This electrical schedule and drawings are for a project to construct a berthing pier, trestle, maintenance facility, fuel storage, and security facilities for the Maritime Force Protection Unit in Bangor, Washington. The schedule specifies over 60 pathways including conduits and cables ranging from 1 to 4 inches in size to connect electrical vaults, pull boxes, enclosures, and facilities. Notable pathways include those connecting vaults for security cameras, water alarms, and the master fire alarm system. The project is being conducted by the Naval Facilities Engineering Command Northwest for the Department of the Navy to support the Maritime Force Protection Unit's operations and the stand-up of the Nuclear Weapons Security Program.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYSTEMS PATHWAY SCHEDULE
PATHWAY ID SIZE TYPE MATERIAL END 1 END 2 NOTES
T-41 2" CONDUIT RTRC VAULT V-05 SCADA CABINET
T-42 2" CONDUIT RTRC VAULT V-06 ENCLOSURE E-03
T-43 2" CONDUIT RTRC VAULT V-06 ENCLOSURE E-03
T-44 2" CONDUIT RTRC VAULT V-07 ENCLOSURE E-04
T-45 2" CONDUIT RTRC VAULT V-07 ENCLOSURE E-04
T-11 4" CONDUIT RTRC PULL BOX PB-02 PULL BOX PB-03
T-12 4" CONDUIT RTRC VAULT V-05 VAULT V-06
T-13 4" CONDUIT RTRC VAULT V-06 VAULT V-07
T-14 2" CONDUIT RTRC VAULT V-07 NORTH FIXED FIGHTING POSITION
T-15 2" CONDUIT RTRC VAULT V-05 SOUTH FIXED FIGHTING POSITION
T-05 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-01
T-06 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-01
T-07 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-02
T-08 4" CONDUIT PVC VAULT V-03 ENCLOSURE E-02
T-09 4" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-02
T-10 2" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-04
T-24 4" CONDUIT RTRC PULL BOX PB-03 VAULT V-05
T-25 4" CONDUIT RTRC VAULT V-05
T-26 2" CONDUIT RTRC VAULT V-05
T-30 2" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-04
T-31 2" CONDUIT RTRC SCADA CABINET VAULT V-06
T-32 1" CONDUIT RTRC VAULT V-06 HIGH WATER ALARM FOR SP-2
T-33 1" CONDUIT RTRC VAULT V-06 HIGH WATER ALARM FOR SP-3
T-17 1-1/2" CONDUIT RTRC PULL BOX PB-05 CARD READER VEHICULAR PIER BOUND
T-18 1" CONDUIT FLEXIBLE PULL BOX PB-05 CARD READER PEDESTRIAN PIER BOUND
T-19 1" CONDUIT FLEXIBLE PULL BOX PB-05 REQUEST TO EXIT PEDESTRIAN LAND BOUND
T-20 1-1/2" CONDUIT RTRC PULL BOX PB-05 PULL BOX PB-06
T-21 1-1/2" CONDUIT RTRC PULL BOX PB-06 REQUEST TO EXIT VEHICULAR LAND BOUND
T-22 1-1/2" CONDUIT RTRC PULL BOX PB-05 REQUEST TO EXIT VEHICULAR LAND BOUND
T-35 4" CONDUIT RTRC VAULT V-03 PULL BOX PB-01
T-36 4" CONDUIT RTRC VAULT V-03 PULL BOX PB-01
T-37 2" CONDUIT RTRC VAULT V-03 PULL BOX PB-01
T-38 2" CONDUIT RTRC VAULT V-03 PULL BOX PB-01
T-39 4" CONDUIT RTRC PULL BOX PB-01 PULL BOX PB-02
T-40 2" CONDUIT RTRC PULL BOX PB-02 PULL BOX PB-03
PULL BOX PB-03
PULL BOX PB-03
T-46
T-47
T-48
T-49
T-50
T-52
T-53
T-54
4" CONDUIT RTRC
4" CONDUIT RTRC
4" CONDUIT RTRC
1" CONDUIT RTRC
1" CONDUIT RTRC
2" CONDUIT RTRC
2" CONDUIT RTRC
1-1/2" CONDUIT RTRC
PULL BOX PB-02
PULL BOX PB-02
PULL BOX PB-05 PULL BOX PB-07
PULL BOX PB-03
VAULT V-05
VAULT V-06
VAULT V-06
VAULT V-07
SCADA CABINET MECHANICAL METER HEAD END
MASTER FIRE ALARM BOX
MASTER FIRE ALARM BOXMASTER FIRE ALARM BOX
HEAT TRACESCADA CABINET
T-55 1-1/2"
1"
AMI METERS SCADA CABINETCONDUIT
CONDUIT PVC
PVC AMI METERING
T-56 AMI METERS SCADA CABINET AMI METERING
2" CONDUIT PVCT-57 VAULT V-03 MASTER FIRE ALARM BOX
1-1/2" CONDUIT RTRC MECH METER HEAD END FM1T-58
1-1/2" CONDUIT RTRC MECH METER HEAD END FM2T-59
1-1/2" CONDUIT RTRC MECH METER HEAD END FM3T-60
4" CONDUIT RTRC PB-01 PB-02T-61
2" CONDUIT RTRC PB-04 PB-05T-62
2" CONDUIT RTRC PB-04 PB-05T-63
SCALE:
EPROJECT NO.:
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
SHEET OF
DRAWFORM REVISION: 31 JANUARY 2017
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
AS NOTED
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
D E P A R T M E N T
O F
T H E
N A V Y
N A V F A C
N W
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S
IL
V E R D A L E W A S H
IN
G T O N
N A V A L
B A S E
K
IT
S A P B A N G O R
S
IL
V E R D A L E W A S H
IN
G T O N
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
S
YM
D
ES
C R
IP
TI
O N
D A
TE
A P P R
FIRE PROTECTION
D. GIBSON/T. BOLING
1389895
:3 :3
A M
C U s e rs S b o ll e n D o c u m e n ts P M O D P
IE
R E L E C R S b o ll e n .r vt
F Y
M
C O
N P
R O
J E
C T
P -9
T P
P P
IE
R
A N
D M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
EL
EC
TR
IC
A L S C H
ED
U
LE
S
N A V A L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M A N D
N O R
TH
W
ES
T
BCPSMB BGA
EW628
264 269
16046612
DOUG BUSSARD
B. GALLOWAY
B. NIXON
P
PI
P
AL
P
PI
S M B
P
PI
S M B
P
PI
0/
S M B
NOTES:
1. FOR EACH 4" CONDUIT, PROVIDE (3) 3-CELL FABRIC INNERDUCT.
| Sheets |
| EW101 - ELECTRICAL SITE PLAN |
| EW628 - ELECTRICAL SCHEDULES |
File details come from the government source that posted it. Updated .