EW131 Rev 2.pdf

PDF 226 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached
Solicitation number
n44255
Issued by

About this file

This document package includes construction plans and specifications for a federal contract opportunity issued by the Department of the Navy Naval Facilities Engineering Command. The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit Bangor's operations mission of providing security escort for submarines through protection by presence and defense by force during transit between homeport and surface/dive points in the Strait of Juan de Fuca and test range. The construction plans cover a pier systems plan across two sheets, electrical sections, SCADA and medium voltage switchgear and fuel tank low voltage one-line diagrams, and an electrical schedule. Relevant details include requirements for a vehicle loop detector, card reader back boxes, vehicle detection loops, and high water alarm conduit routing.

View the file

Other files

File Type Posted
Sections B- F-G forms.pdf PDF
Rev1442.pdf PDF
SF30 Amendment 0010.pdf PDF
SB106 Rev 2.pdf PDF
EW404 Rev 3.pdf PDF
01 32 17.00 20 Rev.pdf PDF
Attachment K.docx DOCX document
VMF SIte 3 from Sturgeon St.jpg JPG image
EW626 Rev 1.pdf PDF
Answer Attachment.xlsx XLSX spreadsheet
KB Spit 1 - Pier Location.jpg JPG image
MW301 Rev 1.pdf PDF
EW628 Rev 4.pdf PDF
Fueling Site rev.jpg JPG image
MB602 Rev 1.pdf PDF
EW303 Rev 2.pdf PDF
EB603 Rev 1.pdf PDF
08 41 13 Rev.pdf PDF
MW103 Rev 1.pdf PDF
EW623 Rev 2.pdf PDF
MW102 Rev 1.pdf PDF
EB605 Rev 3.pdf PDF
EB606 Rev 2.pdf PDF
MB603 Rev 1.pdf PDF
EB101 Rev 3.pdf PDF
Amendment 0009 Final.pdf PDF
EB609 Rev 1.pdf PDF
10 56 13 Rev.pdf PDF
25 10 10.00 24.pdf PDF
MW101 Rev 1.pdf PDF
EB131 Rev 1.pdf PDF
22 13 29 Rev.pdf PDF
VMF Site 1 from Sturgeon St.jpg JPG image
01 45 35 Rev.pdf PDF
Fueling Site From Sealion Road.jpg JPG image
08 11 16 Rev.pdf PDF
EW111 Rev 2.pdf PDF
MW602 Rev 2.pdf PDF
EW301 Rev 1.pdf PDF
Fueling Site.jpg JPG image
SB503 Rev 1.pdf PDF
Gaurd booths.pdf PDF
EW611 Rev 3.pdf PDF
EW401 Rev 7.pdf PDF
03 30 00 Rev.pdf PDF
Sealion Road.jpg JPG image
EW621 Rev 4.pdf PDF
EW101 Rev 3.pdf PDF
EW627 Rev 6.pdf PDF
AB101 Rev 5.pdf PDF
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CR

CR

J H G F

E

T1

T2

T3

M A

TC

H

LIN

E

S E

E D

W G

E W

M A

T C

H

LI

N E

S E

E D

W G

E W

C1

EW301

5 6

V-03

UP TO E-01 AND E-02

PB-06

T-18 T-19

PB-05

ON GATE

T-05

T-06

T-07

T-08

T-09 T-10

T-17

T-61

T-20

T-09

A1

EW502

PB-01

T-36

REX

REX

REX

T-22

T-21

T-62

T-39 T-62 T-39

C2

EW303

T-38

A1

EW503

PB-07

T-50

A1

EW503

MASTER FIRE ALARM BOX

SP-1 HIGH

WATER ALARM

T-57

C4

EW303

9 9

T-37

T-35

EW504

C1

EW504

C4

4"

2"

T-61

T-61

GUARD HOUSE

A3

EW403

PB-04

T-70 T-71

PULL BOX PB-08

T-72

T-72

T-73

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:5 :4

P M

C U s e rs s m a rs h a ll D o c u m e n ts P M O D P

IE

R E L E C R s m a rs h a ll .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

P

IE

R

SY

ST

EM

S

P

LA

N

S H

EE

T

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EW131

224 269

16046572

DOUG BUSSARD

B. GALLOWAY

B. NIXON

SCALE: 1/8" = 1'-0"

PIER SYSTEMS PLAN - SHEET 1

SCALE:

8' 8'

1/8" = 1'-0"

16'16'

GENERAL NOTES: SHEET KEYNOTES:

1. WALL MOUNTED ENCLOSURE.

2. COORDINATE LOCATION OF PEDESTAL MOUNTED MASTER FIRE ALARM BOX

NEXT TO WALL MOUNTED PANEL TPP2C.

3. PROVIDE VEHICLE LOOP DETECTOR WITH NORMALLY OPEN AND NORMALLY

CLOSED RELAY OUTPUTS. LEDS TO INDICATE STATUS AND ISSUES AND

DIAGNOSTICS PORT FOR ADVANCED TROUBLESHOOTING. AUTOMATIC

FREQUENCY TUNING AND SENSITIVITY ADJUSTMENTS.

4. MOUNT BACK BOX FOR CARD READER ON NORTH SIDE OF WALL.

5. MOUNT BACK BOX FOR CARD READER ON SIDE OF GATE.

6. REQUEST TO EXIT ON GOOSENECK ATTACHED TO RAIL/WALL.

1. COORDINATE EXACT LOCATION OF BACK BOXES FOR EECS SYSTEM

WITH CONTRACTING OFFICER PRIOR TO INSTALLATION.

KEY PLAN

N

7. EMBED VEHICLE DETECTION LOOP 1 TO 2" BELOW SURFACE OF ROADWAY

WITH PROTECTIVE CASING TO PREVENT DAMAGE DURING INSTALL. MINIMUM

IS 5 LOOPS OF 14 AWG XLPE INSULATED WIRE WITH A 6' DIAMETER LOOP.

LEAD WIRES BACK TO DETECTOR TO BE TWISTED AT 3 TO 5 TURNS A FOOT.

SAW CUTTING LOOP CHANNELS AFTER CONCRETE IS POURED IS NOT

ALLOWED. COORDINATE EXACT LOCATION AND CONFIGURATION WITH

MANUFACTURER PRIOR TO INSTALLATION.

8. ROUTE HIGH WATER ALARM CONDUCTORS IN CONDUIT T-71, T-72, T-73,

T-74, AND T-75. INTERCEPT IN PULL BOX PE-07. SEE SHEET EW121.

9. COORDINATE CONDUIT ROUTING AND EQUIPMENT CONNECTION POINTS WITH

GATE AND TURNSTILE MANUFACTURER. 1

P

PI

P

AL

P

PI

0/

S M B

Sheets
EW131 - PIER SYSTEMS PLAN - SHEET 1
EW132 - PIER SYSTEMS PLAN - SHEET 2
EW301 - ELECTRICAL SECTIONS
EW303 - ELECTRICAL SECTIONS
EW611 - SCADA AND MV SWGR & FUEL TANK LOW VOLTAGE ONE-LINE
EW627 - ELECTRICAL SCHEDULES
EW631 - UNDER PIER LIGHTING CABLE/PATHWAY SCHEDULE CONTINUED

File details come from the government source that posted it. Updated .