73. Contract Price Form Spreadsheet 2024 08 28.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
- Solicitation number
- 47PB0024R0049
About this file
This document is a Contract Price Form Spreadsheet for a federal contract opportunity related to the construction, repair, and alterations of the Houlton Land Port of Entry in Houlton, Maine. The contract opportunity is for Construction Manager as Constructor (CMc) services, which includes design phase and construction phase services. The construction is estimated to be in the range of $22,000,000 to $32,000,000 and is part of the Bipartisan Infrastructure Law (BIL) and targeted for Inflation Reduction Act (IRA) funding. The contract opportunity is not set aside for small businesses, but both small and large businesses are encouraged to participate. The solicitation has a proposal submission deadline of November 11, 2024 at 2:00 PM EST. The price form spreadsheet provides detailed line items for the base bid, bid options, and associated costs for the design, exterior building envelope, life safety, accessibility, mechanical, electrical, and IRA-related work.
View the file
Other files
Show 40 more
Latest 50 of 108 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Summary | Price |
| Design Phased Services | $ - 0 |
| Base Bid | $ - 0 |
| Bid Option 1 - Repair Water Line | $ - 0 |
| Bid Option 2 - Primary Emergency Generator | $ - 0 |
| Bid Option 3 - Secondry Emergency Generator | $ - 0 |
| Bid Option 4 - FDA/GSA/APHIS Building - Exterior Building Envelope | $ - 0 |
| Bid Option 5 - Commercial Inspection Building - Exterior Building Envelope | $ - 0 |
| Bid Option 6 - FDA/GSA/APHIs Building - Life Safety and Fire Protection | $ - 0 |
| Bid Option 7 - Commercial Inspection Building - Life Safety and Fire Protection | $ - 0 |
Design Phased Services
| CLIN | ITEM | PRICE |
| CLIN 0001 | Design Phase Services - Includes All Bid Options | $ - 0 |
Base Bid
| CLIN | ITEM | PRICE |
| CLIN 0001 | Main Port Building Exterior Building (Façade, Roof, Storefront, Windows, Entrances, Exterior Metal Doors, Exterior Frames, Building Sealants) Note: Costs for construction materials included below in CLIN 0002 shall not be duplicated in CLIN 0001. | $ - 0 |
| CLIN 0002 | Target ECW - Acquisition and Installation of low embodied carbon materials (SubCLIN 0002AA + 0002AB + 0002AC + 0002AD) | $ - 0 |
| SubCLIN 0002AA | Target ECW – Acquisition and installation of low embodied carbon steel and associated expenses | $ - 0 |
| SubCLIN 0002AB | Target ECW – Acquisition and installation of low embodied carbon asphalt and associated expenses | $ - 0 |
| SubCLIN 0002AC | Target ECW – Acquisition and installation of low embodied carbon glass and associated expenses | $ - 0 |
| SubCLIN 0002AD | Target ECW – Acquisition and installation of low embodied carbon concrete and associated expenses | $ - 0 |
| CLIN 0003 | Main Port Building Life Safety and Fire Protection Systems | $ - 0 |
| CLIN 0004 | Main Port Building Acessibility | $ - 0 |
| CLIN 0005 | Main Port Building Mechanical Systems | $ - 0 |
| CLIN 0006 | Main Port Building Electrical Systems (Plus Transformer) | $ - 0 |
| CLIN 0007 | Target ECW - IRA Emerging and Sustainable Technologies | $ - 0 |
| Target Estimated Cost of Work (ECW) - (CLIN 0001 + CLIN 0002 + CLIN 0003 + CLIN 0004 + CLIN 0005 + CLIN 0006 + CLIN 0007) | $ - 0 | |
| CMc Contingency Allowance (CCA) Percentage | 0% | |
| CCA (Target ECW x CCA Percentage) | $ - 0 | |
| Fee Percentage | 0% | |
| Fee (Target ECW x Fee Percentage) | $ - 0 | |
| CLIN 0008 | Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee) | $ - 0 |
| Total Evaluated Price (CLIN 0001 + CLIN 0007) | $ - 0 |
Bid Option 1
| CLIN | ITEM | PRICE |
| CLIN 0001 | Bid Option 1: Site Systems - Water Line | $ - 0 |
| Target Estimated Cost of Work (ECW) - (CLIN 0001) | $ - 0 | |
| CMc Contingency Allowance (CCA) Percentage | 0% | |
| CCA (Target ECW x CCA Percentage) | $ - 0 | |
| Fee Percentage | 0% | |
| Fee (Target ECW x Fee Percentage) | $ - 0 | |
| CLIN 0002 | Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee) | $ - 0 |
| Total Evaluated Price (CLIN 0001 + CLIN 0002) | $ - 0 |
Bid Option 2
| CLIN | ITEM | PRICE |
| CLIN 0001 | Bid Option 2: Primary Emergency Generator | |
| Target Estimated Cost of Work (ECW) - (CLIN 0001) | ||
| CMc Contingency Allowance (CCA) Percentage | 0% | |
| CCA (Target ECW x CCA Percentage) | ||
| Fee Percentage | 0% | |
| Fee (Target ECW x Fee Percentage) | ||
| CLIN 0002 | Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee) | |
| Total Evaluated Price (CLIN 0001 + CLIN 0002) |
Bid Option 3
| CLIN | ITEM | PRICE |
| CLIN 0001 | Bid Option 3: Secondary Emergency Generator | |
| Target Estimated Cost of Work (ECW) - (CLIN 0001) | ||
| CMc Contingency Allowance (CCA) Percentage | 0% | |
| CCA (Target ECW x CCA Percentage) | ||
| Fee Percentage | 0% | |
| Fee (Target ECW x Fee Percentage) | ||
| CLIN 0002 | Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee) | |
| Total Evaluated Price (CLIN 0001 + CLIN 0002) |
Bid Option 4
| CLIN | ITEM | PRICE |
| CLIN 0001 | Bid Option 4: FDA/GSA/APHIS Building - Exterior Building Envelope (Façade, Roof, Storefront, Windows, Entrances, Exterior Metal Doors, Exterior Frames, Building Sealants) Note: Costs for construction materials included below in CLIN 0002 shall not be duplicated in CLIN 0001. | |
| CLIN 0002 | Target ECW - Acquisition and Installation of low embodied carbon materials (SubCLIN 0002AA + 0002AB + 0002AC + 0002AD) | |
| SubCLIN 0002AA | Target ECW – Acquisition and installation of low embodied carbon steel and associated expenses | |
| SubCLIN 0002AB | Target ECW – Acquisition and installation of low embodied carbon asphalt and associated expenses | |
| SubCLIN 0002AC | Target ECW – Acquisition and installation of low embodied carbon glass and associated expenses | |
| SubCLIN 0002AD | Target ECW – Acquisition and installation of low embodied carbon concrete and associated expenses | |
| Target Estimated Cost of Work (ECW) - (CLIN 0001) | ||
| CMc Contingency Allowance (CCA) Percentage | 0% | |
| CCA (Target ECW x CCA Percentage) | ||
| Fee Percentage | 0% | |
| Fee (Target ECW x Fee Percentage) | ||
| CLIN 0003 | Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee) | |
| Total Evaluated Price (CLIN 0001 + CLIN 0003) |
Bid Option 5
| CLIN | ITEM | PRICE |
| CLIN 0001 | Bid Option 5: Commercial Inspection Building - Exterior Building Envelope (Façade, Roof, Storefront, Windows, Entrances, Exterior Metal Doors, Exterior Frames, Building Sealants) Note: Costs for construction materials included below in CLIN 0002 shall not be duplicated in CLIN 0001. | |
| CLIN 0002 | Target ECW - Acquisition and Installation of low embodied carbon materials (SubCLIN 0002AA + 0002AB + 0002AC + 0002AD) | |
| SubCLIN 0002AA | Target ECW – Acquisition and installation of low embodied carbon steel and associated expenses | |
| SubCLIN 0002AB | Target ECW – Acquisition and installation of low embodied carbon asphalt and associated expenses | |
| SubCLIN 0002AC | Target ECW – Acquisition and installation of low embodied carbon glass and associated expenses | |
| SubCLIN 0002AD | Target ECW – Acquisition and installation of low embodied carbon concrete and associated expenses | |
| Target Estimated Cost of Work (ECW) - (CLIN 0001) | ||
| CMc Contingency Allowance (CCA) Percentage | 0% | |
| CCA (Target ECW x CCA Percentage) | ||
| Fee Percentage | 0% | |
| Fee (Target ECW x Fee Percentage) | ||
| CLIN 0003 | Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee) | |
| Total Evaluated Price (CLIN 0001 + CLIN 0003) |
Bid Option 6
| CLIN | ITEM | PRICE |
| CLIN 0001 | Bid Option 6: FDA/GSA/APHIs Building - Life Safety and Fire Protection | |
| Target Estimated Cost of Work (ECW) - (CLIN 0001) | ||
| CMc Contingency Allowance (CCA) Percentage | 0% | |
| CCA (Target ECW x CCA Percentage) | ||
| Fee Percentage | 0% | |
| Fee (Target ECW x Fee Percentage) | ||
| CLIN 0002 | Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee) | |
| Total Evaluated Price (CLIN 0001 + CLIN 0002) |
Bid Option 7
| CLIN | ITEM | PRICE |
| CLIN 0001 | Bid Option 7: Commercial Inspection Building - Life Safety and Fire Protection | |
| Target Estimated Cost of Work (ECW) - (CLIN 0001) | ||
| CMc Contingency Allowance (CCA) Percentage | 0% | |
| CCA (Target ECW x CCA Percentage) | ||
| Fee Percentage | 0% | |
| Fee (Target ECW x Fee Percentage) | ||
| CLIN 0002 | Guaranteed Maximum Price (GMP) Option for Construction Services (Total ECW + CCA + Fee) | |
| Total Evaluated Price (CLIN 0001 + CLIN 0002) |
File details come from the government source that posted it. Updated .