73. Contract Price Form Spreadsheet 2024 08 28.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
Solicitation number
47PB0024R0049
Issued by

About this file

This document is a Contract Price Form Spreadsheet for a federal contract opportunity related to the construction, repair, and alterations of the Houlton Land Port of Entry in Houlton, Maine. The contract opportunity is for Construction Manager as Constructor (CMc) services, which includes design phase and construction phase services. The construction is estimated to be in the range of $22,000,000 to $32,000,000 and is part of the Bipartisan Infrastructure Law (BIL) and targeted for Inflation Reduction Act (IRA) funding. The contract opportunity is not set aside for small businesses, but both small and large businesses are encouraged to participate. The solicitation has a proposal submission deadline of November 11, 2024 at 2:00 PM EST. The price form spreadsheet provides detailed line items for the base bid, bid options, and associated costs for the design, exterior building envelope, life safety, accessibility, mechanical, electrical, and IRA-related work.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf PDF
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf PDF
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
83 Exhibit G.1_MEPFP_Equipment.pdf PDF
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

SummaryPrice
Design Phased Services$ - 0
Base Bid$ - 0
Bid Option 1 - Repair Water Line$ - 0
Bid Option 2 - Primary Emergency Generator$ - 0
Bid Option 3 - Secondry Emergency Generator$ - 0
Bid Option 4 - FDA/GSA/APHIS Building - Exterior Building Envelope$ - 0
Bid Option 5 - Commercial Inspection Building - Exterior Building Envelope$ - 0
Bid Option 6 - FDA/GSA/APHIs Building - Life Safety and Fire Protection$ - 0
Bid Option 7 - Commercial Inspection Building - Life Safety and Fire Protection$ - 0

Design Phased Services

CLINITEMPRICE
CLIN 0001Design Phase Services - Includes All Bid Options$ - 0

Base Bid

CLINITEMPRICE
CLIN 0001Main Port Building Exterior Building (Façade, Roof, Storefront, Windows, Entrances, Exterior Metal Doors, Exterior Frames, Building Sealants) Note: Costs for construction materials included below in CLIN 0002 shall not be duplicated in CLIN 0001.$ - 0
CLIN 0002Target ECW - Acquisition and Installation of low embodied carbon materials (SubCLIN 0002AA + 0002AB + 0002AC + 0002AD)$ - 0
SubCLIN 0002AATarget ECW – Acquisition and installation of low embodied carbon steel and associated expenses$ - 0
SubCLIN 0002ABTarget ECW – Acquisition and installation of low embodied carbon asphalt and associated expenses$ - 0
SubCLIN 0002ACTarget ECW – Acquisition and installation of low embodied carbon glass and associated expenses$ - 0
SubCLIN 0002ADTarget ECW – Acquisition and installation of low embodied carbon concrete and associated expenses$ - 0
CLIN 0003Main Port Building Life Safety and Fire Protection Systems$ - 0
CLIN 0004Main Port Building Acessibility$ - 0
CLIN 0005Main Port Building Mechanical Systems$ - 0
CLIN 0006Main Port Building Electrical Systems (Plus Transformer)$ - 0
CLIN 0007Target ECW - IRA Emerging and Sustainable Technologies$ - 0
Target Estimated Cost of Work (ECW) - (CLIN 0001 + CLIN 0002 + CLIN 0003 + CLIN 0004 + CLIN 0005 + CLIN 0006 + CLIN 0007)$ - 0
CMc Contingency Allowance (CCA) Percentage0%
CCA (Target ECW x CCA Percentage)$ - 0
Fee Percentage0%
Fee (Target ECW x Fee Percentage)$ - 0
CLIN 0008Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee)$ - 0
Total Evaluated Price (CLIN 0001 + CLIN 0007)$ - 0

Bid Option 1

CLINITEMPRICE
CLIN 0001Bid Option 1: Site Systems - Water Line$ - 0
Target Estimated Cost of Work (ECW) - (CLIN 0001)$ - 0
CMc Contingency Allowance (CCA) Percentage0%
CCA (Target ECW x CCA Percentage)$ - 0
Fee Percentage0%
Fee (Target ECW x Fee Percentage)$ - 0
CLIN 0002Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee)$ - 0
Total Evaluated Price (CLIN 0001 + CLIN 0002)$ - 0

Bid Option 2

CLINITEMPRICE
CLIN 0001Bid Option 2: Primary Emergency Generator
Target Estimated Cost of Work (ECW) - (CLIN 0001)
CMc Contingency Allowance (CCA) Percentage0%
CCA (Target ECW x CCA Percentage)
Fee Percentage0%
Fee (Target ECW x Fee Percentage)
CLIN 0002Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee)
Total Evaluated Price (CLIN 0001 + CLIN 0002)

Bid Option 3

CLINITEMPRICE
CLIN 0001Bid Option 3: Secondary Emergency Generator
Target Estimated Cost of Work (ECW) - (CLIN 0001)
CMc Contingency Allowance (CCA) Percentage0%
CCA (Target ECW x CCA Percentage)
Fee Percentage0%
Fee (Target ECW x Fee Percentage)
CLIN 0002Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee)
Total Evaluated Price (CLIN 0001 + CLIN 0002)

Bid Option 4

CLINITEMPRICE
CLIN 0001Bid Option 4: FDA/GSA/APHIS Building - Exterior Building Envelope (Façade, Roof, Storefront, Windows, Entrances, Exterior Metal Doors, Exterior Frames, Building Sealants) Note: Costs for construction materials included below in CLIN 0002 shall not be duplicated in CLIN 0001.
CLIN 0002Target ECW - Acquisition and Installation of low embodied carbon materials (SubCLIN 0002AA + 0002AB + 0002AC + 0002AD)
SubCLIN 0002AATarget ECW – Acquisition and installation of low embodied carbon steel and associated expenses
SubCLIN 0002ABTarget ECW – Acquisition and installation of low embodied carbon asphalt and associated expenses
SubCLIN 0002ACTarget ECW – Acquisition and installation of low embodied carbon glass and associated expenses
SubCLIN 0002ADTarget ECW – Acquisition and installation of low embodied carbon concrete and associated expenses
Target Estimated Cost of Work (ECW) - (CLIN 0001)
CMc Contingency Allowance (CCA) Percentage0%
CCA (Target ECW x CCA Percentage)
Fee Percentage0%
Fee (Target ECW x Fee Percentage)
CLIN 0003Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee)
Total Evaluated Price (CLIN 0001 + CLIN 0003)

Bid Option 5

CLINITEMPRICE
CLIN 0001Bid Option 5: Commercial Inspection Building - Exterior Building Envelope (Façade, Roof, Storefront, Windows, Entrances, Exterior Metal Doors, Exterior Frames, Building Sealants) Note: Costs for construction materials included below in CLIN 0002 shall not be duplicated in CLIN 0001.
CLIN 0002Target ECW - Acquisition and Installation of low embodied carbon materials (SubCLIN 0002AA + 0002AB + 0002AC + 0002AD)
SubCLIN 0002AATarget ECW – Acquisition and installation of low embodied carbon steel and associated expenses
SubCLIN 0002ABTarget ECW – Acquisition and installation of low embodied carbon asphalt and associated expenses
SubCLIN 0002ACTarget ECW – Acquisition and installation of low embodied carbon glass and associated expenses
SubCLIN 0002ADTarget ECW – Acquisition and installation of low embodied carbon concrete and associated expenses
Target Estimated Cost of Work (ECW) - (CLIN 0001)
CMc Contingency Allowance (CCA) Percentage0%
CCA (Target ECW x CCA Percentage)
Fee Percentage0%
Fee (Target ECW x Fee Percentage)
CLIN 0003Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee)
Total Evaluated Price (CLIN 0001 + CLIN 0003)

Bid Option 6

CLINITEMPRICE
CLIN 0001Bid Option 6: FDA/GSA/APHIs Building - Life Safety and Fire Protection
Target Estimated Cost of Work (ECW) - (CLIN 0001)
CMc Contingency Allowance (CCA) Percentage0%
CCA (Target ECW x CCA Percentage)
Fee Percentage0%
Fee (Target ECW x Fee Percentage)
CLIN 0002Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee)
Total Evaluated Price (CLIN 0001 + CLIN 0002)

Bid Option 7

CLINITEMPRICE
CLIN 0001Bid Option 7: Commercial Inspection Building - Life Safety and Fire Protection
Target Estimated Cost of Work (ECW) - (CLIN 0001)
CMc Contingency Allowance (CCA) Percentage0%
CCA (Target ECW x CCA Percentage)
Fee Percentage0%
Fee (Target ECW x Fee Percentage)
CLIN 0002Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee)
Total Evaluated Price (CLIN 0001 + CLIN 0002)

File details come from the government source that posted it. Updated .