Gaurd booths.pdf

PDF 47 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached
Solicitation number
n44255
Issued by

About this file

This document package includes a technical specification for pre-engineered guard booths and hazardous materials storage buildings, along with details of a related federal contract opportunity.

The technical specification outlines requirements for guard booths that must be ballistically rated to NIJ Level IV, including the roof. It specifies materials, dimensions, and features for the booths and includes requirements for a hazardous materials storage building. The building must have a 4-hour bi-directional fire rating and include containment, doors, signage, lighting, and electrical systems suitable for hazardous environments.

The federal contract opportunity is to construct a berthing pier, trestle, vessel maintenance facility and parking for the Maritime Force Protection Unit to provide security for submarine transit in the Strait of Juan de Fuca. The solicitation number is n44255 and is issued by the Department of the Navy Naval Facilities Engineering Command to support the Nuclear Weapons Security program.

View the file

Other files

File Type Posted
Sections B- F-G forms.pdf PDF
Rev1442.pdf PDF
SF30 Amendment 0010.pdf PDF
SB106 Rev 2.pdf PDF
EW404 Rev 3.pdf PDF
01 32 17.00 20 Rev.pdf PDF
Attachment K.docx DOCX document
VMF SIte 3 from Sturgeon St.jpg JPG image
EW626 Rev 1.pdf PDF
Answer Attachment.xlsx XLSX spreadsheet
KB Spit 1 - Pier Location.jpg JPG image
MW301 Rev 1.pdf PDF
EW628 Rev 4.pdf PDF
Fueling Site rev.jpg JPG image
MB602 Rev 1.pdf PDF
EW303 Rev 2.pdf PDF
EB603 Rev 1.pdf PDF
08 41 13 Rev.pdf PDF
MW103 Rev 1.pdf PDF
EW623 Rev 2.pdf PDF
MW102 Rev 1.pdf PDF
EB605 Rev 3.pdf PDF
EB606 Rev 2.pdf PDF
MB603 Rev 1.pdf PDF
EB101 Rev 3.pdf PDF
Amendment 0009 Final.pdf PDF
EB609 Rev 1.pdf PDF
10 56 13 Rev.pdf PDF
25 10 10.00 24.pdf PDF
MW101 Rev 1.pdf PDF
EB131 Rev 1.pdf PDF
22 13 29 Rev.pdf PDF
VMF Site 1 from Sturgeon St.jpg JPG image
01 45 35 Rev.pdf PDF
Fueling Site From Sealion Road.jpg JPG image
08 11 16 Rev.pdf PDF
EW111 Rev 2.pdf PDF
MW602 Rev 2.pdf PDF
EW301 Rev 1.pdf PDF
Fueling Site.jpg JPG image
SB503 Rev 1.pdf PDF
EW611 Rev 3.pdf PDF
EW401 Rev 7.pdf PDF
03 30 00 Rev.pdf PDF
Sealion Road.jpg JPG image
EW621 Rev 4.pdf PDF
EW101 Rev 3.pdf PDF
EW627 Rev 6.pdf PDF
AB101 Rev 5.pdf PDF
KB Spit 2 - Pier Location.jpg JPG image
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P907 Vehicle Maintenance Facility 160112

SECTION 13 34 20

PRE-ENGINEERED GUARD BOOTHS AND HAZARDOUS MATERIALS STORAGE BUILDINGS

04/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 325 (2017) Steel Construction Manual

AISC 341 (2016) Seismic Provisions for Structural Steel Buildings

AISC 350 (2005) Load and Resistance Factor Design (LRFD)Specification for Structural Steel Buildings

AISC 360 (2016) Specification for Structural Steel Buildings

AMERICAN IRON AND STEEL INSTITUTE (AISI)

AISC/AISI 121 (2004) Standard Definitions for Use in the Design of Steel Structures

AISI SG03-3 (2002; Suppl 2001-2004; R 2008) Cold-Formed Steel Design Manual Set

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE/SEI 7-05 (2006) Minimum Design Loads for Buildings and Other Structures, Including Supplement No. 1

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2018) International Building Code

1.2 GENERAL REQUIREMENTS

1.2.1 Structural Performance

Provide metal building systems capable of withstanding the effects of gravity loads and the following loads and stresses within the limits and conditions indicated.

1.2.1.1 Engineering

Design building systems conforming to ICC IBC .

SECTION 13 34 20 Page 1

1.2.1.2 Design Loads

Conform to the requirements of ICC IBC and ASCE/SEI 7-05 .

1.2.1.3 Live Loads

Include all vertical loads induced by the building occupancy, as well as loads induced by maintenance workers, materials and equipment for roof live loads.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Detail Drawings

SD-03 Product Data

Manufacturer's catalog data

SD-04 Samples

Finish. Submit manufacturer's standard colors for selection by the Contracting Officer

SD-05 Design Data

Manufacturer's descriptive and technical literature

1.4 QUALITY ASSURANCE

1.4.1 Manufacturer's Qualifications

Guard booth system manufacturer must have a minimum of five (5) years experience as a manufacturer of guard booth systems and accessory products.

Provide engineering services by an authorized currently licensed engineer in the geographical area where construction will take place. Provide certified engineering calculations.

1.4.2 Structural Steel

Comply with AISC 325 , AISC 341 for seismic impacted designs, AISC 350 , and AISC 360 , for design requirements and allowable stresses.

1.4.3 Cold-Formed Steel

Comply with AISC/AISI 121 and AISI SG03-3 for design requirements and allowable stresses.

SECTION 13 34 20 Page 2

1.5 SHIPPING, HANDLING AND STORAGE

1.5.1 Delivery

Package and deliver components, sheets, metal panels, and other manufactured items so as not to be damaged or deformed and protected during transportation and handling.

1.6 PROJECT CONDITIONS

1.6.1 Field Measurements

1.6.1.1 Established Dimensions for Foundations

Comply with established dimensions on approved anchor-bolt plans, established foundation dimensions, and proceed with fabricating structural framing. Do not proceed without verifying field measurements. Coordinate anchor-bolt installation to ensure that actual anchorage dimensions correspond to established dimensions.

1.7 COORDINATION

Coordinate size and location of concrete foundations and casting of anchor-bolt inserts into foundation walls and footings. Concrete, reinforcement, and formwork requirements are specified in Division 03 Section "Cast-in-Place Concrete".

Coordinate metal panel assemblies with rain drainage work, flashing, trim, and construction of supports and other adjoining work to provide a leak-proof, secure, and non-corrosive installation.

PART 2 PRODUCTS

2.1 Guard Booth

The guard booth shall be ballistically rated to National Institute of Justice - Level 1V (NIJ-IV) including the roof.

Booths shall be seated on raised 6-inch minimum concrete curbed slab and/or sidewalk. Provide roof overhang as indicated.

The guard booths shall have swing door with large windows, as indicated, with heavy-duty hardware. The windows shall be moderately tinted.

Locksets on doors shall meet UL 437.

Provide heavy-duty steel workbench type counters with drawers and electrical access ports. Counters shall have a depth of 24 inches and a height of 36 inches.

Provide an in-line centrifugal fan supply, and a split system heat pump.

See mechanical drawings for mechanical equipment schedules.

All electrical components shall be UL approved and installed in accordance with the NEC. Panel boards shall be 100A, 24 circuit, 208Y/120V 3-phase 4-wire with bolt on circuit breakers. All luminaries shall be LED and be connected to dimmer switches. All electrical receptacles shall be 20A. See electrical drawings for other systems and cabinets to be installed.

SECTION 13 34 20 Page 3 rhendryx Architect rhendryx Cloud+

PPI 382

rhendryx Architect rhendryx Cloud+

PPI 380

rhendryx Architect rhendryx Cloud+

PPI 381

Finish shall be corrosion resistant with a finish coat of two-component industrial paint in accordance with the Steel Structures Painting Council.

The booth shall have conduit, wiring, and connectors for two dial telephones.

Provide Roof capable of supporting mechanical condensing unit weighing 120 lbs.

Submit Detail Drawings, Manufacturer's catalog data, and Manufacturer's descriptive and technical literature demonstrating conformance to these requirements.

2.2 Hazardous Materials Storage Building

UL Approved 4-hour bi-directional design with dimensions and compartments as indicated in the drawings.

Assembly: weatherproof, fire rated, non-combustible construction per UL U490, with two (2) layers of 3/4" UL classified fire-resistive wallboard fastened to interior and exterior sides of load-bearings steel studs.

Mineral wall batts, nominally 3" thick, minimum 4pcf. The interior and exterior surfaces clad with corrosion resistant galvanealed steel sheets.

Base: open channel construction with structural steel hold-down brackets as recommended by manufacturer for securing to foundation.

Containment: minimum 30% of total storage capacity.

Doors: 3-hour fire rated, 60"W x 80"H UL classified and labeled, with UL listed self closers and exterior security locks with keyless interior safety release levers.

Finish: Exterior finish to have high solids, chemical resitant epoxy undercoat with heat reflective white aliphatic polyurethane topcoat.

Interior finish to have high solids, chemical resistant epoxy coating with white aliphatic polyurethane topcoat.

Signage: DOT hazard classification placards with rust-proof aluminum holder and stainless steel clips and pressure sensitive NFPA 704 Hazard Rating Signs.

Electrical: Provide Class 1 Division 1 LED ceiling mounted luminarires to provide 20 footcandles average at the floor. Provide Class 1 Division 1 weatherprooof light switch outside the door with pilot light. Conduit and wiring shall be rated for Class 1 Division 1 environment. Coordinate electrical connection points shall be located on top or side of unit to allow National Electrical Code access.

PART 3 EXECUTION

3.1 EXAMINATION

Before erection proceeds examine with the erector present the concrete foundation dimensions, concrete surfaces, anchor bolt size and placement, locations of bearing plates, and other embedment's to receive structural framing with the metal building manufacturer's templates and drawings before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the

SECTION 13 34 20 Page 4

Work.

Proceed with erection only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

Install the guard booth in conformance with the booth manufacturer's shop drawings and written installation instruction. Finished installation shall be water tight.

Do not field cut, drill, or alter structural members without written approval from booth manufacturer.

-- End of Section --

SECTION 13 34 20 Page 5

File details come from the government source that posted it. Updated .