SZCQ139904_FP-102_addendum2.pdf

PDF 358 KB Posted

Attached to
ADAL Two Existing Hangars to Accommodate the New KC46 Tanker
Solicitation number
W912TF15R0500
Issued by

About this file

SZCQ139904_FP-102_addendum2

View the file

Other files

File Type Posted
15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139901_253_FP-101_Addendum2.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FP-102_Addendum2.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FA-102_Addendum2.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
Consolidated_RFI_answers_FBO_posting_3.31.15.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
253-_E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1A

1B

1C

5A 5B

8A C

7B 7A

12 14

A

24A

27C 23A

27B 27A

D

23B

15 17

3940A

40B

39A 39B

40D

40C

B

32D 32C

43B

43C

1 2 3 4 5 6 7

J

H

G

F

E

D

C

B

A'

B'

C'

14' 15'12'10'

D'

E'

F'

G'

9'

8'7'5'3'2' 6'4'

11' 13'

PROVIDE NEW SPRINKLER

SYSTEM FOR ENTIRE NEW

TAIL DOCK SEE NOTE 5.

MODIFY EXISTING

SPRINKLERS IN

RENOVATED AREA

CUT AND CAP BRANCH LINES FROM

EXISTING AIRCRAFT BAY SPRINKLER

SYSTEM. DEMOLISH EXISTING

SPRINKLERS AND PIPING

SPRINKLER ZONE #3

SPRINKLER

ZONE #1

SPRINKLER

ZONE #2

SPRINKLER ZONE #2

SPRINKLER ZONE #3

EXISTING

SPRINKLER

SYSTEM TO

REMAIN.

NEW DRAFT

CURTAIN

STORAGE

42D

ELEC

INVERTER ROOM

43A

PROPULSION,

REPAIR, AND

RECLAMATION

SECTION

CTK

CTK

42B

AMXS READY

ROOM

11A

AMXS TRAINING

ROOM

11F

AMXS READY

ROOM

AMXS

SUPERVISION

FLIGHT CHIEF

11B

FLIGHT CHIEF

11C

FLIGHT CHIEF

11D

FLIGHT CHIEF

11E

MODIFY

EXISTING

SPRINKLERS IN

RENOVATED

AREA

EXISTING DRAFT

CURTAIN

EXISTING DOOR HEADER

PROVIDES REQUIREMENT FOR

DRAFT CURTAIN

EXISTING DOOR HEADER

PROVIDES REQUIREMENT FOR

DRAFT CURTAIN

FIRE SUPPRESSION NOTES

EXPAND AND MODIFY THE EXISTING SPRINKLER SYSTEMS OF THE HANGAR

BAY AS SHOWN ON THE DRAWINGS AND IN THE SPECIFICATIONS.

MODIFY THE EXISTING WET PIPE SPRINKLER SYSTEMS FOR THE SHOPS AND

OFFICES AS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS.

PROVIDE SPRINKLER GUARDS FOR SPRINKLERS WHERE THEY ARE

INSTALLED IN AREAS SUBJECT TO PHYSICAL DAMAGE, INCLUDING BUT NOT

LIMITED, MECHANICAL ROOMS, STORAGE, AND MAINTENANCE AREAS.

SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION NOT SHOWN

ON THE DRAWINGS.

PROVIDE DESIGN DENSITY OF 0.20 GPM/SQFT OVER DESIGN AREA OF 5,000

SQUARE FEET FOR EXISTING SYSTEM IN MAIN PORTION OF HANGAR.

1.

2.

3.

4.

5.

HANGAR AREA: SYSTEM PROVIDING A

DENSITY OF 0.20 GPM/SQFT. OVER DESIGN

AREA OF 5,000 SQUARE FEET

HC-2: SYSTEM PROVIDING A DENSITY OF

0.20 GPM/SQFT. OVER DESIGN AREA OF

2,500 SQUARE FEET

SPRINKLER DESIGN HATCH LEGEND

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by No. Date

SheetAS SHOWN

Stamp

B-2 SUBMITTAL1 08/15/14

B-3 SUBMITTAL2 11/21/14

B-3 RESUBMITTAL3 12/31/14

ADDENDUM 24 02/25/15

FP-102

FIRE SUPPRESSION ZONING PLAN

25 FEBRUARY 2015

S. MILLER

S. BLOCK

M. MEADE

M. AARON

SZCQ139904

KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

0' 3' 10' 20' 40'

PLAN

NORTH

SCALE: 1" = 20'-0"

FIRE SUPPRESSION ZONING PLAN

4 4