MW101 Rev 1.pdf
PDF 396 KB Posted
- Attached to
- Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
- Solicitation number
- n44255
About this file
This document includes plans for a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit (MFPU) Bangor's operations mission. The project constructs facilities including a pier, trestle, abutment utility vault, lift station pump control panel, and leak detection system. Utilities routed through trenches will include 8-inch potable water, 4-inch sanitary sewer, and double contained 3-inch oily waste pipes. The leak detection system will include sensors in containment boxes on the pier, trestle, abutment utility vault connected by cable to a monitoring and alarm panel. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command for these construction services.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8" POTABLE WATER
4" SANITARY SEWER, DOUBLE
CONTAINED (PUMPED)
3" OILY WASTE, DOUBLE
CONTAINED (PUMPED)
C3
MW301
J H G F
T1
T2
T3
M W
M W
3 3
A1
MW402
4" SS UNDERGROUND
3" OILY WASTE
UNDERGROUND
M W
M W
TRESTLE
ABUTMENT (SHORE SIDE)
8"PW SEE CW154
B1
MW301
LIFT STATION PUMP CONTROL PANEL 6
LEAK DETECTION PANEL 4LDS-3
A1
MW413
VAULT
SUMP
telephone: 206.448.1911
2301 Fifth Avenue, Suite 401 www.notkin.com facsimile: 206.448.9485
Seattle, WA 98121
Contact: Peter Sloane, P.E.
notkin#: 217069 mechanical engineers notkin
SCALE:
EPROJECT NO.:
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
SHEET OF
DRAWFORM REVISION: 31 JANUARY 2017
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
AS NOTED
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
N A
V F
A C
N W
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
IL
V E
R D
A L
E W
A S
H
IN
G T
O N
N A
V A
L B
A S
E K
IT
S
A P
-B A
N G
O R
S
IL
V E
R D
A L E
W
A S
H
IN
G T
O N
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
S
YM
D
ES
C R
IP
TI
O N
D A
TE
A P P R
FIRE PROTECTION
D. GIBSON/T. BOLING
1389895
K. PAULSON
/2 /2
:2
:0
P M
C R e v it P ro je c ts
\P -9
\P
-P
IE
R
-1
-M
E C
H -R d e ta c h e d
.r v t
F Y
M
C O
N P
R O
J E
C T
P -9
T P
P P
IE
R
A N
D M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
T P
P T
R E
S T
LE
A
N D
P
IE
R P
LA
N
A
R E
A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
N O
R T
H W
E S
T
IRRPS LDS
MW101
191 269
16046539
B. GALLOWAY
B. NIXON
SCALE: 1/8" = 1'-0"
TPP TRESTLE AND PIER PLAN - AREA 1
A1
N0' 4' 8' 16'
SHEET KEYNOTES:
NOT USED.
PROVIDE 1" INSULATION & T316 SST
WEATHER JACKET ON PW PIPE AND
FITTINGS IN TRENCHES.
PROVIDE 1/2" INSULATION & T316 SST
WEATHER JACKET ON OW AND SS PIPE,
FITTINGS, AND VALVES IN TRENCHES.
PROVIDE LEAK DETECTION
MONITORING ALARM PANEL (LDS-3),
SEE A1/MW402. SEE ELECTRICAL
DRAWINGS FOR FIBER CABLE AND
CONDUIT TO NETWORK CABINET IN
FUELING FACILITY UTILITY ENCLOSURE.
PROVIDE SINGLE POINT
DISTINGUISHING LEAK SENSOR IN
EACH CONTAINMENT BOX ON PIER,
TRESTLE, AND ABUTMENT UTILITY
VAULT, AND CONNECTION CABLES IN
CONDUIT FROM SENSORS TO LEAK
DETECTION MONITORING / ALARM
PANEL LDS-3.
PROVIDE LIFT STATION PUMP CONTROL
PANEL, SEE A1/MW402.
1.
2.
3.
4.
5.
6.
SCALE: NONE
KEY PLAN
MW002, MW401, MW402
P
PI
0/
A
JM
| Sheets |
| MW101 - TPP TRESTLE AND PIER PLAN - AREA 1 |
File details come from the government source that posted it. Updated .