This amendment modifies solicitation number n44255 for a construction project. The work constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, and a fuel distribution and storage system to support the Maritime Force Protection Unit at Bangor. Facilities are required to support operations and testing missions. The Department of the Navy Naval Facilities Engineering Command is the agency. This amendment includes the applicable Small Business Forms for offerors to use in their responses.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 014 | Ref: Section 01 57 19.01, part 3.1.1.8. Is there merchantable timber present within the logging/clearing limits of this contract for which the contractor will be required to reimburse the market value of such timber to the Government? If so, what is the approximate value of the timber which proposers should consider for their bids? | 41 | Assume 194 MBF of marketable forest products consisting of Douglas-Fir, Western Red Cedar, and other minor species are located within the construction clearining limits of this contract. These forest products must be puchased by the contractor in advance of removal. The actual price at time of removal will be based on rates established twice yearly by the Washington State Department of Revenue. | |
| 034 | Contractors were not allowed to take photos during the site visit on 8/10. NAVFAC representative suggested that NAVFAC could take photos of the 3 primary construction areas and provide those to contractors via Amendment. Please provide these photos at your earliest convenience. | 78 | Photos provided in amendment #009. | |
| 137 | Plan Sheet CW114, Note 4, states: “Remove Exist Beach Debris as Required for Construction and Pile Driving During Low Tide…”. Please confirm that ALL of the debris on the beach does not need to be removed; only what is required by Contractor's means need to be removed. | |||
| 287 | All beach debris noted on details A3 and A4 on drawing CW114 shall be removed. | |||
| 083 | Section 01 57 19.01 20 Paragraph 3.1.1.8 states that “Merchantable forest products such as timber and firewood must be appraised and payment received by the Government prior to disturbance or removal, in accordance with COMNAVREGNWINST 11015.1, forest product sales and permit program. | |||
| Please provide the details of this requirement such as assumed value of the forest products. | 312 | Assume 194 MBF of marketable forest products consisting of Douglas-Fir, Western Red Cedar, and other minor species are located within the construction clearining limits of this contract. These forest products must be puchased by the contractor in advance of removal. The actual price at time of removal will be based on rates established twice yearly by the Washington State Department of Revenue. | ||
| 153 | Reference section 01 57 19, A0004, and previous PPIs. The ESA/MMMPA Monitoring and Construction Restriction Requirements indicates that 2 MAMU monitors are required during impact driving operations. It does not specifically state how many MMM are required during vibratory or impact driving or where these monitors are to be located (e.g. land based, boat based). Please provide required number and type/location of MMM proposers should consider as a basis for bids. | 329 | It is expected that a minimum of four marine mammal monitors will be required. One of the four total marine mammal monitors may also serve as the monitoring coordinator. During pile driving one marine mammal monitor should be stationed on a vessel and the remaining three on K/B pier, along the shore, or on the pile driving derrick as required to maximize observation of the injury zone. | |
| 154 | Amendment 0004 issued a revised Section 01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULE. This revised section states that proposers should allow two lost work days per month of pile driving activity due to the presence of protected species in the shutdown zones. Please confirm that the Government will provide compensation for both standby costs as well as an extension of contract time for any delays in excess of 2 days per month due to presence of protected species | 330 | Any “suspensions of work” will be determined as prescribed in FAR 52.241-14 Suspension of Work. |
If it is in the best interest of the Government to “suspend work,” the Contracting Officer will determine any compensation due to the impact the delay has on the contractor and may be satisfied through a request for equitable adjustment or claim.
A suspension of work may not result in a time extension to the contract, such as where the critical path has not been affected or in the case of a critical delay. A suspension of work can cause impact damages, such as lost productivity, idle equipment and material escalation costs.
96 Reference: Plan Sheet EW611, EW627 Plan Sheet EW611 shows fiber to and from the following locations but does not call out a cable ID on Plan sheet EW627. Please add cable ID's for the following runs to the Systems Cable Schedule.
B7136 to KB Pier ( Encl E-07) KB Pier (Encl E-07) to KB Pier (Encl E-08) Utility Building to Pier SCADA cabinet
| Please confirm Cable ID's C-01 (B7136 to E-01), C-04 (E-02 to E-03), and C-04 (E-03 to E-04) are installed and terminated by the government. | 354 | Cable ID's C-01, C-04 and C-04 are provided and terminated by the Contractor. All cables, conduits, enclosures, etc. shown on the drawings shall be provided by the Contractor. Deleted Note 5 on revised sheet EW627. Second C-04 cable tag has been revised to C-05 per revised sheet EW627. See revised sheet EW611. |
| 97 | Reference: Specification 33 71 02 | |
| Specification 33 71 02 2.1.4 calls for provision of innerduct. "Size as indicated." The specifications and plan sheets do not indicate a size. Please indicate size of innerduct. | 355 | See revised sheet EW101, EW628 and EB101. Please note conduit changes on sheet EB131. |
| 98 | Reference: Plan Sheets MW112, EW111, EW303, EW611 | |
| Plan sheets EW111 and EW303 show LDS-2 panel located near the J line on the trestle. Plan sheet MW112 and EW611 show LDS-2 panel located on the KB Dock. Please clarify where LDS-2 will be located. | 356 | LDS-2 is located on the KB dock trestle, as shown on MW112. |
See revised sheets EW111 & EW303.
99 RFP Drawings - Vol 2 (VMF) RFP P907 Final Specification Questions:
| Operable windows in between the translucent panels are show on Drawing AB604. Please provide a specification section for windows and glazing for these elements, and confirm if they will be required to comply with the UFC 4-010-01 (2012; with Change 1) DoD Minimum Antiterrorism Standards for Buildings ATFP blast design standards. | 357 | Per PPI 169 response, refer to Sections 08 51 13 and 08 81 00 included in Amendment #006. Refer to PPI 183 and 358 responses regarding applicabiility of Antiterrorism Force Protection Criteria. |
| 100 | RFP Drawings - Vol 2 (VMF) |
RFP P907 Final Specification Question:
| Specification section 08 60 45 Translucent Panels referenced UFC 4-010-01 (2012; with Change 1) DoD Minimum Antiterrorism Standards for Buildings. Please confirm if the VMF building is intended to be ATFP blast designed per this reference and not the current 2018 reference. | 358 | Per PPI response 183 (same question): The government established the VMF to be located more than 50 feet on the interior side of a controlled perimeter during the design phase; therefore, construction standoff distances do not apply per Interim Technical Guidance (ITG 2018-02), Implementation of NAVADMIN 026/18 Policy and Exemptions to Minimum Antiterrorism UFC Standards for Navy Projects— 12 March 2018. This ITG exemption has been incorporated into subsequent releases of UFC 4-010-01 FYSA. |
| 101 | Reference: Plan Sheets EW627, EB609 | |
| Plan sheet EW627 Systems Cable Schedule Note 5 calls for EECS cables and devices to be furnished and installed by Government. Please confirm if this note applies to Systems Cable Schedule on Plan Sheet EB609. | 359 | All cables, conduits, enclosures, etc. shown on the drawings shall be provided by the Contractor. Duplicate Cable ID C-04 was renamed to C-05. Deleted Note 5 on revised sheet EW627. |
| 102 | Reference: Plan Sheets MW611, EW401 | |
| Please confirm that Pump Control Panels PCP-1 and PCP-2 on plan sheet MW611 should be DFP-1S and DFP-2S as noted on detail A4/EW401. | 360 | Revised tags to be PCP-1 and PCP-2. See revised sheets EW401 and EW621. |
| 103 | Reference: Specification 25 10 10.00 24 UMCS Front End Integration |
The last sentence in specification 25 10 10.00 24 3.3.5 UMCS Network Connection says "The existing network infrastructure requires additional work to provide the capacity and connectivity required by this project."
| Will "additional work" to the infrastructure be included in the contract? Please provide detailed scope of this infrastructure work if it is to be included in the bid. | 361 | Sentence is removed. See revised specification 25 10 10.00 24. |
| 104 | Reference: Plan Sheets EW602, EW605 |
Sheet Keynote 7/EW602 call for the servicing of the existing generator circuit breaker.
1. Is the existing breaker electrically operated?
2. Does the existing breaker have the following accessories: Shunt trip, Auxiliary Contacts or Bell Alarm?
3. In lieu of refurbishing/retrofitting the existing breaker, may we propose a new breaker with the relay included all in one enclosure?
4. What are the dimension constraints of the area where the breaker is currently located?
5. Are there more detailed drawings of the existing equipment?
6. Does the existing generator fuel tank currently have fuel in it or is the fuel tank empty?
7. How many gallons is the generator tank base?
8. Will contractor need to make any disconnections to existing generator to relocate it? 362 1. The existing breaker is not electrically operated.
2. It is unknow if the breaker has those options. PPI 22 provided all available existing information.
3. Proposal is acceptable as long as the generator sequence of operations and protection are equivalent to the contract document requirements.
4. This information is not known.
5. Existing drawings and information were provided in PPI 22.
6. Yes
7. Existing drawings and information were provided in PPI 22.
8. Generator is disconnected.
105 Reference: Plan Sheet EW131, MW602 Note 1 in the Sump Pump Schedule on plan sheet MW602 calls for a Simplex sump pump with integral sealed float activation switch, no external control required. Sheet Keynote 8 on plan sheet EW131 calls for routing SP-1 high water alarm conductors in conduit L-43, L-42, and L-41.
1. If external controls will be required for sump pumps, please provide control diagrams.
| 2. If control panels are required for each sump pump, please provide location of each panel. | 363 | Sump pumps have integral on-off controls controls via a float switch. Sump Pump Schedule on MW602 has been revised to provide a second sealed float for high water alarm and connection to alarm monitoring points indicated on the electrical plans EW131, EW132, and EW133. See revised specification section 22 13 29. |
| 106 | Reference: EW626, EW121, EW122, EW403 | |
| The Lighting Cable Pathway identifies lighting control conduits for the FL-1 flood luminaires and the trestle XL-03 trestle lights (L-36, L-38, L-40, L41, L,42, L,43, and L-44). Sheet Keynote 1/EW121, 5/EW122, and 3/EW403 call for switch controls to the BL-1 pier face lighting, but there does not appear to be conduits to run these controls. Please provide conduits in the Lighting Cable/Pathway Schedule for BL-1 switch controls. | 364 | Control wiring for the FL-1 luminaires is rated for 600V and run in the lighting circuit conduit. See revised Sheet EW626. |
| 107 | Reference: EB402, EW627. |
Sheet Keynote 6 on plan sheet EB402 calls out space for EECS and IDS System Enclosures (GFGI).
| Please confirm if enclosures E-02, E-03, and E-04 in the Systems - Enclosures/Pull Box/ Vault Schedule on plan sheet EW627 that reference IDS and EECS are GFGI as well. | 365 | E-02, E-03 and E-04 are to be provided by Contractor. |
| 108 | Reference: Plan Sheet MB602, EB605, EB608 |
1. The Shop Equipment Schedule calls for 2#8, 1#18 EGC for the following equipment: BF-1, BG-3, BS-2, DC-3, DC-4, DC-5, DG-2, DP-2, DP-3, EG-1, HP-1, IW-1, LA-1, LA-1, LM-1, MM-1, SB-2, SP-2, SR-1, SV-1, TB-1, TM-1, TS-1, and WT-1. Please confirm the correct EGC size.
2. Branch Panel 12E1 on plan sheet EB608 shows a three pole breaker for Lathe LA-1. The Shop Equipment Schedule on plan sheet EB605 calls for 3 phase but only shows 2#8, 1#18. Please correct number of wires for Lathe LA-1.
| 3. EF-1 and EF-4 in the FAN SCHEDULE on plan sheet MB602 list voltage at 208v, and horsepower at 1/2HP. In the MOTOR AND EQUIPMENT WIRING SCHEDULE on plan sheet EB605 these motors have varying horsepowers, varying wire sizes and voltage is listed at 120v. Please clarify the horsepower, voltage, and wire sizes for each of these fans. | 366 | See revised Sheet EB605 and EB606. |
| 109 | Reference: Plan Sheet ID101, EB111, EB607 | |
| On plan sheet ID101, the Weld Shop Equipment to be relocated lists Welding Machines WM-1, WM-2, WM-3, and WM-4. Plan sheet EB111 shows receptacles and circuits for welding machines 1-3 and the branch panel on plan sheet EB607 shows breakers for welding machines 1-3. Will a circuit be required for welding machine WM-4? | 367 | Portable welding outlets are provided in Repair Bays for the fourth welder. See Sheet EB111 Keynotes 2 and 7. |
| 110 | Reference: Plan Sheet MB603 | |
| (ELECTRIC) UNIT HEATER SCHEDULE on plan sheet lists EUH-1 and EUH-2. EUH-2 is not shown in the Volume 1 or Volume 2 drawings. Please identify where EUH-2 is located and provide circuit information. | 368 | There is no EUH-2. See revised sheet MB603. |
| 111 | Reference: Plan Sheet MB401, MB901 | |
| Please identify equipment ET-1 on plan sheet MB401 and MB901. | 369 | Refer to PB602. |
| 112 | Reference: MW612, EW621 | |
| Plumbing Fixture P-15 (ES/EWS) on plan sheet MW612 calls for heat tracing on exterior shower and eyewash. Will the heat trace require a separate circuit in addition to the P-15 circuit in the MOTOR AND EQUIPMENT WIRING SCHEDULE on plan sheet EW621? | 370 | Heat trace has manufacturer's controller and requires it's own 115V/1ph circuit. |
See revised sheets EW401, EW621 & EW623 adding circuit.
| 113 | Reference: Plan Sheet MB501 | |
| ERV-1 is not shown in equipment schedules or electrical schedules. Please provide circuit information for ERV-1 indicator light and identify what equipment it is serving. | 371 | There is no ERV-1. |
| 114 | Reference: Specification 33 57 00 | |
| Specification 33 57 00 2.4.1 Calls for Dispensing Units 1-4 to include a SS hose reel with electric power rewind hose return. Will additional circuits be needed for the hose reels? | 372 | Each Fuel Dispenser (DISP-X) has single point power (120V/1PH). The power rewind hose reel is integral to the unit. |
| 115 | Reference: Drawings - Vol 2 (VMF) | |
| 1. Please provide SCADA diagram for VMF Building including network cabinets, fiber optic cabling connections, network switches, supervisory controllers, DDC controllers, real time automation controllers, and connection to existing building. | 373 | See revised sheet EB603. |
| 116 | Reference: Plan Sheet EW611, EW627, Specification 26 27 14.00 20, 33 56 10 |
1. Specification 26 27 14.00 20 2.3 calls for KYZ Pulsed Signal Converter. Plan sheet EW611 does not show any locations with KYZ Pulsed Signal Converters. Please confirm if KYZ Pulsed Signal Converters will be used on this project.
2. Specification 33 56 10 2.7 calls for MODBUS connections to the Niagara Controller in Network Equipment Cabinet in Utility Enclosure Equipment Room. Please clarify where Modbus connections and hardware are located in Utility Building.
3. The following Cable ID's in Systems Cable Pathway on plan sheet EW627 are not shown on the SCADA diagram on plan sheet EW611: C-01, C-02, C-03, C-04, C-04.
Please update plan sheet EW611 to show cable ID's C-01, C-02, C-03, C-04, C-04 along with associated TO-FROM enclosures.
4. Plan sheet EW611 show multiple locations where discrete signals are called out for leak detection, heat trace, sump pumps, fuel pumps, VIL, and lift stations. Please provide conduit ID's, types and sizes for these control cables to run in.
5. Please identify devices in the Pier SCADA cabinet (blank circle), KB Fuel Control Collection Box (blank circle) and Utility Building (blank circle).
6.Please clarify if LDS-3 will need a fiber connection as it is not shown on plan sheet EW611. 374 1)KYZ Pulsed signal converter to be used if modbus is not available from the mechanical system.
2) The Network Equipment Cabinet is shown on the west wall of the equipment room on the enlarged Utility Enclosure Plan A1 / MW412 and A4 / EW401.
Added notes to EW611 showing what equipment goes in the communication cabinet.
3) EW611 does not include C-01,C-02,C-03,C-04& C-04 due to these are not part of the SCADA system.
4) See revised sheets EW131, EW132 and EW303.
5) See revised EW611.
6) PPI 053 defines the wiring to LDS-3 as descrete controls by mechanical.
117 Reference: Plan Sheets EW621, EW624, EW625, MW101
1. The conduit note for FM-1, FM-2, FM-3, HTP-1, and LDS-1 in the Motor and Equipment Schedule on plan sheet EW621 says "See power pathway schedule". Power pathway schedules on plan sheets EW624 and EW625 do not include pathway ID's for FM-1, FM-2, FM-3, HTP-1, and LDS-1. Please provide pathway ID's for this equipment in the power conduit schedule.
2. Plan sheet MW101 calls out Leak Detection System LDS-3. Plan sheet EW621 does not show LDS-3 in the Equipment Wiring Schedule. Please provide power feed information for LDS-3 in the schedule. 375 1. Power wiring shall be routed without conduit in the vault below therefore conduit numbers were not given.
2. See revised Sheet and EW111, EW404, and EW621.
118 Reference: Division 25 Specifications
1. Division 25 does not reference an ATO "Authority to Operate". What are NAVAC's requirements regarding ATO?
2. What are NAVAC's hardening requirements?
3. Is it acceptable for devices to be hardened off site?
4. Does the new facility need to integrate with existing systems on site?
5. Will the servers be required to integrate with existing active directory/Host based security system, maintenance and service?
6. Specification 25 10 10.00 24 1.3.28 mentions NAVAC NW is moving to Niagara 4 via inclusion in the enterprise ATO. Is this direction to integrate into this ATO?
7. Is an ATO or ATC required in order to undergo any of the verification or acceptance tests?
8. Specification 25 10 10.00 24 1.3.39 mentions using a SAAR form to request a domain account which means the server needs to be integrated into the network. No direction on how this gets done? Do they provide a server? Is it Virtualized? Is it Niagara? Please provide specific direction.
Specification 25 10 10.00 24 2.3.1.5 mentions Gateway for DNP-3. Please provide more information on gateway for DNP-3 and its requirements. 376 1) Contractor to submit an RFI (request for information) after the award of the contract.
2) Contractor to submit an RFI (request for information) after the award of the contract.
3) Contractor to submit an RFI (request for information) after the award of the contract.
4) Yes
5) Yes
6) Contractor to submit an RFI (request for information) after the award of the contract. 7) Contractor to submit an RFI (request for information) after the award of the contract. 8) Contractor to submit an RFI (request for information) after the award of the contract. 9) Contractor to submit an RFI (request for information) after the award of the contract.
| 119 | Reference: Plan Sheet MB602, EB605. | |
| EF-1 and EF-4 in the FAN SCHEDULE on plan sheet MB602 list voltage at 208v, and horsepower at 1/2HP. In the MOTOR AND EQUIPMENT WIRING SCHEDULE on plan sheet EB605 these motors have varying horsepowers, varying wire sizes and voltage is listed at 120v. Please clarify the horsepower, voltage, and wire sizes for each of these fans. | 377 | See reponse to PPI 366 (above). |
See revised sheets EB605 & EB609.
| 120 | Specification 21 13 16.00 20 2.1.8 calls for a complete nitrogen generator system with equipment operating at 208v, 2 phase. Please provide circuit for nitrogen generator system. | 378 | Equipment is shown and is indicated as equipment "NG-1" on sheets EB111, EB605 and EB609. |
| 121 | RFP Drawings - Vol. 2 (VMF) |
Sheets - AB402, AB403, AB603 PPI #165 Response Question:
PPI #165 response confirmed that countertops (except overhead counter door top) are solid surface material and clarified material thickness of 3/4" for backslash. It was assumed the intent was to have a matching 3/4" countertop thickness.
| Per Subcontractor, Corian Linen is not available in 3/4" thickness. Subcontractor also does not know of a comparable brand with 3/4" thickness in a similar finish. Please confirm 1/2" thick Corian Linen is acceptable for countertop and backsplash. | 379 | 1/2"T solid surface is acceptable. | ||
| 169 | Spec section 13 34 20, para. 2.1. The referenced paragraph indicates that the guardhouse shall have rain gutters and the roof drain shall be tight line to the storm drainage system. This is not shown on the contract drawings. Please clarify the requirement for gutters and where the tight line is to be connected to the storm drain. | |||
| 380 | Please refer to revised language in Paragraph 2.1 of Section 13 34 20 for clarity. | |||
| 170 | Spec Section 13 34 20, para. 2.1. The referenced paragraph indicates to provide an 18” wide counter at a standard height for a standing person. The counter is shown on drawing AW101 to be 2’ wide and the windows do not allow for the counter to be higher than approximately 3’-3” which is lower than the spec requirement. Please clarify the counter width requirement and what height is required for the counter. | 381 | Please refer to revised language in Paragraph 2.1 of Section 13 34 20 for clarity. | |
| 171 | Spec Section 13 34 20, para. 2.1. The specification requires that the guard booth be ballistically rated to National Institute of Justice – Level 4 (NIJ-IV). Is the roof of the guardhouse required to meet this standard? | 382 | Please refer to revised language in Paragraph 2.1 of Section 13 34 20 for clarity. | |
| 172 | Regarding the High Pressure Washer scheduled on plan sheet PB603 and specified in 22 00 00, 2.14, is this a cold water or hot water system? If a cold water system is intended, there are no units made with “a minimum liquid storage volume of 5 gallons”, unless this volume is meant for the detergent bucket. If a hot water system is intended, the performance specifications do not line up with commercially available models and there is no natural gas piping run to the wash rack utility building. Please clarify and/or provide the basis of the specification. | 383 | The high pressure washer (HPW-1) uses cold water. Basis of design is Hydroblaster Pressure Washer 5/3000 E. | |
| 173 | On Plan Sheet, MW301, the insulation thickness is detailed for the 8” Potable Water, 4” Sanitary Sewer, and 3” Oily Water, but the jacket material is not indicated. (Specification section 23 07 00 has jacket materials, including aluminum, PVC, & stainless.) What jacket material is required for the pier and trestle piping systems? | 384 | Provide stainless steel jackets per revised Specification 23 07 00 section 2.5.3.2.2. See revised sheets MW101, MW102, MW103, MW301. | |
| 174 | Specification Section 33 31 23.00, 2.1.1 Secondary (Containment) Pipe states: The secondary, or containment, pipe of the double containment piping system shall be FRP, 3/16 inch (0.1875”) nominal wall thickness wound, ASTM D2996, which appears excessive for these small diameter applications. Will commercially available FRP containment pipe that meets or exceeds the specified working pressure, with the following wall thicknesses be allowed: 0.127” wall for 8” diameter ; 0.122” wall for 6” diameter ; 0 .083” for 4” diameter; 0.086” for 3” diameter? | 385 | No exceptions taken. | |
| 175 | Specification Section 33 52 11, Fueling Facility Utility Enclosure, 2.1.1 requires Stainless Steel with interior and exterior surfaces painted with high-performance epoxy coatings per Section 09 96 00. Specification Section 09 96 00, High-Performance Coatings, 2.2.1 Epoxy Coatings, specifies conformance to “MPI ASM 116 for epoxy coatings and epoxy block filler, as modified.” MPI 116 is for block filler. Please confirm this is the appropriate specification for the top coat over stainless steel. | 386 | Provide epoxy coatings for stainless steel the same as specified for Aluminym Surface Coatings in Spec Section 09 96 00 - 2.2.1.4. | |
| 176 | Amendment 0006 states to remove section 01 45 35 and replace with revised section 01 45 35 provided in the amendment. Please confirm the intent to remove the prior version of this spec includes deleting the existing Schedule of Special Inspections tables labled "A" through "AA" that were included as part of the of the inital spec section 01 45 35. | 387 | No, schedule of special inspections is not removed. See revised specification 01 45 35, with inspections added. | |
| 177 | Amendment 6 indicated that door 001-1 is aluminum. See government tracking # 135. Please provide a specification for aluminum frames and doors. | 388 | Refer to the incorporation of Section 08 11 16 Aluminum Doors and Frames & Section 08 41 13 Aluminum-Framed Entrances and Storefronts. | |
| 39 | a. Channel Strut Supports – Specification Section 05 50 13.2.1.13 |
Per Drawings SB106, SB502 and SB503, it is clear that there are multiple components that will be required for the Channel Strut Grid Assembly, including the strut channels, channel nuts, splice hardware, diagonal braces, vertical rod stiffeners, transverse braces and hinged seismic fittings, mounting bracket and risers, miscellaneous fittings, clamps and hardware? Please see attached Unistrut catalog, starting on Page 206 for components available in Stainless Steel.
| We have been told by the manufacturer’s representative that not all of the Channel Strut Grid catalog components are available in 316 stainless steel. Is there an alternate material that will be acceptable for those components not available from the manufacturer in 316 stainless steel? | 389 | In lieu of stainless steel, the strut components can be of A653 GR33 steel. General notes on SB106 have been updated to include A653 GR33 steel. |
| 40 | a. Steel Storage Racks – Specification Section 10 56 13 |
The sizes of the Steel Storage Racks per Drawing ID-101 (Volume 2, VMF Drawing Set) do not match the sizes of the Bulk Steel Storage Rack per the Schedule, provided in Specification Section 10 56 13.3.4.
| Please confirm actual sizes and quantities of the bulk steel storage racks as shown on Drawing ID- 101. Please also note that I was informed by a Steel Rack Manufacturer that based on the height of the storage racks, the storage units with a depth less than 36” would not meet the seismic tie-down requirements. | 390 | Revised storage types and dimensions are incorporated to Drawing AB101 and Section 10 56 13. Mechanically fasten racks to each other and to the floor with embedded anchor bolts similar to other tie down methods. |
| 41 | a. Steel Storage Racks – Specification Section 10 56 13 | |
| A built-in Battery Storage Rack is shown on Drawing ID-101 (Volume 2, VMF Drawing Set), but is not identified on the Steel Storage Rack Schedule found in Specification Section 10 56 13.3.4. Please confirm the size, type of construction and loading requirements for the Battery Storage Rack. | 391 | Section 10 56 13 has been updated to include the size of the Battery Storage Unit. |
| 42 | a. Steel Storage Racks – Specification Section 10 56 13 | |
| Two Each Exterior Metal Storage Units are shown on Drawing ID-101 (Volume 2 VMF Drawing), but are not dentified on the Steel Storage Rack Schedule - Specification Section 10 56 13.3.4. Please confirm the size, type of construction, and loading requirements for the Exterior Metal Storage Units. | 392 | These Storage Racks are existing and are to be moved by the government. |
| 43 | Reference: Drawing MW101 and MW401 underground sanitary sewer piping system from UST-3 to trestle abutment | |
| Question: Please confirm spec section 33 30 00 2.2.2.1.1 PVC Gravity Pipe and Fittings is correct spec section and material type for single wall underground sanitary sewer piping and fittings for sewer pipe traveling from UST-3 to trestle a | 393 | The pipe and fittings between the trestle abutment and UST-3 is forced main (pressure) pipe since the berthed vessels pump into this system. The specification for single wall buired sanitary sewer (forced-main) piping is 33 31 23.00 10 section 2.3. |
| 44 | Reference: UST-3 and OWS-1 Vent piping | |
| Question: Please confirm internal pipe coating of vent piping for UST-3 and OWS-1 are not required? | 394 | Confirmed. |
| 45 | Reference: 33 31 23 2.9.1 Pipe Coatings and Linings | |
| Question: Please confirm fittings and weld joints are not required to have interior or exterior coating or lining? | 395 | Confirmed. |
| 46 | Reference: PPI answer 101 #2 - 33 31 23 2.9.1 Pipe coatings and linings interior and exterior liquid epoxy AWWA C210 for Oily Waste and Sanitary Sewer pipe |
Question: AWWA C210 states “This standard sets minimum requirements for shop and field applied, liquid epoxy exterior and interior lining used in the potable-water-supply industry. AWWA C210 makes no reference of oily waste or sanitary sewer system. Please confirm AWWA C210 standard is approved for oily waste and sanitary
| sewer systems and resistant to chemical composition of SS and OW? | 396 | Confirmed. |
| 47 | Reference: 22 00 00 3.1.5 Corrosion Protection for Buried Pipe and Fittings | |
| Question: Please confirm corrosion protection applies in accordance with NACE SP0169 to underground waste cast iron pipe and fittings? | 397 | Confirmed. |
| 49 | Amendment 6 |
Per Amendment 6, the Fuel Facilities between the Control Building and the containment vault structure near the head of the KB dock must be completed between 09/23/2021 and 01/01/2022. Would the Government allow demolition of the Asphalt and Cement Concrete pavements to be completed prior to 09/23/2021? Allowing this work to take place prior to 09/23/2021 would help assure that the complete system as required, would be fully installed and the pavements replaced within the given time constraints
| GOVERNMENT RESPONSE: | 399 | Bald Eagle permit places these restrictions. Perform as specified in contract documents. | ||
| 50 | According to the updated 01 14 00 / e.1 Rev01, construction at the Fuel Facility site along Sealion Road will occur between 1st September and 1st January. The work in this area will required an excessive amount of dewatering and erosion control due to the weather conditions this time of the year given the depth of excavations for the fuel tanks, will the Navy consider waving this constrain? | 400 | Bald Eagle permit places these restrictions. Perform as specified in contract documents. | |
| 023 | SHEET SB102 NOTE 11 SAYS TO MAKE CONTROL JOINTS WHERE SQUARES ARE 400 SF OR LESS |
CONCRETE SPECS SECTION 03 30 00 PARA 3.11 JOINTS SAYS TO MAKE CONTROL JOINTS 1200 SF OR LESS.
WHICH IS IT? 400 SF OR 1200 SF
| 401 | Maintain 400 sf to control cracking. See revised 03 30 00 |
| 012 | RFI: FAR 52.249-10(a) states in part, "The Contractor and its sureties shall be liable for any damage to the Government resulting from the Contractor's refusal or failure to complete the work within the specified time, whether or not the Contractor's right to proceed with the work is terminated." (Emphasis added.) However, FAR 52.211-12 provides for liquidated damages of "$5,739 for each calendar day of delay until the work is completed or accepted," and that "If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed." This opens the door for Contractor to be unfairly exposed to both any actual delay damages, including consequential damages, plus liquidated damages for delay, and it undermines the purpose of liquidated damages. Please confirm the liquidated damages established by FAR 52.211-12 will be the Government's sole and exclusive remedy for Contractor not completing the work within the Contract Time, or explain what is intended. |
| 347 | In the event of delays that fall under FAR 52.211-12, the Government may utilize all remedies available under the FAR. This contract is no exception |
| 018 | RFP Section: Section B Evaluation Factors for Award |
Paragraph: Factor 1, paragraph (d) Question: Please define “partnership”. 34 For purposes of this contract, a partnership is an entity made up of two or more companies who will be jointly bidding on and performing the work.