About this file

This document is a Solicitation for Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for the U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The project is part of the Bipartisan Infrastructure Law (BIL) and may receive Inflation Reduction Act (IRA) funding. The Magnitude of Construction is estimated between $22,000,000 and $32,000,000. The solicitation requires proposals for a contract to construct the project, with Design Phase services awarded on a Firm-Fixed Price basis and Construction Phase services awarded with a Guaranteed Maximum Price (GMP). The solicitation is not set aside for Small Businesses, but Small and Large Businesses are encouraged to participate. A Pre-Proposal Conference and Site Visit are scheduled in October 2024, and proposals are due by November 11, 2024. The contracting agency is the General Services Administration Public Buildings Service Region 1.

View the file

Other files

File Type Posted
128. A.0 SOW CMc Houlton LPOE Final revised 2024 12 17.pdf PDF
129. Exhibit D_2325-GSA-Houlton ME LPOE_Design Options.pdf PDF
Solicitation Amendment 47PB0024R0049_0007.pdf PDF
127. Houlton LPOE CMc RFI Tracker Sheet 2024 12 17.xlsx XLSX spreadsheet
113A. Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
119. Exhibit_N_Houlton_ME_DBT_MSR_FSL.pdf PDF
112. Exhibit_I__National_Operational_Excellence_Checklists__Final_Concept.pdf PDF
126. Houlton LPOE CMc RFI Tracker Sheet 2024 12 06.xlsx XLSX spreadsheet
116. Exhibit_K_Houlton_ME_LPOE_2021_P100_Performance_Matrix_Final_Concept.pdf PDF
100. Exhibit_A_Houlton_BIL_-_AE_SOW__20221212_Indexed.pdf PDF
99. ContractData-20241031-042251.pdf PDF
129. Houlton Land Port of Entry - Construction Manager as Advisor & Commissioning Provider - Rev 09Dec24.pdf PDF
127. P100 Submittal Matrix v10_CMc.pdf PDF
125. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
114. Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
122. Exhibit_P_Houlton_ME_LPOE_Final_Concept_Specifications_Table_of_Contents.pdf PDF
121. Exhibit_Q_2325_GSA_Houlton_LPOE_Communications_Plan.pdf PDF
Solicitation Amendment 47PB0024R0049_0006.pdf PDF
102. Exhibit_C_100_percent_PDS_Report_Houlton_LPOE_02-08-2021.pdf PDF
101. Exhibit_B_Houlton_BIL_-_AE_SOW_Revised_4March24.pdf PDF
113. Exhibit_J_Final_Concept_Development_Report_Narrative_MEP.pdf PDF
Solicitation Amendment 47PB0024R0049_0005.pdf PDF
Houlton LPOE CMc RFI Tracker Sheet 2024 11 22.xlsx XLSX spreadsheet
Solicitation Amendment 47PB0024R0049_0004.pdf PDF
33. A.7 GSA P-100 2021 with 2022 Addendum Final.pdf PDF
Solicitation Amendment 47PB0024R0049_0003.pdf PDF
35. D.4 P100 Submittal Matrix v10 CMc 2021.pdf PDF
98. Houlton LPOE CMc RFI Tracker Sheet 2024 10 29 - Site Visit RFI's.pdf PDF
85 Exhibit J_Houlton_LEED_NC_Scorecard.pdf PDF
80 Exhibit E.1_MPB Roof Structure.pdf PDF
96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs.pdf PDF
83 Exhibit G.1_MEPFP_Equipment.pdf PDF
87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative.pdf PDF
72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10.pdf PDF
93 Exhibit AA_National Operational Excellence Checklists_Concept Development.pdf PDF
95 IRA Program Construction Solicitation Desk Guide 2024 10 01.pdf PDF
81 Exhibit F_MEP Basis of Design Narrative.pdf PDF
76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17.pdf PDF
75 Presolicitation in SAM 2024 08 27.pdf PDF
86 Exhibit J.1_GSA Sustainable Buildings_Checklist.pdf PDF
94 Exhibit BB_Houlton ME LPOPE_Concept Development_Specifications Table of Contents .pdf PDF
Solicitation Amendment 47PB0024R0049_0001.pdf PDF
91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1.pdf PDF
Solicitation Amendment 47PB0024R0049_0002.pdf PDF
5. Form B - Request for Construction Documents 2024 10 08.pdf PDF
8. Pre-Proposal Site Visit R1 2024 10 08.pdf PDF
7. Pre-Proposal Conference R1 2024 10 08.pdf PDF
74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051.pdf PDF
6. CBP Non-Disclosure Agreement Form 2024 10 08.pdf PDF
73. Contract Price Form Spreadsheet 2024 08 28.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIFORMAT II Level 3 Detail

GSA OFFICE OF DESIGN AND CONSTRUCTION
UNIFORMAT II WBS COST ELEMENT ORGANIZATION
UNIFORMAT L1UNIFORMAT L2UNIFORMAT L3E UOMQuantity Definition
ASUBSTRUCTURESFFootprint area at grade
A10FOUNDATIONS
A1010STANDARD FOUNDATIONSSFFootprint area at grade
A1020SPECIAL FOUNDATIONSSFFootprint area at grade
A1030SLAB ON GRADESFFootprint area at grade
A20BASEMENT CONSTRUCTIONCYVolume of excavation
A2010BASEMENT EXCAVATIONCYArea of basement plan measured to outside of enclosing wall and average depth of finished grade to underside of slab on grade
A2020BASEMENT WALLSSFArea of wall
BSHELLSFSum area of supported floors and roof structure
B10SUPERSTRUCTURESFSum area of supported floors and roof structure
B1010FLOOR CONSTRUCTIONSFArea of supported floors
B1020ROOF CONSTRUCTIONSFArea of supported roof
B20EXTERIOR ENCLOSURESFArea of exterior walls
B2010EXTERIOR WALLSSFArea of exterior walls
B2020EXTERIOR WINDOWSSFArea of windows
B2030EXTERIOR DOORSEANumber of doors
B30ROOFINGSFGross area of roof
B3010ROOF COVERINGSSFGross area of roof
CINTERIORSSFGross floor area
C10INTERIOR CONSTRUCTIONSFGross floor area
C1010PARTITIONSSFArea of partitions
C1020INTERIOR DOORSLEFNumber of leaves
C1030FITTINGSSFGross floor area
C20STAIRSFLTNumber of flights
C2010STAIR CONSTRUCTIONFLTNumber of flights
C2020STAIR FINISHESSFArea of finished landings, treads, risers
C30INTERIOR FINISHESSFArea of finishing
C3010WALL FINISHESSFArea of finished walls
C3020FLOOR FINISHESSFArea of finished floors
C3030CEILING FINISHESSFArea of ceilings
DSERVICESEA
D10CONVEYINGSTYNumber of stories
D1010ELEVATORS AND LIFTSSTPNumber of stops
D1020ESCALATORS AND MOVING WALKSLFLength of stairs or walks
D1090OTHER CONVEYING SYSTEMSEA
D20PLUMBINGEANumber of fixtures
D2010PLUMBING FIXTURESEANumber of fixtures
D2020DOMESTIC WATER DISTRIBUTIONEANumber of fixtures
D2030SANITARY WASTEEANumber of fixtures
D2040RAIN WATER DRAINAGESFArea of roof
D2090OTHER PLUMBING SYSTEMSEANumber of special fixtures, etc.
D30HVACMBHTotal MBH capacity
D3010ENERGY SUPPLYMBHTotal power of heating system
D3020HEAT GENERATING SYSTEMSMBHTotal power of heating system
D3030COOLING GENERATING SYSTEMSTONTotal power of cooling capacity
D3040DISTRIBUTION SYSTEMSMBHPower
D3050TERMINAL & PACKAGE UNITSMBHPower
D3060CONTROLS & INSTRUMENTATIONMBHPower
D3070SYSTEMS TESTING & BALANCINGMBHPower
D3090OTHER HVAC SYSTEMS AND EQUIPMENTEANumber of special mechanical systems
D40FIRE PROTECTIONSFGross floor area
D4010FIRE ALARM & DETECTION SYSTEMSSFGross floor area
D4020FIRE SUPPRESSION WATER SUPPLY AND EQUIPMENTLFLength of system
D4030STANDPIPE SYSTEMSEANumber of sprinkler heads
D4040SPRINKLERSEANumber of sprinkler heads
D4050FIRE PROTECTION SPECIALTIESEANumber of extinguishers
D4090OTHER FIRE PROTECTION SYSTEMSEAEach system
D50ELECTRICALAMPGross floor area
D5010ELECTRICAL SERVICE & DISTRIBUTIONAMPGross floor area
D5020LIGHTING & BRANCH WIRINGSFFloor area
D5030COMMUNICATIONS & SECURITYSFFloor area
D5090OTHER ELECTRICAL SERVICESSFGross Floor area
EEQUIPMENT & FURNISHINGSSFGross Floor area
E10EQUIPMENTSFGross Floor area
E1010COMMERCIAL EQUIPMENTSFFloor area
E1020INSTITUTIONAL EQUIPMENTSFFloor area
E1030VEHICULAR EQUIPMENTEAPieces of equipment
E1090OTHER EQUIPMENT
E20FURNISHINGSSFFloor area
E2010FIXED FURNISHINGSSFFloor area
E2020MOVEABLE FURNISHINGS
FSPECIAL CONSTRUCTION & DEMOLITIONSFFloor area
F10SPECIAL CONSTRUCTIONSFFloor area
F1010SPECIAL STRUCTURESSFFloor area
F1020INTEGRATED CONSTRUCTIONSFFloor area
F1030SPECIAL CONSTRUCTION SYSTEMSSFArea of room
F1040SPECIAL FACILITIESSFArea of room
F1050SPECIAL CONTROLS AND INSTRUMENTATIONXX
F20SELECTIVE BUILDING DEMOLITIONLS
F2010BUILDING ELEMENTS DEMOLITIONLS
F2020HAZARDOUS COMPONENTS ABATEMENTLS
GSITEWORKACRTotal area of site
G10BUILDING-RELATED SITEWORK
G1010SITE PREPARATIONSACRTotal area of site
G1020SITE IMPROVEMENTSLS
G1030SITE CIVIL/MECHANICAL UTILITIESEAEach utility
G1040SITE ELECTRICAL UTILITIESEASystems total
G20NON-BUILDING-RELATED SITEWORK
G2010SITE PREPARATIONSACRTotal area of site
G2020SITE IMPROVEMENTSLS
G2030SITE CIVIL/MECHANICAL UTILITIESEAEach utility
G2040SITE ELECTRICAL UTILITIESEASystems total
G30OTHER SITE CONSTRUCTIONLS
G3010SERVICE AND PEDESTRIAN TUNNELS
G3020OTHER SITE CONSTRUCTIONXX
ZINDIRECT COSTS
Z10DESIGN CONTINGENCY
Z1010FEASIBILITY STUDY SUBMISSION
Z1020PDS SUBMISSION
Z1030CONCEPT PHASE SUBMISSION
Z1040DESIGN DEVELOPMENT PHASE SUBMISSION
Z105065% CD PHASE SUBMISSION
Z106090% CD PHASE SUBMISSION
Z1070100% CD PHASE SUBMISSION
Z20GENERAL CONDITIONS and PROFIT
Z2010NEW CONSTRUCTION - SINGLE PHASE
Z2020REPAIR AND ALTERATION - SINGLE PHASE
Z2030NEW CONSTRUCTION - MULTI-PHASED
Z2040REPAIR AND ALTERATION - MULTI-PHASED
Z30ESCALATION TO CONSTRUCTION MID-POINT
Z40CONTINGENCY AND RESERVATION
Z4010CONSTRUCTION CONTINGENCY
Z4020RESERVATION
Z50ART-IN-ARCHITECTURE