91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf

PDF 1 MB Posted

Attached to
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
Solicitation number
47PB0024R0049
Issued by

About this file

This document is a solicitation for Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for the U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The solicitation includes requirements for Design Phase services to be awarded on a Firm-Fixed Price basis and Construction Phase services to be awarded with a Guaranteed Maximum Price (GMP). The magnitude of construction is estimated between $22,000,000 and $32,000,000, including potential Inflation Reduction Act (IRA) funding. The solicitation is not set aside for small businesses, but both small and large businesses are encouraged to participate. Key dates include a pre-proposal conference on October 10, 2024 and a pre-proposal site visit on October 17, 2024. Proposals are due by November 11, 2024. The contracting agency is the General Services Administration Public Buildings Service Region 1.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf PDF
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf PDF
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
83 Exhibit G.1_MEPFP_Equipment.pdf PDF
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
73. Contract Price Form Spreadsheet 2024 08 28.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT Y

ST

A

TE

O

F M

A

IN

E, U

N

IT

ED

S

TA

TE

O F

A M

ER

IC

A

N

EW

B R

U N

SW

IC

K , C

A N

A D

A

TAX MAP 30 - LOT 6

UNITED STATES

OF AMERICA

E

E

SHED

STORAGE

BUILDING

F.F. 461.59'

CBP

BUILDING

F.F. 465.43'

SECONDARY

INSPECTION

BORDER

STATION

F.F. 466.06'

INTERSTATE 95 NORTHBOUND

RAMP "B

INTERSTATE 95

SOUTHBOUND

FDA/GSA/APHIS

BUILDING

F.F. 461.59'

N51° 53' 18"W

143.73'

N55° 57' 11"W

244.73'

S45 ° 1

5'

"W

8.3 6'

S1 6°

4'

7"

W

1.

S1 6°

4'

7"

W

8.

L=2351.17 R=1232.39

S46 ° 3

3'

"W

.02

S56° 41' 58"E 44.02'

S33° 58' 29"E

128.00'

L=2351.17

R=1410.39

N46 ° 4

3'

"E

4.1

3'

N46 ° 4

3'

"E

6.8

7'

L=

.17

R=9

.93

FL

OOD

ZO

NE

A

FL

OOD

ZO

NE

X

FLOOD ZONE A

FLOOD ZONE X

POND

BENCHMARK:

N.W. BOLT

ELEV. 466.77'

( IN FEET )

GRAPHIC SCALE

040 20 40 80 120

1 inch = 40 ft.

ENGINEERING ENVIRONMENTAL SURVEYING

WWW.HALEYWARD.COM

One Merchants Plaza, Suite 701

Bangor, Maine 04401 207.989.4824

1234567

PROJECT

TITLE

DATE SCALE

DRAWN BY DESIGNED BY CHECKED BY

PROJECT No.

DRAWING No. REV.

A

B

C

D

A

B

C

D

FI

LE

L O

C

AT

IO

N

: P :\M

E\

8-

M

AR

VE

L_

D

ES

IG

N

S\

1- H

O U

LT

O

N B

O R

D

ER

-E

XI

ST

IN

G C

O N

D

IT

IO

N

S-

JA

T\

-C

AD

_F

IL

ES

\S

U R

VE

Y\

8.

1- V-

XP

.D

W G

, 2

4.

.1 4, :0

PM

1234567

HOULTON MAINE LAND PORT OF ENTRY

HOULTON, AROOSTOOK COUNTY, MAINE

EXISTING SITE PLAN

2024.05.13 1" = 40'

JAT/BLQ --- ---

14488.001

V101

DESCRIPTION BY CHK.DATE

DRAWING ISSUE STATUS

REV.

NOT FOR CONSTRUCTION

LOCATION MAP:

NOT TO SCALE

USGS QUADRANGLE: HOULTON NORTH

MAPTECH® USGS TOPOGRAPHIC SERIESTM,

©MAPTECH®, INC. 978-933-3000

WWW.MAPTECH.COM/TOPO

SITE

PLAN REFERENCE:

1) "BOUNDARY & UTILITY SURVEY, HOULTON, MAINE, AROOSTOOK COUNTY",

PREPARED BY TITCOMB ASSOCIATES, DAVID E. TITCOMB, PLS #1275, DATED

JUNE 6, 2005 AND NOT YET RECORDED AT THE AROOSTOOK COUNTY SOUTHER

DIVISION REGISTRY OF DEEDS.

UTILITIES NOTE:

THERE MAY BE ADDITIONAL UNDERGROUND WIRES, CABLES, UTILITIES, AND/OR

STRUCTURES NOT SHOWN ON THIS PLAN. THE LOCATIONS SHOWN HEREON ARE

BASED UPON A COMBINATION OF MARKINGS SET OUT BY CENTERLINE UTILITIES INC.,

SURFACE FEATURES VISIBLE AT THE TIME OF THE SURVEY AND INFORMATION ON

PLAN REFERENCE #1. NO EXCAVATIONS WERE MADE DURING THE COURSE OF THIS

SURVEY TO VERIFY AND/OR LOCATE ANY UNDERGROUND STRUCTURES. ANY FUTURE

DEVELOPMENT OR CONSTRUCTION MUST BE AWARE OF CERTAIN UNKNOWN OR

UNDERGROUND LINES THAT MAY EXIST. THIS SURVEY IS NOT RESPONSIBLE FOR

COMPLETE RESOLUTION OF ALL BURIED OR OBSCURED UTILITY LINES.

NOTES:

1) THIS IS NOT A STANDARD BOUNDARY SURVEY. PROPERTY LINES SHOWN

HEREON ARE CONSIDERED APPROXIMATE.

2) THIS PLAN DEPICTS EXISTING CONDITIONS AS FOUND AND SURVEYED BY HALEY

WARD, INC. DURING THE MONTH OF NOVEMBER, 2023..

3) THIS SURVEY IS ORIENTED TO THE MAINE STATE PLANE COORDINATE SYSTEM,

EAST ZONE, NORTH AMERICAN DATUM OF 1983 (NAD 83).

4) ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF

1988 (NAVD 88).

MAJOR FOOT CONTOUR

MINOR FOOT CONTOUR

LEGEND:

EDGE OF PAVEMENT

BENCHMARK

MONUMENT

OVERHEAD UTILITY LINE

EDGE OF GRAVEL

PIN FOUND

SEWER MANHOLE

UTILITY POLE

CATCH BASIN

HYDRANT

APPROXIMATE PROPERTY LINE

GUY ANCHOR

UNDERGROUND ELECTRICAL LINE

UNDERGROUND COMMUNICATIONS LINE

SEWER LINE

STORM DRAIN

LIGHT POLE

ELECTRIC BOX

G R

ID

N

O R

TH

TREE OR SHRUB

PAVEMENT

CONCRETE

Based on the FEMA FIRM panel #230021 004 B dated August 19, 1991, the proposed development is within a FEMA special flood hazard area, Zone A. Zone A refers to an area that will be inundated during the 100-year storm event, but where a Base Flood Elevation (BFE) has not been established.

A technical memorandum for the hydrolic analysis for unnamed pond on smith brook dated july 1, 2024 identifies the 100-year and 500-year flood events for the area.

The 100-year100-year design flood event level is iden-tified as 456.32’456.32’

The 500-year500-year design flood event level is identified as 456.75’456.75’

The Houlton, Maine LPOE is classified as a The Houlton, Maine LPOE is classified as a critical action facility and both GSA and CBP critical action facility and both GSA and CBP standards require that critical infrastructure, standards require that critical infrastructure, mechanical and electrical system be located mechanical and electrical system be located above benchmarks based on flood eleva-above benchmarks based on flood eleva-tions; the most stringent of which is 5’ above tions; the most stringent of which is 5’ above the 100-year flood level. All three buildings, the 100-year flood level. All three buildings, the Main Port building, FDA/GSA/APHIS and the Main Port building, FDA/GSA/APHIS and CIB buildings are all above this benchmark.CIB buildings are all above this benchmark.

100 - Year Design Flood Event

500 - Year Design Flood Event

100 - Year Design Flood Event + 5’

145 Hudson St. New York, NY 10013 • 161 Calle San Jorge, San Juan, PR 00911 • marveldesigns.com3 47PB00-23-F-0129 Houlton ME LPOE • June 7, 2024

PRLIMINARY DESIGN FLOOD LEVELS: 100 YR & 500 YR

File details come from the government source that posted it. Updated .