83 Exhibit G.1_MEPFP_Equipment.pdf

PDF 46 KB Posted

Attached to
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
Solicitation number
47PB0024R0049
Issued by

About this file

This document appears to be an Exhibit G.1 that lists the equipment and specifications for the Main Port Building as part of a federal contract opportunity. The key details include:

The Main Port Building equipment includes an air source heat pump chiller, variable speed chilled water and hot water pumps, backup propane or electric boilers, dedicated outdoor air units, central station air handling units, fan coil units, and various exhaust fans. Quantities, manufacturers, models, and service life are provided for each piece of equipment. The document also includes equipment for a Variable Refrigerant Flow (VRF) system and a ground source heat pump chiller system, with similar details. Additionally, it lists electrical equipment such as a transformer, switchboard, generator, and UPS. The service life for most mechanical and electrical equipment is 20-25 years.

This equipment is part of a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services contract for the U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The overall project is estimated to be between $22-32 million and is funded through the Bipartisan Infrastructure Law (BIL) and potentially the Inflation Reduction Act (IRA). The solicitation has specific requirements for proposal submission, evaluation, and award.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf PDF
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf PDF
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
73. Contract Price Form Spreadsheet 2024 08 28.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT G.1

Main Port Building

Equipment Qty Manufacturer Model Service Life (years)

Air Source Heat Pump (ASHP) Chiller (4 pipe) Cooling: 91 tons Heating: 627 MBH 1 (3 Modules) Trane AXM030 15

CHW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25

HW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25

Backup Boiler (Option 1 = propane) 2 (1 standby) Fulton EDR-750 25

Backup Boiler (Option 2 = electric) 2 (1 standby) Cleaver Brooks WB-122 20

Dedicated Outdoor Air Unit (DOAS) 1 Trane Climate Changer CSAA006 25

Central Station Air Handling Unit (AHU) 1 Trane Climate Changer CSAA030 25

Central Station Air Handling Unit (AHU) 1 Trane Climate Changer CSAA017 25

Chilled water Fan Coil Unit (FCU) 3 IEC CPY 25

Toilet Exhaust Fan (L1) 1 Greenheck CUE 25

Toilet Exhaust Fan (L2) 1 Greenheck CUE 25

General Exhaust Fan 2 Greenheck CUE 25

Ductwork - - - 25

Piping - - - 25

Valves, fittings, appurtenances - - - 25

Equipment Qty Manufacturer Model Service Life

VRF Outdoor Unit Cooling: 16 tons Heating: 215 MBH 3 Mitsubishi CITY MULTI TUHYH1923BN40AN 15

VRF Outdoor Unit (for DOAS) Cooling: 12 tons Heating: 160 MBH 2 Mitsubishi CITY MULTI TUHYH1443BN40AN 15

VRF Indoor Unit Cooling: 1 ton Heating: 15 MBH 16 Mitsubishi 15

VRF Indoor Unit Cooling: 3 tons Heating: 40 MBH 10 Mitsubishi TPEFYP036MA144A 15

VRF DOAS Cooling: 4.4 tons Heating: 52 MBH 2 Mitsubishi TPEFYP072OA140A 15

HW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25

Backup Boiler (Option 1 = propane) 2 (1 standby) Fulton EDR-750 25

Backup Boiler (Option 2 = electric) 2 (1 standby) Cleaver Brooks WB-122 20

Toilet Exhaust Fan (L1) 1 Greenheck CUE 25

Toilet Exhaust Fan (L2) 1 Greenheck CUE 25

General Exhaust Fan 2 Greenheck CUE 25

Ductwork - - - 25

Piping - - - 25

Valves, fittings, appurtenances - - - 25

Equipment Qty Manufacturer Model Service Life

Ground Source Heat Pump (GSHP) Chiller (4 pipe) Cooling: 68 tons Heating: 627 MBH 1 ClimateMaster TMW-840 20

CHW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25

HW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25

Backup Boiler (Option 1 = propane) 2 (1 standby) Fulton EDR-750 25

Backup Boiler (Option 2 = electric) 2 (1 standby) Cleaver Brooks WB-122 20

Dedicated Outdoor Air Unit (DOAS) Cooling: 4.4 tons Heating: 52 MBH 1 IEC CPY 25

4-Pipe Fan Coil Unit (FCU) Cooling: 1 ton Heating: 15 MBH 13 IEC CPY 20

4-Pipe Fan Coil Unit (FCU) Cooling: 3 tons Heating: 40 MBH 10 IEC CPY 20

2-pipe Fan Coil Unit (FCU) cooling only 3 IEC CPY 20

Toilet Exhaust Fan (L1) 1 Greenheck CUE 25

Toilet Exhaust Fan (L2) 1 Greenheck CUE 25

General Exhaust Fan 2 Greenheck CUE 25

Ductwork - - - 25

Piping - - - 25

Valves, fittings, appurtenances - - - 25

300 CFM

1 ton

Design Option 3 - Geothermal

144 GPM

70 GPM

750 MBH

750 MBH

Capacity

200 CFM

300 CFM

200 CFM

200 CFM

300 CFM

Capacity

70 GPM

750 MBH

200 CFM

750 MBH

Design Option 1 - Air Source Heat Pump

Design Option 2 - VRF

Capacity

144 GPM

70 GPM

2,550 CFM

13,400 CFM

1 ton

750 MBH

750 MBH

8,3000 CFM

200 CFM

200 CFM

Equipment Capacity Qty Service Life (years)

Submersible utility transformer 1500 KVA 1 25

New Switchboard - MDB 4000 A 1 30

ATS w/ Bypass 4000 A 1 20

New Generator 1500 KVA 1 20

New Generator Panel 60 A 1 20

New Distribution Panel 100 A 1 30

New Distribution Panels 125 A 1 30

New Distribution Panels 150 A 4 30

UPS 50 KVA 1 10

Equipment Qty Manufacturer Model Service Life (years)

Domestic Water Heater 119 Gallong Storage 50 GPH Recovery 1 AO Smith LTE 120D 8 to 12

Capacity