3819P22115A10_c0v0_FY26_TGI.pdf
PDF 161 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This document is a Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) detailing the removal and installation of 1B Boiler Safety Valves and Pilot Panels. The work is scheduled to be performed between July 21, 2026, and November 21, 2027, in the Fire Room (8-76-0-E). The project involves replacing multiple safety valve and pilot panel assemblies manufactured by Greno Industries Inc., including high drum, low drum, and superheater safety valves, each meeting MIL-V-24740 specifications. The instruction includes detailed material lists specifying numerous components such as gaskets, bolts, nuts, and washers, with specific stock numbers, quantities, and material requirements. The task will be executed by Code 232, with support services provided by SRF-JRMC, including crane rigging, utilities services, and quality assurance inspections.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: 1B BLR SAF V & PNL AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
*(K2-1) - F/O – REMOVE AND INSTALL 1B BOILER SAFETY VALVES AND PILOT PANELS
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
KOUHEI SUZUKI 232. 315-243-2490 22-FEB-2025
APPROVED BY: CODE PHONE DATE
HIDEMI SENDA 232. 315-243-5615 22-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II
MIC-L-1
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: 1B BLR SAF V & PNL AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-4 QA34A
(1)
J-1 M 1-5 Map (1)
1. SCOPE/PURPOSE
1.1 Title: 1B Boiler Safety Valves and Pilot Panels: remove and install
1.2 Location of Work:
1.2.1 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), 1B Boiler High Drum Safety Valve and Pilot Panel Assembly Mfr: Greno Industries Inc.
Specification: MIL-V-24740
1.3.1.1 Quantity (One EA), Safety Valve
Specification: MIL-V-24740, Class I, Style 57 Mfr Id: 6350-357 Size: Inlet 2-1/2-Inch IPS, Outlet 3-1/2-Inch IPS
APL: 88A150412
Item No: V-1 of 2.3.
1.3.1.2 Quantity (One EA), Pilot Panel
Model: 8000
APL: 501550030
Item No: PC-1 of 2.3.
1.3.2 Quantity (One EA), 1B Boiler Low Drum Safety Valve and Pilot Panel Assembly Mfr: Greno Industries Inc.
Specification: MIL-V-24740
1.3.2.1 Quantity (One EA), Safety Valve
Specification: MIL-V-24740, Class I, Style 57 Mfr Id: 6350-357 Size: Inlet 2-1/2-Inch IPS, Outlet 3-1/2-Inch IPS
APL: 88A150412
Item No: V-2 of 2.4.
1.3.2.2 Quantity (One EA), Pilot Panel
Model: 8000
APL: 501550030
Item No: F-100 of 2.4.
1.3.3 Quantity (One EA), 1B Boiler Superheater Safety Valve and Pilot Panel Assembly Mfr: Greno Industries Inc.
Specification: MIL-V-24740
1.3.3.1 Quantity (One EA), Safety Valve
Specification: MIL-V-24740, Class I, Style 23
FOUO
SHIP: LCC-19 CHG/VER: 0/0
Mfr Id: 6350-323 Size: Inlet 2-1/2-Inch IPS, Outlet 3-1/2-Inch IPS
APL: 88A150412
Item No: V-1 of 2.4.
1.3.3.2 Quantity (One EA), Pilot Panel
Model: 8000
APL: 501550030
Item No: F-100 of 2.4.
1.3.3.3 Quantity (8 EA), Safety Valve Inlet Side Stud Bolt (MIC-L-I) Material: Alloy Steel, Grade B16 or Equal.
Size: 3/4”-10UNC-2A, 5-1/2 Inch LG
1.3.3.4 Quantity (16 EA), Safety Valve Inlet Side Heavy Hex Nut (MIC-L-I) Material: Alloy Steel, Grade B7 or Equal.
Size: 3/4"-10UNC-2B
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 11/21/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 200-
8337506
INSTALLATION GIS SYSTEM
HIGH DRUM SAFETY VALVE
A Y AL
L
4 DWG 200-
6577980
S/A 1371 LCC-19 SUPHTR/LOW
DRUM SAFE V REPL AND ASSOC
PP INSTL
B Y AL
L
5 TM S6435-
Q1-MMO-
Remote Operated Pilot Sdafety Valve System for 600 PSI Boilers
6 N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 009-27 of 2.1.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.1.1 Accomplish the requirements of 009-09 of 2.1.
5.2 Remove each equipment listed in 1.3.1 through 1.3.4, using 2.3 through 2.5 and Enclosure-01 for guidance.
5.3 Install each equipment listed in 1.3.1 through 1.3.4, using 2.3 through 2.5 and Enclosure-01 for guidance.
5.3.1 Restore each mating surface exposed by each equipment removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.
5.3.2 Remove existing and install each new steam piping joint gasket, conforming to MIL-G-24716.
5.3.3 Document joint/component record of FJ-1 on QA Form 34A, Enclosure-02.
5.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.5 Notes:
5.5.1 Planner: Code 232 K. Suzuki, 243-2490
5.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.5.3 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line item “K2-1”.
5.5.4 Each equipment will be overhaul by Original Equipment Manufacturing (OEM). Notify Business Agent (BA) to coordinate the shipment and deliver each removed equipment listed in 1.3.1 through 1.3.3 to A61. OEM TGI number is 3819P22115 A12. Procedure 5.3 may be performed after completion of TGI No. 3819P22115 A12.
5.5.5 JCN EM02-L192 is related to this TGI.
5.6 Government Furnished Material (GFM):
5.6.1 SRF-JRMC will provide GFM listed in the Material List.
5.7 SRF-JRMC will provide the following service work: (TGI No. 3819P22115S11)
5.7.1 [C740] Crane and crane rigging service.
5.7.2 [X99E] Utilities service, electrical.
5.7.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.7.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.7.6 [C133] QA Inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
1B BLR SAF V & PNL AY A 0 0
CU PHASE TITLE:
*(K2-1) - F/O – REMOVE AND INSTALL 1B BOILER SAFETY VALVES AND PILOT PANELS
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
1B BLR SPHTR STY VLV PA 1B BLR HD SFTY VLV PA 1B BLR LD SFTY VLV PA 1B SPHTR SFTY PLT
V- 1B LO DRUM SFTY PLT V- 1B HI DRUM SFTY PLT V-
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P22115A10-MAP.docx) saved on 21-FEB-2025 0000.
2. ENCLOSURE-02 (3819P22115A10-QA34A.docx) saved on 21-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
KANKE ,KOUHEI
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P22115 A10
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to remove and install 1B boiler each safety valve and pilot panel.
Location of Work:
Fire Room (8-76-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 OMCH: HRs, QA HRs 22 KE PC
5.2 OMCH: HRs, RGRS HRs 22 KE PC
5.3 OMCH: HRs, RGRS HRs, QA HRs 22 KE PC
5.4 PNTR: HRs, QA: HRs 22 KE PC
Machinery Work CFM for paint and misc such as plastic sheets/bags and other consumable.
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
1B BLR SAF V & PNL AY A 0 0
CU PHASE TITLE:
*(K2-1) - F/O – REMOVE AND INSTALL 1B BOILER SAFETY VALVES AND PILOT PANELS
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P22115 A10
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M GASKET, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
T/M: S6435-Q1-MMO-010,
FIG.A-1-2
9B 5330 012886619 NA 4 N 50495146 9/EA
002 M BOLT, BOLT, M18 X 2.5 X 80
MM, MATERIAL CARBON
STEEL, ASTM-A-36, FOR PILOT
PANEL ASSEMBLY,
T/M: S6435-Q1-MMO-010,
FIG.A-1-49
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
9B 5306 LL9303489 NA 4 N 50517465 12/EA
003 M NUT, NUT, M18 X 2.5,
MATERIAL CARBON STEEL,
ASTM-A-36
FOR PILOT PANEL ASSEMBLY,
T/M: S6435-Q1-MMO-010,
FIG.A-1-50
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
9B 5310 LL9303490 NA 4 N 50517469 12/EA
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
004 M LOCK WASHER, LOCK
WASHER, M18, MATERIAL:
CARBON STEEL, ASTM-A-36,
FOR PILOT PANEL ASSEMBLY,
T/M: S6435-Q1-MMO-010,
FIG.A-1-51
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
9B 5310 LL9303491 NA 4 N 50517478 12/EA
005 M WASHER,FLAT, WASHER,
FLAT, M18, MATERIAL
CARBON STEEL, ASTM-A-36,
FOR PILOT PANEL ASSEMBLY,
T/M: S6435-Q1-MMO-010,
FIG.A-1-52
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
9B 5310 LL9303492 NA 4 N 50517483 12/EA
006 M GASKET,SPIRAL WOUND,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR LOW DRUM VALVE
OUTLET FLANGE SPIRAL
GASKET
9B 5330 013387810 NA 4 N 50495148 1/EA
007 M GASKET,S, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR LOW DRUM VALVE
INLET FLANGE SPIRAL
GASKET
9B 5330 013387888 NA 4 N 50495201 1/EA
008 M STUD,CONTINUOUS THR,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR LOW DRUM VALVE
OUTLET FLANGE BOLT
9B 5307 006853458 NA 4 N 50495149 8/EA
009 M STUD,CON, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR LOW DRUM VALVE
INLET FLANGE BOLT
9B 5307 006376493 NA 4 N 50495202 8/EA
010 M NUT,PLAI, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR LOW DRUM VALVE
OUTLET FLANGE NUT
9B 5310 006373631 NA 4 N 50495204 16/EA
011 M NUT,PLAIN,HEXAGON, ORIG:
C232 K. SUZUKI 243-2490
ORDERED FOR KTR
FOR LOW DRUM VALVE
INLET FLANGE BOLT
9B 5310 008405873 NA 4 N 50505173 16/EA
011 M NUT,PLAIN,HEXAGON, ORIG:
C232 K. SUZUKI 243-2490
ORDERED FOR KTR
FOR LOW DRUM VALVE
INLET FLANGE BOLT
9B 5310 008405873 NA 4 N 50495139 16/EA
FOUO
M-3
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
012 M GASKET,S, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR LOW DRUM VALVE
UPPER AND LOWER
ACTUATION FLANGE GASKET
9B 5330 013387816 NA 4 N 50495205 2/EA
013 M STUD,CONTINUOUS THR,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR LOW DRUM VALVE
UPPER AND LOWER
ACTUATION FLANGE BOLT
9B 5307 006376465 NA 4 N 50495150 8/EA
014 M NUT,PLAI, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR LOW DRUM VALVE
UPPER AND LOWER
ACTUATION FLANGE NUT
9B 5310 006373628 NA 4 N 50495207 16/EA
015 M GASKET,SPIRAL WOUND,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR HIGH DRUM VALVE
OUTLET FLANGE SPIRAL
GASKET
9B 5330 013387810 NA 4 N 50495151 1/EA
016 M GASKET,S, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR HIGH DRUM VALVE
INLET FLANGE SPIRAL
GASKET
9B 5330 013387888 NA 4 N 50495208 1/EA
017 M STUD,CONTINUOUS THR,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR HIGH DRUM VALVE
OUTLET FLANGE BOLT
9B 5307 006853458 NA 4 N 50495152 8/EA
018 M STUD,CON, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR HIGH DRUM VALVE
INLET FLANGE BOLT
9B 5307 006376493 NA 4 N 50495209 8/EA
019 M NUT,PLAI, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR HIGH DRUM VALVE
OUTLET AND INLET FLANGE
NUT
9B 5310 006373631 NA 4 N 50495210 16/EA
020 M GASKET,S, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR HIGH DRUM VALVE
UPPER ACTUATION FLANGE
GASKET
9B 5330 013387832 NA 4 N 50495212 1/EA
FOUO
M-4
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
021 M GASKET,S, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR HIGH DRUM VALVE
LOWER ACTUATION FLANGE
GASKET
9B 5330 013387849 NA 4 N 50495213 1/EA
022 M STUD,CON, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR HIGH DRUM VALVE
UPPER ACTUATION FLANGE
BOLT
9B 5307 006376494 NA 4 N 50495214 8/EA
023 M STUD,CONTINUOUS THR,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR HIGH DRUM VALVE
LOWER ACTUATION FLANGE
BOLT
9B 5307 006376465 NA 4 N 50495153 8/EA
024 M NUT, HEX, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR HIGH DRUM VALVE
LOWER ACTUATION FLANGE
NUT
NUT, HEX, 1/2"-13UNC-2B,
ALLOY STEEL, ASTM A194,
GRADE 7.MIL-DTL-1222 TY I,
GRADE 7.
9Z 5310 LL4709555 NA 4 N 50497487 16/EA
025 M NUT, HEX, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR HIGH DRUM VALVE
UPPER ACTUATION FLANGE
NUT
NUT, HEX HEAD,
SPEC: MIL-DTL-1222 TYPE I &
ASTM A194,
SIZE: 3/4"-10UNC-2B,
MATL: ALLOY STEEL, GRADE
7, DO NOT CROSS NSN: 5310-00-
637-3631(GRADE 4 OR 7)
9Z 5310 LL4709559 NA 4 N 50497488 16/EA
026 M GASKET,SPIRAL WOUND,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR SUPERHEATER VALVE
OUTLET FLANGE SPIRAL
GASKET
9B 5330 013387810 NA 4 N 50495154 1/EA
027 M GASKET,S, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR SUPERHEATER VALVE
INLET FLANGE SPIRAL
GASKET
9B 5330 013387888 NA 4 N 50495215 1/EA
FOUO
M-5
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
028 M STUD,CONTINUOUS THR,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR SUPERHEATER VALVE
OUTLET FLANGE BOLT
9B 5307 006853458 NA 4 N 50495155 8/EA
029 M STUD,CONTINUOUS THR,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR SUPERHEATER VALVE
INLET FLANGE BOLT
1H 5307 012345608 L1 I 1 N 50495142 8/EA
030 M NUT,PLAI, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR SUPERHEATER VALVE
OUTLET FLANGE NUT
9B 5310 006373631 NA 4 N 50495199 16/EA
031 M NUT,PLAIN,HEXAGON, ORIG:
C232 K. SUZUKI 243-2490
ORDERED FOR KTR
FOR SUPERHEATER VALVE
INLET FLANGE BOLT
1H 5310 013833251 L1 I 1 N 50495144 16/EA
032 M GASKET,S, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR SUPERHEATER VALVE
UPPER AND LOWER
ACTUATION FLANGE GASKET
9B 5330 013387816 NA 4 N 50495200 2/EA
033 M STUD,CONTINUOUS THR,
ORIG: C232 K. SUZUKI 243-
ORDERED FOR KTR
FOR SUPERHEATER VALVE
UPPER AND LOWER
ACTUATION FLANGE BOLT
9B 5307 006376465 NA 4 N 50495147 8/EA
034 M NUT,PLAI, ORIG: C232 K.
SUZUKI 243-2490
ORDERED FOR KTR
FOR SUPERHEATER VALVE
UPPER AND LOWER
ACTUATION FLANGE NUT
9B 5310 006373628 NA 4 N 50495216 16/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 1B BLR SAF V & PNL AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P22115 A10
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 1B BLR SAF V & PNL AY A 0
MAPPING PLAN
3819P22115A10 ENCLOSURE-01
SHEET 1 OF 1
FJ-1
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
JOINT/COMPONENT ASSEMBLY RECORD Planning must fill in blocks identified by a prior to issuing.
QA FORM 34A
(For Assemblies Not Requiring Torque Documentation)
PAGE __1___ OF __1___
1. SHIP HULL
NO.
2. JCN 3. LWC/SHOP 4. CWP/REC
NO.
5. SYSTEM/COMPONENT/ROTATABLE POOL
NO
USS BLUE RIDGE LCC-19 EM02-L192 KTR N/A 1B Superheater Safety Valve Inlet Flange
6. REFERENCES (Specify Assembly Number if applicable.)
A. MAPPING PLAN, ENCLOSURE-01 B. TGI No. 3819P22115 A10 C.
D. E. F.
7. NEW MATERIAL
PC
NO.
REF. JOINT
ID
DESCRIPTION
(Include thickness for shims; diameter and thread pitch for fasteners)
QTY LOE IDENT (E.G., MIC NO/NSN/ROTATABLE POOL
NO)
(FOR LEVEL I FASTENERS: Include Material Marking, Color Code, Heat/Lot Number, and
Manufacturer’s Symbol)
CRAFT
INT
8. JOINT DATA
FOR OTHER THAN JOINT MAKE-UP, DESCRIBE
THE SPECIFIC ATTRIBUTE AND LOCATION OF
THE ACCEPTANCE CRITERIA. IDENTIFY
JOINTS THAT REQUIRE CONTROLLED
ASSEMBLY PROCEDURES.
INSPECTOR (SHIPYARDS ONLY - FOR CONTROLLED ASSEMBLY JOINTS ONLY) & CRAFTSMAN
SIGNATURE CERTIFIES:
(1) JOINT SEALING SURFACES, ALIGNMENT, GAP AND PARALLELISM ARE SAT PER
SPECIFIED REQUIREMENTS AND STUDS HAVE BEEN CHECKED FOR ROTATION IF APPLICABLE, OR
ATTRIBUTE IS ACCEPTABLE PER SPECIFIED CRITERIA.
(2) ALL NEW MATERIAL ASSOCIATED WITH THIS JOINT MEETS SPECIFIED REQUIREMENTS, IS
INSTALLED & LISTED IN BLOCK 7; EXISTING MATERIAL ASSOCIATED WITH THIS JOINT IS
ACCEPTABLE AND CORRECTLY INSTALLED.
FOR FLEET ONLY: FOR NON-CONTROLLED ASSEMBLIES WHEN NO SPECIFIC ATTRIBUTE IS
SPECIFIED, INSPECTOR SIGNATURE CERTIFIES ACCEPTANCE OF LEVEL I MATERIAL ONLY.
JOINT ID & JOINT TYPE OR ATTRIBUTE
DESCRIPTION
JT.
REF
(C) FOR
CRAFTSMAN OR
(I) FOR
INSPECTOR
CRAFTSMAN SIGNATURE/BADGE/DATE (FOR EACH JOINT/ATTRIBUTE)
INSPECTOR SIGNATURE/BADGE/DATE (FOR EACH (I) JOINT/ATTRIBUTE)
(C)
A. FJ-1
A B
B.
C.
D.
E.
9. LOCKING DEVICE INSTALLED
OR REQD ACTION:
NA
MATL. DESCRIPTION/NSN/PC. NO. JT. ID. CRAFTSMAN SIGNATURE/BADGE/DATE SAT
10. REMARKS (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA) (FOR USE WHEN SIGNATURE DOES NOT ALREADY
APPEAR ON FORM)
INITIAL SIGNATURE/BADGE NO.
11. LWC SUPERVISOR/SHOP SUPERVISOR SIGNATURE/BADGE NO (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
12. QAS SIGNATURE /BADGE NO (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
3819P22115A10 ENCLOSURE-02-1 TOTAL 1
File details come from the government source that posted it. Updated .