SZCQ139901_253_FP-101_Addendum2.pdf
PDF 458 KB Posted
- Solicitation number
- W912TF15R0500
About this file
SZCQ139901_253_FP-101 Addendum2
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A'
B'
C'
14' 15'12'10'
D'
E'
F'
G'
9'8'7'5'3'2' 6'4' 11' 13'
1 2 3 4 5 6 7
J
H
G
F
E
D
C
B HEF GENERATOR
(TYP)
HEF GENERATOR
(TYP)
HANGAR
EXPECTED HEF FOAM
COVERAGE AT 1 MINUTE
FP-101
FP-101
EXISTING
DIAPHRAGM
TANK TO REMAIN
EXISTING HEF
TEST HEADER TO
REMAIN
8" & 4" INCOMING FIRE
MAIN FROM BUILDING 254
EXISTING
SPRINKLER
RISERS
EXISTING HEF
RISERS
TO SPRINKLERS
REPLACE DEMOLISHED FIRE
DEPARTMENT CONNECTION
WITH STORZ FIRE
DEPARTMENT CONNECTION
SPRINKLER RISER
ANGLE DELUGE VIKING
F1 OR EQUAL
(MEZZANINE LEVEL)
PROPORTIONER
RELOCATED TO
MEZZANINE LEVEL
COMPOSITE
SHOP
PAINT
STOR
PAINT
MIXING
TOOL
ROOM
OFFICE
TR
HEF GENERATOR
(TYP)
NEW DRAFT
CURTAIN
EXISTING
DRAFT CURTAIN
EXISTING DRAFT
CURTAIN
EXISTING
DRAFT CURTAIN
EXISTING
DRAFT CURTAIN
6" STRAINER
SPRINKLER RISER
PIPE AND FITTINGS TO
ACCOMMODATE NEW
SPRINKLER RISER
EXISTING
SPRINKLER RISERS
EXISTING HEF RISER EXISTING
SPRINKLER RISER
REPLACE
DEMOLISHED FIRE
DEPARTMENT
CONNECTION WITH
STORZ FIRE
DEPARTMENT
CONNECTION
8" EXISTING FIRE MAIN
4" EXISTING FIRE MAIN
EXISTING HEF TEST
HEADER
EXISTING
DIAPHRAGM TANK
TO REMAIN
PROPORTIONER
RELOCATED TO
MEZZANINE LEVEL
ANGLE DELUGE VIKING
F1 OR EQUAL
(MEZZANINE LEVEL)
BUTTERFLY VALVE
(MEZZANINE LEVEL)
FIRE SUPPRESSION NOTES
POSITION HEF GENERATORS AT LOCATION SHOWN DRAWING. ELEVATION OF UNITS SHALL
BE 6 INCHES ABOVE THE TOP OF THE BOTTOM CHORD OF STRUCTURAL STEEL. SEE
STRUCTURAL DRAWINGS FOR MOUNTING DETAIL. IN SOME CASES HEF GENERATOR
DISCHARGE WILL BE DIRECTLY ABOVE BOTTOM CHORD MEMBERS, WHICH IS ACCEPTABLE.
THE CONTRACTOR SHALL DESIGN AND INSTALL NEW HEF GENERATOR SUPPORT FRAMING
AND CONNECTION, NOT CALLED OUT, IN ACCORDANCE WITH THE MANUFACTURES
RECOMMENDATIONS. THE CONTRACTOR SHALL PERFORM A SEISMIC ANALYSIS AND
PROVIDE LATERAL BRACING IF REQUIRED.
MODIFY THE EXISTING HIGH EXPANSION FOAM SYSTEM TO PROTECT ALL AREAS OF THE
HANGAR BAY AS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS.
SEE SHEET FP-102 FOR ADDITIONAL ZONING INFORMATION.
SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION NOT SHOWN ON THE
DRAWINGS.
FLUSH AND DISPOSE OF EXISTING HEF CONCENTRATE AND REPLACE WITH ANSUL 2.0%
TYPE CONCENTRATE. REUSE EXISTING HEF DIAPHRAGM TANK.
PROVIDE SEPARATE CONTROL VALVE, WATERFLOW SWITCH, TEST AND DRAIN ASSEMBLY
FOR EACH PAINT BOOTH. LOCATE THESE ITEMS OUTSIDE AND NEAR THE BOOTH THEY
SERVE.
1.
2.
3.
4.
5.
6.
7.
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by No. Date
SheetAS SHOWN
Stamp
B-2 SUBMITTAL1 08/15/14
B-3 SUBMITTAL2 01/09/15
ADDENDUM 23 02/25/15
FP-101
FIRE SUPPRESSION PLAN
25 FEBRUARY 2015
M. AARON
S. BLOCK
M. MEADE
M. AARON
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
0' 4' 8' 16' 32'
PLAN
NORTH
SCALE: 1/16" = 1'-0"
FIRE SUPPRESSION PLAN
SCALE:N.T.S.
FIRE SUPPRESSION ELEVATION
SCALE:N.T.S.
FIRE SUPPRESSION ELEVATION
File details come from the government source that posted it. Updated .