EB605 Rev 3.pdf

PDF 155 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
Solicitation number
n44255
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains an electrical schedule and specifications for a federal construction project. The schedule lists various equipment to be installed including air handling units, compressors, exhaust fans, heaters and powered doors along with their required voltages, phases, panel assignments, wire and conduit sizes, and disconnect ratings. The project constructs a berthing pier, vessel maintenance facility, fuel distribution and storage systems to support operations of the Maritime Force Protection Unit in Bangor, Washington. The Navy is soliciting bids for this project through solicitation number n44255 with responses due on various dates in 2020. The opportunity is set aside for small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0010 -Use the applicable Small Business Forms attached, newest first.
File Type Posted
SF30 Amendment 0010.pdf PDF
Sealion Road.jpg JPG image
VMF SIte 3 from Sturgeon St.jpg JPG image
VMF Site 2 from Sturgeon St.jpg JPG image
KB Spit 2 - Pier Location.jpg JPG image
EW627 Rev 6.pdf PDF
EW631 Rev 1.pdf PDF
EW621 Rev 4.pdf PDF
EW101 Rev 3.pdf PDF
EW132 Rev 2.pdf PDF
EW131 Rev 2.pdf PDF
AB101 Rev 5.pdf PDF
23 07 00 Rev.pdf PDF
EW626 Rev 1.pdf PDF
Fueling Site rev.jpg JPG image
MB602 Rev 1.pdf PDF
EW122 Rev 1.pdf PDF
EB606 Rev 1.pdf PDF
09 90 00 Rev.pdf PDF
33 52 11 Rev.pdf PDF
P907_Amend0006_Specs.pdf PDF
P907_Amend0006_Drawings.pdf PDF
1100 kW Generator Photo_0006.pdf PDF
PPI AMEND 0006.pdf PDF
Amendment 0005.pdf PDF
EW612 Rev 1.pdf PDF
31 62 16.19.pdf PDF
SW601 Rev 1.pdf PDF
AB101 Rev 1.pdf PDF
EW601 Rev 1.pdf PDF
AB502 Rev 1.pdf PDF
CW161 Rev 1.pdf PDF
EW602 Rev 2.pdf PDF
P907 TPP Pier Geotechnical Report.pdf PDF
CS102 Rev 1.pdf PDF
EW141 Rev 1.pdf PDF
CS103 Rev 1.pdf PDF
EW124 Rev 1.pdf PDF
P-876 AS-Built_E130.pdf PDF
AB603 Rev 1.pdf PDF
01 32 17.00 20.pdf PDF
AB111 Rev 1.pdf PDF
SF30 Continuation .pdf PDF
SITES WALK.pdf PDF
Amendment 003.pdf PDF
Amendment 0001.docx DOCX document
P907 Project Location.pdf PDF
SF30 Amendment 0001.pdf PDF
Sections A-L forms.pdf PDF
RFP P-907 Pier and Maintence Facility.pdf PDF
Show all 50

Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:4 :1

A M

C U s e rs S b o ll e n D o c u m e n ts P B L D G E L E C R S b o ll e n .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

EL

EC

TR

IC

A L S C H

ED

U

LE

S

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EB605

130 135

16046755

D. BUSSARD

B. GALLOWAY

B. NIXON

MOTOR AND EQUIPMENT WIRING SCHEDULE

EQUIPMENT ID DESCRIPTION KVA/HP VOLTS PHASE PANEL WIRE & CONDUIT

DISCONNECT SIZE

(AMPS) Fuse (AMPS) COMMENTS

AC-1 SPLIT AC SYSTEM 208 1 3/4"C, 2#12, 1#12 EGC 30 FED FROM ACCU-1

AC-2 SPLIT AC SYSTEM 208 1 3/4"C, 2#12, 1#12 EGC 30 FED FROM ACCU-2

ACCU-1 SPLIT AC SYSTEM 2.7 KVA 208 1 12M1 1"C, 3#12, 1#12 EGC 30 (3) PROVIDE 1"C, 2#12, 1#12 EGC TO AC-1 FOR POWER,NEMA 3R

DISCONNECT SWITCH

ACCU-2 SPLIT AC SYSTEM 3.7 KVA 208 1 12M1 1"C, 3#10, 1#10 EGC 30 PROVIDE 1"C, 2#12, 1#12 EGC TO AC-2 FOR POWER,NEMA 3R

DISCONNECT SWITCH

AD-1 AIR DRYER 1.5 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC 20

AHU-1 AIR HANDLING UNIT 37.2 KVA 480 3 MDP-1 1-1/2"C, 3#4, 1#10 EGC 60

CF-1 CYCLONE FILTER 3 HP 480 3 14M1 3/4"C, 3#10, 1#10 EGC 30 NEMA 3R DISCONNECT SWITCH

COMP-1 AIR COMPRESSOR 25 HP 480 3 MDP-1 1-1/2"C, 3#4, 1#10 EGC 100 PROVIDED WITH INTEFRAL SOFT STARTER

CRN-1 CRANE 15 HP 480 3 14E1 1"C, 3#8, 1#10 EGC 60 COORDINATE CIRCUIT SIZE AND LOCATION WITH CRANE

MANUFACTURER

CU-1 CONDENSING UNIT 15.8 KVA 480 3 14M1 3/4"C, 3#10, 1#10 EGC 30 NEMA 3R DISCONNECT SWITCH

D-005-1 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-006-2 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-007-1 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-007-2 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-008-1 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-008-2 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-009-1 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-009-2 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-010-2 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-015-1 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-015-2 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-114-1 POWERED DOOR 1-1/2 HP 480 3 14E1 3/4"C, 3#12, 1#12 EGC 30

D-114-3 POWERED DOOR 1/4 HP 120 1 12M1 3/4"C, 3#12, 1#12 EGC 30

EF-1 EXHAUST FAN 1/2 HP 208 1 12M1 3/4"C, 2#12, 1#12 EGC (2)

EF-3 EXHAUST FAN 1/4 HP 120 1 12M1 3/4"C, 2#10, 1#10 EGC (2)

EF-4 EXHAUST FAN 1/2 HP 208 1 12M1 3/4"C, 2#10, 1#10 EGC (2)

EF-5 EXHAUST FAN 1/4 HP 120 1 12M1 3/4"C, 2#12, 1#12 EGC (2)

EF-6 EXHAUST FAN 1/6 HP 120 1 12M1 3/4"C, 2#12, 1#12 EGC (2)

EF-8 EXHAUST FAN 3 HP 208 3 12M1 3/4"C, 3#12, 1#12 EGC 30

EF-10 EXHAUST FAN 2 HP 480 3 14M1 3/4"C, 3#10, 1#10 EGC 30

EUH-1 ELECTRICAL UNIT HEATER 1.5 KVA 120 1 12M1 1"C, 2#10, 1#10 EGC (1)

FACP-1 FIRE ALARM CONTROL PANEL 1.2 KVA 120 1 12R1 3/4"C, 2#12, 1#12 EGC 20

GWH-1 GAS WATER HEATER 0.6 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

HPW-1 HIGH PRESSURE WASHER 10 HP 480 3 14M1 1"C, 3#10, 1#10 EGC 30

HV-1 HEAT & VENT UNIT 2.4 KVA 480 3 14M1 3/4"C, 3#12, 1#12 EGC 30

HV-2 HEAT & VENT UNIT 2.4 KVA 480 3 14M1 3/4"C, 3#12, 1#12 EGC 30

HV-3 HEAT & VENT UNIT 8.1 KVA 480 3 14M1 3/4"C, 3#12, 1#12 EGC 30

HWCP-1 HOT WATER CIRCULATION PUMP .117 KVA 120 1 12M1 3/4"C, 3#10, 1#10 EGC (2)

LLI-1 DETENTION TANK LIQUID LEVEL

INDICATOR

.18 KVA 120 1 12E1 1"C, 2#12, 1#12 EGC (1)

MNP-1 MASS NOTIFICATION PANEL 1.2 KVA 120 1 12R1 3/4"C, 2#12, 1#12 EGC 20

NG-1 NITROGEN GENERATOR 1.6 KVA 208 3 12M1 3/4"C, 3#12, 1#12 EGC (2)

P1 WATER CLOSET 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P2A WATER CLOSET 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P2B WATER CLOSET 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P3 URINAL 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P4 URINAL 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P5A LAVATORY 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P5B LAVATORY 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P5C LAVATORY 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P5D LAVATORY 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P7 FOOD WASTE DISPOSAL 3/4 HP 120 1 12R1 3/4"C, 2#12, 1#12 EGC (2)

P10 DRINKING FOUNTAIN 1.2 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

P14A EMERGENCY EYE WASH STATION 2.4 KVA 120 1 12M1 3/4"C, 2#10, 1#10 EGC 30

P14B EMERGENCY EYE WASH STATION 2.4 KVA 120 1 12M1 3/4"C, 2#10, 1#10 EGC 30

RH-1 RADIANT HEATER 0.12 KVA 120 1 12M1 3/4"C, 2#10, 1#10 EGC (1)

RH-2 RADIANT HEATER 0.12 KVA 120 1 12M1 3/4"C, 2#10, 1#10 EGC (1)

RH-3 RADIANT HEATER 0.12 KVA 120 1 12M1 3/4"C, 2#10, 1#10 EGC (1)

RH-4 RADIANT HEATER 0.12 KVA 120 1 12M1 3/4"C, 2#10, 1#10 EGC (1)

RH-5 RADIANT HEATER 0.12 KVA 120 1 12M1 3/4"C, 2#10, 1#10 EGC (1)

SB-1 STORAGE BUILDING 0.5 KVA 120 1 12E1 3/4"C, 2#10, 1#10 EGC (1)

SCP-1 SECURITY CONTROL PANEL 1.2 KVA 120 1 12R1 3/4"C, 3#12, 1#12 EGC

SF-1 SUPPLY FAN 1/8 HP 120 1 12M1 3/4"C, 2#12, 1#12 EGC (2)

TP-1A ELECTRONIC TRAP PRIMER 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

TP-1B ELECTRONIC TRAP PRIMER 0.1 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (1)

TU-1 TERMINAL UNIT 3.5 KVA 208 1 12M1 3/4"C, 2#10, 1#10 EGC 30

TU-2 TERMINAL UNIT 2.2 KVA 208 1 12M1 3/4"C, 2#10, 1#10 EGC 30

TU-3 TERMINAL UNIT 4.7 KVA 208 1 12M1 3/4"C, 2#10, 1#10 EGC 30

UH-1 UNIT HEATER 0.11 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (2)

UH-2 UNIT HEATER 0.11 KVA 120 1 12M1 3/4"C, 2#12, 1#12 EGC (2)

NOTES:

1. PROVIDE SNAP SWITCH DISCONNECT

2. PROVIDE MANUAL MOTOR

3. SIZE FUSE PER MANUFACTURER INSTRUCTIONS

P

PI

8/

P

AL

P

PI

S M B

P

PI

0/

S M B

Sheets
EB605 - ELECTRICAL SCHEDULES
EB606 - ELECTRICAL SCHEDULES

File details come from the government source that posted it. Updated .