EW301 Rev 1.pdf
PDF 313 KB Posted
- Attached to
- Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
- Solicitation number
- n44255
About this file
This document package includes electrical drawings and specifications for a pier and vessel maintenance facility project. The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit (MFPU) Bangor's operations mission of providing security escort for submarines through protection by presence and defense by force during transit between homeport and the surface/dive points in the Strait of Juan de Fuca and test range. Drawings include plans for pier systems, electrical sections, lighting cable pathways, and a one-line diagram. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command for general contractor services.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T1
P-04
T-09
T-10 T-30
T-39
L-07
P-03
GROUND LEVEL
0"
P-08
L-42
3" 316 SS STRUCTURAL METAL CHANNEL
MOUNTED ON 5' CENTER MAXIMUM
T-61
L-63
T-72
STUB CONDUIT 2" ABOVE FLOOR OF
VAULT UNDER SUBSTATIONS
B
P-20
P-26
T-12
T-47 P-23
P-21 L-14
P-22 P-25
P-24
P-30
P-27
P-28
P-29
T-31
T-32
B
P-36 P-35
P-40
T-13
P-39
T-48 L-15
P-37
P-38
T-33
T/DECK
EL 20.50
B-LVL1
EL 18.00
BVR1
BVR2
E-03
T-43
T-42
P-32 P-31
P-34
P-33
DOUBLE DUPLEX
RECEPTACLE
PROVIDE 316 SS STRUCTURAL METAL
CHANNEL FOR SUPPORT OF RECEPTACLES
AND COMMUNICATIONS BOXES (TYP)
BVR3
BVR4
E-04
P-43
P-44
P-41
P-42
T-44
T-45
PROVIDE 316 SS STRUCTURAL METAL
CHANNEL FOR SUPPORT OF RECEPTACLES
AND COMMUNICATIONS BOXES (TYP)
DOUBLE DUPLEX RECEPTACLE
BB
T-14 P-46
P-45
L-16
SCALE:
EPROJECT NO.:
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
SHEET OF
DRAWFORM REVISION: 31 JANUARY 2017
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
AS NOTED
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
D E P A R T M E N T
O F
T H E
N A V Y
N A V F A C
N W
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S
IL
V E R D A L E W A S H
IN
G T O N
N A V A L
B A S E
K
IT
S A P B A N G O R
S
IL
V E R D A L E W A S H
IN
G T O N
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
S
YM
D
ES
C R
IP
TI
O N
D A
TE
A P P R
FIRE PROTECTION
D. GIBSON/T. BOLING
1389895
:5 :5
P M
C U s e rs s m a rs h a ll D o c u m e n ts P M O D P
IE
R E L E C R s m a rs h a ll .r vt
F Y
M
C O
N P
R O
J E
C T
P -9
T P
P P
IE
R
A N
D M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
EL
EC
TR
IC
A L S
EC
TI
O N S
N A V A L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M A N D
N O R
TH
W
ES
T
BCPSMB BGA
EW301
228 269
16046576
DOUG BUSSARD
B. GALLOWAY
B. NIXON
SCALE:
4' 4'
1/4" = 1'-0"
8'8'
SCALE: 1/4" = 1'-0" EW111
TRESTLE SECTION
C1
EW121, EW124, EW131
SCALE: NONE
PIER STAIRS ISOMETRIC
C2
SCALE: 1/4" = 1'-0" EW112
PIER ELECTRICAL PATHWAY SECTION 1
B1
EW122, EW132
SCALE: 1/4" = 1'-0" EW112
PIER ELECTRICAL PATHWAY SECTION 2
B2
EW113, EW122, EW132
EW112
SCALE: 1/4" = 1'-0" EW112
BLOCKING VESSEL POWER & COMM
CONNECTION ELEVATION - SOUTH
C4
EW132
SCALE: 1/4" = 1'-0" EW113
BLOCKING VESSEL POWER & COMM
CONNECTION ELEVATION - NORTH
B4
EW133
SHEET KEYNOTES:
1. REFER TO ONE-LINE DIAGRAM ON SHEET EW604 FOR ADDITIONAL INFORMATION.
SCALE:
4' 4'
1/4" = 1'-0"
8'8'
SCALE:
4' 4'
1/4" = 1'-0"
8'8'
SCALE:
4' 4'
1/4" = 1'-0"
8'8'
SCALE:
4' 4'
1/4" = 1'-0"
8'8'
SCALE: 1/4" = 1'-0" EW113
PIER ELECTRICAL PATHWAY SECTION 3
B3
EW123, EW133
SCALE:
4' 4'
1/4" = 1'-0"
8'8'
P
PI
0/
S M B
| Sheets |
| EW131 - PIER SYSTEMS PLAN - SHEET 1 |
| EW132 - PIER SYSTEMS PLAN - SHEET 2 |
| EW301 - ELECTRICAL SECTIONS |
| EW303 - ELECTRICAL SECTIONS |
| EW611 - SCADA AND MV SWGR & FUEL TANK LOW VOLTAGE ONE-LINE |
| EW627 - ELECTRICAL SCHEDULES |
| EW631 - UNDER PIER LIGHTING CABLE/PATHWAY SCHEDULE CONTINUED |
File details come from the government source that posted it. Updated .