97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx
XLSX spreadsheet 53 KB Posted
- Attached to
- Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME
- Solicitation number
- 47PB0024R0049
About this file
This document is a Solicitation for Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for the U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The project is part of the Bipartisan Infrastructure Law (BIL) and may receive Inflation Reduction Act (IRA) funding. The Magnitude of Construction is estimated between $22,000,000 and $32,000,000. The solicitation requires proposals for a contract to construct the project, with Design Phase services awarded on a Firm-Fixed Price basis and Construction Phase services awarded with a Guaranteed Maximum Price (GMP). The solicitation is not set aside for Small Businesses, but Small and Large Businesses are encouraged to participate. A Pre-Proposal Conference and Site Visit are scheduled in October 2024, and proposals are due by November 11, 2024. The contracting agency is the General Services Administration Public Buildings Service Region 1.
View the file
Other files
Show 40 more
Latest 50 of 108 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIFORMAT II Level 3 Detail
| GSA OFFICE OF DESIGN AND CONSTRUCTION | |||||||
| UNIFORMAT II WBS COST ELEMENT ORGANIZATION | |||||||
| UNIFORMAT L1 | UNIFORMAT L2 | UNIFORMAT L3 | E UOM | Quantity Definition | |||
| A | SUBSTRUCTURE | SF | Footprint area at grade | ||||
| A10 | FOUNDATIONS | ||||||
| A1010 | STANDARD FOUNDATIONS | SF | Footprint area at grade | ||||
| A1020 | SPECIAL FOUNDATIONS | SF | Footprint area at grade | ||||
| A1030 | SLAB ON GRADE | SF | Footprint area at grade | ||||
| A20 | BASEMENT CONSTRUCTION | CY | Volume of excavation | ||||
| A2010 | BASEMENT EXCAVATION | CY | Area of basement plan measured to outside of enclosing wall and average depth of finished grade to underside of slab on grade | ||||
| A2020 | BASEMENT WALLS | SF | Area of wall | ||||
| B | SHELL | SF | Sum area of supported floors and roof structure | ||||
| B10 | SUPERSTRUCTURE | SF | Sum area of supported floors and roof structure | ||||
| B1010 | FLOOR CONSTRUCTION | SF | Area of supported floors | ||||
| B1020 | ROOF CONSTRUCTION | SF | Area of supported roof | ||||
| B20 | EXTERIOR ENCLOSURE | SF | Area of exterior walls | ||||
| B2010 | EXTERIOR WALLS | SF | Area of exterior walls | ||||
| B2020 | EXTERIOR WINDOWS | SF | Area of windows | ||||
| B2030 | EXTERIOR DOORS | EA | Number of doors | ||||
| B30 | ROOFING | SF | Gross area of roof | ||||
| B3010 | ROOF COVERINGS | SF | Gross area of roof | ||||
| C | INTERIORS | SF | Gross floor area | ||||
| C10 | INTERIOR CONSTRUCTION | SF | Gross floor area | ||||
| C1010 | PARTITIONS | SF | Area of partitions | ||||
| C1020 | INTERIOR DOORS | LEF | Number of leaves | ||||
| C1030 | FITTINGS | SF | Gross floor area | ||||
| C20 | STAIRS | FLT | Number of flights | ||||
| C2010 | STAIR CONSTRUCTION | FLT | Number of flights | ||||
| C2020 | STAIR FINISHES | SF | Area of finished landings, treads, risers | ||||
| C30 | INTERIOR FINISHES | SF | Area of finishing | ||||
| C3010 | WALL FINISHES | SF | Area of finished walls | ||||
| C3020 | FLOOR FINISHES | SF | Area of finished floors | ||||
| C3030 | CEILING FINISHES | SF | Area of ceilings | ||||
| D | SERVICES | EA | |||||
| D10 | CONVEYING | STY | Number of stories | ||||
| D1010 | ELEVATORS AND LIFTS | STP | Number of stops | ||||
| D1020 | ESCALATORS AND MOVING WALKS | LF | Length of stairs or walks | ||||
| D1090 | OTHER CONVEYING SYSTEMS | EA | |||||
| D20 | PLUMBING | EA | Number of fixtures | ||||
| D2010 | PLUMBING FIXTURES | EA | Number of fixtures | ||||
| D2020 | DOMESTIC WATER DISTRIBUTION | EA | Number of fixtures | ||||
| D2030 | SANITARY WASTE | EA | Number of fixtures | ||||
| D2040 | RAIN WATER DRAINAGE | SF | Area of roof | ||||
| D2090 | OTHER PLUMBING SYSTEMS | EA | Number of special fixtures, etc. | ||||
| D30 | HVAC | MBH | Total MBH capacity | ||||
| D3010 | ENERGY SUPPLY | MBH | Total power of heating system | ||||
| D3020 | HEAT GENERATING SYSTEMS | MBH | Total power of heating system | ||||
| D3030 | COOLING GENERATING SYSTEMS | TON | Total power of cooling capacity | ||||
| D3040 | DISTRIBUTION SYSTEMS | MBH | Power | ||||
| D3050 | TERMINAL & PACKAGE UNITS | MBH | Power | ||||
| D3060 | CONTROLS & INSTRUMENTATION | MBH | Power | ||||
| D3070 | SYSTEMS TESTING & BALANCING | MBH | Power | ||||
| D3090 | OTHER HVAC SYSTEMS AND EQUIPMENT | EA | Number of special mechanical systems | ||||
| D40 | FIRE PROTECTION | SF | Gross floor area | ||||
| D4010 | FIRE ALARM & DETECTION SYSTEMS | SF | Gross floor area | ||||
| D4020 | FIRE SUPPRESSION WATER SUPPLY AND EQUIPMENT | LF | Length of system | ||||
| D4030 | STANDPIPE SYSTEMS | EA | Number of sprinkler heads | ||||
| D4040 | SPRINKLERS | EA | Number of sprinkler heads | ||||
| D4050 | FIRE PROTECTION SPECIALTIES | EA | Number of extinguishers | ||||
| D4090 | OTHER FIRE PROTECTION SYSTEMS | EA | Each system | ||||
| D50 | ELECTRICAL | AMP | Gross floor area | ||||
| D5010 | ELECTRICAL SERVICE & DISTRIBUTION | AMP | Gross floor area | ||||
| D5020 | LIGHTING & BRANCH WIRING | SF | Floor area | ||||
| D5030 | COMMUNICATIONS & SECURITY | SF | Floor area | ||||
| D5090 | OTHER ELECTRICAL SERVICES | SF | Gross Floor area | ||||
| E | EQUIPMENT & FURNISHINGS | SF | Gross Floor area | ||||
| E10 | EQUIPMENT | SF | Gross Floor area | ||||
| E1010 | COMMERCIAL EQUIPMENT | SF | Floor area | ||||
| E1020 | INSTITUTIONAL EQUIPMENT | SF | Floor area | ||||
| E1030 | VEHICULAR EQUIPMENT | EA | Pieces of equipment | ||||
| E1090 | OTHER EQUIPMENT | ||||||
| E20 | FURNISHINGS | SF | Floor area | ||||
| E2010 | FIXED FURNISHINGS | SF | Floor area | ||||
| E2020 | MOVEABLE FURNISHINGS | ||||||
| F | SPECIAL CONSTRUCTION & DEMOLITION | SF | Floor area | ||||
| F10 | SPECIAL CONSTRUCTION | SF | Floor area | ||||
| F1010 | SPECIAL STRUCTURES | SF | Floor area | ||||
| F1020 | INTEGRATED CONSTRUCTION | SF | Floor area | ||||
| F1030 | SPECIAL CONSTRUCTION SYSTEMS | SF | Area of room | ||||
| F1040 | SPECIAL FACILITIES | SF | Area of room | ||||
| F1050 | SPECIAL CONTROLS AND INSTRUMENTATION | XX | |||||
| F20 | SELECTIVE BUILDING DEMOLITION | LS | |||||
| F2010 | BUILDING ELEMENTS DEMOLITION | LS | |||||
| F2020 | HAZARDOUS COMPONENTS ABATEMENT | LS | |||||
| G | SITEWORK | ACR | Total area of site | ||||
| G10 | BUILDING-RELATED SITEWORK | ||||||
| G1010 | SITE PREPARATIONS | ACR | Total area of site | ||||
| G1020 | SITE IMPROVEMENTS | LS | |||||
| G1030 | SITE CIVIL/MECHANICAL UTILITIES | EA | Each utility | ||||
| G1040 | SITE ELECTRICAL UTILITIES | EA | Systems total | ||||
| G20 | NON-BUILDING-RELATED SITEWORK | ||||||
| G2010 | SITE PREPARATIONS | ACR | Total area of site | ||||
| G2020 | SITE IMPROVEMENTS | LS | |||||
| G2030 | SITE CIVIL/MECHANICAL UTILITIES | EA | Each utility | ||||
| G2040 | SITE ELECTRICAL UTILITIES | EA | Systems total | ||||
| G30 | OTHER SITE CONSTRUCTION | LS | |||||
| G3010 | SERVICE AND PEDESTRIAN TUNNELS | ||||||
| G3020 | OTHER SITE CONSTRUCTION | XX | |||||
| Z | INDIRECT COSTS | ||||||
| Z10 | DESIGN CONTINGENCY | ||||||
| Z1010 | FEASIBILITY STUDY SUBMISSION | ||||||
| Z1020 | PDS SUBMISSION | ||||||
| Z1030 | CONCEPT PHASE SUBMISSION | ||||||
| Z1040 | DESIGN DEVELOPMENT PHASE SUBMISSION | ||||||
| Z1050 | 65% CD PHASE SUBMISSION | ||||||
| Z1060 | 90% CD PHASE SUBMISSION | ||||||
| Z1070 | 100% CD PHASE SUBMISSION | ||||||
| Z20 | GENERAL CONDITIONS and PROFIT | ||||||
| Z2010 | NEW CONSTRUCTION - SINGLE PHASE | ||||||
| Z2020 | REPAIR AND ALTERATION - SINGLE PHASE | ||||||
| Z2030 | NEW CONSTRUCTION - MULTI-PHASED | ||||||
| Z2040 | REPAIR AND ALTERATION - MULTI-PHASED | ||||||
| Z30 | ESCALATION TO CONSTRUCTION MID-POINT | ||||||
| Z40 | CONTINGENCY AND RESERVATION | ||||||
| Z4010 | CONSTRUCTION CONTINGENCY | ||||||
| Z4020 | RESERVATION | ||||||
| Z50 | ART-IN-ARCHITECTURE |