EW621 Rev 4.pdf
PDF 151 KB Posted
- Attached to
- Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
- Solicitation number
- n44255
About this file
This document provides electrical schedules and specifications for a federal construction project to build a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit (MFPU) Bangor's operations mission. Key details include electrical equipment to be installed such as split system condensing units, diesel fuel pumps, dispensors, heaters, flow meters, sump pumps, lighting fixtures, and specifications for wire sizing and conduit. The schedules list equipment descriptions, voltage requirements, panel assignments, conduit and disconnect sizing. The Department of the Navy Naval Facilities Engineering Command is the agency managing this project to support the Nuclear Weapons Security Program mission.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
EPROJECT NO.:
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
SHEET OF
DRAWFORM REVISION: 31 JANUARY 2017
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
AS NOTED
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
D E P A R T M E N T
O F
T H E
N A V Y
N A V F A C
N W
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S
IL
V E R D A L E W A S H
IN
G T O N
N A V A L
B A S E
K
IT
S A P B A N G O R
S
IL
V E R D A L E W A S H
IN
G T O N
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
S
YM
D
ES
C R
IP
TI
O N
D A
TE
A P P R
FIRE PROTECTION
D. GIBSON/T. BOLING
1389895
:1 :1
P M
C U s e rs S b o ll e n D o c u m e n ts P M O D P
IE
R E L E C R S b o ll e n .r vt
F Y
M
C O
N P
R O
J E
C T
P -9
T P
P P
IE
R
A N
D M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
EL
EC
TR
IC
A L S C H
ED
U
LE
S
N A V A L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M A N D
N O R
TH
W
ES
T
BCPSMB BGA
EW621
257 269
16046605
DOUG BUSSARD
B. GALLOWAY
B. NIXON
MOTOR AND EQUIPMENT WIRING SCHEDULE
PLAN MARK DESCRIPTION KW/HP VOLTS PH PANEL WIRE CONDUIT DISCONNECT SIZE (AMPS) NOTES
ACCU-3 SPLIT SYSTEM CONDESING UNIT 0.21 KVA 208 1 TPP2C 2#12, 1#12 GND 3/4" POWERS INDOOR UNIT AC-3
DFP-1 DIESEL FUEL PUMP 2 HP 208 1 FUEL PNL 2#10, 1#10 GND VIA DUCT BANK PROVIDE CONNECTION TO CONTROLLER & PUMP
DFP-2 DIESEL FUEL PUMP 2 HP 208 1 FUEL PNL 2#10, 1#10 GND VIA DUCT BANK PROVIDE CONNECTION TO CONTROLLER & PUMP
DISP-1 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1
DISP-2 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1
DISP-3 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1
DISP-4 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1
ESH-1 ELECTRIC SPACE HEATER 1.6 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1
ESH-2 ELECTRIC SPACE HEATER 1.6 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1
EW-HT EYE WASH HEAT TRACE 0.06 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1
FM-1 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1
FM-2 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1
FM-3 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1
FPE-1 FREEZE PROTECTION ENCLOSURE 1.5 kVA 120 1 TPP2B 2#10, 1#10 GND 1"
FSV2 FLOW CONTROL VALVE 0.1 KVA 120 1 PANEL A3 2#12, 1#12 GND 3/4" NOTE 1
FUELCP DIESEL FUEL CONTROL PANEL (UTILITY BUILDING) 0.1 KVA 120 1 2#12, 1#12 GND 3/4" NOTE 1
GAM-1 GATE ACTUATOR MOTOR 1 HP 480 1 TPPMSB2 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2
GAM-2 GATE ACTUATOR MOTOR 1 HP 480 1 TPPMSB2 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2
HTP-1 HEAT TRACE PANEL 5.4 KVA 208 1 TPP2A 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE
LDS-1 LEAK DETECTION SYSTEM PANEL (UTILITY BUILDING) 0.1 KVA 120 1 FUEL PNL 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1
LDS-2 DIESEL FUEL LEAK DETECTOR (KB PIER) 0.1 KVA 120 1 2#10, 1#10 GND NA
LDS-3 LEAK DETECTION SYSTEM PANEL (TPP PIER) 0.1 KVA 120 1 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1
LPM-1 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#10, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR
LPM-2 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#10, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR
LPM-3 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#8, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR
LSP-1 UPLANDS LIFT STATION PUMP 7 1/2 HP 480 3 TPP4B 3#10, 1#10 GND VIA DUCT BANK NOTE 5
LSP-2 UPLANDS LIFT STATION PUMP 7 1/2 HP 480 3 TPP4B 3#10, 1#10 GND VIA DUCT BANK NOTE 5
P-15 EMRG SHOWER / EYE WASH STATION WATER HEATER 1 1/2 HP 120 1 FUEL PNL 2#12, 1#12 GND 3/4"
PCP-1 DEISEL FUEL PUMP STARTER CONNECTION (UTILITY BUILDING) 208 1 2#10, 1#10 GND NA NOTE 3 STARTER FOR DFP-1
PCP-2 DEISEL FUEL PUMP STARTER CONNECTION (UTILITY BUILDING) 208 1 2#10, 1#10 GND NA NOTE 3 STARTER FOR DFP-2
SF-1 UTILTY ENCLOSURE VENTILATION FAN 1/30 HP 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 2
SF-2 GUARD HOUSE VENTILATION FAN 1/8 HP 120 1 TPP2C 2#12, 1#12 GND 3/4" NOTE 2
SP-1 SUMP PUMP 1/2 HP 120 1 TPP2B 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4
SP-2 SUMP PUMP 1/2 HP 120 1 TPP2A 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4
SP-3 SUMP PUMP 1/2 HP 120 1 TPP2A 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4
SP-4 SUMP PUMP 1/2 HP 120 1 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4
TMS-1 CONTINUOUS TANK INVENTORY AND PUMP CONTROL PANEL 0.1 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1
TP-1 TURNSTYLE POWER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1
LUMINAIRE SCHEDULE
EQUIPMENT
ID DESCRIPTION COLOR TEMP WATTAGE LUMENS MOUNTING VOLTAGE COMMENTS
BL-1 LED FLOODLIGHT 4000 K 160.0 W 13249 BULL RAIL 277 V
FL-1 POLE MOUNTED LED FLOODLIGHT 4000 K 440.0 W 21102 POLE 480 V
L3 INDUSTRIAL ENCLOSED AND GASKETED LUMINAIRE 4000 K 40.0 W 4000 SURFACE 120 V
L4 INDUSTRIAL ENCLOSED AND GASKETED LUMINAIRE 4000 K 56.0 W 6000 SURFACE 120 V
NL-1 NAVIGATION LIGHT 4000 K 100.0 W BOLLARD 120 V
SL-1 SEACH LIGHT 300.0 W 120 V MINIMUM 1,000,000 CANDELA POWER
UL-1 UNDER PIER ENCLOSED AND GASKETED LUMINAIRE 5700 K 30.0 W 4000 SURFACE 277 V
WP-1 WALL PACK 4000 K 38.0 W 4070 WALL 120-277V
XL-03 PEDESTRIAN POLE MOUNTED LUMINAIRE 4000 K 210.0 W 18551 POLE 277 V
XL-03A PEDESTRIAN POLE MOUNTED LUMINAIRE 4000 K 140.0 W 18551 POLE PROVIDE OPTIONAL PHOTOCELL, 120-277V
NOTES:
1. PROVIDE 20A SNAP SWITCH DISCONNECT NEXT TO EQUIPMENT.
2. PROVIDE WEATHERPROOF MANUAL MOTOR STARTER DISCONNECT.
3. SIZE FUSE PER MANUFACTURES INSTRUCTIONS.
4. MOUNT DISCONNECT HIGH ON TRENCH WALL NEXT TO PUMP.
5. PROVIDE SINGLE POINT CONNECTION FOR LSP-1 & 2 WITH 3#8 & 1#8EGC FROM PANEL TPP4B TO CONTROL PANEL IN ADDITION
TO WIRE SHOWN IN SCHEDULE FROM CONTROL PANEL TO PUMPS.
P
PI
S M B
P
PI
0/
S M B
P
PI
0/
S M B
P
PI
0/
S M B
| Sheets |
| EW621 - ELECTRICAL SCHEDULES |
File details come from the government source that posted it. Updated .