EW131 Rev 2.pdf

PDF 226 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
Solicitation number
n44255
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document package includes construction plans and specifications for a federal contract opportunity issued by the Department of the Navy Naval Facilities Engineering Command. The project constructs a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit Bangor's operations mission of providing security escort for submarines through protection by presence and defense by force during transit between homeport and surface/dive points in the Strait of Juan de Fuca and test range. The construction plans cover a pier systems plan across two sheets, electrical sections, SCADA and medium voltage switchgear and fuel tank low voltage one-line diagrams, and an electrical schedule. Relevant details include requirements for a vehicle loop detector, card reader back boxes, vehicle detection loops, and high water alarm conduit routing.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0010 -Use the applicable Small Business Forms attached, newest first.
File Type Posted
SF30 Amendment 0010.pdf PDF
Sealion Road.jpg JPG image
VMF SIte 3 from Sturgeon St.jpg JPG image
VMF Site 2 from Sturgeon St.jpg JPG image
KB Spit 2 - Pier Location.jpg JPG image
EW627 Rev 6.pdf PDF
EW631 Rev 1.pdf PDF
EW621 Rev 4.pdf PDF
EW101 Rev 3.pdf PDF
EW132 Rev 2.pdf PDF
AB101 Rev 5.pdf PDF
23 07 00 Rev.pdf PDF
EW626 Rev 1.pdf PDF
Fueling Site rev.jpg JPG image
MB602 Rev 1.pdf PDF
EW122 Rev 1.pdf PDF
EB606 Rev 1.pdf PDF
09 90 00 Rev.pdf PDF
33 52 11 Rev.pdf PDF
MW613 Rev 1.pdf PDF
P907_Amend0006_Specs.pdf PDF
P907_Amend0006_Drawings.pdf PDF
1100 kW Generator Photo_0006.pdf PDF
PPI AMEND 0006.pdf PDF
Amendment 0005.pdf PDF
EW612 Rev 1.pdf PDF
31 62 16.19.pdf PDF
SW601 Rev 1.pdf PDF
AB101 Rev 1.pdf PDF
EW601 Rev 1.pdf PDF
AB502 Rev 1.pdf PDF
CW161 Rev 1.pdf PDF
EW602 Rev 2.pdf PDF
P907 TPP Pier Geotechnical Report.pdf PDF
CS102 Rev 1.pdf PDF
EW141 Rev 1.pdf PDF
CS103 Rev 1.pdf PDF
EW124 Rev 1.pdf PDF
P-876 AS-Built_E130.pdf PDF
AB603 Rev 1.pdf PDF
01 32 17.00 20.pdf PDF
AB111 Rev 1.pdf PDF
SF30 Continuation .pdf PDF
SITES WALK.pdf PDF
Amendment 003.pdf PDF
Amendment 0001.docx DOCX document
P907 Project Location.pdf PDF
SF30 Amendment 0001.pdf PDF
Sections A-L forms.pdf PDF
RFP P-907 Pier and Maintence Facility.pdf PDF
Show all 50

Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CR

CR

J H G F

E

T1

T2

T3

M A

TC

H

LIN

E

S E

E D

W G

E W

M A

T C

H

LI

N E

S E

E D

W G

E W

C1

EW301

5 6

V-03

UP TO E-01 AND E-02

PB-06

T-18 T-19

PB-05

ON GATE

T-05

T-06

T-07

T-08

T-09 T-10

T-17

T-61

T-20

T-09

A1

EW502

PB-01

T-36

REX

REX

REX

T-22

T-21

T-62

T-39 T-62 T-39

C2

EW303

T-38

A1

EW503

PB-07

T-50

A1

EW503

MASTER FIRE ALARM BOX

SP-1 HIGH

WATER ALARM

T-57

C4

EW303

9 9

T-37

T-35

EW504

C1

EW504

C4

4"

2"

T-61

T-61

GUARD HOUSE

A3

EW403

PB-04

T-70 T-71

PULL BOX PB-08

T-72

T-72

T-73

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:5 :4

P M

C U s e rs s m a rs h a ll D o c u m e n ts P M O D P

IE

R E L E C R s m a rs h a ll .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

P

IE

R

SY

ST

EM

S

P

LA

N

S H

EE

T

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EW131

224 269

16046572

DOUG BUSSARD

B. GALLOWAY

B. NIXON

SCALE: 1/8" = 1'-0"

PIER SYSTEMS PLAN - SHEET 1

SCALE:

8' 8'

1/8" = 1'-0"

16'16'

GENERAL NOTES: SHEET KEYNOTES:

1. WALL MOUNTED ENCLOSURE.

2. COORDINATE LOCATION OF PEDESTAL MOUNTED MASTER FIRE ALARM BOX

NEXT TO WALL MOUNTED PANEL TPP2C.

3. PROVIDE VEHICLE LOOP DETECTOR WITH NORMALLY OPEN AND NORMALLY

CLOSED RELAY OUTPUTS. LEDS TO INDICATE STATUS AND ISSUES AND

DIAGNOSTICS PORT FOR ADVANCED TROUBLESHOOTING. AUTOMATIC

FREQUENCY TUNING AND SENSITIVITY ADJUSTMENTS.

4. MOUNT BACK BOX FOR CARD READER ON NORTH SIDE OF WALL.

5. MOUNT BACK BOX FOR CARD READER ON SIDE OF GATE.

6. REQUEST TO EXIT ON GOOSENECK ATTACHED TO RAIL/WALL.

1. COORDINATE EXACT LOCATION OF BACK BOXES FOR EECS SYSTEM

WITH CONTRACTING OFFICER PRIOR TO INSTALLATION.

KEY PLAN

N

7. EMBED VEHICLE DETECTION LOOP 1 TO 2" BELOW SURFACE OF ROADWAY

WITH PROTECTIVE CASING TO PREVENT DAMAGE DURING INSTALL. MINIMUM

IS 5 LOOPS OF 14 AWG XLPE INSULATED WIRE WITH A 6' DIAMETER LOOP.

LEAD WIRES BACK TO DETECTOR TO BE TWISTED AT 3 TO 5 TURNS A FOOT.

SAW CUTTING LOOP CHANNELS AFTER CONCRETE IS POURED IS NOT

ALLOWED. COORDINATE EXACT LOCATION AND CONFIGURATION WITH

MANUFACTURER PRIOR TO INSTALLATION.

8. ROUTE HIGH WATER ALARM CONDUCTORS IN CONDUIT T-71, T-72, T-73,

T-74, AND T-75. INTERCEPT IN PULL BOX PE-07. SEE SHEET EW121.

9. COORDINATE CONDUIT ROUTING AND EQUIPMENT CONNECTION POINTS WITH

GATE AND TURNSTILE MANUFACTURER. 1

P

PI

P

AL

P

PI

0/

S M B

Sheets
EW131 - PIER SYSTEMS PLAN - SHEET 1
EW132 - PIER SYSTEMS PLAN - SHEET 2
EW301 - ELECTRICAL SECTIONS
EW303 - ELECTRICAL SECTIONS
EW611 - SCADA AND MV SWGR & FUEL TANK LOW VOLTAGE ONE-LINE
EW627 - ELECTRICAL SCHEDULES
EW631 - UNDER PIER LIGHTING CABLE/PATHWAY SCHEDULE CONTINUED