This document is a specification for sanitary sewerage pumps required for a project to construct a general purpose berthing pier and tessel with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit (MFPU) Bangor's operations mission.
The specification covers submersible centrifugal pumps designed to pump solids up to 3/4 inches in diameter and capable of withstanding submergence. Pump characteristics for four pumps (SP-1, SP-2, SP-3, SP-4) are included along with requirements for pump casings, mating surfaces, coatings, impellers, wearing rings, shafts, seals, bearings, motors, power cables, and installation systems. Submittal requirements, product standards, delivery and storage, field testing, manufacturer services, and training are also defined. The related federal contract opportunity is for the Navy to solicit bids for the project to support MFPU Bangor's mission to provide security escort for submarines through protection and defense during transit in the Strait of Juan de Fuca and test range.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bangor P-907 TPP Pier 217069
SECTION 22 13 29
SANITARY SEWERAGE PUMPS
02/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)
ABMA 11 (2014) Load Ratings and Fatigue Life for Roller Bearings
ABMA 9 (2015) Load Ratings and Fatigue Life for Ball Bearings
ASME INTERNATIONAL (ASME)
ASME B40.100 (2013) Pressure Gauges and Gauge Attachments
ASTM INTERNATIONAL (ASTM)
ASTM A153/A153M (2016) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA MG 1 (2016; SUPP 2016) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SECTION 22 13 29 Rev 1 Page 1 October 28, 2020
SD-02 Shop Drawings
Equipment Installation; G
SD-03 Product Data
Materials and Equipment Framed Instructions Spare Parts
SD-06 Test Reports
Field Testing and Adjusting Equipment
SD-10 Operation and Maintenance Data
Operating and Maintenance Manuals; G
1.3 DELIVERY, STORAGE, AND HANDLING
Protect from the weather, excessive humidity and excessive temperature variation; and dirt, dust, or other contaminants all equipment delivered and placed in storage.
1.4 EXTRA MATERIALS
Submit spare parts data for each different item of material and equipment specified, after approval of the related submittals, and not later than two months prior to the date of beneficial occupancy. Include in the data a complete list of parts and supplies, with current unit prices and source of supply
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Equipment shall be supported by a service organization that is, in the opinion of the Contracting Officer, reasonably convenient to the site. Pump casings shall be constructed of cast iron of uniform quality and free from blow holes, porosity, hard spots, shrinkage defects, cracks, and other injurious defects. Impellers shall be cast iron or ductile iron unless otherwise specified for rotors.
2.1.1 Nameplates
Provide each major item of equipment with the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate secured to the item of equipment.
2.1.2 Special Tools
Provide one set of special tools, calibration devices, and instruments required for operation, calibration, and maintenance of the equipment.
SECTION 22 13 29 Rev 1 Page 2 October 28, 2020
2.1.3 Electric Motors
Motors shall conform to NEMA MG 1.
2.1.4 Motor Controls
Controls shall conform to NEMA ICS 1 .
2.1.5 Bolts, Nuts, Anchors, and Washers
Bolts, nuts, anchors, and washers shall be steel; galvanized in accordance with ASTM A153/A153M .
2.1.6 Pressure Gauges
Standard pressure gauges shall be provided on the discharge side of pumps. Gauges shall comply with ASME B40.100 . Gauge ranges shall be as appropriate for the particular installation.
2.2 SUBMERSIBLE CENTRIFUGAL PUMPS
Submersible centrifugal pumps shall be centrifugal type pumps designed to pump solids up to 3/4 inches in diameter and shall be capable of withstanding submergence as required for the particular installation.
2.2.1 Pump Characteristics (SP-1, SP-2, SP-3, SP-4)
See equipment schedules on drawings.
2.2.2 Pump Casing
Casing shall be constructed of cast iron. The casing shall be capable of withstanding operating pressures 50 percent greater than the maximum operating pressures. The volute shall have smooth passages which provide unobstructed flow through the pump.
2.2.3 Mating Surfaces
Mating surfaces where watertight seal is required, including seal between discharge connection elbow and pump, shall be machined and fitted with nitrile rubber O-rings. Fitting shall be such that sealing is accomplished by metal-to-metal contact between mating surfaces, resulting in proper compression of the O-rings without the requirement of specific torque limits.
2.2.4 Coatings
Exterior surfaces of the casing in contact with sewage shall be protected by a sewage resistant coal tar epoxy coating. All exposed nuts and bolts shall be stainless steel.
2.2.5 Impeller
The impeller shall be of the single shrouded non-clogging design to minimize clogging of solids, fibrous materials, heavy sludge, or other materials found in sewage. The impeller shall be statically, dynamically, and hydraulically balanced within the operating range and to the first critical speed at 150 percent of the maximum operating speed. The impeller shall be securely keyed to the shaft with a locking arrangement
SECTION 22 13 29 Rev 1 Page 3 October 28, 2020 whereby the impeller cannot be loosened by torque from either forward or reverse direction.
2.2.6 Wearing Rings
Wearing rings, when required, shall be renewable type and shall be provided on the impeller and casing and shall have wearing surfaces normal to the axis of rotation. Material for wear rings shall be standard of pump manufacturer. Wearing rings shall be designed for ease of maintenance and shall be adequately secured to prevent rotation.
2.2.7 Pump Shaft
The pump shaft shall be of high grade alloy steel and shall be of adequate size and strength to transmit the full driver horsepower with a liberal safety factor.
2.2.8 Seals
A tandem mechanical shaft seal system running in an oil bath shall be provided. Seals shall be of carbon and ceramic with each interface held in contact by its own spring system. Conventional mechanical seals which require a constant pressure differential to effect sealing will not be allowed.
2.2.9 Bearings
Pump bearings shall be ball or roller type designed to handle all thrust loads in either direction. Pumps depending only on hydraulic balance end thrust will not be acceptable. Bearings shall have an ABEMA L-10 life of 50,000 hours minimum, as specified in ABMA 9 or ABMA 11.
2.2.10 Motor
The pump motor shall have Class F insulation, NEMA B design, in accordance with NEMA MG 1, and shall be watertight. The motor shall be either oil filled, air filled with a water jacket, or air filled with cooling fins which encircles the stator housing.
2.2.11 Power Cable
The power cable shall comply with NFPA 70 , Type SO, and shall be of standard construction for submersible pump applications. The power cable shall enter the pump through a heavy duty entry assembly provided with an internal grommet assembly to prevent leakage. The cable entry junction chamber and motor shall be separated by a stator lead sealing gland or terminal board which shall isolate the motor interior from foreign material gaining access through the pump top. Epoxies, silicones, or other secondary sealing systems are not acceptable.
2.2.12 Installation Systems
2.2.12.1 Bolt Down Systems
The pump mount system shall include a base designed to support the weight of the pump. The base shall be capable of withstanding all stresses imposed upon it by vibration, shock, and direct and eccentric loads.
SECTION 22 13 29 Rev 1 Page 4 October 28, 2020
2.2.12.2 Lifting Chain
Lifting chain to raise and lower the pump through the limits indicated shall be provided. The chain shall be galvanized and shall be capable of supporting the pump.
2.3 ELECTRICAL WORK
Provide electrical motor driven equipment specified complete with motors, motor starters, controls and wiring in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Electrical characteristics shall be as specified or indicated. Motor starters shall be provided complete with thermal overload protection and other appurtenances necessary for the motor control specified. Manual or automatic control and protective or signal devices required for the operation specified, and any control wiring required for controls and devices but not shown, shall be provided.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
3.2 EQUIPMENT INSTALLATION
Submit Drawings containing complete wiring and schematic diagrams and any other details required to demonstrate that the system has been coordinated and will properly function as a unit. Show on the Drawings proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work including clearances for maintenance and operation.
3.2.1 Pump Installation
Install pumping equipment and appurtenances in the position indicated and in accordance with the manufacturer's written instructions. Provide all appurtenances required for a complete and operating pumping system, including such items as piping, conduit, valves, anchors, grouting, pumps, drivers, power supply, and controls.
3.3 PAINTING
Pumps and motors shall be thoroughly cleaned, primed, and given two finish coats of paint at the factory in accordance with the recommendations of the manufacturer. Field painting required for ferrous surfaces not finished at the factory is specified in Section 09 90 00 PAINTS AND
COATINGS.
3.4 FRAMED INSTRUCTIONS
Condensed operating instructions shall be submitted to the Contracting Officer. Submit pump characteristic curves showing capacity in gpm, net positive suction head (NPSH), head, efficiency, and pumping horsepower from 0 gpm to 110 percent (100 percent for positive displacement pumps) of design capacity. Submit a complete list of equipment and material, including manufacturer's descriptive data and technical literature, performance charts and curves, catalog cuts, and installation instructions, SECTION 22 13 29 Rev 1 Page 5 October 28, 2020 inclouding diagrams and instructions.
3.5 FIELD TESTING AND ADJUSTING EQUIPMENT
3.5.1 Operational Test
Prior to acceptance, an operational test of all pumps, drivers, and control systems shall be performed to determine if the installed equipment meets the purpose and intent of the specifications. Tests shall demonstrate that the equipment is not electrically, mechanically, structurally, or otherwise defective; is in safe and satisfactory operating condition; and conforms with the specified operating characteristics. Prior to applying electrical power to any motor driven equipment, the drive train shall be rotated by hand to demonstrate free operation of all mechanical parts. Tests shall include checks for excessive vibration, leaks in all piping and seals, correct operation of control systems and equipment, proper alignment, excessive noise levels, and power consumption.
3.5.2 Retesting
If any deficiencies are revealed during any test, such deficiencies shall be corrected and the tests shall be reconducted.
3.5.3 Performance Test Reports
Submit performance test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, upon completion and testing of the installed system. In each test report indicate the final position of controls.
3.6 MANUFACTURER'S SERVICES
Provide the services of a manufacturer's representative who is experienced in the installation, adjustment, and operation of the equipment specified. The representative shall supervise the installation, adjustment, and testing of the equipment.
3.7 FIELD TRAINING
Provide a field training course for designated operating and maintenance staff members. Training shall be provided for a total period of 8 hours of normal working time and shall start after the system is functionally complete but prior to final acceptance tests. Field training shall cover all of the items contained in the operating and maintenance manuals.
Submit 2 copies of operation and 2 copies of maintenance manuals for the equipment furnished. One complete set prior to performance testing and the remainder upon acceptance. Operation manuals shall detail the step-by-step procedures required for system startup, operation, and shutdown. Include in the operation manuals the manufacturer's name, model number, parts list, and brief description of all equipment and their basic operating features. List in the maintenance manuals routine maintenance procedures, possible breakdowns and repairs, and troubleshooting guides.
Maintenance manuals shall include piping and equipment layout and simplified wiring and control diagrams of the system as installed.
Manuals shall be approved prior to the field training course.
-- End of Section --
SECTION 22 13 29 Rev 1 Page 6 October 28, 2020
SECTION 22 13 29 Rev 1 Page 7 October 28, 2020
| 22 13 29 - SANITARY SEWERAGE PUMPS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.4 EXTRA MATERIALS |
| PART 2 PRODUCTS |
| 2.1 MATERIALS AND EQUIPMENT |
| 2.1.1 Nameplates |
| 2.1.2 Special Tools |
| 2.1.3 Electric Motors |
| 2.1.4 Motor Controls |
| 2.1.5 Bolts, Nuts, Anchors, and Washers |
| 2.1.6 Pressure Gauges |
| 2.2 SUBMERSIBLE CENTRIFUGAL PUMPS |
| 2.2.1 Pump Characteristics SP-1, SP-2, SP-3, SP-4 |
| 2.2.2 Pump Casing |
| 2.2.3 Mating Surfaces |
| 2.2.4 Coatings |
| 2.2.5 Impeller |
| 2.2.6 Wearing Rings |
| 2.2.7 Pump Shaft |
| 2.2.8 Seals |
| 2.2.9 Bearings |
| 2.2.10 Motor |
| 2.2.11 Power Cable |
| 2.2.12 Installation Systems |
| 2.2.12.1 Bolt Down Systems |
| 2.2.12.2 Lifting Chain |
2.3 ELECTRICAL WORK
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.2 EQUIPMENT INSTALLATION |
| 3.2.1 Pump Installation |
| 3.3 PAINTING |
| 3.4 FRAMED INSTRUCTIONS |
| 3.5 FIELD TESTING AND ADJUSTING EQUIPMENT |
| 3.5.1 Operational Test |
| 3.5.2 Retesting |
| 3.5.3 Performance Test Reports |
| 3.6 MANUFACTURER'S SERVICES |
| 3.7 FIELD TRAINING |