3819P25001T01_c0v0_TGI.pdf
PDF 83 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This document is a WebAIM Short Form Task Group Instruction for the USS Blue Ridge (LCC-19), dated 14-APR-2025, focusing on a Low Pressure Air Tightness & Operational Test for the KTR system. The task instruction (TGI No. 55121-3-300KTR) involves conducting a tightness and operational test on the low pressure air system, referencing technical publication TP 55121-3-300KTR. The document outlines work to be performed by three groups: Contractor (V), Quality Assurance (G), and Ship's Force (S), all of whom are required to accomplish and document the test in accordance with the referenced technical publication. The instruction includes administrative details such as preparation by Harada Kazuya on 26-MAR-2025 and approval by Irei Sean F. on 12-APR-2025, with the zone manager listed as Takahashi Yasuhiko.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
14-APR-2025 0859
20.14.15.2.9020 (September 2024) ICN: 3819P25001 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 55121-3-300KTR TT T 7 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 55121
CU PHASE TITLE: LOW PRESSURE AIR (T & OP), S/A 98081D - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EXSAZC89
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HARADA, KAZUYA 246.2 3152432048 26-MAR-2025
APPROVED BY: CODE: PHONE: DATE:
IREI, SEAN F. 246.2 3152437427 12-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSA-ZC89
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
250A0001
Tightness & Operational Test for Low Pressure Air System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
14-APR-2025 0859
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P25001 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 55121-3-300KTR TT T 7 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 55121
CU PHASE TITLE: LOW PRESSURE AIR (T & OP), S/A 98081D - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 55121-3-300KTR LOW AND MEDIUM
PRESSURE AIR (T & OP) -
KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 55121-3-300KTR.
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 55121-3-300KTR.
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 55121-3-300KTR.
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P25001 KEY OP: T01
File details come from the government source that posted it. Updated .