Addendum 003 - Equipment - Tab 3 - Anchor Bolt List R0.pdf

PDF 231 KB Posted

Attached to
Request for Proposal - Construction Services for Project L-897, Central Plateau Water Treatment Facility
Solicitation number
338214
Issued by

View the file

Other files

File Type Posted
Addendum 003 - O and M Manual - Prelim Oper and Maint Manual - Template R0.pdf PDF
Addendum 003 - Equipment - Automatic Strainers R0.pdf PDF
Addendum 003 - Valves - Other Check Valves R0.pdf PDF
Addendum 003 - Recommended Electrical Spare Parts List R0.pdf PDF
Addendum 003 - Valves - Butterfly Valves R0.pdf PDF
Addendum 003 - Electrical Drawings - REMOTE IO 24VDC POWER PANEL.pdf PDF
Addendum 003 - Valves - Air Release Valves R0.pdf PDF
Addendum 003 - Analytical Instrumentation Valve List R0.pdf PDF
Addendum 003 - Valves - Auto Drain Valve R0.pdf PDF
Addendum 003 - Equipment - Commissioning Plan R0.pdf PDF
Addendum 003 - Valves - Diaphragm Valves R0.pdf PDF
Addendum 003 - VDL 006-006 RFP Const Bidder Pall Documents.xlsx XLSX spreadsheet
Addendum 003 - Valves - Other Solenoid Valves R0.pdf PDF
Addendum 003 - Electrical Drawings - FEED STRAINER PLC IO PANEL.pdf PDF
Addendum 003 - Valves - Other Air Pressure Valves R0.pdf PDF
Addendum 003 - Analytical Instrumentation - Flow Instrumentation R1.pdf PDF
Addendum 003 - Valves - Solenoid Valves R0.pdf PDF
Addendum 003 - Equipment - Actuator Torque Tables R1.pdf PDF
Addendum 003 - Equipment - Filter Elements R0.pdf PDF
Addendum 003 - Valves - Dual Disc Check Valves R0.pdf PDF
Addendum 003 - Equipment - FRP Tanks R0.pdf PDF
Addendum 003 - Equipment - Equipment List R0 - Pall Comments.pdf PDF
Addendum 003 - O and M Manual - System Functional Description (SFD) R0.pdf PDF
Addendum 003 - Electrical Drawings - MAIN CONTROL PANEL.pdf PDF
Addendum 003 - Electrical Drawings - MF VALVE RACK PANEL.pdf PDF
Addendum 003 - Electrical Drawings - Main CP 24VDC Power Panel.pdf PDF
Addendum 003 - Analytical Instrumentation - Level Instrumentation R1.pdf PDF
Addendum 003 - Valves - Air Pressure Control Valves R0.pdf PDF
Addendum 003 - Equipment - FRP Tanks attachment.pdf PDF
Addendum 003 - Contractual Electrical Spare Parts List R0.pdf PDF
Addendum 003 - Equipment - Air System R1.pdf PDF
Addendum 003 - Analytical Instrumentation - Temperature Instrumentation R1.pdf PDF
Addendum 003 - Valves - Ball Valves R0.pdf PDF
Addendum 003 - Valves - Chemical Pressure Control Valves R0.pdf PDF
Addendum 003 - Major Electrical Comp R0.pdf PDF
Addendum 003 - Electrical Drawings - CIP CAUSTIC ROOM PLC IO PANEL.pdf PDF
Addendum 003 - Exceptions and Clarifications - Specification Cross Reference Matrix R0.pdf PDF
Addendum 003 - Equipment - Calibration Columns R0.pdf PDF
Addendum 003 - Equipment - Centrifugal Pumps R0.pdf PDF
Addendum 003 - Equipment - Indeeco Heater General Infor R0.pdf PDF
Addendum 003 - Mechanical Drawings - Membrane Train Assy Dwg R3.pdf PDF
Addendum 003.pdf PDF
Addendum 003 - Equipment - Wilden Pump General Information R0.pdf PDF
Addendum 003 - Equipment - Water Softener R0.pdf PDF
Addendum 003 - Electrical Drawings - Interconnect Diagram Pall Comments.pdf PDF
Addendum 003 - Analytical Instrumentation - Pressure Instrumentation R1.pdf PDF
Addendum 003 - Mechanical Drawings - P and ID R4 Pall Submittal Return Comments.pdf PDF
Addendum 003 - Valves - Water Pressure Control Valves R0.pdf PDF
Addendum 003 - Equipment - Other Strainers R0.pdf PDF
Addendum 003 - Equipment - NSF PID Scope R0.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER PAGE OF SELLER’S SUBMITTAL

City Name: Hanford, WA - MSA

Pall Project No.: 01.000287

Job Number: Project L-897, Subcontract 70816

Task Register 6 (Task 1 – VI Submittal Package)

To: (Contractor)

Mission Support Alliance, LLC (MSA)

PO Box 650

Richland, WA 99352

From: (Subcontractor)

Pall Water

A Division of Pall Corporation

839 State Route 13

Cortland, NY 13045

Patty Willis

Phone: 607-758-1699

Name of Project: Hanford, WA, Central Plateau WTF

Pall Document Number: NYCS000015577 Rev: 00

Description of Item: Anchor Bolt List

Specification Section: HNF-SPEC-63538, 05 13 00

Deviations: None

INDEX:

Page 1: Cover Page Information

Page 2: Revision History and Approvals

Page 3: Tab 3 - NYCS000015577, Anchor Bolt List

Date: 3/4/2020

PALL ADVANCED SEPARATIONS SYSTEMS

DIVISION OF PALL CORPORATION, CORTLAND, NY

Rev Name Date Created By

Approved By

Created By

Approved By

Created By

Approved By

Created By

Approved By

Revision Description

Title

Document # Revision griffinju Text Box These commodities, technology, or software may only be exported from the United States in accordance with the Export Administration Regulations. Diversion contrary to U.S. law is prohibited.

Document:

NYCS000015577 Project #: 01.289

Revision: 00 Project: Hanford, WA.

ID Description Comment Anchor Bolt

Diameter (inches)

Epoxy Anchor Bolt Material Anchor Bolt Embedment (Minimum) inches

Approximate length to order

(inches)

Number of Sub-

Systems

Bolts Per Sub-

System

Bolts Total Sub-System

Sub-Total Approx inches

Comment

1 8 inch Transverse Valve Rack Per ATI seismic report, Phase A 7/8 SET-3G A320 Grade B8M (316SS) 5.5 12 4 4 16 192 2 Module Rack Per ATI seismic report, Phase A 1/2 SET-3G A320 Grade B8M (316SS) 4 10 24 4 96 960 3 3117 gallon acid tank Per ATI seismic report, Phase A 3/4 SET-3G A320 Grade B8M (316SS) 7.5 12 4 4 16 192 for angle stops --- 3117 gallon acid tank Per Tank Fabricator seismic report TBD TBD A320 Grade B8M (316SS) TBD TBD TBD TBD TBD TBD Needs addition anchorage, design by Tank Fabricator 4 5201 gallon caustic tank Per ATI seismic report, Phase A 3/4 SET-3G A320 Grade B8M (316SS) 7.5 12 4 4 16 192 for angle stops --- 5201 gallon caustic tank Per Tank Fabricator seismic report TBD TBD A320 Grade B8M (316SS) TBD TBD TBD TBD TBD TBD Needs addition anchorage, design by Tank Fabricator 5 RF pumps Per ATI seismic report, Phase A 3/8 AT-XP A320 Grade B8M (316SS) 3 9 3 4 12 108 6 CIP pumps Per ATI seismic report, Phase A 3/8 AT-XP A320 Grade B8M (316SS) 3 9 2 4 8 72 7 Culligen water softeners Per ATI seismic report, Phase A 5/8 SET-3G A320 Grade B8M (316SS) 4.75 9 2 3 6 54 8 Culligen brine tank Per ATI seismic report, Phase A 1/2 AT-XP A320 Grade B8M (316SS) 3 6 1 4 4 24 9 Air compressors Per ATI seismic report, Phase B 1/2 AT-XP A320 Grade B8M (316SS) 3 8 2 8 16 128

10 Air receivers Per ATI seismic report, Phase B 5/8 AT-XP A320 Grade B8M (316SS) 5 9 2 4 8 72 11 Main Panel Per ATI seismic report, Phase B 3/8 AT-XP A320 Grade B8M (316SS) 3 7 1 6 6 42

13, 14 Acid and Caustic panels Per ATI seismic report, Phase B --- --- --- --- 2 --- --- --- No anchor bolts, hardware by Others 15 Feed strainer panel Per ATI seismic report, Phase B --- --- --- --- --- 1 --- --- --- No anchor bolts, hardware by Others 16 Remore I/O power panel Per ATI seismic report, Phase B --- --- --- --- --- 1 --- --- --- No anchor bolts, hardware by Others

12, 17 Power Supply for Main panel, 120VAC Relay panel Per ATI seismic report, Phase B --- --- --- --- --- 2 --- --- --- No anchor bolts, hardware by Others

Diameter Total Approximate Inches calc'd # of lengths 6 foot lengths 7/8 192 2.7 3 3/4 384 5.3 6 5/8 126 1.8 2 1/2 1112 15.4 17 3/8 222 3.1 4

Refer to ATI Seismic Reports. The summary information here has been transposed.

Anchor Bolts will be supplied in six foot lengths of threaded rod, to be cut in the field by Contractor.

Cover page
Revision History & Approvals
Tab 3 - NYCS000015577,rev00 - Anchor Bolt List
Title: Anchor Bolt List, 01.287
Document: NYCS000015577
Revision: 00
RevRow1: 0
NameCreated By: DMLarkin
DateCreated By: 02-MAR-2020
NameApproved By: SWatson
DateApproved By: 02-MAR-2020
Revision DescriptionRow1: Initial Issue
RevRow2:
NameCreated By_2:
DateCreated By_2:
NameApproved By_2:
DateApproved By_2:
Revision DescriptionRow2:
RevRow3:
NameCreated By_3:
DateCreated By_3:
NameApproved By_3:
DateApproved By_3:
Revision DescriptionRow3:
RevRow4:
NameCreated By_4:
DateCreated By_4:
NameApproved By_4:
DateApproved By_4:
Revision DescriptionRow4:

File details come from the government source that posted it. Updated .