AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0004 is issued prior to receipt of the bids and does hereby become a part of the contract documents, and in case of conflict, it shall supersede original project manual and draw ings. Each bidder shall be responsible for information contained herein to sub-contractors and suppliers to ensure that their proposal covers all w ork required by the contract documents including this amendment. Each bidder shall acknow ledge receipt of this amendment on the proposal form w here indicated.
This amendment includes RFI answ ers 146-150 & 200-225 and cooresponding specfication and draw ing revisions posted to FBO secured documents.
**PROPOSAL DUE DATE EXTENDED TO 7 APRIL 2015, at 2:00 PM EST**
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Mar-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912TF-15-R-0500
X 9B. DATED (SEE ITEM 11)
28-Jan-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Mar-2015
CODE
FA6291 NEW HAMPSHIRE AIR NATIONAL GUARD
USPFO-NH JOINT CONTRACTING
302 NEWMARKET ST
PEASE ANGB
NEWINGTON NH 03803-0157
W912TF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912TF-15-R-0500
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 01-Apr-2015 02:00 PM to 07-Apr-2015 02:00 PM.
CLIN 0002
The CLIN extended description has changed from Hangar 253: IAW Bid Option 1 of SZCQ139901 Plans & Specs dated: Jan. 09, 2015Replace the existing corrugated metal roof with a standing seam roof that matches the tail dock addition. The existing corrugated metal roof and all associated flashings and materials will be removed to the existing metaldeck system allowing a new roof system to be placed over the existing metaldeck to match the roofing for the new eyebrow. If this option is accepted thecurrent two inches of rigid insulation will be replaced with three inches. to Hangar 253: IAW Bid Option 1 of SZCQ139901 Plans & Specs dated: Jan. 09, 2015Remove flashing, lighting protection, roofing, insulation and corrugated metal deck, to structrual framing, and install metal roof deck, insulation, and standing seam roof to match new addition, and replace the existing soffits..
CLIN 0008
The CLIN extended description has changed from Hangar 254: IAW Bid Option 2 of SZCQ139904 Plans & Specs dated: Nov. 21, 2014, REV Dec. 31, 2014Replace the existing corrugated metal roof with a standing seam roof that matches the tail dock addition. The existing corrugated metal roof and all associated flashings and materials will be removed to the existing metal deck system allowing a new roof system to be placed over the existing metal deck to match the roofing for the new eyebrow. If this option is accepted the current two inches of rigid insulation will be replaced with three inches. to Hangar 254: IAW Bid Option 2 of SZCQ139904 Plans & Specs dated: Nov. 21, 2014, REV Dec. 31, 2014Remove flashing, lighting protection, roofing, insulation and corrugated metal deck, to structrual framing, and install metal roof deck, insulation, and standing seam roof to match new addition, and replace the existing soffits..
(End of Summary of Changes)