EW621 Rev 4.pdf

PDF 151 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
Solicitation number
n44255
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document provides electrical schedules and specifications for a federal construction project to build a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit (MFPU) Bangor's operations mission. Key details include electrical equipment to be installed such as split system condensing units, diesel fuel pumps, dispensors, heaters, flow meters, sump pumps, lighting fixtures, and specifications for wire sizing and conduit. The schedules list equipment descriptions, voltage requirements, panel assignments, conduit and disconnect sizing. The Department of the Navy Naval Facilities Engineering Command is the agency managing this project to support the Nuclear Weapons Security Program mission.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0010 -Use the applicable Small Business Forms attached, newest first.
File Type Posted
Sections B- F-G forms.pdf PDF
Rev1442.pdf PDF
SB106 Rev 2.pdf PDF
Fueling Site From Sealion Road.jpg JPG image
Fueling Site.jpg JPG image
SB503 Rev 1.pdf PDF
MW301 Rev 1.pdf PDF
MW102 Rev 1.pdf PDF
EW628 Rev 4.pdf PDF
EW401 Rev 7.pdf PDF
EW623 Rev 2.pdf PDF
EB605 Rev 3.pdf PDF
03 30 00 Rev.pdf PDF
01 45 35 Rev.pdf PDF
08 11 16 Rev.pdf PDF
Answer Attachment.xlsx XLSX spreadsheet
CS101 Rev 1.pdf PDF
MW613 Rev 1.pdf PDF
MW611 Rev 1.pdf PDF
MW112 Rev 1.pdf PDF
MW601 Rev 1.pdf PDF
Amendment 008 changes.docx DOCX document
26 11 13.00 20 Rev.pdf PDF
01 45 00.00 20.pdf PDF
13 34 20 Rev.pdf PDF
Amendment 0008.pdf PDF
1100 kW Generator Photo_0006.pdf PDF
PPI AMEND 0006.pdf PDF
Amendment 0005.pdf PDF
CS102 Rev 1.pdf PDF
EW141 Rev 1.pdf PDF
CS103 Rev 1.pdf PDF
EW124 Rev 1.pdf PDF
P-876 AS-Built_E130.pdf PDF
AB603 Rev 1.pdf PDF
01 32 17.00 20.pdf PDF
AB111 Rev 1.pdf PDF
EW404 Rev 1.pdf PDF
EW602 Rev 1.pdf PDF
SF30 Continuation .pdf PDF
Amendment 0004.pdf PDF
Amendment 003.pdf PDF
SF30 Continuation rev.pdf PDF
Amendment 0002 SF30.pdf PDF
Amend_1_Page_2.pdf PDF
P907 Project Location.pdf PDF
SF30 Amendment 0001.pdf PDF
RFP P-907 Pier and Maintence Facility.pdf PDF
RFP Attachment K_EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment J.pdf PDF
Show all 50

Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:1 :1

P M

C U s e rs S b o ll e n D o c u m e n ts P M O D P

IE

R E L E C R S b o ll e n .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

EL

EC

TR

IC

A L S C H

ED

U

LE

S

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EW621

257 269

16046605

DOUG BUSSARD

B. GALLOWAY

B. NIXON

MOTOR AND EQUIPMENT WIRING SCHEDULE

PLAN MARK DESCRIPTION KW/HP VOLTS PH PANEL WIRE CONDUIT DISCONNECT SIZE (AMPS) NOTES

ACCU-3 SPLIT SYSTEM CONDESING UNIT 0.21 KVA 208 1 TPP2C 2#12, 1#12 GND 3/4" POWERS INDOOR UNIT AC-3

DFP-1 DIESEL FUEL PUMP 2 HP 208 1 FUEL PNL 2#10, 1#10 GND VIA DUCT BANK PROVIDE CONNECTION TO CONTROLLER & PUMP

DFP-2 DIESEL FUEL PUMP 2 HP 208 1 FUEL PNL 2#10, 1#10 GND VIA DUCT BANK PROVIDE CONNECTION TO CONTROLLER & PUMP

DISP-1 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1

DISP-2 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1

DISP-3 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1

DISP-4 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1

ESH-1 ELECTRIC SPACE HEATER 1.6 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1

ESH-2 ELECTRIC SPACE HEATER 1.6 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1

EW-HT EYE WASH HEAT TRACE 0.06 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1

FM-1 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

FM-2 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

FM-3 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

FPE-1 FREEZE PROTECTION ENCLOSURE 1.5 kVA 120 1 TPP2B 2#10, 1#10 GND 1"

FSV2 FLOW CONTROL VALVE 0.1 KVA 120 1 PANEL A3 2#12, 1#12 GND 3/4" NOTE 1

FUELCP DIESEL FUEL CONTROL PANEL (UTILITY BUILDING) 0.1 KVA 120 1 2#12, 1#12 GND 3/4" NOTE 1

GAM-1 GATE ACTUATOR MOTOR 1 HP 480 1 TPPMSB2 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2

GAM-2 GATE ACTUATOR MOTOR 1 HP 480 1 TPPMSB2 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2

HTP-1 HEAT TRACE PANEL 5.4 KVA 208 1 TPP2A 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE

LDS-1 LEAK DETECTION SYSTEM PANEL (UTILITY BUILDING) 0.1 KVA 120 1 FUEL PNL 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

LDS-2 DIESEL FUEL LEAK DETECTOR (KB PIER) 0.1 KVA 120 1 2#10, 1#10 GND NA

LDS-3 LEAK DETECTION SYSTEM PANEL (TPP PIER) 0.1 KVA 120 1 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

LPM-1 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#10, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR

LPM-2 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#10, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR

LPM-3 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#8, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR

LSP-1 UPLANDS LIFT STATION PUMP 7 1/2 HP 480 3 TPP4B 3#10, 1#10 GND VIA DUCT BANK NOTE 5

LSP-2 UPLANDS LIFT STATION PUMP 7 1/2 HP 480 3 TPP4B 3#10, 1#10 GND VIA DUCT BANK NOTE 5

P-15 EMRG SHOWER / EYE WASH STATION WATER HEATER 1 1/2 HP 120 1 FUEL PNL 2#12, 1#12 GND 3/4"

PCP-1 DEISEL FUEL PUMP STARTER CONNECTION (UTILITY BUILDING) 208 1 2#10, 1#10 GND NA NOTE 3 STARTER FOR DFP-1

PCP-2 DEISEL FUEL PUMP STARTER CONNECTION (UTILITY BUILDING) 208 1 2#10, 1#10 GND NA NOTE 3 STARTER FOR DFP-2

SF-1 UTILTY ENCLOSURE VENTILATION FAN 1/30 HP 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 2

SF-2 GUARD HOUSE VENTILATION FAN 1/8 HP 120 1 TPP2C 2#12, 1#12 GND 3/4" NOTE 2

SP-1 SUMP PUMP 1/2 HP 120 1 TPP2B 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4

SP-2 SUMP PUMP 1/2 HP 120 1 TPP2A 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4

SP-3 SUMP PUMP 1/2 HP 120 1 TPP2A 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4

SP-4 SUMP PUMP 1/2 HP 120 1 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4

TMS-1 CONTINUOUS TANK INVENTORY AND PUMP CONTROL PANEL 0.1 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1

TP-1 TURNSTYLE POWER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

LUMINAIRE SCHEDULE

EQUIPMENT

ID DESCRIPTION COLOR TEMP WATTAGE LUMENS MOUNTING VOLTAGE COMMENTS

BL-1 LED FLOODLIGHT 4000 K 160.0 W 13249 BULL RAIL 277 V

FL-1 POLE MOUNTED LED FLOODLIGHT 4000 K 440.0 W 21102 POLE 480 V

L3 INDUSTRIAL ENCLOSED AND GASKETED LUMINAIRE 4000 K 40.0 W 4000 SURFACE 120 V

L4 INDUSTRIAL ENCLOSED AND GASKETED LUMINAIRE 4000 K 56.0 W 6000 SURFACE 120 V

NL-1 NAVIGATION LIGHT 4000 K 100.0 W BOLLARD 120 V

SL-1 SEACH LIGHT 300.0 W 120 V MINIMUM 1,000,000 CANDELA POWER

UL-1 UNDER PIER ENCLOSED AND GASKETED LUMINAIRE 5700 K 30.0 W 4000 SURFACE 277 V

WP-1 WALL PACK 4000 K 38.0 W 4070 WALL 120-277V

XL-03 PEDESTRIAN POLE MOUNTED LUMINAIRE 4000 K 210.0 W 18551 POLE 277 V

XL-03A PEDESTRIAN POLE MOUNTED LUMINAIRE 4000 K 140.0 W 18551 POLE PROVIDE OPTIONAL PHOTOCELL, 120-277V

NOTES:

1. PROVIDE 20A SNAP SWITCH DISCONNECT NEXT TO EQUIPMENT.

2. PROVIDE WEATHERPROOF MANUAL MOTOR STARTER DISCONNECT.

3. SIZE FUSE PER MANUFACTURES INSTRUCTIONS.

4. MOUNT DISCONNECT HIGH ON TRENCH WALL NEXT TO PUMP.

5. PROVIDE SINGLE POINT CONNECTION FOR LSP-1 & 2 WITH 3#8 & 1#8EGC FROM PANEL TPP4B TO CONTROL PANEL IN ADDITION

TO WIRE SHOWN IN SCHEDULE FROM CONTROL PANEL TO PUMPS.

P

PI

S M B

P

PI

0/

S M B

P

PI

0/

S M B

P

PI

0/

S M B

Sheets
EW621 - ELECTRICAL SCHEDULES

File details come from the government source that posted it. Updated .