15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139901_253_FP-101_Addendum2.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FP-102_Addendum2.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
SZCQ139904_FP-102_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FA-102_Addendum2.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
Consolidated_RFI_answers_FBO_posting_3.31.15.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

SheetAS SHOWN

Stamp

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD

09 JANUARY 2015

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SZCQ139901

MGD

MGD

WAP

LDC

B-3 Submittal

B-2 Submittal

01/09/15

08/15/14 E-601

ELECTRICAL ONE-LINE DIAGRAMS

NOTE: NEW PANEL FOR FIRE

ALARM CONTROL PANEL AND

FOAM SYSTEM CONTROL PANEL

HAS BEEN MOVED TO PROJECT

NUMBER: SZCQ139904

1 REVISION 1 02/17/15

2 REVISION 2 03/03/15

T

EX.

RDP-2

480V

DEMO

RDP-1

480/277V -4W

200A

EX.

HP

480V

T

EX. UTILITY

TRANSFORMER

225 KVA,

13.8KV:208/120V EX. MCC

208V, 600A

EX.

MDP

EX.

LP-B

EX.

LP-C

EX.

PP-C

EX.

PP-B

EX.

LP

150/3 175/3

NEW

HP-2

480/277V -4W

200A

NEW

HP-3

480/277V -4W

300A

NEW

LP-2

208/120V -4W

200A

NEW

LP-3

208/120V -4W

200A

NEW

LP-4

208/120V -4W

100A

4#3/0, 1#6(GND), 2"C

T

NEW 1000KVA

UTILITY TRANSFORMER

13.8KV:480V

-4W

(SEE DETAIL 3/E-002)

BLDG

FPCP 350

NEW FIRE

PUMP

BLDG

FPCP 350

NEW

480V 100A C.B.

ENCL.

4#1/0, 1#6(GND), 2"C

HANGAR

DOOR

CONTROL

PANEL

100 AMP

MANUAL

TRANSFER

SWITCH

T

REMOVE 300KVA UTILITY

TRANSFORMER AND

TURN OVER TO GOVERNMENT.

TRANSPORT TO LOCATION ON

BASE PER CONTRACTING

OFFICER'S DIRECTION.

BLDG

FPCP 200

300KVA,

13.8KV:480/277V

FI

R

E P

U M

P

REMOVE FEEDERS

(4#400) TO CONTROL

PANEL AND FIRE

PUMP

NOTE: NEW FIRE

PUMPS FOR BLDG

254 TO BE INSTALLED

UNDER THIS

PROJECT. NEW FIRE

PUMPS TO SERVICE

BOTH BUILDING 253

AND 254.

4#350, 1#4(GND), 3"C

NOTE: NEW FIRE

PUMPS LOCATED IN

BLDG 254 TO BE

INSTALLED UNDER

THIS PROJECT. FIRE

PUMPS TO SERVICE

BOTH BUILDINGS 253

AND 254.

REPLACE

CT CABINET

T

EX

RDP-2

EX

HP

GENERAL NOTES:

A. THE PEAK DEMAND FOR THE 480V SERVICE IN

BUILDING 253 FROM 5/29/2013 - 5/29/2014 WAS

LISTED AS 24KW PER PEAK DEMAND DATA IN

BASE ENERGY SOFTWARE SYSTEM.

B. THE PEAK DEMAND FOR THE 208V SERVICE IN

BUILDING 253 FROM 5/29/2013 - 5/29/2014 WAS

LISTED AS 28KW PER PEAK DEMAND DATA IN

BASE ENERGY SOFTWARE SYSTEM.

C. TURN OVER 300KVA UTILITY TRANSFORMER TO

GOVERNMENT AFTER DEMOLITION.

D. CONTRACTOR TO DISCONNECT UTILITY FEED

AT SECTIONALIZING CABINET FOR DEMOLITION

OF 300KVA TRANSFORMER AND RE-WORK OF

480V ELECTRICAL SYSTEMS. COORDINATE

WORK WITH CONTRACTING OFFICER'S

REPRESENTATIVE.

E. PROVIDE NEW PLAQUE ON ALL SERVICE

ENTRANCE EQUIPMENT INDICATING SERVICE

ENTRANCE NUMBER (I.E. SERVICE ENTRANCE

#1 OF 3) AND LOCATION OF ADDITIONAL

SERVICE ENTRANCES PER NEC 230.2(E).

KEY NOTES:

REMOVE 2 SETS: 4 - 350 KCMIL IN EACH

3" CONDUIT. ABANDON CONDUIT.

400A ENCLOSED CIRCUIT BREAKER

UTILIZED AS JUNCTION BOX.

UTILIZE EXISTING FEEDER AND

CONDUIT TO RDP-2. RECONNECT TO

NEW PANEL FOLLOWING DEMOLITION

PHASE.

400HZ FREQUENCY CONVERTOR.

COORDINATE CT REPLACEMENT WITH

CONTRACTING OFFICER.

REMOVE CIRCUIT BREAKER

ENCLOSURE; RE-WORK AS

INDICATED IN DETAIL 2

REMOVE RDP-1 AND ASSOCIATED

FEEDER; RE-WORK AS INDICATED IN

DETAIL 2

NEW

RDP-1

480/277V -4W

800A

FEEDER TO BE CONNECTED

AHEAD OF OVERCURRENT

PROTECTION IN PANEL RDP-1

AND DOWNSTREAM OF EXISTING

SMART METER.

NEW CT CABINET

IF REQUIRED

REPLACE EXISTING WIREWAY AS

REQUIRED TO ACCOMMODATE

NEW SERVICE

500 KVA,

13.8KV:480/277V

EXISTING - 2 SETS:

3#350, 1#1(GND), 3"C

2 SETS: 4-750 KCMIL IN EACH 4" CONDUIT,

NEW

LP-2A

208/120V -4W

60A

4#6, 1#10(GND), 1"C

4#3, 1#8(GND), 1 1/4"C

IF REQUIRED

2 SETS: 3#350, 1#1(GND), 2-1/2"C

CROUSE-HINDS 'ARKTITE' -

CATALOG #: AREA2042/6S22,

200 AMP, WEATHERPROOF

RECEPTACLE ASSEMBLY

NEW

480V 100A C.B.

ENCL.

2 SETS: 4#350, 1#1(GND), 4"C &

4#3/0, 1#6(GND), 2"C

EXISTING

SECTIONALIZING

CABINET

REMOVE FEEDERS

(3#1/0 15KV, 1#1/0

600V) TO

SECTIONALIZING

CABINET

1-4"C SPARE WITH NYLON PULLSTRING

NEW FIRE

PUMP

EXISTING

SECTIONALIZING

CABINET

3#1/0 15KV, 1#1/0 600V,

IN EXISTING 4" CONDUIT.

PROVIDE NEW 15KV

LOAD BREAK ELBOWS.

SEE SITE PLAN E-002.

PROVIDE #2/0 GROUND

CONDUCTOR ABOVE

DUCT BANK PER

SPECIFICATIONS.

UTILIZE SPARE CONDUIT

UNDER ASPHALT FOR

GROUND CONDUCTOR

IN LIEU OF ABOVE DUCT

BANK.

NEW

LP-E

208/120V -3W

30A

3#10, 1#10(GND), 3/4"C

NEW

HAND

HOLE

NEW

HP-4

480/277V -4W

150A

4#1/0, 1#6(GND), 2 1/2"C

PROVIDE #2/0 GROUND CONDUCTOR ABOVE

DUCT BANK PER SPECIFICATIONS.

REMOVE 500KVA UTILITY

TRANSFORMER AND

TURN OVER TO GOVERNMENT.

TRANSPORT TO LOCATION ON

BASE PER CONTRACTING

OFFICER'S DIRECTION.

EXISTING

SECTIONALIZING

CABINET

REMOVE FEEDERS

(3#1/0 15KV, 1#1/0 600V)

TO SECTIONALIZING

CABINET, 2-4" CONDUITS

SHALL REMAIN

NEW 750KVA

UTILITY TRANSFORMER

13.8KV:480V

-4W

(SEE DETAIL 3/E-002)

REPLACE EXISTING WIREWAY AS

REQUIRED TO ACCOMMODATE

NEW SERVICE

EXISTING

SECTIONALIZING

CABINET

NEW SERVICE ENTRANCE

RATED 480V, 3-POLE

DISCONNECT SWITCH

WITH 250 AMP FUSES

3-250 KCMIL IN 2-1/2" CONDUIT,

NEW

HAND

HOLE

3#1/0 15KV, 1#1/0 600V IN

EXISTING 4" CONDUIT.

PROVIDE NEW 15KV LOAD

BREAK ELBOWS. SEE SITE

PLAN E-002. PROVIDE #2/0

GROUND CONDUCTOR

ABOVE DUCT BANK PER

SPECIFICATIONS.

3#1/0 15KV, 1#1/0 600V IN 4" CONDUIT. PROVIDE

NEW 15KV LOAD BREAK ELBOWS. SEE SITE PLAN

E-002. PROVIDE #2/0 GROUND CONDUCTOR

ABOVE DUCT BANK PER SPECIFICATIONS.

PROVIDE (1) ADDITIONAL 4" CONDUIT SPARE

PROVIDE (1) ADDITIONAL 2-1/2" CONDUIT SPARE

NEW CT

CABINET

COORDINATE NEW CT'S WITH

CONTRACTING OFFICER

File details come from the government source that posted it. Updated .