This document is a Request for Information (RFI) Tracker Sheet related to a Construction Manager as Constructor (CMc) opportunity for the Houlton Land Port of Entry project in Houlton, Maine. The project will require compliance with Federal Acquisition Regulation (FAR) and modified Cost Accounting Standards (CAS) coverage. The price proposal should include the completed SF-1442, Contract Price Form, and Section II of the Agreement. A bid bond is not required at the proposal stage. The solicitation is not set aside for small businesses, but both small and large businesses are encouraged to participate. The solicitation was originally posted on September 26, 2024 but has been updated to October 3, 2024, with the proposal due date changed from November 26, 2024 to November 11, 2024. The project is part of the Bipartisan Infrastructure Law (BIL) and may also receive Inflation Reduction Act (IRA) funding. The estimated construction magnitude is between $22,000,000 and $32,000,000.
View the file
Other files
Show 40 more
Latest 50 of 108 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 47PB0024R0049 Project Name:
Houlton, ME
Pre-Proposal Conference RFI's
RFI Number Question Response Date Submitted Date Received Date Answered
Will the Houlton Land Port of Entry Project require Federal Acquisition Regulation (FAR) and Cost Accounting Standards (CAS) compliance?
Yes, all our projects follow the Federal Acquisition Regulations (FAR) and the General Services Administration Manual Regulations (GSAM/R) Per GSAM 536.7105-3 and FAR Part 30 Cost Accounting Standards. This project is under $50,000,000 so we will follow the Modified CAS Coverage, see below and Reference 48 C.F.R Subpart
9903.2 - CAS Program Requirements, Subpart 9903.201-2.
Types of CAS coverage: (b) Modified Coverage:
(1) Modified CAS coverage requires only that the contractor comply with Standard 9904.401, Consistency in Estimating, Accumulating, and Reporting Costs, Standard 9904.402, Consistency in Allocating Costs Incurred for the Same Purpose, Standard 9904.405, Accounting for Unallowable Costs and Standard 9904.406, Cost Accounting Standard - Cost Accounting Period. Modified, rather, than full, CAS coverage may be applied to a covered contract of less than $50 million awarded to a business unit that received less than $50 million in net CAS-covered awards in the immediately preceding cost accounting period.
(2) If any one contract is awarded with modified CAS coverage, all CAS-covered contracts awarded to that business unit during that cost accounting period must also have modified coverage with the following exception: if the business unit receives a single CAS-covered contract award of $50 million or more, that contract must be subject to full CAS coverage. Thereafter, any covered contract awarded in the same cost accounting period must also be subject to full CAS coverage.
(3) A contract awarded with modified CAS coverage shall remain subject to such coverage throughout its life regardless of changes in the business unit's CAS status during subsequent cost accounting periods.
10/15/2024 10/15/2024 10/15/2024
Volume III Price Proposal: The contents of the price proposal are listed in the table on pgs. 8-9 include only the SF 1442, Contract Price Form included as part of the SF-1442 and Section II of the Agreement. On pg. 10 item (3) Price Proposal, additional items are listed to be included in the Price Proposal. Some of the items listed on pg. 10 are included in Volume IV Other Information to Submit with Proposals. Please confirm the contents of Volume III Price Proposal and Volume IV Other Information to Submit with Proposals.
TO BE SUBMITTED BY THE PROPOSAL DUE DATE:
Sealed Package #1: Volume I "Reps and Certs" Parts 1 -3, and Volume II "Technical Proposal" response to all 6 Evaluation Factors Sealed Package #2: Volume III "Price Proposal" including the completed/signed SF1442 and the Agreement Section II.B "Contract Price Form", pages 8 - 11 completed; Volume IV "Other Information" parts 1 - 6 and Volume V "Requirements of Joint Venture"
10/15/2024 10/15/2024 10/15/2024
Bid Bond: Please confirm that a bid bond is to be submitted with this proposal. If a bid bond is required at this stage, which volume should it be included in?
A bid bond is required when the Construction Option is elected, well after the contract is awarded. So, it does not need to be submitted by the proposal due date.
10/15/2024 10/15/2024 10/15/2024