96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf

PDF 34 KB Posted

Attached to
Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
Solicitation number
47PB0024R0049
Issued by

About this file

This document is a Request for Information (RFI) Tracker Sheet related to a Construction Manager as Constructor (CMc) opportunity for the Houlton Land Port of Entry project in Houlton, Maine. The project will require compliance with Federal Acquisition Regulation (FAR) and modified Cost Accounting Standards (CAS) coverage. The price proposal should include the completed SF-1442, Contract Price Form, and Section II of the Agreement. A bid bond is not required at the proposal stage. The solicitation is not set aside for small businesses, but both small and large businesses are encouraged to participate. The solicitation was originally posted on September 26, 2024 but has been updated to October 3, 2024, with the proposal due date changed from November 26, 2024 to November 11, 2024. The project is part of the Bipartisan Infrastructure Law (BIL) and may also receive Inflation Reduction Act (IRA) funding. The estimated construction magnitude is between $22,000,000 and $32,000,000.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf PDF
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
83 Exhibit G.1_MEPFP_Equipment.pdf PDF
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
73. Contract Price Form Spreadsheet 2024 08 28.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 47PB0024R0049 Project Name:

Houlton, ME

Pre-Proposal Conference RFI's

RFI Number Question Response Date Submitted Date Received Date Answered

Will the Houlton Land Port of Entry Project require Federal Acquisition Regulation (FAR) and Cost Accounting Standards (CAS) compliance?

Yes, all our projects follow the Federal Acquisition Regulations (FAR) and the General Services Administration Manual Regulations (GSAM/R) Per GSAM 536.7105-3 and FAR Part 30 Cost Accounting Standards. This project is under $50,000,000 so we will follow the Modified CAS Coverage, see below and Reference 48 C.F.R Subpart

9903.2 - CAS Program Requirements, Subpart 9903.201-2.

Types of CAS coverage: (b) Modified Coverage:

(1) Modified CAS coverage requires only that the contractor comply with Standard 9904.401, Consistency in Estimating, Accumulating, and Reporting Costs, Standard 9904.402, Consistency in Allocating Costs Incurred for the Same Purpose, Standard 9904.405, Accounting for Unallowable Costs and Standard 9904.406, Cost Accounting Standard - Cost Accounting Period. Modified, rather, than full, CAS coverage may be applied to a covered contract of less than $50 million awarded to a business unit that received less than $50 million in net CAS-covered awards in the immediately preceding cost accounting period.

(2) If any one contract is awarded with modified CAS coverage, all CAS-covered contracts awarded to that business unit during that cost accounting period must also have modified coverage with the following exception: if the business unit receives a single CAS-covered contract award of $50 million or more, that contract must be subject to full CAS coverage. Thereafter, any covered contract awarded in the same cost accounting period must also be subject to full CAS coverage.

(3) A contract awarded with modified CAS coverage shall remain subject to such coverage throughout its life regardless of changes in the business unit's CAS status during subsequent cost accounting periods.

10/15/2024 10/15/2024 10/15/2024

Volume III Price Proposal: The contents of the price proposal are listed in the table on pgs. 8-9 include only the SF 1442, Contract Price Form included as part of the SF-1442 and Section II of the Agreement. On pg. 10 item (3) Price Proposal, additional items are listed to be included in the Price Proposal. Some of the items listed on pg. 10 are included in Volume IV Other Information to Submit with Proposals. Please confirm the contents of Volume III Price Proposal and Volume IV Other Information to Submit with Proposals.

TO BE SUBMITTED BY THE PROPOSAL DUE DATE:

Sealed Package #1: Volume I "Reps and Certs" Parts 1 -3, and Volume II "Technical Proposal" response to all 6 Evaluation Factors Sealed Package #2: Volume III "Price Proposal" including the completed/signed SF1442 and the Agreement Section II.B "Contract Price Form", pages 8 - 11 completed; Volume IV "Other Information" parts 1 - 6 and Volume V "Requirements of Joint Venture"

10/15/2024 10/15/2024 10/15/2024

Bid Bond: Please confirm that a bid bond is to be submitted with this proposal. If a bid bond is required at this stage, which volume should it be included in?

A bid bond is required when the Construction Option is elected, well after the contract is awarded. So, it does not need to be submitted by the proposal due date.

10/15/2024 10/15/2024 10/15/2024

File details come from the government source that posted it. Updated .