3819P25514A01_c0v0_FY26_TGI.pdf
PDF 179 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This Task Group Instruction (TGI) details a naval maintenance project for the USS Blue Ridge to replace the foundation of the 1B Auxiliary Machinery Cooling Water (AMCW) Strainer in Fire Room 8-76-0-E. The project is scheduled to start on 7/21/2026 and complete by 11/21/2027, with work focused on removing the existing foundation, fabricating and installing a new foundation, and performing associated tasks such as cleaning the bilge area and addressing potential lead and asbestos hazards.
The task involves multiple materials and components, including metal plates, screws, studs, nuts, washers, and various pipe insulation materials from brands like K-FLEX ECO. SRF-JRMC will provide government-furnished material and services, including crane and rigging, utility services (electrical, air, water, and steam), and safety and quality assurance inspections. The project will be executed by contractor personnel under the guidance of planners from codes 231B, 232, and 234, with oversight from a Work Integration Manager.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
09-JAN-2025 1053
20.14.15.2.9020 (September 2024) ICN: 3819P25514 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FDN OF 1B AMCW AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPLACE FOUNDATION OF 1B AMCW STRAINER IN 8-76-0-E
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 6
EM029014
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ASHINA, TAKAAKI 231B 3152434370 19-DEC-2024
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 19-DEC-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-9014
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
255A1114
1. SCOPE/PURPOSE:
1.1 Title: Foundation of 1B Auxiliary Machinery Cooling Water (AMCW) Strainer in 8-76-0-E; replace
1.2 Location of Work:
1.2.1 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Foundation, including chock of 1B AMCW Strainer in 8-76-0-E, Frames between 84 and 86, Starboard
Remarks: See Ref. No. 3 for material and detail
1.4 Security Classification: None.
1.5 Initial Condition:
TGI Short Form
09-JAN-2025 1053
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P25514 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FDN OF 1B AMCW AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPLACE FOUNDATION OF 1B AMCW STRAINER IN 8-76-0-E
FOUO Pg 2 of 6
CU PHASE DESCRIPTION (Cont.)
1.5.1 Potential Lead Hazard
1.5.2 Potential Asbestos Hazard
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 11/21/2027
2. PROCEDURE:
2.1 Pump out, clean and dry the bilge area located in 1.2.1 free from oil, debris, and other foreign matter.
2.2 Remove existing, fabricate and install new each foundation listed in 1.3.1 in accordance with Ref. No. 3, using Ref. No. 4 for guidance.
2.2.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.
2.3 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.4 Notes:
2.4.1 Planner: Code 231B T. Ashina, 243-4370
Planner: Code 232 K. Ikeda, 243-0958 Planner: Code 234 A. Onose, 243-0093
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 JCN EM02-9014 is related to this TGI.
2.5 Government Furnished Material (GFM):
2.5.1 SRF-JRMC will provide GFM listed in the Material List.
2.6 SRF-JRMC will provide the following service work: (TGI No. 3819P25514S02).
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA Inspection for (G) symbol(s).
09-JAN-2025 1053
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P25514 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FDN OF 1B AMCW AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPLACE FOUNDATION OF 1B AMCW STRAINER IN 8-76-0-E
FOUO Pg 3 of 6
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
09-JAN-2025 1053
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P25514 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FDN OF 1B AMCW AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPLACE FOUNDATION OF 1B AMCW STRAINER IN 8-76-0-E
FOUO Pg 4 of 6
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 113-7541895 FDNS FIRE RM INCDTL S/A
- Y ALL
4 DWG 114-2491157 TRANSV BHD FR 76 & 86 N Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 SFTR, LBR.
2.2 SFTR, WELD, PNTR, QA, PFTR, INSL, OMCH.
2.3 PNTR, QA
Structure Work CFM: all paints, thinner, grits, including disposal cost, lead analysis cost, firewatch cost, and misc such as electrode, gases, temporary covering, and other consumable.
Machinery Work and Piping Work CFM: bulk sampling and analysis cost, marine chemist, and misc.
Process Funding Document
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PLATE,ME, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9B 9515 001533184 NA 4 N 50065286 14/SF
200 M SCREW,CA, ORIG: C232, K.
IKEDA, 243-0958
ORDERED FOR KTR
9B 5305 001744057 NA 4 N 50065287 16/EA
201 M STUD, ORIG: C232, K. IKEDA,
243-0958
ORDERED FOR KTR
SIZE: 1/2"-13UNC-2A X 1-3/4"
LG
MIL-STD-1222, TYPE: I, STYLE:
D. FULL BODY
NI-CU (QQ-N-281), GRADE 400
OR 405
NA 4 N 6/EA
202 M NUT,PLAI, ORIG: C232, K.
IKEDA, 243-0958
ORDERED FOR KTR
9B 5310 002725700 NA 4 N 50065288 22/EA
203 M RUBBER S, ORIG: C232, K.
IKEDA, 243-0958
ORDERED FOR KTR
9B 5330 014905071 NA 4 N 50065071 1/SH
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P25514 KEY OP: A01
09-JAN-2025 1053
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P25514 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FDN OF 1B AMCW AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPLACE FOUNDATION OF 1B AMCW STRAINER IN 8-76-0-E
FOUO Pg 5 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
204 M SCREW,CAP,HEXAGON H,
ORIG: C232, K. IKEDA, 243-
ORDERED FOR KTR
9B 5305 014233251 NA 4 N 50065075 4/EA
205 M WASHER,FLAT, ORIG: C232, K.
IKEDA, 243-0958
ORDERED FOR KTR
9B 5310 005847980 NA 4 N 50065080 4/EA
400 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 2" IPS,
SIZE: 2-3/8" ID X 3/4" THK X 6
FT LG,
ORDERED FOR KTR
ORIG: C234 A. ONOSE 070-
7787-2051
9B 5970 LL9607844 NA 4 N 50067519 2/EA
401 M INSULATION PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4-1/8" OD TUBE,
SIZE: 4-1/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDERED FOR KTR
ORIG: C234 A. ONOSE 070-
7787-2051
9B 5970 LL9607847 NA 4 N 50067521 2/EA
402 M INSULATION, PIPE,
INSULATION, PIPE, BRAND: K-
FLEX ECO, SPECIFICATION
COMPLIANCE: EB 4013, FOR
SIZE: 2-1/2" IPS, SIZE: 2-7/8" ID
X 3/4" THK X 6FT LG, UI: EA/6
FT(ONE CONTINUOUS
LENGTH REQUIRED), MATL:
NON-HALOGEN, **GSA
ADVANTAGE ITEM**
ORDERED FOR KTR
C234 A. ONOSE 070-7787-2051
9B 5970 LL9607845 NA 4 N 50067523 2/EA
403 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR SIZE: 4" IPS,
SIZE: 4-1/2" ID X 3/4" THK X 6
FT LG, UI: EA/6 FT(ONE
CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORIG:C-234 A. ONOSE 070-
7787-2051
ORDERED FOR KTR
9B 5640 LL9607848 NA 4 N 50067525 2/EA
09-JAN-2025 1053
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P25514 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FDN OF 1B AMCW AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPLACE FOUNDATION OF 1B AMCW STRAINER IN 8-76-0-E
FOUO Pg 6 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
404 M ADHESIVE, ADHESHIVE FOR
PLASTIC TUBE
ORIG: C-234 A. ONOSE 070-
7787-2051
ORDERED FOR KTR
9B 8040 008419773 NA 4 Y 50065086 2/PT
405 M ADHESIVE, ADHESIVE FOR
CLOTH
ORIG: D234 A. ONOSE 070-
7787-2051
ORDERED FOR CONTRACTOR
9B 8040 002738708 NA 4 Y 50065095 2/GL
File details come from the government source that posted it. Updated .