This electrical schedule and drawings are for a project to construct a berthing pier, trestle, maintenance facility, fuel storage, and security facilities for the Maritime Force Protection Unit in Bangor, Washington. The schedule specifies over 60 pathways including conduits and cables ranging from 1 to 4 inches in size to connect electrical vaults, pull boxes, enclosures, and facilities. Notable pathways include those connecting vaults for security cameras, water alarms, and the master fire alarm system. The project is being conducted by the Naval Facilities Engineering Command Northwest for the Department of the Navy to support the Maritime Force Protection Unit's operations and the stand-up of the Nuclear Weapons Security Program.

View the file

Other files

File Type Posted
Sections B- F-G forms.pdf PDF
Rev1442.pdf PDF
SF30 Amendment 0010.pdf PDF
SB106 Rev 2.pdf PDF
EW404 Rev 3.pdf PDF
01 32 17.00 20 Rev.pdf PDF
Attachment K.docx DOCX document
VMF SIte 3 from Sturgeon St.jpg JPG image
EW626 Rev 1.pdf PDF
Answer Attachment.xlsx XLSX spreadsheet
KB Spit 1 - Pier Location.jpg JPG image
MW301 Rev 1.pdf PDF
Fueling Site rev.jpg JPG image
MB602 Rev 1.pdf PDF
EW303 Rev 2.pdf PDF
EB603 Rev 1.pdf PDF
08 41 13 Rev.pdf PDF
MW103 Rev 1.pdf PDF
EW623 Rev 2.pdf PDF
MW102 Rev 1.pdf PDF
EB605 Rev 3.pdf PDF
EB606 Rev 2.pdf PDF
MB603 Rev 1.pdf PDF
EB101 Rev 3.pdf PDF
Amendment 0009 Final.pdf PDF
EB609 Rev 1.pdf PDF
10 56 13 Rev.pdf PDF
25 10 10.00 24.pdf PDF
MW101 Rev 1.pdf PDF
EB131 Rev 1.pdf PDF
22 13 29 Rev.pdf PDF
VMF Site 1 from Sturgeon St.jpg JPG image
01 45 35 Rev.pdf PDF
Fueling Site From Sealion Road.jpg JPG image
08 11 16 Rev.pdf PDF
EW111 Rev 2.pdf PDF
MW602 Rev 2.pdf PDF
EW301 Rev 1.pdf PDF
Fueling Site.jpg JPG image
SB503 Rev 1.pdf PDF
Gaurd booths.pdf PDF
EW611 Rev 3.pdf PDF
EW401 Rev 7.pdf PDF
03 30 00 Rev.pdf PDF
Sealion Road.jpg JPG image
EW621 Rev 4.pdf PDF
EW101 Rev 3.pdf PDF
EW627 Rev 6.pdf PDF
AB101 Rev 5.pdf PDF
KB Spit 2 - Pier Location.jpg JPG image
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYSTEMS PATHWAY SCHEDULE

PATHWAY ID SIZE TYPE MATERIAL END 1 END 2 NOTES

T-41 2" CONDUIT RTRC VAULT V-05 SCADA CABINET

T-42 2" CONDUIT RTRC VAULT V-06 ENCLOSURE E-03

T-43 2" CONDUIT RTRC VAULT V-06 ENCLOSURE E-03

T-44 2" CONDUIT RTRC VAULT V-07 ENCLOSURE E-04

T-45 2" CONDUIT RTRC VAULT V-07 ENCLOSURE E-04

T-11 4" CONDUIT RTRC PULL BOX PB-02 PULL BOX PB-03

T-12 4" CONDUIT RTRC VAULT V-05 VAULT V-06

T-13 4" CONDUIT RTRC VAULT V-06 VAULT V-07

T-14 2" CONDUIT RTRC VAULT V-07 NORTH FIXED FIGHTING POSITION

T-15 2" CONDUIT RTRC VAULT V-05 SOUTH FIXED FIGHTING POSITION

T-05 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-01

T-06 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-01

T-07 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-02

T-08 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-02

T-09 4" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-02

T-10 2" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-04

T-24 4" CONDUIT RTRC PULL BOX PB-03 VAULT V-05

T-25 4" CONDUIT RTRC VAULT V-05

T-26 2" CONDUIT RTRC VAULT V-05

T-30 2" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-04

T-31 2" CONDUIT RTRC SCADA CABINET VAULT V-06

T-32 1" CONDUIT RTRC VAULT V-06 HIGH WATER ALARM FOR SP-2

T-33 1" CONDUIT RTRC VAULT V-06 HIGH WATER ALARM FOR SP-3

T-17 1-1/2" CONDUIT RTRC PULL BOX PB-05 CARD READER VEHICULAR PIER BOUND

T-18 1" CONDUIT FLEXIBLE PULL BOX PB-05 CARD READER PEDESTRIAN PIER BOUND

T-19 1" CONDUIT FLEXIBLE PULL BOX PB-05 REQUEST TO EXIT PEDESTRIAN LAND BOUND

T-20 1-1/2" CONDUIT RTRC PULL BOX PB-05 PULL BOX PB-06

T-21 1-1/2" CONDUIT RTRC PULL BOX PB-06 REQUEST TO EXIT VEHICULAR LAND BOUND

T-22 1-1/2" CONDUIT RTRC PULL BOX PB-05 REQUEST TO EXIT VEHICULAR LAND BOUND

T-35 4" CONDUIT RTRC VAULT V-03 PULL BOX PB-01

T-36 4" CONDUIT RTRC VAULT V-03 PULL BOX PB-01

T-37 2" CONDUIT RTRC VAULT V-03 PULL BOX PB-01

T-38 2" CONDUIT RTRC VAULT V-03 PULL BOX PB-01

T-39 4" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-02

T-40 2" CONDUIT RTRC PULL BOX PB-02 PULL BOX PB-03

PULL BOX PB-03

PULL BOX PB-03

T-46

T-47

T-48

T-49

T-50

T-52

T-53

T-54

4" CONDUIT RTRC

4" CONDUIT RTRC

4" CONDUIT RTRC

1" CONDUIT RTRC

1" CONDUIT RTRC

2" CONDUIT RTRC

2" CONDUIT RTRC

1-1/2" CONDUIT RTRC

PULL BOX PB-02

PULL BOX PB-02

PULL BOX PB-05 PULL BOX PB-07

PULL BOX PB-03

VAULT V-05

VAULT V-06

VAULT V-06

VAULT V-07

SCADA CABINET MECHANICAL METER HEAD END

MASTER FIRE ALARM BOX

MASTER FIRE ALARM BOXMASTER FIRE ALARM BOX

HEAT TRACESCADA CABINET

T-55 1-1/2"

1"

AMI METERS SCADA CABINETCONDUIT

CONDUIT PVC

PVC AMI METERING

T-56 AMI METERS SCADA CABINET AMI METERING

2" CONDUIT PVCT-57 VAULT V-03 MASTER FIRE ALARM BOX

1-1/2" CONDUIT RTRC MECH METER HEAD END FM1T-58

1-1/2" CONDUIT RTRC MECH METER HEAD END FM2T-59

1-1/2" CONDUIT RTRC MECH METER HEAD END FM3T-60

4" CONDUIT RTRC PB-01 PB-02T-61

2" CONDUIT RTRC PB-04 PB-05T-62

2" CONDUIT RTRC PB-04 PB-05T-63

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:3 :3

A M

C U s e rs S b o ll e n D o c u m e n ts P M O D P

IE

R E L E C R S b o ll e n .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

EL

EC

TR

IC

A L S C H

ED

U

LE

S

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EW628

264 269

16046612

DOUG BUSSARD

B. GALLOWAY

B. NIXON

P

PI

P

AL

P

PI

S M B

P

PI

S M B

P

PI

0/

S M B

NOTES:

1. FOR EACH 4" CONDUIT, PROVIDE (3) 3-CELL FABRIC INNERDUCT.