Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
SheetAS SHOWN
Stamp
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD
09 JANUARY 2015
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SZCQ139901
MGD
MGD
WAP
LDC
B-3 Submittal
B-2 Submittal
01/09/15
08/15/14 E-601
ELECTRICAL ONE-LINE DIAGRAMS
NOTE: NEW PANEL FOR FIRE
ALARM CONTROL PANEL AND
FOAM SYSTEM CONTROL PANEL
HAS BEEN MOVED TO PROJECT
NUMBER: SZCQ139904
1 REVISION 1 02/17/15
2 REVISION 2 03/03/15
T
EX.
RDP-2
480V
DEMO
RDP-1
480/277V -4W
200A
EX.
HP
480V
T
EX. UTILITY
TRANSFORMER
225 KVA,
13.8KV:208/120V EX. MCC
208V, 600A
EX.
MDP
EX.
LP-B
EX.
LP-C
EX.
PP-C
EX.
PP-B
EX.
LP
150/3 175/3
NEW
HP-2
480/277V -4W
200A
NEW
HP-3
480/277V -4W
300A
NEW
LP-2
208/120V -4W
200A
NEW
LP-3
208/120V -4W
200A
NEW
LP-4
208/120V -4W
100A
4#3/0, 1#6(GND), 2"C
T
NEW 1000KVA
UTILITY TRANSFORMER
13.8KV:480V
-4W
(SEE DETAIL 3/E-002)
BLDG
FPCP 350
NEW FIRE
PUMP
BLDG
FPCP 350
NEW
480V 100A C.B.
ENCL.
4#1/0, 1#6(GND), 2"C
HANGAR
DOOR
CONTROL
PANEL
100 AMP
MANUAL
TRANSFER
SWITCH
T
REMOVE 300KVA UTILITY
TRANSFORMER AND
TURN OVER TO GOVERNMENT.
TRANSPORT TO LOCATION ON
BASE PER CONTRACTING
OFFICER'S DIRECTION.
BLDG
FPCP 200
300KVA,
13.8KV:480/277V
FI
R
E P
U M
P
REMOVE FEEDERS
(4#400) TO CONTROL
PANEL AND FIRE
PUMP
NOTE: NEW FIRE
PUMPS FOR BLDG
254 TO BE INSTALLED
UNDER THIS
PROJECT. NEW FIRE
PUMPS TO SERVICE
BOTH BUILDING 253
AND 254.
4#350, 1#4(GND), 3"C
NOTE: NEW FIRE
PUMPS LOCATED IN
BLDG 254 TO BE
INSTALLED UNDER
THIS PROJECT. FIRE
PUMPS TO SERVICE
BOTH BUILDINGS 253
AND 254.
REPLACE
CT CABINET
T
EX
RDP-2
EX
HP
GENERAL NOTES:
A. THE PEAK DEMAND FOR THE 480V SERVICE IN
BUILDING 253 FROM 5/29/2013 - 5/29/2014 WAS
LISTED AS 24KW PER PEAK DEMAND DATA IN
BASE ENERGY SOFTWARE SYSTEM.
B. THE PEAK DEMAND FOR THE 208V SERVICE IN
BUILDING 253 FROM 5/29/2013 - 5/29/2014 WAS
LISTED AS 28KW PER PEAK DEMAND DATA IN
BASE ENERGY SOFTWARE SYSTEM.
C. TURN OVER 300KVA UTILITY TRANSFORMER TO
GOVERNMENT AFTER DEMOLITION.
D. CONTRACTOR TO DISCONNECT UTILITY FEED
AT SECTIONALIZING CABINET FOR DEMOLITION
OF 300KVA TRANSFORMER AND RE-WORK OF
480V ELECTRICAL SYSTEMS. COORDINATE
WORK WITH CONTRACTING OFFICER'S
REPRESENTATIVE.
E. PROVIDE NEW PLAQUE ON ALL SERVICE
ENTRANCE EQUIPMENT INDICATING SERVICE
ENTRANCE NUMBER (I.E. SERVICE ENTRANCE
#1 OF 3) AND LOCATION OF ADDITIONAL
SERVICE ENTRANCES PER NEC 230.2(E).
KEY NOTES:
REMOVE 2 SETS: 4 - 350 KCMIL IN EACH
3" CONDUIT. ABANDON CONDUIT.
400A ENCLOSED CIRCUIT BREAKER
UTILIZED AS JUNCTION BOX.
UTILIZE EXISTING FEEDER AND
CONDUIT TO RDP-2. RECONNECT TO
NEW PANEL FOLLOWING DEMOLITION
PHASE.
400HZ FREQUENCY CONVERTOR.
COORDINATE CT REPLACEMENT WITH
CONTRACTING OFFICER.
REMOVE CIRCUIT BREAKER
ENCLOSURE; RE-WORK AS
INDICATED IN DETAIL 2
REMOVE RDP-1 AND ASSOCIATED
FEEDER; RE-WORK AS INDICATED IN
DETAIL 2
NEW
RDP-1
480/277V -4W
800A
FEEDER TO BE CONNECTED
AHEAD OF OVERCURRENT
PROTECTION IN PANEL RDP-1
AND DOWNSTREAM OF EXISTING
SMART METER.
NEW CT CABINET
IF REQUIRED
REPLACE EXISTING WIREWAY AS
REQUIRED TO ACCOMMODATE
NEW SERVICE
500 KVA,
13.8KV:480/277V
EXISTING - 2 SETS:
3#350, 1#1(GND), 3"C
2 SETS: 4-750 KCMIL IN EACH 4" CONDUIT,
NEW
LP-2A
208/120V -4W
60A
4#6, 1#10(GND), 1"C
4#3, 1#8(GND), 1 1/4"C
IF REQUIRED
2 SETS: 3#350, 1#1(GND), 2-1/2"C
CROUSE-HINDS 'ARKTITE' -
CATALOG #: AREA2042/6S22,
200 AMP, WEATHERPROOF
RECEPTACLE ASSEMBLY
NEW
480V 100A C.B.
ENCL.
2 SETS: 4#350, 1#1(GND), 4"C &
4#3/0, 1#6(GND), 2"C
EXISTING
SECTIONALIZING
CABINET
REMOVE FEEDERS
(3#1/0 15KV, 1#1/0
600V) TO
SECTIONALIZING
CABINET
1-4"C SPARE WITH NYLON PULLSTRING
NEW FIRE
PUMP
EXISTING
SECTIONALIZING
CABINET
3#1/0 15KV, 1#1/0 600V,
IN EXISTING 4" CONDUIT.
PROVIDE NEW 15KV
LOAD BREAK ELBOWS.
SEE SITE PLAN E-002.
PROVIDE #2/0 GROUND
CONDUCTOR ABOVE
DUCT BANK PER
SPECIFICATIONS.
UTILIZE SPARE CONDUIT
UNDER ASPHALT FOR
GROUND CONDUCTOR
IN LIEU OF ABOVE DUCT
BANK.
NEW
LP-E
208/120V -3W
30A
3#10, 1#10(GND), 3/4"C
NEW
HAND
HOLE
NEW
HP-4
480/277V -4W
150A
4#1/0, 1#6(GND), 2 1/2"C
PROVIDE #2/0 GROUND CONDUCTOR ABOVE
DUCT BANK PER SPECIFICATIONS.
REMOVE 500KVA UTILITY
TRANSFORMER AND
TURN OVER TO GOVERNMENT.
TRANSPORT TO LOCATION ON
BASE PER CONTRACTING
OFFICER'S DIRECTION.
EXISTING
SECTIONALIZING
CABINET
REMOVE FEEDERS
(3#1/0 15KV, 1#1/0 600V)
TO SECTIONALIZING
CABINET, 2-4" CONDUITS
SHALL REMAIN
NEW 750KVA
UTILITY TRANSFORMER
13.8KV:480V
-4W
(SEE DETAIL 3/E-002)
REPLACE EXISTING WIREWAY AS
REQUIRED TO ACCOMMODATE
NEW SERVICE
EXISTING
SECTIONALIZING
CABINET
NEW SERVICE ENTRANCE
RATED 480V, 3-POLE
DISCONNECT SWITCH
WITH 250 AMP FUSES
3-250 KCMIL IN 2-1/2" CONDUIT,
NEW
HAND
HOLE
3#1/0 15KV, 1#1/0 600V IN
EXISTING 4" CONDUIT.
PROVIDE NEW 15KV LOAD
BREAK ELBOWS. SEE SITE
PLAN E-002. PROVIDE #2/0
GROUND CONDUCTOR
ABOVE DUCT BANK PER
SPECIFICATIONS.
3#1/0 15KV, 1#1/0 600V IN 4" CONDUIT. PROVIDE
NEW 15KV LOAD BREAK ELBOWS. SEE SITE PLAN
E-002. PROVIDE #2/0 GROUND CONDUCTOR
ABOVE DUCT BANK PER SPECIFICATIONS.
PROVIDE (1) ADDITIONAL 4" CONDUIT SPARE
PROVIDE (1) ADDITIONAL 2-1/2" CONDUIT SPARE
NEW CT
CABINET
COORDINATE NEW CT'S WITH
CONTRACTING OFFICER