Water x
Durability - Breakage x
Maintenance - Stain x
Maintenance - Chemical x
Service Life x
Environmental x
Mosaic Tile
Created March 2022 Page 13
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Durability - Abrasion x
Durability - Water x
Durability - Breakage x
Maintenance - Stain x
Maintenance - Chemical x
Service Life x
Environmental x
Limestone Tile
Durability x
Maintenance x
Slate Tile
Durability x
Maintenance x
Marble
Durability x
Maintenance x
Granite
Created March 2022 Page 14
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Maintenance x
Terrazzo
Durability x
Durability - Abrasion x
Maintenance x
Environmental x
Laminate Flooring
Durability x
Durability – Static Load x
Maintenance x
Service Life x
Environmental x
Environmental – Recycled Content x
Wood Flooring
Durability x
Maintenance x
Environmental x
Bamboo Flooring
Created March 2022 Page 15
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Durability x
Maintenance x
Environmental x
Glazed Wall Tile
Durability x
Durability - Absorption x
Maintenance x
Service Life x
Environmental x
Interior Architectural Coatings
Environmental x
Exterior Architectural Coatings
Durability x
Environmental x
Wall Covering – Type II
Durability x
Maintenance x
Environmental – Wall Covering x
Created March 2022 Page 16
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Environmental – Ceiling and Wall Assemblies x
Environmental – Adhesives and Sealants x
Wall Paneling Plastic/Laminate
Durability x
Durability - Abrasion x
Maintenance x
Service Life x
Environmental x
Environmental – Recycled Content x
Wall Paneling Wood
Durability x
Maintenance x
Environmental x
Wall Paneling/Composite Board
Durability x
Maintenance x
Environmental x
Environmental - BioPreferred x
Created March 2022 Page 17
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Wall Paneling Sculptural
Durability x
Maintenance x
Environmental x
Environmental - BioPreferred x
Wall Base
Durability x
Maintenance x
Service Life x
Environmental x
Acoustical Ceilings
Surface Texture x
Open Office NRC x
Open Office CAC x
Enclosed Office NRC x
Enclosed Office CAC x
Durability – Impact Resistance x
Durability – Moisture Resistance x
Created March 2022 Page 18
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Maintenance x
Service Life x
Environmental – Recycled Content x
Environmental – Recyclability x
Environmental – BioPreferred x
Environmental – Light Reflectance x
Environmental – Low Emitting x
Environmental – EPD x
Environmental – Ingredient Disclosure x
4.1 Structural Performance Requirements
Live Load
Uniform Floor Loading x NA
Seismic
Structure X
Existing structure will not be modified other than addition of roof access stair opening in Main Port Building. Existing facades to be replaced will be assessed for resistance and ability to transfer loads to superstructure as required by code. Proposed alterations will be designed to increase building lateral loads by less than 10% to avoid triggering building lateral upgrades.
Nonstructural X
Created March 2022 Page 19
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Wind
Structure X
Existing facades to be replaced will be assessed for resistance and ability to transfer loads to superstructure as required by code. Proposed bulkhead and screenwall additions will be designed to increase building lateral loads by less than 10% to avoid triggering building lateral upgrades.
Vibrations
Serviceability X
All structures are unmodified in their existing structure related to vibrations. Addition of interior stair access to roof level at Main Port Building is not expected to negatively affect existing vibration characteristics.
4.4 Physical Security Performance Requirements
Security
Physical Security Performance LPOE
4.6 Civil Performance Requirements
Flood
Flood Mitigation x
5.1 Mechanical Performance Requirements
Temperature
Performance x 24±2ºC (75±3ºF) cooling, 22±2ºC (72±3ºF) heating, Created March 2022 Page 20
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Allowance for unoccupied hour setup and setback optimized with re-occupancy pick-up and pull-down energy demands within a range of 13ºC to 28ºC (55ºF to 83ºF).
Thermal zones limited to 42 m2 (450 ft2) at the perimeter 5m
(15ft) (or no more than 3 private offices for the interior
Humidity Control
Performance x Maximum 55F dew point – occupied, 60F dew point – unoccupied
Air Movement
Performance x Less than 0.2 m/s (40 fpm) at occupied level
Pressure
Performance x Positive building pressure when occupied, and when outside dew point is higher than 8ºC (47ºF) when unoccupied.
Ventilation
Performance X Standard 62.1 Ventilation Rate Procedure only Air Flow Measurement Stations (AFMS) on VAV systems
Filtration
Performance x
Pleated MERV 13 filters for 100% recirculation air terminal units such as fan coil units (both Dx and hydronic), and fan powered boxes. Pleated MERV 8 prefilters, and bag MERV 13 final filters for all central air handling units and DOAS/ERVs with the exception of DOAS/ERVs units that have direct connections to air handlers with MERV 13 filters. Direct connect DOAS/ERV’s must
Created March 2022 Page 21
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement) have MERV 11 filters. UV Lights for all central air handling unit cooling coils, including DOAS units. For Locations where Operational Management and Design for Smoke Migration Risk from Wildfires are determined to be part of the project scope, the HVAC unit filter module must be ready capable for installation of carbon air filters and the outdoor air intake/ductwork must have permanent filter racks capable for installation of MERV 13 filters. See P100 section on Building Security Performance Requirements for the Interagency Security Committee (ISC) Standard filter requirements that supersede these requirements based on the building Facility Security Level.
HVAC Noise Control
Performance x Comply with ASHRAE Applications Chapter 48, Table 1
HVAC Operational Efficiency
Equipment Performance x Comply with ASHRAE 90.1-Minimum Efficiencies and FEMP
Fan Energy Performance x 5% Below ASHRAE 90.1-Fan System Power Limitation Requirements
HVAC Energy Metering x Install on 50% of HVAC Energy
Whole Building Metering x All major utilities
6.1 Lighting Performance Requirements
Lighting Quality – Interior
Luminance Balance x Design to meet min. 40:1 luminance ratio at task level using photometric calculation software.
Created March 2022 Page 22
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
CCT x Fixtures to be selected with color temperature of <4100K.
CRI x Fixtures to be selected with a color rendering index of 80 or greater.
Fidelity (Rf) x x Lighting color fidelity is N/A to baseline design.
Color Saturation (Rg) x x Lighting color saturation is N/A to baseline design.
Human Centric Lighting x x Human centric lighting design is N/A to baseline design.
Lighting Quality – Exterior
CCT x Fixtures to be selected with color temperature of <3500K.
CRI LPOE
Fixtures to be selected with a color rendering index of 70 or greater.
Light Pollution/Light Trespass x Lighting fixtures to be selected with BUG rating meeting zone code requirements.
Lighting Quantity - Interior
Illuminance – Horizontal x Lighting to be designed to meet IES handbook illuminance levels.
Illuminance – Vertical x Lighting to be designed to meet IES handbook illuminance levels.
Lighting Quantity – Exterior
Illuminance – Horizontal x Lighting to be designed to meet IES handbook illuminance levels.
Illuminance – Vertical x Lighting to be designed to meet IES handbook illuminance levels.
Lighting Energy Use – Interior
Created March 2022 Page 23
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Controls x Lighting controls to be designed to meet ASHRAE 90.1 requirements by utilizing automatic controls and sensors.
Energy Use x Lighting energy use to be demonstrated by project energy model.
Lighting Energy Use – Exterior
Controls x Lighting controls to be designed to meet ASHRAE 90.1 requirements by utilizing automatic controls, sensors, and time clock to dim fixture to 50% at nighttime setback.
Energy Use x Lighting energy use to be demonstrated by project energy model.
Power Quality
Power Factor (Full Light Output) x Fixtures to be selected with power factor of >0.90 at full light output.
Power Factor (Fully Dimmed) x Fixtures to be selected with power factor of >0.75 at fully dimmed.
Total Harmonic Distortion at the LED Driver (Full Light Output) x Fixtures to be selected with THD of <20% at full light output.
Total Harmonic Distortion at the LED Driver (Fully Dimmed) x Fixtures to be selected with THD of <30% at fully dimmed.
Wiring x System to be specified with separate neutral conductor for each branch circuit.
Maintenance
Equipment Life x Equipment to be specified with min. 5 yr warranty.
Created March 2022 Page 24
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Accessibility x Light fixtures will follow architect’s ceiling height design.
Diagnostics x x Diagnostics are N/A to baseline design.
6.4 Electrical Performance Requirements
Transformers
Efficiencies for Network and Substation Transformers x Network transformers will meet all utility company requirements but be designed to meet 10 CFR 431 Part 196 where possible.
Insulating Fluid x Network transformers will meet all utility company requirements but be designed to utilize65 degree biobased oil where possible.
Efficiencies for Low-Voltage Distribution x Transformers will be specified to meet 10 CFR 431 Part 196.
Impedance for Low-Voltage Distribution x Transformers will be specified to have an impedance of >4%
Harmonic Rated & Mitigating Transformers x Where harmonic rated transformers are used, they will be specified to be a zigzag construction and have an impedance of >4% with 3rd harmonic mitigation
Variable Frequency Drives
Up to 25 HP x VFD to be specified as 6-pulse width modulation (PWM) IGBT Drives, Passive Harmonic Filtration <5% THD Current at Drive Terminals.
30 to 100 HP x VFD to be specified as 6-pulse width modulation (PWM) IGBT Drives, Passive Harmonic Filtration <5% THD Current at Drive Terminals
Created March 2022 Page 25
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
125hp and larger x VFD to be specified as 12-pulse width modulation IGBT Drives with integral input phase shifting transformers (PWM), <= 5% THD Current at Drive Terminals
Metering/Monitoring
Metering/Monitoring x
Metering to be specified to meet ASHRAE 90.1 requirements. The power meter will be specified as pulse-type and digital networked and/or tied into any available Advanced Metering System.
Building Automation System
Electrical Meter Input x BAS interfaces will be specified to be MODBUS/TCP/IP Protocol Meters/BACnet/LonWorks protocol Meters to match BAS with twisted pair to BAS for monitoring where required.
PV System Input x There are no PV systems planned for this project.
Automatic Transfer Switches Input x x ATS requirements are N/A for a baseline design.
Standby Generator Input x x Generator BAS input requirements are N/A for a baseline design.
Uninterruptible Power Systems Input x x UPS BAS input requirements are N/A for a baseline design.
Variable Frequency Drives Input x x VFD BAS input requirements are N/A for a baseline design.
Motor Starters Input x x Motor starter BAS input requirements are N/A for a baseline design.
Additional Computer-Based BAS Interface x If additional BAS interface is required it will be specified to be DDC using BACnet or LonTalk open communication protocols.
Created March 2022 Page 26
Attribute
B as el
Notes (Describe how design meets performance or any waivers from a requirement)
Additional Computer-Based BAS Energy Management x Energy management & monitoring software to be specified by BAS designer if within project scope.