ADAL Two Existing Hangars to Accommodate the New KC46 Tanker
Solicitation number
W912TF15R0500
Issued by

About this file

SZCQ139901_253_FA-102 Addendum2

View the file

Other files

File Type Posted
15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139901_253_FP-101_Addendum2.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FP-102_Addendum2.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
SZCQ139904_FP-102_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_Plans_Addendum_1.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
Consolidated_RFI_answers_FBO_posting_3.31.15.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
253-_E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B

B A

A B

B A

A B

B A

E

E

E

F

F

F

E

E

F

F

F

E

E

E

F

F

F

E

E

E

F

E

F

A

B

A

B

B

A

B

A

D

C C

B

A

B

A

C

DA

A A

A

A

B B

B

B

B

LT LT

F

EF F E F E EF

A

B

LT

B

M

CD

LOC

FSCP

FMCP

FO

ANN

CM

MM

F

CD

CD

IR

VS

LT

CO

A'

B'

C'

14' 15'12'10'

D'

E'

F'

G'

9'8'7'5'3'2' 6'4' 11' 13'

1 2 3 4 5 6 7

J

H

G

F

E

D

C

B

HANGAR

EXISTING

HANGAR

EXISTING HEAT

DETECTORS IN THIS

BOUNDARY TO BE

RETAINED

EXISTING

DRAFT CURTAIN

EXISTING DRAFT

CURTAIN

EXISTING DRAFT

CURTAIN

NEW DRAFT

CURTAIN

EXISTING HEAT

DETECTORS IN THIS

BOUNDARY TO BE

RETAINED

WF

FIRE ALARM & MASS NOTIFICATION LEGEND

SPEAKER APPLIANCE

MANUAL FIRE ALARM STATION

SUPERVISORY (TAMPER) SWITCH

VISIBLE APPLIANCE - FOAM NOTIFICATION (110 CD - BLUE STROBE)

SMOKE DETECTOR

VISIBLE APPLIANCE - MASS NOTIFICATION (AMBER STROBE)

SPEAKER / VISIBLE APPLIANCE - CLEAR STROBE (CD = CANDELA RATING)

VISIBLE APPLIANCE -CLEAR STROBE (CD = CANDELA RATING)

RATE COMPENSATED HEAT DETECTOR

MONITOR MODULE

CONTROL MODULE

WATER FLOW SWITCH

FIRE ALARM / MASS NOTIFICATION CONTROL PANEL

ANNUNCIATOR

LOCAL OPERATING CONSOLE

HIGH EXPANSION FOAM MANUAL RELEASE STATION

FOAM SYSTEM CONTROL PANEL

SPEAKER APPLIANCE (WATERPROOF)WP

CEILING MOUNTED HORN / STROBE (CD = CANDELA RATING)

C

INFRARED FLAME DETECTOR

LOW TEMPERATURE ALARM DEVICE

WALL MOUNTED CARBON MONOXIDE DETECTOR

FIRE ALARM & MASS NOTIFICATION NOTES

PROVIDE NEW FIRE ALARM AND MASS NOTIFICATION CONTROL PANEL (FMCP).

NETWORK WITH THE EXISTING FOAM SYSTEM CONTROL PANEL (FSCP). EXPAND

THE EXISTING FSCP AS REQUIRED.

1.

PROVIDE CROSS ZONED HEAT DETECTION TO ACTIVATE HEF SYSTEM. HEF ALSO

ACTIVATED BY SPRINKLER WATER FLOW SWITCH PLUS SINGLE HEAT DETECTOR.

3.

ADS (ACOUSTICALLY DISTINGUISHABLE SPACE):4.

PROVIDE A COMBINATION FIRE ALARM AND MASS NOTIFICATION SYSTEM (MNS)

IN ACCORDANCE WITH UFC 3-600-01, UFC 4-021-01, AND NFPA 72 (2013 EDITION).

A. PERMITTED TO HAVE A CIS SCORE LESS THAN 0.8 IF APPROVED BY

THE DOD INSTALLATION, AND IF OCCUPANT CAN DETERMINE THAT

A VOICE SIGNAL IS BROADCAST AND MUST WALK NO MORE THAN

33 FEET TO FIND A LOCATION WITH A CIS SCORE OF AT LEAST A 0.8

(UFC 4-021-01, 4-6.1.2).

B.

PROVIDE AUDIBLE AND VISUAL NOTIFICATION APPLIANCES THROUGHOUT THE

BUILDING, INCLUDING IN UTILITY AND STORAGE ROOMS. PROVIDE VISUAL FIRE

ALARM STROBES (CLEAR) AND MNS STROBES (AMBER) SPACED IN

ACCORDANCE WITH NFPA 72.

PROVIDE WEATHERPROOF SPEAKERS ON THE EXTERIOR OF THE BUILDING NEAR

EACH OF THE BUILDING ENTRANCES AND EXITS.

PROVIDE AUDIBLE AND VISUAL NOTIFICATION APPLIANCES THROUGHOUT THE

BUILDING, INCLUDING IN UTILITY AND STORAGE ROOMS. PROVIDE VISUAL FIRE

ALARM STROBES (CLEAR) AND MNS STROBES (AMBER) SPACED IN ACCORDANCE

WITH NFPA 72.

THE LAYOUT OF DEVICES AND APPLIANCES ON THIS DRAWING SHOWS THE MINIMUM

NUMBER OF DEVICES AND APPLIANCES. THE CONTRACTOR IS RESPONSIBLE FOR

PROVIDING ADDITIONAL DEVICES, APPLIANCES, AND SYSTEM COMPONENTS AS

REQUIRED TO MEET THE AUDIBILITY AND INTELLIGIBILITY REQUIREMENTS OF UFC 4-

021-01 AND AUDIBLE AND VISIBLE REQUIREMENTS OF NFPA 72. UPON COMPLETION

OF THE INSTALLATION, THE CONTRACTOR IS REQUIRED TO COMPLETE

PERFORMANCE TESTING OF THE MNS FOR COMPLIANCE. PERFORMANCE RESULTS,

INCLUDING THE REQUIRED SOUND PRESSURE LEVELS AND INTELLIGIBILITY VALUES,

SHALL BE DOCUMENTED AND SUBMITTED TO THE GOVERNMENT.

PROVIDE NUMBER OF WATER FLOW AND TAMPER SWITCHES AS REQUIRED BASED

ON THE WORK DETAILED ON FIRE SUPPRESSION SHEETS AND IN THE

SPECIFICATION. COORDINATE WITH FIRE SUPPRESSION CONTRACTOR.

EACH ACOUSTICALLY DISTINGUISHABLE SPACE (ADS) IDENTIFIED ON

THE DRAWING SHALL NOT BE REQUIRED TO COMPLY WITH THE

GENERAL INTELLIGIBILITY REQUIREMENTS FOR THE BUILDING. INSTEAD,

INTELLIGIBILITY WITHIN EACH ADS SHALL COMPLY WITH UFC 4-021-01

WHICH PERMITS AN OCCUPANT TO TRAVEL NO MORE THAN 33 FEET

(NORMALLY OCCUPIED AREAS) OR 50 FEET (NORMALLY UNOCCUPIED

AREAS) TO A LOCATION WHERE INTELLIGIBILITY IS ACHIEVED. THE

AREAS NOT IDENTIFIED WITH AN ADS BOUNDARY SHALL BE REQUIRED

TO COMPLY WITH THE GENERAL INTELLIGIBILITY REQUIREMENTS OF

UFC 4-021-01 AND NFPA 72. THE ADS BOUNDARIES ARE SHOWN ON THE

DRAWING AND THE CONTRACTOR SHALL ALSO INCLUDE THESE

BOUNDARIES ON THE SYSTEM SHOP DRAWINGS.

PROVIDE DUCT DETECTION IN ACCORDANCE WITH NFPA 90A. COORDINATE WITH

MECHANICAL.

2.

5.

6.

7.

8.

9.

10.

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by No. Date

SheetAS SHOWN

Stamp

B-2 SUBMITTAL1 08/15/14

B-3 SUBMITTAL2 01/09/15

ADDENDUM 23 02/25/15

FA-102

FIRE ALARM AND MASS NOTIFICATION UPPER PLAN

25 FEBRUARY 2015

M. AARON

S. BLOCK

M. MEADE

M. AARON

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

PLAN

NORTH

SCALE: 1/16" = 1'-0"

FIRE ALARM AND MASS NOTIFICATION UPPER

PLAN

0' 4' 8' 16' 32'

File details come from the government source that posted it. Updated .