About this file
This document appears to be an Exhibit G.1 that lists the equipment and specifications for the Main Port Building as part of a federal contract opportunity. The key details include:
The Main Port Building equipment includes an air source heat pump chiller, variable speed chilled water and hot water pumps, backup propane or electric boilers, dedicated outdoor air units, central station air handling units, fan coil units, and various exhaust fans. Quantities, manufacturers, models, and service life are provided for each piece of equipment. The document also includes equipment for a Variable Refrigerant Flow (VRF) system and a ground source heat pump chiller system, with similar details. Additionally, it lists electrical equipment such as a transformer, switchboard, generator, and UPS. The service life for most mechanical and electrical equipment is 20-25 years.
This equipment is part of a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services contract for the U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The overall project is estimated to be between $22-32 million and is funded through the Bipartisan Infrastructure Law (BIL) and potentially the Inflation Reduction Act (IRA). The solicitation has specific requirements for proposal submission, evaluation, and award.
View the file
Other files
Show 40 more
Latest 50 of 108 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT G.1
Main Port Building
Equipment Qty Manufacturer Model Service Life (years)
Air Source Heat Pump (ASHP) Chiller (4 pipe) Cooling: 91 tons Heating: 627 MBH 1 (3 Modules) Trane AXM030 15
CHW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25
HW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25
Backup Boiler (Option 1 = propane) 2 (1 standby) Fulton EDR-750 25
Backup Boiler (Option 2 = electric) 2 (1 standby) Cleaver Brooks WB-122 20
Dedicated Outdoor Air Unit (DOAS) 1 Trane Climate Changer CSAA006 25
Central Station Air Handling Unit (AHU) 1 Trane Climate Changer CSAA030 25
Central Station Air Handling Unit (AHU) 1 Trane Climate Changer CSAA017 25
Chilled water Fan Coil Unit (FCU) 3 IEC CPY 25
Toilet Exhaust Fan (L1) 1 Greenheck CUE 25
Toilet Exhaust Fan (L2) 1 Greenheck CUE 25
General Exhaust Fan 2 Greenheck CUE 25
Ductwork - - - 25
Piping - - - 25
Valves, fittings, appurtenances - - - 25
Equipment Qty Manufacturer Model Service Life
VRF Outdoor Unit Cooling: 16 tons Heating: 215 MBH 3 Mitsubishi CITY MULTI TUHYH1923BN40AN 15
VRF Outdoor Unit (for DOAS) Cooling: 12 tons Heating: 160 MBH 2 Mitsubishi CITY MULTI TUHYH1443BN40AN 15
VRF Indoor Unit Cooling: 1 ton Heating: 15 MBH 16 Mitsubishi 15
VRF Indoor Unit Cooling: 3 tons Heating: 40 MBH 10 Mitsubishi TPEFYP036MA144A 15
VRF DOAS Cooling: 4.4 tons Heating: 52 MBH 2 Mitsubishi TPEFYP072OA140A 15
HW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25
Backup Boiler (Option 1 = propane) 2 (1 standby) Fulton EDR-750 25
Backup Boiler (Option 2 = electric) 2 (1 standby) Cleaver Brooks WB-122 20
Toilet Exhaust Fan (L1) 1 Greenheck CUE 25
Toilet Exhaust Fan (L2) 1 Greenheck CUE 25
General Exhaust Fan 2 Greenheck CUE 25
Ductwork - - - 25
Piping - - - 25
Valves, fittings, appurtenances - - - 25
Equipment Qty Manufacturer Model Service Life
Ground Source Heat Pump (GSHP) Chiller (4 pipe) Cooling: 68 tons Heating: 627 MBH 1 ClimateMaster TMW-840 20
CHW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25
HW pumps (vairable speed) 2 (1 standby) Belle & Gossett E-1510 25
Backup Boiler (Option 1 = propane) 2 (1 standby) Fulton EDR-750 25
Backup Boiler (Option 2 = electric) 2 (1 standby) Cleaver Brooks WB-122 20
Dedicated Outdoor Air Unit (DOAS) Cooling: 4.4 tons Heating: 52 MBH 1 IEC CPY 25
4-Pipe Fan Coil Unit (FCU) Cooling: 1 ton Heating: 15 MBH 13 IEC CPY 20
4-Pipe Fan Coil Unit (FCU) Cooling: 3 tons Heating: 40 MBH 10 IEC CPY 20
2-pipe Fan Coil Unit (FCU) cooling only 3 IEC CPY 20
Toilet Exhaust Fan (L1) 1 Greenheck CUE 25
Toilet Exhaust Fan (L2) 1 Greenheck CUE 25
General Exhaust Fan 2 Greenheck CUE 25
Ductwork - - - 25
Piping - - - 25
Valves, fittings, appurtenances - - - 25
300 CFM
1 ton
Design Option 3 - Geothermal
144 GPM
70 GPM
750 MBH
750 MBH
Capacity
200 CFM
300 CFM
200 CFM
200 CFM
300 CFM
Capacity
70 GPM
750 MBH
200 CFM
750 MBH
Design Option 1 - Air Source Heat Pump
Design Option 2 - VRF
Capacity
144 GPM
70 GPM
2,550 CFM
13,400 CFM
1 ton
750 MBH
750 MBH
8,3000 CFM
200 CFM
200 CFM
Equipment Capacity Qty Service Life (years)
Submersible utility transformer 1500 KVA 1 25
New Switchboard - MDB 4000 A 1 30
ATS w/ Bypass 4000 A 1 20
New Generator 1500 KVA 1 20
New Generator Panel 60 A 1 20
New Distribution Panel 100 A 1 30
New Distribution Panels 125 A 1 30
New Distribution Panels 150 A 4 30
UPS 50 KVA 1 10
Equipment Qty Manufacturer Model Service Life (years)
Domestic Water Heater 119 Gallong Storage 50 GPH Recovery 1 AO Smith LTE 120D 8 to 12
Capacity