This document is a Task Group Instruction (TGI) for the USS BLUE RIDGE (LCC-19) detailing the replacement of trunk safety nets in specific ship locations. The primary objective is to remove existing safety net components and install new staples, brackets, support frames, and safety nets in the trunk area and adjacent spaces, including CPO Living Spaces, Uptake Space, Production Control Room, Electronic Imaging Center, and Fire Room. The work is scheduled to start on 7/21/2026 and complete by 11/21/2027.
Key technical specifications include fabricating and installing 52 total staples (17 with base plates, 35 without), using materials such as OS ASTM A36 3/8 inch diameter round bar, two safety nets (one below the 4th deck and one below the 5th deck) made of nylon webbing, and label tags made of aluminum alloy. The safety nets must pass a static load test of 1,750 pounds (+87, -0) for 10 minutes, with no evidence of weakening or failure. The work will be supported by SRF-JRMC, which will provide government-furnished materials, crane services, utilities, and quality assurance inspections.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SAF NET 7-75-2-T AY AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
*F/O – ACCOMPLISH REPLACEMENT OF TRUNK SAFETY NET IN 7-75-2-T
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
MASATO HOSODA 234. 315-243-4572 13-JAN-2025
APPROVED BY: CODE PHONE DATE
NORIAKI IZUMI 234. 315-243-2243 13-JAN-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Fabrication of trunk safety net eliminate from this TGI. Because contractor does not have capability.
CHANGE INSTRUCTIONS:
CH1: Delete paragraph of fabrication for safety net.(7/28/2025)
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SAF NET 7-75-2-T AY AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 1/2
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 1 J-1 1 M1-3 1
QA17
(1)
1. SCOPE/PURPOSE
1.1 Title: Replacement of Trunk Safety Net in 7-75-2-T; accomplish
1.2 Location of Work:
1.2.1 Trunk (7-75-2-T)
1.2.2 CPO Living Space (5-67-0-L)
1.2.3 CPO Living Space (5-68-2-L)
1.2.4 Uptake Space (5-76-0-Q)
1.2.5 Production Control Room (6-68-2-Q)
1.2.6 Electronic Imaging Center (6-72-2-Q)
1.2.7 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (40 EA), Staple for Safety Net in 7-75-2-T
Remarks: See Sheets 3 and 4 of 2.3 for details.
1.3.2 Quantity (4 EA), Bracket for Staple on Vertical Stiffener in 7-75-2-T Remarks: See Sheets 3 and 4 of 2.3 for details.
1.3.3 Quantity (4 EA), Support Frame for Staple on Vertical Stiffener, Transverse Bulkhead Frame 75, and Transverse Bulkhead Frame 76 in 7-75-2-T Remarks: See Sheets 3 and 4 of 2.3 for details.
1.3.4 Quantity (8 EA), Chock Plate on Support Frame in 7-75-2-T Remarks: See Sheets 3 and 4 of 2.3 for details.
1.3.5 Quantity (52 EA in Total), Staple for Safety Net in 7-75-2-T Material:
Staple; OS, ASTM A36, 3/8 Inch Diameter Round Bar.
Base Plate; OS, MIL-S-22698 GR-A, 10.2 LBs Plate Remarks: See Sheets 3 and 5 through 7 of 2.3 for details.
1.3.5.1 Quantity (17 EA), Staple with Base Plate
1.3.5.2 Quantity (35 EA), Staple
1.3.6 Quantity (One EA), No. One Net: Trunk Safety Net for Trunk 7-75-2-T Height: Below 4TH Deck
FOUO
SHIP: LCC-19 CHG/VER: 1/2
Material of Safety Net: Nylon Webbing, One Inch Wide, MIL-W-23223 TY- VII/CL-B Material of Snap Hook: Steel Material of Label Tag: Aluminum Alloy Remarks: See Plan 5-A of 2.3 for details.
1.3.7 Quantity (One EA), No. 2 Net: Trunk Safety Net for Trunk 7-75-2-T Height: Below 5TH Deck Material of Safety Net: Nylon Webbing, One Inch Wide, MIL-W-23223 TY- VII/CL-B Material of Snap Hook: Steel Material of Label Tag: Aluminum Alloy Remarks: See Plan 6-A of 2.3 for details.
1.3.8 Quantity (2 EA), Label Tag, Safety Net for 1.3.6 and 1.3.7 Material: Aluminum Alloy Size: 4-1/8 Inch X 2-1/2 Inch Remarks: See DETAIL 21-E of 2.4 for details.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - N
3 PDD 600-
ELM-250112
REPLACEMENT OF SAFETY NET
IN TRUNK (7-75-2-T)
- Y AL
L
4 DWG 804-
5184163
NETS, SAFETY, TRUNK B Y AL
L
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable.
5. PROCEDURE:
5.1 Remove each existing staple, bracket, support frame, and chock plate listed in 1.3.1 through 1.3.4 in accordance with 2.3.
5.2 Fabricate and install each new staple listed in 1.3.5 in accordance with 2.3 and 2.4.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
7/21/2026
11/21/2027
FOUO
SHIP: LCC-19 CHG/VER: 1/2
5.2.2 Accomplish a hammer test of each new staple listed in 1.3.5 in accordance with Test Note One of 2.3.
(V) “HAMMER TEST”
5.3 Accomplish a load test of each new trunk safety net listed in 1.3.6 and 1.3.7.
(I)(G) ”LOAD TEST”
5.3.1 Test load must be 1,750 LBs (plus87 LBs and minus 0 LBs).
5.3.1.1 Hold test load for 10 minutes.
5.3.1.2 No evidence of weakening or failure of the web, hooks or stitching on the tested trunk safety net are acceptable.
5.3.1.2 Document the test on the QA Form 17 Enclosure-01-1.
5.4 Fabricate and engrave label tag listed in 1.3.8 in accordance with 2.4.
5.4.1 Install new label tag listed in 1.3.8 on new trunk safety net.
5.5 Remove existing and install new trunk safety net listed in 1.3.6 and 1.3.7 in accordance with 2.3, using Ref. 2.4 for guidance.
5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.7 Notes:
5.7.1 Planner: Code 234 M. Hosoda, 243-4572
Code 231B M. Haga, 243-2543 Code 231B T. Takeishi, 243-6704 Code 233 M. Takemura, 080-9350-1458
5.7.2 Work Integration Manager (WIM) Code 333 M. Yaginuma, 080-5419-0598
5.7.3 Trunk safety net fabrication work will be accomplished under the TGI No. 3819P65416A02 (SRF-JRMC TGI).
5.7.4 JCNs OW01-8679 and OW01-8680 are related to this TGI.
5.8 Government Furnished Material (GFM):
5.8.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.9 SRF-JRMC will provide the following service work: (TGI No. 3819P65416S02)
5.9.1 [C740] Crane and crane rigging service.
5.9.2 [X99E] Utilities service.
5.9.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
FOUO
SHIP: LCC-19 CHG/VER: 1/2
5.9.6 [C133] QA Inspection for (G) symbol (s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 1/2
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SAF NET 7-75-2-T AY AY A 0 2
CU PHASE TITLE:
*F/O – ACCOMPLISH REPLACEMENT OF TRUNK SAFETY NET IN 7-75-2-T
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
SAFETY NET 7-75-2-T RZ TRUNK 7-75-2-T MS
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P65416A01-QA17.docx) saved on 11-JAN-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI ,YASUHIKO
JO: KO: TOTAL MAN HRS: TOTAL DURATION: PLANNING ACCEPTANCE:
3819P65416 A01
TOTAL MAT’L COST
CU PHASE DESCRIPTION:
The purpose of this TGI to replace trunk safety net in 7-75-2-T.
Location of Work: Trunk (7-75-2-T), CPO Living Space (5-67-0-L), CPO Living Space (5-68-2-L), Uptake Space (5-76-0-Q), Production Control Room (6-68-2-Q), Electronic Imaging Center (6-72-2-Q), Fire Room (8-76-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 RGRS, PNTR, SMTL, INSL, SFTR, WELD, ELEC
5.2 RGRS, PNTR, SMTL, INSL, SFTR, ELEC, WELD, QA
5.3 RGRs, QA
5.4 SMTL, OMCH
5.5 SFTR
5.6 PNTR, QA
CFM: asbestos sampler and analysis cost for pipe, compartment and duct insulation, lead sampling/analysis cost, adhesive for pin, pin, tyvex suit, plastic bags, gases, electrodes, grits, fastener, cable disposal cost, all paint, thinner, and MISC, enclosing/covering materials and other consumable.
Process Funding Document.
Version-1: revised task. Code 234 N. Izumi, 1/13/2025, -/-/N
Version-2: revise TGI due to delete paragraph of fabrication work for safety net. Code 234 H. Harada, 07/28/2025, Y/Y/N
FOUO
M-1
SHIP: LCC-19 CHG/VER: 1/2
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SAF NET 7-75-2-T AY AY A 0 2
CU PHASE TITLE:
*F/O – ACCOMPLISH REPLACEMENT OF TRUNK SAFETY NET IN 7-75-2-T
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P65416 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
006 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 8" IPS,
SIZE: 8-5/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORIG: C234 M. HOSODA, 243-
ORDERED FOR KTR
9B 5640 LL9607851 NA 4 N 50067457 4/EA
007 M INSULATION, INSULATION,
FLAT SHEET,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
SIZE: 36" W X 48" L X 3/4" THK,
MATL: NON-HALOGEN,
ORIG: C234 M. HOSODA, 243-
ORDERED FOR KTR
9B 5640 LL9607854 NA 4 N 50067455 2/SH
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 1/2
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
008 M ADHESIVE, ADHESIVE FOR
CLOTH
ORIG: C234 M. HOSODA, 243-
ORDERED FOR KTR
9B 8040 002738708 NA 4 Y 50075282 2/GL
009 M ADHESIVE, ADHESIVE FOR
INSULATION
ORIG: C234 M. HOSODA, 243-
ORDERED FOR KTR
9B 8040 008419773 NA 4 Y 50075144 2/PT
010 M SEALING COMPOUND, VAPOR
BARRIER
ORIG: C234 M. HOSODA, 243-
ORDERED FOR KTR
9B 8030 001742588 NA 4 Y 50075136 2/GL
101 M INSULATI, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9Q 5640 008096312 NA 4 N 50075342 8/EA
102 M SOUND CO, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9Q 5640 007565866 NA 4 N 50075344 6/SE
103 M INSULATI, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9Q 5640 008096315 NA 4 N 50075346 6/EA
104 M INSULATION, ACOUSTIC,
MATERIAL ORDER FOR KTR
ORIG: C231B M.HAGA 243-2513
9Q 5640 LL4808709 NA 4 N 50067454 6/SH
105 M TAPE,TEX, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8315 002671632 NA 4 N 50075348 2/RO
106 M TAPE,TEX, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8315 002671633 NA 4 N 50075352 2/RO
107 M CAP,SNAP, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 5325 007377648 NA 4 N 50075355
100/EA
108 M ADHESIVE, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8040 002738708 NA 4 Y 50075128 2/GL
109 M ADHESIVE, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8040 005508835 NA 4 Y 50075123 1/GL
110 M BAR,METAL, MATERIAL
ORDER FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 9510 001881738 NA 4 N 50075113 55/FT
111 M PLATE,ME, MATERIAL ORDER
FOR KTR
2 FT X 3 FT = TATOL 6 SQFT
ORIG: C231B M.HAGA 243-2513
9B 9515 001533184 NA 4 N 50075357 6/SF
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SAF NET 7-75-2-T AY AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P65416 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SAF NET 7-75-2-T AY AY A 0
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P65416A01 ENCLOSURE-01-1 TOTAL 1
TEST AND INSPECTION RECORD
QA FORM 17 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT
USS BLUE RIDGE LCC-19 OW01-8679, OW01-8680 KTR N/A TRUNK SAFETY NET
6. REFERENCES (COMPONENT DETAIL/ASSEMBLY DRAWING AND REV)
A. JFMM Rev. D Chg-3 Vol IV Ch 13 B. GSO Rev. 11, Sec 612i C. 600-ELM-250112 Rev. ”-”
D. E. F.
7. PART DESCRIPTION/PIECE NO.: Trunk Safety Net in 7-75-2-T (2 EA)
8. DESCRIPTION OF TEST AND/OR INSPECTION:
STATIC LOAD TEST FOR TRUNK SAFETY NET
NOTE: 10% of strap assemblies per net panel (minimum of one) are to be tested in accordance with reference B. The tested strap assemblies must have two opposite snap hooks.
1. Suspend/rig one border web with snap hooks from the suitable support using the rigging gear equipments (shackles, wire ropes and etc.).
2. Slowly apply a static test load of 1,750 (+87, -0) LBs to opposite webbing snap hook supporting one border web of the net opening. Hold for 10 Minutes.
3. Slowly remove the test load and visually inspect the tested safety net to meet the following acceptance criteria.
Acceptance criteria: There must be no evidence of weakening or failure of the web, hooks or stitching on the tested trunk safety net.
"TEST ITEM #: No. 1: Below 4TH Deck, Trunk (7-75-2-T) (EL 3-A and PLAN 5-A of Reference C) #: No. 2: Below 5TH Deck, Trunk (7-75-2-T) (EL 3-A and PLAN 6-A of Reference C)
9. RESULTS:
Use Continuation Sheet-1.
10. CRAFTSMAN SIGNATURE DATE 11. QA INSPECTOR SIGNATURE DATE
12. RECORD HAS BEEN REVIEWED FOR COMPLETENESS
QA WCS SIGNATURE (QAO/QAS SIGNATURE FOR SUBSAFE/SOC/SFCC ONLY) DATE
3819P65416A01 ENCLOSURE-01-1 (Continuation Sheet-1) TOTAL 1
9. RESULTS (Continued):
*TEST ITEM
NO.
TOTAL STRAP
ASSEMBLIES
TEST STRAP
ASSEMBLIES TEST LOAD TEST
DURATION TEST RESULT
No. 1 6 EA 1 EA LBs Min SAT / UNSAT
No. 2 7 EA 1 EA LBs Min SAT / UNSAT
TEST LOAD: 1,750 (+87, -0) LBs /TEST DURATION: 10 Minutes (Reference: A, B and C) Acceptance Criteria: There must be no evidence of weakening or failure of the web, hooks or stitching on the tested trunk safety net.
Note: 10% of strap assemblies per net panel (minimum of one) are to be tested in accordance with reference B.
The tested strap assemblies must have two opposite snap hooks.
*TEST FIXTURE INFO:
File details come from the government source that posted it. Updated .