This electrical schedule and drawings are for a project to construct a berthing pier, trestle, maintenance facility, fuel storage, and security facilities for the Maritime Force Protection Unit in Bangor, Washington. The schedule specifies over 60 pathways including conduits and cables ranging from 1 to 4 inches in size to connect electrical vaults, pull boxes, enclosures, and facilities. Notable pathways include those connecting vaults for security cameras, water alarms, and the master fire alarm system. The project is being conducted by the Naval Facilities Engineering Command Northwest for the Department of the Navy to support the Maritime Force Protection Unit's operations and the stand-up of the Nuclear Weapons Security Program.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0010 -Use the applicable Small Business Forms attached, newest first.
File Type Posted
VMF Site 1 from Sturgeon St.jpg JPG image
KB Spit 1 - Pier Location.jpg JPG image
MW101 Rev 1.pdf PDF
EW111 Rev 2.pdf PDF
EB131 Rev 1.pdf PDF
22 13 29 Rev.pdf PDF
08 41 13 Rev.pdf PDF
EW404 Rev 3.pdf PDF
Attachment K.docx DOCX document
01 32 17.00 20 Rev.pdf PDF
Sealion Road.jpg JPG image
VMF SIte 3 from Sturgeon St.jpg JPG image
VMF Site 2 from Sturgeon St.jpg JPG image
106 Rev 1.pdf PDF
EW122 Rev 1.pdf PDF
EB606 Rev 1.pdf PDF
MW412 Rev 1.pdf PDF
EW613 Rev 2.pdf PDF
SW521 Rev 2.pdf PDF
09 90 00 Rev.pdf PDF
33 52 11 Rev.pdf PDF
Amendment 0007.pdf PDF
Revised_Sections 00100 and 00800.pdf PDF
P907 TPS Geotech Report_0006.pdf PDF
P907 TPS UST Site Assess Report_0006.pdf PDF
PPIs Continued.pdf PDF
P907_Amend0006_Specs.pdf PDF
P907_Amend0006_Drawings.pdf PDF
EW404 Rev 1.pdf PDF
EW602 Rev 1.pdf PDF
EW611 Rev 1.pdf PDF
AB104 Rev1.pdf PDF
SW526 Rev 1.pdf PDF
EW612 Rev 1.pdf PDF
31 62 16.19.pdf PDF
SW601 Rev 1.pdf PDF
AB101 Rev 1.pdf PDF
EW601 Rev 1.pdf PDF
AB502 Rev 1.pdf PDF
CW161 Rev 1.pdf PDF
EW602 Rev 2.pdf PDF
Amendment 0004.pdf PDF
SF30 Continuation rev.pdf PDF
SITES WALK.pdf PDF
Amendment 0002 SF30.pdf PDF
Amend_1_Page_2.pdf PDF
Amendment 0001.docx DOCX document
RFP Attachment K_EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment J.pdf PDF
Sections A-L forms.pdf PDF
Show all 50

Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYSTEMS PATHWAY SCHEDULE

PATHWAY ID SIZE TYPE MATERIAL END 1 END 2 NOTES

T-41 2" CONDUIT RTRC VAULT V-05 SCADA CABINET

T-42 2" CONDUIT RTRC VAULT V-06 ENCLOSURE E-03

T-43 2" CONDUIT RTRC VAULT V-06 ENCLOSURE E-03

T-44 2" CONDUIT RTRC VAULT V-07 ENCLOSURE E-04

T-45 2" CONDUIT RTRC VAULT V-07 ENCLOSURE E-04

T-11 4" CONDUIT RTRC PULL BOX PB-02 PULL BOX PB-03

T-12 4" CONDUIT RTRC VAULT V-05 VAULT V-06

T-13 4" CONDUIT RTRC VAULT V-06 VAULT V-07

T-14 2" CONDUIT RTRC VAULT V-07 NORTH FIXED FIGHTING POSITION

T-15 2" CONDUIT RTRC VAULT V-05 SOUTH FIXED FIGHTING POSITION

T-05 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-01

T-06 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-01

T-07 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-02

T-08 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-02

T-09 4" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-02

T-10 2" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-04

T-24 4" CONDUIT RTRC PULL BOX PB-03 VAULT V-05

T-25 4" CONDUIT RTRC VAULT V-05

T-26 2" CONDUIT RTRC VAULT V-05

T-30 2" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-04

T-31 2" CONDUIT RTRC SCADA CABINET VAULT V-06

T-32 1" CONDUIT RTRC VAULT V-06 HIGH WATER ALARM FOR SP-2

T-33 1" CONDUIT RTRC VAULT V-06 HIGH WATER ALARM FOR SP-3

T-17 1-1/2" CONDUIT RTRC PULL BOX PB-05 CARD READER VEHICULAR PIER BOUND

T-18 1" CONDUIT FLEXIBLE PULL BOX PB-05 CARD READER PEDESTRIAN PIER BOUND

T-19 1" CONDUIT FLEXIBLE PULL BOX PB-05 REQUEST TO EXIT PEDESTRIAN LAND BOUND

T-20 1-1/2" CONDUIT RTRC PULL BOX PB-05 PULL BOX PB-06

T-21 1-1/2" CONDUIT RTRC PULL BOX PB-06 REQUEST TO EXIT VEHICULAR LAND BOUND

T-22 1-1/2" CONDUIT RTRC PULL BOX PB-05 REQUEST TO EXIT VEHICULAR LAND BOUND

T-35 4" CONDUIT RTRC VAULT V-03 PULL BOX PB-01

T-36 4" CONDUIT RTRC VAULT V-03 PULL BOX PB-01

T-37 2" CONDUIT RTRC VAULT V-03 PULL BOX PB-01

T-38 2" CONDUIT RTRC VAULT V-03 PULL BOX PB-01

T-39 4" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-02

T-40 2" CONDUIT RTRC PULL BOX PB-02 PULL BOX PB-03

PULL BOX PB-03

PULL BOX PB-03

T-46

T-47

T-48

T-49

T-50

T-52

T-53

T-54

4" CONDUIT RTRC

4" CONDUIT RTRC

4" CONDUIT RTRC

1" CONDUIT RTRC

1" CONDUIT RTRC

2" CONDUIT RTRC

2" CONDUIT RTRC

1-1/2" CONDUIT RTRC

PULL BOX PB-02

PULL BOX PB-02

PULL BOX PB-05 PULL BOX PB-07

PULL BOX PB-03

VAULT V-05

VAULT V-06

VAULT V-06

VAULT V-07

SCADA CABINET MECHANICAL METER HEAD END

MASTER FIRE ALARM BOX

MASTER FIRE ALARM BOXMASTER FIRE ALARM BOX

HEAT TRACESCADA CABINET

T-55 1-1/2"

1"

AMI METERS SCADA CABINETCONDUIT

CONDUIT PVC

PVC AMI METERING

T-56 AMI METERS SCADA CABINET AMI METERING

2" CONDUIT PVCT-57 VAULT V-03 MASTER FIRE ALARM BOX

1-1/2" CONDUIT RTRC MECH METER HEAD END FM1T-58

1-1/2" CONDUIT RTRC MECH METER HEAD END FM2T-59

1-1/2" CONDUIT RTRC MECH METER HEAD END FM3T-60

4" CONDUIT RTRC PB-01 PB-02T-61

2" CONDUIT RTRC PB-04 PB-05T-62

2" CONDUIT RTRC PB-04 PB-05T-63

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:3 :3

A M

C U s e rs S b o ll e n D o c u m e n ts P M O D P

IE

R E L E C R S b o ll e n .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

EL

EC

TR

IC

A L S C H

ED

U

LE

S

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EW628

264 269

16046612

DOUG BUSSARD

B. GALLOWAY

B. NIXON

P

PI

P

AL

P

PI

S M B

P

PI

S M B

P

PI

0/

S M B

NOTES:

1. FOR EACH 4" CONDUIT, PROVIDE (3) 3-CELL FABRIC INNERDUCT.

Sheets
EW101 - ELECTRICAL SITE PLAN
EW628 - ELECTRICAL SCHEDULES

File details come from the government source that posted it. Updated .