3819P22124A01_c0v0_FY26_TGI.pdf
PDF 226 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, detailing a dry lay-up procedure for 1A/B boilers. The task involves performing dry lay-up on two Foster Wheeler main propulsion boilers (1A and 1B), each with a design pressure of 705 PSIG and maximum operating pressure of 655 PSIG, located in the Fire Room (8-76-0-E). The contractor start date is 7/21/2026, with work completion expected by 11/21/2027.
SRF-JRMC (Ship Repair Facility Japan Maintenance Activity) will provide several supporting services, including crane and crane rigging, utility services (electrical, low pressure air, water, and steam), safety and gas-free inspections, and quality assurance inspections. The task requires specific materials such as plastic sheets, rubber sheets, rivets, nuts, washers, studs, hose clamps, and air duct hoses, which will be ordered by the originating code (C234). The procedure will follow guidance from multiple reference documents, including NAVSEA and local standard items, and specific technical manuals for boiler maintenance.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
21-DEC-2024 1127
20.14.15.2.9020 (September 2024) ICN: 3819P22124 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
EM02L200
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAKEMOTO, HIROTAKA 234 3152434479 09-DEC-2024
APPROVED BY: CODE: PHONE: DATE:
IZUMI, NORIAKI 234 3152432243 17-DEC-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-L200
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1124
1. SCOPE/PURPOSE:
1.1 Title: Dry Lay up of 1A/B Boiler; accomplish
1.2 Location of Work:
1.2.1 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Boiler, Main Propulsion, 1A
Mfr: Foster Wheeler Corp Mfr ID: N/A Design Pressure: 705 PSIG Max Operating Pressure: 655 PSIG
APL: 021550096
TGI Short Form
21-DEC-2024 1127
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22124 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.3.2 Quantity (One EA), Boiler, Main Propulsion, 1B
Mfr: Foster Wheeler Corp Mfr ID: N/A Design Pressure: 705 PSIG Max Operating Pressure: 655 PSIG
APL: 021550096
1.4 Security Classification: None.
1.5 Initial Condition: None
1.6 Contractor Start Date: 7/21/2026
1.7 Contractor Work Completion Date: 11/21/2027
2. PROCEDURE:
2.1 Accomplish dry lay up of the boiler listed in 1.3.1 and 1.3.2 in accordance with paragraph 221-2.3.3.1 of Ref. No. 3, using Ref. No. 4 and Ref. No. 5 for guidance.
2.1.1 Accomplish the requirements of 099-906YO of Ref. No. 2.
2.1.1.1 Accomplish the requirements of 009-09 of Ref. No. One.
2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.3 Notes:
2.3.1 Planner: Code 234 H.Takemoto, 243-4479
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 JCN EM02-L200 is related to this TGI.
2.3.4 ELM-250053 was issued for the reference of ICN No.3819N22107, and the ELM was also authorized to apply this TGI by Code 260.
2.3.5 ELM-151002 was issued for the reference of CVN -68 class ship, and the ELM was also authorized to apply this TGI by Code 260.
2.4 Government Furnished Material (GFM):
2.4.1 SRF-JRMC will provide GFM listed in the Material List.
2.5 SRF-JRMC will provide the following service work: (TGI No: 3819P22124S02)
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Provide utility service, electrical.
21-DEC-2024 1127
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22124 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
2.5.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Provide safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Provide gas free inspection for SRF-JRMC employees.
2.5.6 [C133] Provide QA inspection for (G) symbols.
21-DEC-2024 1127
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22124 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP
FOUO Pg 4 of 5
OTHER SPECIAL REQUIREMENTS:
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM S9086-GY-STM-
010/CH-221
Boilers 8 N
4 PDD 200-ELM-
250053
TEMPORARY MANHOLE
COVER FOR HOT AIR LAY-
UP, FAB OF
- Y ALL
5 PDD 525-ELM-
151002
STANDARD SETUP
PROCEDURE OF DRY AIR
LAY-UP RIG FOR CVN-68 CL
SHIP CATSTM WET ACC
A Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 BLRM: QA:
2.2 PNTR:
CFM for hot lay up equipment, tape, paint and MISC such as covering material, plastic bags, and etc.
Process Funding Document
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PLASTIC SHEET, ORIGI:C234
H.TAKEMOTO 243-4479
ORDER FOR KTR
9B 9330 005194300 NA 4 N 1/SH
002 M SHEET,ME, ORIGI:C234
H.TAKEMOTO 243-4479
ORDER FOR KTR
9B 9535 002326868 NA 4 N 3/SH
003 M RUBBER SHEET,SOLID,
ORIGI:C234 H.TAKEMOTO 243-
ORDER FOR KTR
9B 9320 012303891 NA 4 N 1/SH
004 M RIVET,BLIND, ORIGI:C234
H.TAKEMOTO 243-4479
ORDER FOR KTR
9B 5320 008503282 NA 4 N 1/HD
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22124 KEY OP: A01
21-DEC-2024 1127
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22124 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP
FOUO Pg 5 of 5
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
005 M NUT,PLAIN,HEXAGON,
ORIGI:C234 H.TAKEMOTO 243-
ORDER FOR KTR
9B 5310 013722666 NA 4 N 20/EA
006 M WASHER,FLAT, ORIGI:C234
H.TAKEMOTO 243-4479
ORDER FOR KTR
9B 5310 007679425 NA 4 N 1/HD
007 M NUT, HEX, SLFLKG,
ORIGI:C234 H.TAKEMOTO 243-
ORDER FOR KTR
9B 5310 004114385 NA 4 N 20/EA
008 M STUD,FULLY THREADED,
STUD, FULLY THREADED, SIZE
1/2"-13UNC-1A X 10"LG,
STAINLESS STEEL 18-8, MIN
TENSILE STRENGTH 70000PSI,
MIN ROCKWELL HARDNESS
B72.
ORIGI:C234 H.TAKEMOTO 243-
ORDER FOR KTR
9B 5307 LL9003873 NA 4 N 10/EA
009 M STANDOFF, THRD, HEX,
STANDOFF, THREADED,
HEXAGON, 1/2-13UNC-2B, 1-
1/4" LONG, CRES 18-8.
ORIGI:C234 H.TAKEMOTO 243-
ORDER FOR KTR
9B 5340 LL9007282 NA 4 N 10/BA
010 M HOSE,AIR DUCT, ORIGI:C234
H.TAKEMOTO 243-4479
ORDER FOR KTR
HOSE, AIR DUCT, 4"
USING HOT AIR LAY-UP
9B 4720 005402600 NA 4 N 400/FT
011 M CLAMP,HOSE, CLAMP,
ORIGI:C234 H.TAKEMOTO 243-
ORDER FOR KTR
9B 4730 003551872 NA 4 N 50/EA
012 M CLAMP,HOSE, CLAMP, AIR
DUCT HOSE, CRES 301, MIL-
DTL-8783/1A
ORIGI:C234 H.TAKEMOTO 243-
ORDER FOR KTR
9B 4730 008382379 NA 4 N 50/EA
013 M HOSE,AIR DUCT, DUCT 6”
ORIGI:C234 H.TAKEMOTO 243-
ORDER FOR KTR
9B 4720 005951719 NA 4 N 50/FT
File details come from the government source that posted it. Updated .