EB609 Rev 1.pdf

PDF 178 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached
Solicitation number
n44255
Issued by

About this file

This document contains an electrical schedule and cable plan for a facility improvement project. The project involves installing new single-mode and multi-mode optical fiber cables, twisted pair copper cables, and fiber and copper termination panels to provide communications and network services between various rooms at Naval Base Kitsap - Bangor. The electrical schedule specifies circuit breakers, panel loads, and circuits for power and communications receptacles throughout the facility. The cable plan diagram shows proposed cable routes and connections between building rooms.

View the file

Other files

File Type Posted
Sections B- F-G forms.pdf PDF
Rev1442.pdf PDF
SF30 Amendment 0010.pdf PDF
SB106 Rev 2.pdf PDF
EW404 Rev 3.pdf PDF
01 32 17.00 20 Rev.pdf PDF
Attachment K.docx DOCX document
VMF SIte 3 from Sturgeon St.jpg JPG image
EW626 Rev 1.pdf PDF
Answer Attachment.xlsx XLSX spreadsheet
KB Spit 1 - Pier Location.jpg JPG image
MW301 Rev 1.pdf PDF
EW628 Rev 4.pdf PDF
Fueling Site rev.jpg JPG image
MB602 Rev 1.pdf PDF
EW303 Rev 2.pdf PDF
EB603 Rev 1.pdf PDF
08 41 13 Rev.pdf PDF
MW103 Rev 1.pdf PDF
EW623 Rev 2.pdf PDF
MW102 Rev 1.pdf PDF
EB605 Rev 3.pdf PDF
EB606 Rev 2.pdf PDF
MB603 Rev 1.pdf PDF
EB101 Rev 3.pdf PDF
Amendment 0009 Final.pdf PDF
10 56 13 Rev.pdf PDF
25 10 10.00 24.pdf PDF
MW101 Rev 1.pdf PDF
EB131 Rev 1.pdf PDF
22 13 29 Rev.pdf PDF
VMF Site 1 from Sturgeon St.jpg JPG image
01 45 35 Rev.pdf PDF
Fueling Site From Sealion Road.jpg JPG image
08 11 16 Rev.pdf PDF
EW111 Rev 2.pdf PDF
MW602 Rev 2.pdf PDF
EW301 Rev 1.pdf PDF
Fueling Site.jpg JPG image
SB503 Rev 1.pdf PDF
Gaurd booths.pdf PDF
EW611 Rev 3.pdf PDF
EW401 Rev 7.pdf PDF
03 30 00 Rev.pdf PDF
Sealion Road.jpg JPG image
EW621 Rev 4.pdf PDF
EW101 Rev 3.pdf PDF
EW627 Rev 6.pdf PDF
AB101 Rev 5.pdf PDF
KB Spit 2 - Pier Location.jpg JPG image
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES

C-01 SINGLE-MODE OPTICAL FIBER 48-STRAND LOOSE TUBE, OSP LC PATCH PANEL LC PATCH PANEL ROOM 120 - ROOM 113 EECS & IDS SERVICES

C-02 SINGLE-MODE OPTICAL FIBER 48-STRAND LOOSE TUBE, OSP LC PATCH PANEL LC PATCH PANEL ROOM 120 - ROOM 113 NMCI & CGOne NETWORK SERVICES

C-03 SINGLE-MODE OPTICAL FIBER 12-STRAND LOOSE TUBE, OSP LC PATCH PANEL LC PATCH PANEL ROOM 120 - ROOM 113 UMCS SERVICES

C-04 TWISTED PAIR COPPER 100-PAIR OSP TERMINATION PANEL TERMINATION PANEL ROOM 120 - ROOM 113 TELEPHONY SERVICE

SYSTEMS CABLE SCHEDULE

CABLE ID TYPE SIZE CONSTRUCTION VMF BUILDING CONNECTOR BUILDING B7074 CONNECTOR FROM VMF - TO B7074 NOTES

1. MULTI-MODE OPTICAL FIBER CABLES SHALL BE OM4 COMPLIANT.

2. SINGLE-MODE OPTICAL FIBER CABLES SHALL BE OS2 COMPLIANT.

3. TWISTED PAIR COPPER CABLES SHALL BE CATEGORY 3 COMPLIANT.

4. TWISTED COPPER CABLE TERMINATION PANEL TO INCLUDE ELECTRICAL PROTECTION BLOCK, SOLID STATE PROTECTORS, INTERCONNECTION CABLE AND HAND-OFF TERMINATION BLOCK.

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:1 :4

P M

C U s e rs jb o u rg e o is D o c u m e n ts P B L D G E L E C R jb o u rg e o is V F X .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

EL

EC

TR

IC

A L S C H

ED

U

LE

S

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

AuthorDesigner Checker

EB609

134 135

16046759

D. BUSSARD

B. GALLOWAY

B. NIXON

1. PROVIDE GFCI CIRCUIT BREAKER.

Notes:

MISCELLANEOUS 26.86 kVA 100.00% 26.86 kVA Total Calc. Load (A): 113 A

KITCHEN EQUIPMENT 0.00 kVA 0.00% 0.00 kVA Total Conn. Load (A): 110 A

MOTORS 12.54 kVA 107.61% 13.50 kVA Total Calc. Load (kVA): 40.68 kVA

RECEPTACLES 0.00 kVA 0.00% 0.00 kVA Total Conn. Load (kVA): 39.73 kVA

LIGHTING 0.00 kVA 0.00% 0.00 kVA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 130 A 109 A 96 A

Total Load: 15.36 kVA 12.83 kVA 11.54 kVA

71 0.00 -- -- -- 72

69 0.00 -- -- -- 70

67 0.00 3 30 A SPD 68

65 0.00 1 20 A SPARE 66

63 0.00 1 20 A SPARE 64

61 0.00 1 20 A SPARE 62

59 0.00 1 20 A SPARE 60

57 0.00 1 20 A SPARE 58

55 0.00 1 20 A SPARE 56

53 0.00 1 20 A SPARE 54

51 0.00 1 20 A SPARE 52

49 P3,4,5C,5D(NOTE 1) 20 A 1 0.50 0.00 1 20 A SPARE 50

47 AD-1 20 A 1 1.50 0.00 1 20 A SPARE 48

45 -- -- -- 1.87 0.00 1 20 A SPARE 46

43 ACCU-2 30 A 2 1.87 0.00 1 20 A SPARE 44

41 SF-1 20 A 1 0.46 0.00 1 20 A SPARE 42

39 SPARE 20 A 1 0.00 0.56 -- -- -- 40

37 -- -- -- 1.27 0.56 2 20 A EF-4 38

35 -- -- -- 1.27 0.70 1 20 A D-114-3 36

33 EF-8 20 A 3 1.27 0.11 1 20 A UH-2 34

31 -- -- -- 2.35 0.11 1 20 A UH-1 32

29 TU-3 30 A 2 2.35 0.10 1 20 A TP-1B (NOTE 1) 30

27 -- -- -- 1.10 0.10 1 20 A TP-1A (NOTE 1) 28

25 TU-2 20 A 2 1.10 0.12 1 20 A RH-5 26

23 -- -- -- 0.54 0.12 1 20 A RH-4 24

21 -- -- -- 0.54 0.12 1 20 A RH-3 22

19 NG-1 15 A 3 0.54 0.12 1 20 A RH-2 20

17 -- -- -- 1.75 0.12 1 20 A RH-1 18

15 TU-1 20 A 2 1.75 2.40 1 30 A P-14B 16

13 REC: MEZZANINE 20 A 1 0.36 2.40 1 30 A P-14A 14

11 -- -- -- 1.35 0.12 1 20 A HWCP-1 12

9 ACCU-1 20 A 2 1.35 0.70 1 20 A EF-6 10

7 EUH-1 20 A 1 1.50 0.70 1 20 A EF-5 8

5 GWH-1 20 A 1 0.60 0.56 -- -- -- 6

3 P1,2B,5A,5B (NOTE 1) 20 A 1 0.40 0.56 2 20 A EF-1 4

1 EF-3 20 A 1 0.70 1.20 1 20 A P-10 (NOTE 1) 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Enclosure: Type 1 MCB Rating:

Mounting: Surface Wires: 4 Mains Rating: 225 A

Supply From: 12D1 Phases: 3 Mains Type: MLO

Location: ELECTRICAL 121 Volts: 208Y/120V A.I.C. Rating: 22,000

Branch Panel: 12M1

1. PROVIDE SHUNT TRIP BREAKER (SHUNT TRIP USES 2 POLES EACH)

Notes:

MISCELLANEOUS 36.35 kVA 100.00% 36.35 kVA Total Calc. Load (A): 140 A

KITCHEN EQUIPMENT 0.00 kVA 0.00% 0.00 kVA Total Conn. Load (A): 141 A

MOTORS 1.20 kVA 125.00% 1.50 kVA Total Calc. Load (kVA): 50.32 kVA

RECEPTACLES 11.70 kVA 92.74% 10.85 kVA Total Conn. Load (kVA): 50.87 kVA

LIGHTING 0.00 kVA 0.00% 0.00 kVA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 146 A 138 A 141 A

Total Load: 17.44 kVA 16.54 kVA 16.90 kVA

71 SPARE 20 A 1 0.00 0.00 -- -- -- 72

69 SPARE 20 A 1 0.00 0.00 -- -- -- 70

67 SPARE 20 A 1 0.00 0.00 3 30 A SPD 68

65 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 66

63 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 64

61 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 62

59 SCP-1 20 A 1 1.20 0.00 1 20 A SPARE 60

57 REC: COMS 120 20 A 1 0.18 0.00 1 20 A SPARE 58

55 REC: COMS 120 20 A 1 0.18 0.00 1 20 A SPARE 56

53 REC: COMS 120 20 A 1 0.18 0.00 1 20 A SPARE 54

51 REC: COMS 120 20 A 1 0.18 0.00 1 20 A SPARE 52

49 REC: COMS 120 20 A 1 0.36 0.00 1 20 A SPARE 50

47 REC: TRAILER PARKING 20 A 1 0.18 0.00 1 20 A SPARE 48

45 REC: TRAILER PARKING 20 A 1 0.18 0.00 1 20 A SPARE 46

43 REC: TRAILER PARKING 20 A 1 0.18 0.36 1 20 A REC: SITE 44

41 REC: ELECTRONICS TECHNICIAN 107... 20 A 1 0.18 0.36 1 20 A REC: SITE 42

39 REC: ELECTRONICS TECHNICIAN 107... 20 A 1 0.36 0.36 1 20 A REC: SITE 40

37 REC: ELECTRONICS TECHNICIAN 107... 20 A 1 0.36 1.20 1 20 A MNP-1 38

35 LM-1 20 A 1 0.60 1.20 1 20 A FACP-1 36

33 EG-1 20 A 1 1.20 2.50 -- -- -- 34

31 REC: SUPERVISOR OFFICE 106-B 20 A 1 1.44 2.50 2 30 A DRYER 32

29 REC: SUPERVISOR OFFICE 106-C 20 A 1 1.44 1.50 1 20 A REC: EV CHARGING STATION 30

27 REC: MULTIPURPOSE OPEN OFFICE... 20 A 1 1.08 1.50 1 20 A REC: EV CHARGING STATION 28

25 REC: MULTIPURPOSE OPEN OFFICE... 20 A 1 0.90 1.50 1 20 A REC: EV CHARGING STATION 26

23 REC: MULTIPURPOSE OPEN OFFICE... 20 A 1 0.72 1.50 1 20 A REC: EV CHARGING STATION 24

21 REC: RM 101, 106 20 A 1 1.26 1.50 1 20 A REC: EV CHARGING STATION 22

19 REC: BREAK AREA 106-A 20 A 1 1.20 1.50 1 20 A REC: EV CHARGING STATION 20

17 REC: BREAK AREA 106-A 20 A 1 1.20 1.50 1 20 A REC: EV CHARGING STATION 18

15 REC: BREAK AREA 106-A 20 A 1 1.20 1.08 1 20 A REC: RM 119, 121, 122, EXTERIOR 16

13 REC: BREAK AREA 106-A 20 A 1 1.20 0.90 1 20 A REC: SECURE STORAGE 114 14

11 REC: BREAK AREA 106-A 20 A 1 1.20 1.08 1 20 A REC: SECURE STORAGE 114 12

9 REC: BREAK AREA 106-A 20 A 1 1.20 0.36 1 20 A REC: SECURE STORAGE 114 10

7 REC: BREAK AREA 106-A 20 A 1 1.20 0.36 1 20 A REC: SECURE STORAGE 114 8

5 REC: BREAK AREA 106-A 20 A 1 1.20 1.66 1 20 A P-7 6

3 REC: BREAK AREA 106-A 20 A 1 1.20 1.20 1 20 A REC: CLOTH WASHER 4

1 REC: BREAK AREA 106-A 20 A 1 1.20 0.90 1 20 A REC: RESTROOM/JANITOR/CORRIDOR 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Enclosure: Type 1 MCB Rating:

Mounting: Surface Wires: 4 Mains Rating: 225 A

Supply From: 12D1 Phases: 3 Mains Type:

Location: BREAK AREA 106-A Volts: 208Y/120V A.I.C. Rating: 10,000

Branch Panel: 12R1

P

PI

0/

S M B

P907-BLDG-1389895-ELEC-R19_jbourgeois2V9FX
EB609 - ELECTRICAL SCHEDULES

File details come from the government source that posted it. Updated .