This document includes an electrical schedule and enclosure layout for a pier and maintenance facility project. The schedule specifies various electrical enclosures including pedestals, pull boxes, and vaults to house cables and equipment. Enclosures are identified by size, material, locking mechanism, and location notes. A cable schedule also provides cable types from origin to destination points including multi-mode and single-mode optical fiber cables and copper cables for telephony and data networks. The federal contract opportunity is to construct a berthing pier, trestle, and vessel maintenance facility to support the Maritime Force Protection Unit in Bangor, Washington. The solicitation is amendment 0010 requesting use of applicable small business forms. The Navy Naval Facilities Engineering Command is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V-09 - - - - NORTH SIDE OF FUELING STATION EXISTING VAULT.
V-10 36"L X 24"W X 30"D CONCRETE - - 4 - - NORTH SIDE OF FUELING STATION VAULT INSTALLED FLUSH TO THE FINISHED GRADE.
NOTES:
E-07 NEMA 4X HANDLE LATCH PEDESTAL KB PIER FOR UMCS AND VIL SYSTEM
E-08 NEMA 4X HANDLE LATCH PEDESTAL KB PIER FOR UMCS AND VIL SYSTEM
PB-01 24"L X 15"W X 8"D NEMA 4X SCREW LATCH - 1,2,3 - - TRESTLE PULL BOX MOUNTED TO THE SIDE OF THE TRESTLE.
PB-02 24"L X 15"W X 8"D NEMA 4X SCREW LATCH - 1,2,3 - - TRESTLE PULL BOX MOUNTED TO THE SIDE OF THE TRESTLE.
PB-03 24"L X 15"W X 8"D NEMA 4X SCREW LATCH - 1,2,3 - - TRESTLE PULL BOX MOUNTED TO THE SIDE OF THE TRESTLE.
PB-04 18"L X 8"W X 12"D NEMA 4X SCREW LATCH - 1,2 - - TRESTLE PULL BOX MOUNTED TO THE SIDE OF THE TRESTLE.
E-03 30"H x 18"W x 12"D NEMA 4X HANDLE LATCH PEDESTAL 1 - YES SOUTH BLOCKING VESSEL BROW FOR IDS AND EECS CONTROL PANEL.
E-04 30"H x 18"W x 12"D NEMA 4X HANDLE LATCH PEDESTAL 1 - YES NORTH BLOCKING VESSEL BROW FOR IDS AND EECS CONTROL PANEL.
E-05 24"H x 24"W x 18"D KEYED LATCH WALL 72" - FUELING STATION UTILITY BUILDING WALL MOUNT EQUIPMENT CABINET
E-06 15 RU EQUIPMENT RACK MINIMUM NEMA 3X KEYED LATCH FLOOR 1 - PIER ELECTRICAL SWITCH GEAR NEMA 3X FLOOR MOUNT EQUIPMENT CABINET SUITABLE FOR SCADA EQUIPMENT.
V-01 - - - - - SOUTHEAST CORNER OF B-7136 EXISTING VAULT.
V-02 48"L X 48"W X 48"D CONCRETE - - 4 - - LAND SIDE OF KB PIER VAULT INSTALLED FLUSH TO THE FINISHED GRADE.
V-03 48"L X 48"W X 48"D CONCRETE - - 4 - - LAND SIDE OF TPP TRESTLE VAULT INSTALLED FLUSH TO THE FINISHED GRADE.
V-04 36"L X 24"W X 30"D CONCRETE - - 4 - - NORTH SIDE OF FUELING STATION VAULT INSTALLED FLUSH TO THE FINISHED GRADE.
V-05 - CONCRETE - - 4 - - SOUTH SIDE OF TPP PIER VAULT INSTALLED FLUSH TO THE FINISHED GRADE OF THE TRESTLE.
V-06 - CONCRETE - - 4 - - WEST SIDE OF TPP PIER VAULT INSTALLED FLUSH TO THE FINISHED GRADE OF THE TRESTLE.
V-07 - CONCRETE - - 4 - - LAND SIDE OF KB PIER VAULT INSTALLED FLUSH TO THE FINISHED GRADE.
V-08 36"L X 24"W X 30"D CONCRETE - - 4 - - NORTHEAST SIDE OF B7136 VAULT INSTALLED FLUSH TO THE FINISHED GRADE.
SYSTEMS - ENCLOSURE/PULL BOX/VAULT SCHEDULE
ENCLOSURE ID. SIZE TYPE LOCK MOUNT NOTES HEIGHT (AFF)
RAISED CONCRETE
PAD (AFF)
LOCATION NOTES
E-01 18"H x 24"W x 8"D NEMA 4 KEYED LATCH WALL 1 24" - GUARD HOUSE FOR TELEPHONY CABLE TERMINATION DEVICES.
E-02 18"H x 24"W x 8"D NEMA 4 KEYED LATCH WALL 1 24" - GUARD HOUSE FOR IDS AND EECS CONTROL PANEL.
1. PULL BOXES AND ENCLOSURES SHALL BE PAINTED 304 STAINLESS STEEL.
2. PULL BOXES (PB) SHALL HAVE A >180 DEGREE HINGE ON A VERTICAL SIDE.
3. MINIMUM PULL BOX SIZES SHOWN. INCREASE PULL BOX SIZES TO ACCOMMODATE INTERNAL AND EXTERNAL SEISMIC COUPLER FITTINGS.
4. PROVIDE PULLING EYES IN VAULT.
PB-05 12"L X 30"W X 8"D NEMA 4X SCREW LATCH RAILING 1,2 - - PIER SUBSTATION PULL BOX MOUNTED TO THE SIDE OF THE TRESTLE.
PB-06 8"L X 8"W X 8"D NEMA 4X SCREW LATCH - 1,2 - - TRESTLE PULL BOX MOUNTED TO THE SIDE OF THE TRESTLE.
PB-07 18"L X 6"W X 6'D NEMA 4X SCREW LATCH RAILING 1,2 - - PIER SUBSTATION PULL BOX MOUNTED TO THE SIDE OF THE TRESTLE.
PB-08 6"L X 6"W X 6"D NEMA 4X SCREW LATCH WALL 1 - - TRESTLE PULL BOX MOUNTED TO THE SIDE OF THE TRESTLE.
C-02 TWISTED PAIR COPPER 25-PAIR OSP RUGGEDIZED PE-89 B7136 - ENCLOSURE E-02 TELEPHONY SERVICE
C-03 MULTI-MODE OPTICAL FIBER 6-STRAND LOOSE TUBE, OSP RUGGEDIZED PE-89 B7136 - ENCLOSURE E-02 NMCI NETWORK SERVICES
C-04 SINGLE-MODE OPTICAL FIBER 12-STRAND LOOSE TUBE, OSP RUGGEDIZED PE-89 ENCLOSURE E-02 - ENCLOSURE E-03 EECS AND IDS SERVICES
C-08 SINGLE-MODE OPTICAL FIBER 12-STRAND LOOSE TUBE, OSP UTILITY BUILDING CABINET - WFF SWITCH GEAR UMCS SERVICES
C-09 SINGLE-MODE OPTICAL FIBER 6-STRAND LOOSE TUBE, OSP B7136 - UTILITY BUILDING CABINET UMCS SERVICES
C-10 SINGLE-MODE OPTICAL FIBER 6-STRAND LOOSE TUBE, OSP UTILITY BUILDING CABINET - ENCLOSURE E-07 UMCS SERVICES
C-05 SINGLE-MODE OPTICAL FIBER 12-STRAND LOOSE TUBE, OSP RUGGEDIZED PE-89 ENCLOSURE E-02 - ENCLOSURE E-04 EECS AND IDS SERVICES
C-06 SINGLE-MODE OPTICAL FIBER 12-STRAND LOOSE TUBE, OSP B7136 - PIER SCADA CABINET UMCS SERVICES
C-07 SINGLE-MODE OPTICAL FIBER 12-STRAND LOOSE TUBE, OSP B7136 - UTILITY BUILDING CABINET UMCS SERVICES
NOTES
1. OPTICAL FIBER CONNECTORS SHALL BE LC.
SYSTEMS CABLE SCHEDULE
CABLE ID TYPE SIZE CONSTRUCTION RATING TO-FROM NOTES
C-01 SINGLE-MODE OPTICAL FIBER 24-STRAND LOOSE TUBE, OSP RUGGEDIZED PE-89 B7136 - ENCLOSURE E-01 EECS AND IDS SERVICES
2. SINGLE-MODE OPTICAL FIBER CABLES SHALL BE OS2 COMPLIANT.
3. TWISTED PAIR COPPER CABLES SHALL BE CATEGORY 3 COMPLIANT.
4. TWISTED COPPER CABLE TERMINATION PANEL TO INCLUDE ELECTRICAL PROTECTION BLOCK, SOLID STATE PROTECTORS, INTERCONNECTION CABLE AND HAND-OFF TERMINATION BLOCK.
C-11 - C-17 (6)CATEGORY 6 SCADA CABINET - AMI METERS4-PAIR OSP
PE-89
PE-89
PE-89
PE-89
PE-89
PE-89 ENERGY MANAGEMENT
C-18 - C-19 SINGLE-MODE OPTICAL FIBER VAULT-01 RADAR STATION24-STRAND LOOSE TUBE, OSP PE-89 COORDINATE WITH SWFPAC
SCALE:
EPROJECT NO.:
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
SHEET OF
DRAWFORM REVISION: 31 JANUARY 2017
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
AS NOTED
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
D E P A R T M E N T
O F
T H E
N A V Y
N A V F A C
N W
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S
IL
V E R D A L E W A S H
IN
G T O N
N A V A L
B A S E
K
IT
S A P B A N G O R
S
IL
V E R D A L E W A S H
IN
G T O N
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
S
YM
D
ES
C R
IP
TI
O N
D A
TE
A P P R
FIRE PROTECTION
D. GIBSON/T. BOLING
1389895
:2 :1
A M
C U s e rs S b o ll e n D o c u m e n ts P M O D P
IE
R E L E C R S b o ll e n .r vt
F Y
M
C O
N P
R O
J E
C T
P -9
T P
P P
IE
R
A N
D M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
EL
EC
TR
IC
A L S C H
ED
U
LE
S
N A V A L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M A N D
N O R
TH
W
ES
T
BCPSMB BGA
EW627
263 269
16046611
DOUG BUSSARD
B. GALLOWAY
B. NIXON
P
PI
P
AL
P
PI
S M B
P
PI
S M B
P
PI
S M B
P
PI
0/
S M B
P
PI
0/
S M B
| Sheets |
| EW627 - ELECTRICAL SCHEDULES |
File details come from the government source that posted it. Updated .