Addendum 003 - Valves - Dual Disc Check Valves R0.pdf
PDF 429 KB Posted
- Attached to
- Request for Proposal - Construction Services for Project L-897, Central Plateau Water Treatment Facility
- Solicitation number
- 338214
- Issued by
-
Department of Energy
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER PAGE OF SELLER’S SUBMITTAL
City Name: Hanford, WA - MSA
Pall Project No.: 01.000287
Job Number: Project L-897, Subcontract 70816
Task Register 6 (Task 1 – VI Submittal Package)
To: (Contractor)
Mission Support Alliance, LLC (MSA)
PO Box 650
Richland, WA 99352
From: (Subcontractor)
Pall Water
A Division of Pall Corporation
839 State Route 13
Cortland, NY 13045
Patty Willis
Phone: 607-758-1699
Name of Project: Hanford, WA, Central Plateau WTF
Pall Document Number: NYCS000015217 Rev: 00
Description of Item: Dual Disc Check Valves, 01.287
Specification Section: 40 05 66
Deviations: See document NYCS000015376
INDEX:
Page 1: Cover Page Information
Page 2: Revision History and Approvals
Page 3: Tab 1 - NYCS000015408,CSS,Dual Disc Check Valves,01.287
Pages 4-5: Tab 2 - NYCS000015283,SureFlow,Dual Disc Check,2in,WH172257
Pages 6-7: Tab 3 - NYCS000015284,SureFlow,Dual Disc Check,6in,WH172258
Date: 12/19/2019
PALL ADVANCED SEPARATIONS SYSTEMS
DIVISION OF PALL CORPORATION, CORTLAND, NY
Rev Name Date Created By
Approved By
Created By
Approved By
Created By
Approved By
Created By
Approved By
Revision Description
Title
Document # Revision griffinju Text Box These commodities, technology, or software may only be exported from the United States in accordance with the Export Administration Regulations. Diversion contrary to U.S. law is prohibited.
Doc Number: NYCS000015408R00 Doc Title: NYCS000015408,CSS,Dual Disc Check Valves,01.287.docx
Components Specification Sections
The following specification sections are relevant to the approval of submittal NYCS000015217, Dual Disc Check Valves,01.287:
L‐897, Attachment No. 2 ‐ HNF‐SPEC‐63538, Section 40 05 66, Check Valves.
Any exceptions and clarifications to the specification section above can be found in submittal NYCS000015376,L‐897,Section 40 05 66,Es and Cs,01.287.
Pall has taken exceptions and clarifications relevant to the dual disc check valves proposed.
BURLINGTON, ONTARIO, CANADA
LarkinD Text Box
NYCS000015283R00
LarkinD Text Box
WH172257
Part #: 0200FE150SSVIRK
LarkinD Rectangle
June 12, 2007
Installation Manual for Sure Flow Equipment Dual Door Check Valves
The valve is inserted between two companion flanges with gaskets on contact faces. Stud bolts that will span the valve and flanges are installed, and the joint made up in the same manner as any flanged joint. The Sure Flow wafer check valve flange diameter has been sized such that the valve centerline will be in alignment with the center of the companion flanges when it is cradled by the stud bolts. The normal installation of the Sure Flow wafer check valve is for horizontal flow with the pin vertical, which allows the plates to swing correctly. The valve should be installed a minimum of 7 to 10 pipe diameters away from any turbulence. The valve may be installed for vertical flow-up or vertical flow-down. When installed in a vertical pipeline, the valve may require a special torque spring or lightweight plates according to the direction of flow, the line pressure, or the line medium.
When removing the valve from the line, only one half of the stud bolts need to be removed, and the others just loosened.
In order to ensure correct installation, the direction of flow is indicated by arrows cast into the side of the body.
BURLINGTON, ONTARIO, CANADA
LarkinD Text Box
NYCS000015284R00
LarkinD Text Box
WH172258
Part #: 0600FE150SSVIRK
LarkinD Rectangle
June 12, 2007
Installation Manual for Sure Flow Equipment Dual Door Check Valves
The valve is inserted between two companion flanges with gaskets on contact faces. Stud bolts that will span the valve and flanges are installed, and the joint made up in the same manner as any flanged joint. The Sure Flow wafer check valve flange diameter has been sized such that the valve centerline will be in alignment with the center of the companion flanges when it is cradled by the stud bolts. The normal installation of the Sure Flow wafer check valve is for horizontal flow with the pin vertical, which allows the plates to swing correctly. The valve should be installed a minimum of 7 to 10 pipe diameters away from any turbulence. The valve may be installed for vertical flow-up or vertical flow-down. When installed in a vertical pipeline, the valve may require a special torque spring or lightweight plates according to the direction of flow, the line pressure, or the line medium.
When removing the valve from the line, only one half of the stud bolts need to be removed, and the others just loosened.
In order to ensure correct installation, the direction of flow is indicated by arrows cast into the side of the body.
| Cover Page Information |
| Revision History and Approvals |
| Tab 1 - NYCS000015408,CSS,Dual Disc Check Valves |
| Tab 2 - NYCS000015283,SureFlow,Dual Disc Check,2in |
| Tab 3 - NYCS000015284,SureFlow,Dual Disc Check,6in |
| Title: Dual Disc Check Valves, 01.287 |
| Document: NYCS000015217 |
| Revision: 00 |
| RevRow1: 0 |
| NameCreated By: DMLarkin |
| DateCreated By: 09-DEC-2019 |
| NameApproved By: JHoskins |
| DateApproved By: 09-DEC-2019 |
| Revision DescriptionRow1: Initial Issue |
| RevRow2: |
| NameCreated By_2: |
| DateCreated By_2: |
| NameApproved By_2: |
| DateApproved By_2: |
| Revision DescriptionRow2: |
| RevRow3: |
| NameCreated By_3: |
| DateCreated By_3: |
| NameApproved By_3: |
| DateApproved By_3: |
| Revision DescriptionRow3: |
| RevRow4: |
| NameCreated By_4: |
| DateCreated By_4: |
| NameApproved By_4: |
| DateApproved By_4: |
| Revision DescriptionRow4: |
File details come from the government source that posted it. Updated .