SZCQ139901_253_FP-101_Addendum2.pdf

PDF 458 KB Posted

Attached to
ADAL Two Existing Hangars to Accommodate the New KC46 Tanker
Solicitation number
W912TF15R0500
Issued by

About this file

SZCQ139901_253_FP-101 Addendum2

View the file

Other files

File Type Posted
15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FP-102_Addendum2.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
SZCQ139904_FP-102_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FA-102_Addendum2.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
Consolidated_RFI_answers_FBO_posting_3.31.15.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
253-_E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A'

B'

C'

14' 15'12'10'

D'

E'

F'

G'

9'8'7'5'3'2' 6'4' 11' 13'

1 2 3 4 5 6 7

J

H

G

F

E

D

C

B HEF GENERATOR

(TYP)

HEF GENERATOR

(TYP)

HANGAR

EXPECTED HEF FOAM

COVERAGE AT 1 MINUTE

FP-101

FP-101

EXISTING

DIAPHRAGM

TANK TO REMAIN

EXISTING HEF

TEST HEADER TO

REMAIN

8" & 4" INCOMING FIRE

MAIN FROM BUILDING 254

EXISTING

SPRINKLER

RISERS

EXISTING HEF

RISERS

TO SPRINKLERS

REPLACE DEMOLISHED FIRE

DEPARTMENT CONNECTION

WITH STORZ FIRE

DEPARTMENT CONNECTION

SPRINKLER RISER

ANGLE DELUGE VIKING

F1 OR EQUAL

(MEZZANINE LEVEL)

PROPORTIONER

RELOCATED TO

MEZZANINE LEVEL

COMPOSITE

SHOP

PAINT

STOR

PAINT

MIXING

TOOL

ROOM

OFFICE

TR

HEF GENERATOR

(TYP)

NEW DRAFT

CURTAIN

EXISTING

DRAFT CURTAIN

EXISTING DRAFT

CURTAIN

EXISTING

DRAFT CURTAIN

EXISTING

DRAFT CURTAIN

6" STRAINER

SPRINKLER RISER

PIPE AND FITTINGS TO

ACCOMMODATE NEW

SPRINKLER RISER

EXISTING

SPRINKLER RISERS

EXISTING HEF RISER EXISTING

SPRINKLER RISER

REPLACE

DEMOLISHED FIRE

DEPARTMENT

CONNECTION WITH

STORZ FIRE

DEPARTMENT

CONNECTION

8" EXISTING FIRE MAIN

4" EXISTING FIRE MAIN

EXISTING HEF TEST

HEADER

EXISTING

DIAPHRAGM TANK

TO REMAIN

PROPORTIONER

RELOCATED TO

MEZZANINE LEVEL

ANGLE DELUGE VIKING

F1 OR EQUAL

(MEZZANINE LEVEL)

BUTTERFLY VALVE

(MEZZANINE LEVEL)

FIRE SUPPRESSION NOTES

POSITION HEF GENERATORS AT LOCATION SHOWN DRAWING. ELEVATION OF UNITS SHALL

BE 6 INCHES ABOVE THE TOP OF THE BOTTOM CHORD OF STRUCTURAL STEEL. SEE

STRUCTURAL DRAWINGS FOR MOUNTING DETAIL. IN SOME CASES HEF GENERATOR

DISCHARGE WILL BE DIRECTLY ABOVE BOTTOM CHORD MEMBERS, WHICH IS ACCEPTABLE.

THE CONTRACTOR SHALL DESIGN AND INSTALL NEW HEF GENERATOR SUPPORT FRAMING

AND CONNECTION, NOT CALLED OUT, IN ACCORDANCE WITH THE MANUFACTURES

RECOMMENDATIONS. THE CONTRACTOR SHALL PERFORM A SEISMIC ANALYSIS AND

PROVIDE LATERAL BRACING IF REQUIRED.

MODIFY THE EXISTING HIGH EXPANSION FOAM SYSTEM TO PROTECT ALL AREAS OF THE

HANGAR BAY AS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS.

SEE SHEET FP-102 FOR ADDITIONAL ZONING INFORMATION.

SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION NOT SHOWN ON THE

DRAWINGS.

FLUSH AND DISPOSE OF EXISTING HEF CONCENTRATE AND REPLACE WITH ANSUL 2.0%

TYPE CONCENTRATE. REUSE EXISTING HEF DIAPHRAGM TANK.

PROVIDE SEPARATE CONTROL VALVE, WATERFLOW SWITCH, TEST AND DRAIN ASSEMBLY

FOR EACH PAINT BOOTH. LOCATE THESE ITEMS OUTSIDE AND NEAR THE BOOTH THEY

SERVE.

1.

2.

3.

4.

5.

6.

7.

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by No. Date

SheetAS SHOWN

Stamp

B-2 SUBMITTAL1 08/15/14

B-3 SUBMITTAL2 01/09/15

ADDENDUM 23 02/25/15

FP-101

FIRE SUPPRESSION PLAN

25 FEBRUARY 2015

M. AARON

S. BLOCK

M. MEADE

M. AARON

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

0' 4' 8' 16' 32'

PLAN

NORTH

SCALE: 1/16" = 1'-0"

FIRE SUPPRESSION PLAN

SCALE:N.T.S.

FIRE SUPPRESSION ELEVATION

SCALE:N.T.S.

FIRE SUPPRESSION ELEVATION

File details come from the government source that posted it. Updated .