Addendum 003 - Equipment - FRP Tanks attachment.pdf

PDF 110 KB Posted

Attached to
Request for Proposal - Construction Services for Project L-897, Central Plateau Water Treatment Facility
Solicitation number
338214
Issued by

View the file

Other files

File Type Posted
Addendum 003 - O and M Manual - Prelim Oper and Maint Manual - Template R0.pdf PDF
Addendum 003 - Equipment - Automatic Strainers R0.pdf PDF
Addendum 003 - Valves - Other Check Valves R0.pdf PDF
Addendum 003 - Recommended Electrical Spare Parts List R0.pdf PDF
Addendum 003 - Equipment - Tab 3 - Anchor Bolt List R0.pdf PDF
Addendum 003 - Valves - Butterfly Valves R0.pdf PDF
Addendum 003 - Electrical Drawings - REMOTE IO 24VDC POWER PANEL.pdf PDF
Addendum 003 - Valves - Air Release Valves R0.pdf PDF
Addendum 003 - Analytical Instrumentation Valve List R0.pdf PDF
Addendum 003 - Valves - Auto Drain Valve R0.pdf PDF
Addendum 003 - Equipment - Commissioning Plan R0.pdf PDF
Addendum 003 - Valves - Diaphragm Valves R0.pdf PDF
Addendum 003 - VDL 006-006 RFP Const Bidder Pall Documents.xlsx XLSX spreadsheet
Addendum 003 - Valves - Other Solenoid Valves R0.pdf PDF
Addendum 003 - Electrical Drawings - FEED STRAINER PLC IO PANEL.pdf PDF
Addendum 003 - Valves - Other Air Pressure Valves R0.pdf PDF
Addendum 003 - Analytical Instrumentation - Flow Instrumentation R1.pdf PDF
Addendum 003 - Valves - Solenoid Valves R0.pdf PDF
Addendum 003 - Equipment - Actuator Torque Tables R1.pdf PDF
Addendum 003 - Equipment - Filter Elements R0.pdf PDF
Addendum 003 - Valves - Dual Disc Check Valves R0.pdf PDF
Addendum 003 - Equipment - FRP Tanks R0.pdf PDF
Addendum 003 - Equipment - Equipment List R0 - Pall Comments.pdf PDF
Addendum 003 - O and M Manual - System Functional Description (SFD) R0.pdf PDF
Addendum 003 - Electrical Drawings - MAIN CONTROL PANEL.pdf PDF
Addendum 003 - Electrical Drawings - MF VALVE RACK PANEL.pdf PDF
Addendum 003 - Electrical Drawings - Main CP 24VDC Power Panel.pdf PDF
Addendum 003 - Analytical Instrumentation - Level Instrumentation R1.pdf PDF
Addendum 003 - Valves - Air Pressure Control Valves R0.pdf PDF
Addendum 003 - Contractual Electrical Spare Parts List R0.pdf PDF
Addendum 003 - Equipment - Air System R1.pdf PDF
Addendum 003 - Analytical Instrumentation - Temperature Instrumentation R1.pdf PDF
Addendum 003 - Valves - Ball Valves R0.pdf PDF
Addendum 003 - Valves - Chemical Pressure Control Valves R0.pdf PDF
Addendum 003 - Major Electrical Comp R0.pdf PDF
Addendum 003 - Electrical Drawings - CIP CAUSTIC ROOM PLC IO PANEL.pdf PDF
Addendum 003 - Exceptions and Clarifications - Specification Cross Reference Matrix R0.pdf PDF
Addendum 003 - Equipment - Calibration Columns R0.pdf PDF
Addendum 003 - Equipment - Centrifugal Pumps R0.pdf PDF
Addendum 003 - Equipment - Indeeco Heater General Infor R0.pdf PDF
Addendum 003 - Mechanical Drawings - Membrane Train Assy Dwg R3.pdf PDF
Addendum 003.pdf PDF
Addendum 003 - Equipment - Wilden Pump General Information R0.pdf PDF
Addendum 003 - Equipment - Water Softener R0.pdf PDF
Addendum 003 - Electrical Drawings - Interconnect Diagram Pall Comments.pdf PDF
Addendum 003 - Analytical Instrumentation - Pressure Instrumentation R1.pdf PDF
Addendum 003 - Mechanical Drawings - P and ID R4 Pall Submittal Return Comments.pdf PDF
Addendum 003 - Valves - Water Pressure Control Valves R0.pdf PDF
Addendum 003 - Equipment - Other Strainers R0.pdf PDF
Addendum 003 - Equipment - NSF PID Scope R0.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0°

45°

90°

135°

180°

215°

270°

315°

12 13

0°

45°

90°

135°

180°

215°

270°

315°

8 9

PRELIMINARY

NOT FOR

CONSTRUCTION

OR

RECORDING

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

TEAM 1

TEAM 2

TEAM 3

TEAM 4

TEAM 5

TEAM 6

TEAM 7

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

F. M. LAST

F. M. LAST

F. M. LAST

F. M. LAST

F. M. LAST

F. M. LAST

F. M. LAST

3/4" = 1'-0"C

:\r vt

\2

8\

_0

0_ P_ se an

.w ei ge l.r vt 1/

9/

2:

:1

PM

H-2-838404-2

CIP TANK LAYOUT

10100563

Thomas Helgeson

10100563_00_P.rvt

CPWTF

HANFORD

3/4" = 1'-0"

CIP TANK 1 DETAIL

3/4" = 1'-0"

CIP TANK 2 DETAIL

20 2-INCH SAMPLE SIDE- 1 FT 6 IN

19 4-INCH SPARE

18 2-IN DRAIN 0 IN

17 LEVEL GAUGE NA- TOP ENTRY

16 6-INCH CIPR NA- TOP ENTRY

15 8-INCH AV NA- TOP ENTRY

14 SIDE MANWAY SIDE- 3 FT

13 CIP-LSLL-5003 SIDE- 1 FT

12 CIP-LIT-5006 SIDE- 3 FT 1 IN

11 CIP-TIT-5007 SIDE- 5 IN

10 CIP-LSHH-5002 SIDE- 11 FT 5 IN

9 10-INCH HEATER SIDE- 2 FT 5 IN

8 TOP MANWAY NA- TOP ENTRY

7 8-INCH OVERFLOW SIDE- 12 FT 1 IN

6 2-INCH NAOH NA- TOP ENTRY

5 2-INCH CTA NA- TOP ENTRY

4 2-INCH NAOCL NA- TOP ENTRY

3 2-INCH CTS NA- TOP ENTRY

2 2-INCH STW NA- TOP ENTRY

1 6-INCH CIPS SIDE- 1 FT

ITEM

DESCRIPTION VERTICAL DISTANCE FROM BASE OF TANK TO

CENTERLINE OF ITEM

PLAN -CIP TANK 1

17 4-IN SPARE

16 2-INCH DRAIN 0 IN

15 LEVEL GAUGE NA- TOP ENTRY

14 2-INCH SAMPLE SIDE- 1 FT 6 IN

13 6-INCH CPR NA- TOP ENTRY

12 8-INCH AV NA- TOP ENTRY

11 3-INCH NPW NA- TOP ENTRY

10 SIDE MANWAY 3 FT

9 CIP-LSLL-5103 SIDE- 1 FT 6 IN

8 CIP-LIT-5107 SIDE- 5 IN

7 8-INCH OVERFLOW SIDE- 7 FT 1 IN

6 6-INCH CIPS SIDE 1 FT

5 CIP-LSHH-5102 SIDE- 6 FT 5 IN

4 2-INCH CTA NA- TOP ENTRY

3 TOP MANWAY NA- TOP ENTRY

2 10-INCH HEATER SIDE- 2 FT 5 IN

1 CIP-TIT-5107 SIDE- 3 FT

ITEM

DESCRIPTION VERTICAL DISTANCE FROM BASE OF TANK TO

CENTERLINE OF ITEM

PLAN -CIP TANK 2

Sheets
H-2-838404-2 -

File details come from the government source that posted it. Updated .