Amendment 0010 -Use the applicable Small Business Forms attached

Closed Solicitation Posted

Solicitation number
n44255
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Silverdale WA 98383 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The solicitation seeks proposals to construct a general purpose berthing pier and trestle with controlled access, a vessel maintenance facility with parking, fuel distribution and storage systems to support the Maritime Force Protection Unit's operations mission at Naval Base Kitsap in Bangor, Washington. The Department of the Navy Naval Facilities Engineering Command seeks to award a fixed-price construction contract valued between $25-100 million to construct these facilities. Proposals are due by various dates specified in amendments with evaluation based on technical approach, past performance, and price.

The solicitation carries no set-aside designations and involves NAICS codes 237310 for highway, street, and bridge construction and 237990 for other heavy and civil engineering construction. The facilities must be constructed by January 2023 to support over 100 submarines transiting annually between their homeport and test ranges in the Strait of Juan de Fuca in furtherance of the Nuclear Weapons Security Program mission. The place of performance is Naval Base Kitsap in Bangor, Washington. Key details include installation of 236 steel pipe piles and construction of an 18,278 square foot vehicle maintenance facility.

Notice text

6 versions

Update #6 · Latest ·

The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system.

Facilities are required to support the Maritime Force Protection Unit (MFPU) Bangor’s operations mission to provide security escort for submarines through protection by presence and defense by force during transit between homeport and the surface/dive points in the Strait of Juan de Fuca and test range.  This mission supports the stand-up of the Nuclear Weapons Security (NWS) Program mission as mandated by National Security Presidential Directive and Instructions.

Update #5 ·

Amendment 0004

The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system.

Facilities are required to support the Maritime Force Protection Unit (MFPU) Bangor’s operations mission to provide security escort for submarines through protection by presence and defense by force during transit between homeport and the surface/dive points in the Strait of Juan de Fuca and test range.  This mission supports the stand-up of the Nuclear Weapons Security (NWS) Program mission as mandated by National Security Presidential Directive and Instructions.

Update #4 ·

Amendment 0003

The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system.

Facilities are required to support the Maritime Force Protection Unit (MFPU) Bangor’s operations mission to provide security escort for submarines through protection by presence and defense by force during transit between homeport and the surface/dive points in the Strait of Juan de Fuca and test range.  This mission supports the stand-up of the Nuclear Weapons Security (NWS) Program mission as mandated by National Security Presidential Directive and Instructions.

Update #3 ·

Amendment 0002

The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system.

Facilities are required to support the Maritime Force Protection Unit (MFPU) Bangor’s operations mission to provide security escort for submarines through protection by presence and defense by force during transit between homeport and the surface/dive points in the Strait of Juan de Fuca and test range.  This mission supports the stand-up of the Nuclear Weapons Security (NWS) Program mission as mandated by National Security Presidential Directive and Instructions.

Update #2 ·

Amendment 0001

The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system.

Facilities are required to support the Maritime Force Protection Unit (MFPU) Bangor’s operations mission to provide security escort for submarines through protection by presence and defense by force during transit between homeport and the surface/dive points in the Strait of Juan de Fuca and test range.  This mission supports the stand-up of the Nuclear Weapons Security (NWS) Program mission as mandated by National Security Presidential Directive and Instructions.

Update #1 ·

The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system.

Facilities are required to support the Maritime Force Protection Unit (MFPU) Bangor’s operations mission to provide security escort for submarines through protection by presence and defense by force during transit between homeport and the surface/dive points in the Strait of Juan de Fuca and test range.  This mission supports the stand-up of the Nuclear Weapons Security (NWS) Program mission as mandated by National Security Presidential Directive and Instructions.

Files

File Type Posted
Sections B- F-G forms.pdf PDF
SF30 Amendment 0010.pdf PDF
Rev1442.pdf PDF
SB106 Rev 2.pdf PDF
Sealion Road.jpg JPG image
Gaurd booths.pdf PDF
Fueling Site From Sealion Road.jpg JPG image
VMF SIte 3 from Sturgeon St.jpg JPG image
MW602 Rev 2.pdf PDF
Fueling Site.jpg JPG image
VMF Site 2 from Sturgeon St.jpg JPG image
MB603 Rev 1.pdf PDF
SB503 Rev 1.pdf PDF
KB Spit 2 - Pier Location.jpg JPG image
MW103 Rev 1.pdf PDF
MW301 Rev 1.pdf PDF
EW627 Rev 6.pdf PDF
EW611 Rev 3.pdf PDF
MW102 Rev 1.pdf PDF
EW631 Rev 1.pdf PDF
EW301 Rev 1.pdf PDF
EW628 Rev 4.pdf PDF
EW621 Rev 4.pdf PDF
EW303 Rev 2.pdf PDF
EW401 Rev 7.pdf PDF
EW101 Rev 3.pdf PDF
EB609 Rev 1.pdf PDF
EW623 Rev 2.pdf PDF
EW132 Rev 2.pdf PDF
EB101 Rev 3.pdf PDF
EB605 Rev 3.pdf PDF
EW131 Rev 2.pdf PDF
EB603 Rev 1.pdf PDF
03 30 00 Rev.pdf PDF
AB101 Rev 5.pdf PDF
EB606 Rev 2.pdf PDF
01 45 35 Rev.pdf PDF
23 07 00 Rev.pdf PDF
25 10 10.00 24.pdf PDF
08 11 16 Rev.pdf PDF
EW626 Rev 1.pdf PDF
10 56 13 Rev.pdf PDF
Answer Attachment.xlsx XLSX spreadsheet
Fueling Site rev.jpg JPG image
Amendment 0009 Final.pdf PDF
VMF Site 1 from Sturgeon St.jpg JPG image
MB602 Rev 1.pdf PDF
KB Spit 1 - Pier Location.jpg JPG image
MW101 Rev 1.pdf PDF
EW111 Rev 2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.