EW621 Rev 4.pdf

PDF 151 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached
Solicitation number
n44255
Issued by

About this file

This document provides electrical schedules and specifications for a federal construction project to build a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit (MFPU) Bangor's operations mission. Key details include electrical equipment to be installed such as split system condensing units, diesel fuel pumps, dispensors, heaters, flow meters, sump pumps, lighting fixtures, and specifications for wire sizing and conduit. The schedules list equipment descriptions, voltage requirements, panel assignments, conduit and disconnect sizing. The Department of the Navy Naval Facilities Engineering Command is the agency managing this project to support the Nuclear Weapons Security Program mission.

View the file

Other files

File Type Posted
Sections B- F-G forms.pdf PDF
Rev1442.pdf PDF
SF30 Amendment 0010.pdf PDF
SB106 Rev 2.pdf PDF
EW404 Rev 3.pdf PDF
01 32 17.00 20 Rev.pdf PDF
Attachment K.docx DOCX document
VMF SIte 3 from Sturgeon St.jpg JPG image
EW626 Rev 1.pdf PDF
Answer Attachment.xlsx XLSX spreadsheet
KB Spit 1 - Pier Location.jpg JPG image
MW301 Rev 1.pdf PDF
EW628 Rev 4.pdf PDF
Fueling Site rev.jpg JPG image
MB602 Rev 1.pdf PDF
EW303 Rev 2.pdf PDF
EB603 Rev 1.pdf PDF
08 41 13 Rev.pdf PDF
MW103 Rev 1.pdf PDF
EW623 Rev 2.pdf PDF
MW102 Rev 1.pdf PDF
EB605 Rev 3.pdf PDF
EB606 Rev 2.pdf PDF
MB603 Rev 1.pdf PDF
EB101 Rev 3.pdf PDF
Amendment 0009 Final.pdf PDF
EB609 Rev 1.pdf PDF
10 56 13 Rev.pdf PDF
25 10 10.00 24.pdf PDF
MW101 Rev 1.pdf PDF
EB131 Rev 1.pdf PDF
22 13 29 Rev.pdf PDF
VMF Site 1 from Sturgeon St.jpg JPG image
01 45 35 Rev.pdf PDF
Fueling Site From Sealion Road.jpg JPG image
08 11 16 Rev.pdf PDF
EW111 Rev 2.pdf PDF
MW602 Rev 2.pdf PDF
EW301 Rev 1.pdf PDF
Fueling Site.jpg JPG image
SB503 Rev 1.pdf PDF
Gaurd booths.pdf PDF
EW611 Rev 3.pdf PDF
EW401 Rev 7.pdf PDF
03 30 00 Rev.pdf PDF
Sealion Road.jpg JPG image
EW101 Rev 3.pdf PDF
EW627 Rev 6.pdf PDF
AB101 Rev 5.pdf PDF
KB Spit 2 - Pier Location.jpg JPG image
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:1 :1

P M

C U s e rs S b o ll e n D o c u m e n ts P M O D P

IE

R E L E C R S b o ll e n .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

EL

EC

TR

IC

A L S C H

ED

U

LE

S

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EW621

257 269

16046605

DOUG BUSSARD

B. GALLOWAY

B. NIXON

MOTOR AND EQUIPMENT WIRING SCHEDULE

PLAN MARK DESCRIPTION KW/HP VOLTS PH PANEL WIRE CONDUIT DISCONNECT SIZE (AMPS) NOTES

ACCU-3 SPLIT SYSTEM CONDESING UNIT 0.21 KVA 208 1 TPP2C 2#12, 1#12 GND 3/4" POWERS INDOOR UNIT AC-3

DFP-1 DIESEL FUEL PUMP 2 HP 208 1 FUEL PNL 2#10, 1#10 GND VIA DUCT BANK PROVIDE CONNECTION TO CONTROLLER & PUMP

DFP-2 DIESEL FUEL PUMP 2 HP 208 1 FUEL PNL 2#10, 1#10 GND VIA DUCT BANK PROVIDE CONNECTION TO CONTROLLER & PUMP

DISP-1 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1

DISP-2 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1

DISP-3 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1

DISP-4 DIESEL FUEL DISPENSOR 1.08 KVA 120 1 PANEL A3 SEE ONELINE NA NOTE 1

ESH-1 ELECTRIC SPACE HEATER 1.6 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1

ESH-2 ELECTRIC SPACE HEATER 1.6 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1

EW-HT EYE WASH HEAT TRACE 0.06 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1

FM-1 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

FM-2 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

FM-3 FLOW METER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

FPE-1 FREEZE PROTECTION ENCLOSURE 1.5 kVA 120 1 TPP2B 2#10, 1#10 GND 1"

FSV2 FLOW CONTROL VALVE 0.1 KVA 120 1 PANEL A3 2#12, 1#12 GND 3/4" NOTE 1

FUELCP DIESEL FUEL CONTROL PANEL (UTILITY BUILDING) 0.1 KVA 120 1 2#12, 1#12 GND 3/4" NOTE 1

GAM-1 GATE ACTUATOR MOTOR 1 HP 480 1 TPPMSB2 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2

GAM-2 GATE ACTUATOR MOTOR 1 HP 480 1 TPPMSB2 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2

HTP-1 HEAT TRACE PANEL 5.4 KVA 208 1 TPP2A 3#10, 1#10 GND SEE POWER PATHWAY SCHEDULE

LDS-1 LEAK DETECTION SYSTEM PANEL (UTILITY BUILDING) 0.1 KVA 120 1 FUEL PNL 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

LDS-2 DIESEL FUEL LEAK DETECTOR (KB PIER) 0.1 KVA 120 1 2#10, 1#10 GND NA

LDS-3 LEAK DETECTION SYSTEM PANEL (TPP PIER) 0.1 KVA 120 1 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

LPM-1 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#10, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR

LPM-2 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#10, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR

LPM-3 LIGHT POLE MAST ELEVATOR MOTOR 1 HP 480 3 TPPMSB2 3#8, 1#10 GND SEE LIGHTING PATHWAY SCHEDULE PROVIDE POLE WITH RECEPT TO DISCONNECT MOTOR

LSP-1 UPLANDS LIFT STATION PUMP 7 1/2 HP 480 3 TPP4B 3#10, 1#10 GND VIA DUCT BANK NOTE 5

LSP-2 UPLANDS LIFT STATION PUMP 7 1/2 HP 480 3 TPP4B 3#10, 1#10 GND VIA DUCT BANK NOTE 5

P-15 EMRG SHOWER / EYE WASH STATION WATER HEATER 1 1/2 HP 120 1 FUEL PNL 2#12, 1#12 GND 3/4"

PCP-1 DEISEL FUEL PUMP STARTER CONNECTION (UTILITY BUILDING) 208 1 2#10, 1#10 GND NA NOTE 3 STARTER FOR DFP-1

PCP-2 DEISEL FUEL PUMP STARTER CONNECTION (UTILITY BUILDING) 208 1 2#10, 1#10 GND NA NOTE 3 STARTER FOR DFP-2

SF-1 UTILTY ENCLOSURE VENTILATION FAN 1/30 HP 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 2

SF-2 GUARD HOUSE VENTILATION FAN 1/8 HP 120 1 TPP2C 2#12, 1#12 GND 3/4" NOTE 2

SP-1 SUMP PUMP 1/2 HP 120 1 TPP2B 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4

SP-2 SUMP PUMP 1/2 HP 120 1 TPP2A 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4

SP-3 SUMP PUMP 1/2 HP 120 1 TPP2A 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4

SP-4 SUMP PUMP 1/2 HP 120 1 2#10, 1#10 GND SEE POWER PATHWAY SCHEDULE NOTE 2, 4

TMS-1 CONTINUOUS TANK INVENTORY AND PUMP CONTROL PANEL 0.1 KVA 120 1 FUEL PNL 2#12, 1#12 GND 3/4" NOTE 1

TP-1 TURNSTYLE POWER 0.1 KVA 120 1 TPP2A 2#12, 1#12 GND SEE POWER PATHWAY SCHEDULE NOTE 1

LUMINAIRE SCHEDULE

EQUIPMENT

ID DESCRIPTION COLOR TEMP WATTAGE LUMENS MOUNTING VOLTAGE COMMENTS

BL-1 LED FLOODLIGHT 4000 K 160.0 W 13249 BULL RAIL 277 V

FL-1 POLE MOUNTED LED FLOODLIGHT 4000 K 440.0 W 21102 POLE 480 V

L3 INDUSTRIAL ENCLOSED AND GASKETED LUMINAIRE 4000 K 40.0 W 4000 SURFACE 120 V

L4 INDUSTRIAL ENCLOSED AND GASKETED LUMINAIRE 4000 K 56.0 W 6000 SURFACE 120 V

NL-1 NAVIGATION LIGHT 4000 K 100.0 W BOLLARD 120 V

SL-1 SEACH LIGHT 300.0 W 120 V MINIMUM 1,000,000 CANDELA POWER

UL-1 UNDER PIER ENCLOSED AND GASKETED LUMINAIRE 5700 K 30.0 W 4000 SURFACE 277 V

WP-1 WALL PACK 4000 K 38.0 W 4070 WALL 120-277V

XL-03 PEDESTRIAN POLE MOUNTED LUMINAIRE 4000 K 210.0 W 18551 POLE 277 V

XL-03A PEDESTRIAN POLE MOUNTED LUMINAIRE 4000 K 140.0 W 18551 POLE PROVIDE OPTIONAL PHOTOCELL, 120-277V

NOTES:

1. PROVIDE 20A SNAP SWITCH DISCONNECT NEXT TO EQUIPMENT.

2. PROVIDE WEATHERPROOF MANUAL MOTOR STARTER DISCONNECT.

3. SIZE FUSE PER MANUFACTURES INSTRUCTIONS.

4. MOUNT DISCONNECT HIGH ON TRENCH WALL NEXT TO PUMP.

5. PROVIDE SINGLE POINT CONNECTION FOR LSP-1 & 2 WITH 3#8 & 1#8EGC FROM PANEL TPP4B TO CONTROL PANEL IN ADDITION

TO WIRE SHOWN IN SCHEDULE FROM CONTROL PANEL TO PUMPS.

P

PI

S M B

P

PI

0/

S M B

P

PI

0/

S M B

P

PI

0/

S M B

Sheets
EW621 - ELECTRICAL SCHEDULES