SZCQ139901_Plans_Addendum_1.pdf

PDF 6 MB Posted

Attached to
ADAL Two Existing Hangars to Accommodate the New KC46 Tanker
Solicitation number
W912TF15R0500
Issued by

About this file

SZCQ139901_Plans_Addendum_1

View the file

Other files

File Type Posted
15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139901_253_FP-101_Addendum2.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FP-102_Addendum2.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
SZCQ139904_FP-102_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_253_FA-102_Addendum2.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
Consolidated_RFI_answers_FBO_posting_3.31.15.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
253-_E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7

J

H

G

F

E

D

C

B

A'

S-503

S-501

S-501

S-501

S-501

7' - 3" 7' - 3"

/2

S-503 1 S-503

S-504

STEP FOOTING

C F-

2' -6

C F-

2' -6

EDGE OF FOOTING IS

EDGE OF EXISTING

GRADE BEAM (TYP)

FOUNDATION TIE BEAM (TYP)

4'

-0

6'

6"

3'

-0

STEP FOOTING

LOWER CURB AT

DOOR OPENINGS.

SEE ARCHITECTURAL

DRAWINGS FOR

LOCATION. (TYP)

GENERAL NOTES:

1. FOR STRUCTURAL GENERAL NOTES SEE S-001

2. FOR ABBREVIATIONS AND SYMBOLS SEE S-001

PLAN NOTES:

1. SEE SLAB ON GRADE PLAN S-101 FOR SLAB

INFORMATION

2. FOR TYP FOUNDATION SUBGRADE DETAIL SEE S-

502.

3. FOR TYP STEPPED FOOTING DETAIL SEE S-502.

4. FOR TYP FOUNDATION AND CONCRETE WALL

INTERSECTION AND CORNER BAR REINFORCING

SEE S-524.

5. FOR TYP CONTINUOUS FOOTING CONSTRUCTION

JOINT DETAIL SEE S-502

6. FOR TYP FOUNDATION ADJACENT TO UTILITY

EXCAVATION DETAIL SEE S-524.

7. CF-'x' INDICATES CONTINUOUS FOOTING TYPE 'x'.

8. REFERENCE ELEVATION 0'-0" IS REFERRING TO

NAVD88 ACTUAL ELEVATION 95.60. SEE CIVIL

DRAWINGS FOR MORE INFORMATION ON ACTUAL

ELEVATIONS.

LEGEND:

<-2'-6"> INDICATES TOP OF FTG ELEVATION

2'-6" BELOW REFERENCE

ELEVATION. TOP OF FTG

ELEVATION IS <-2'-6"> UNLESS

NOTED OTHERWISE ON PLAN

INDICATES FOOTING STEP

LOCATION-SEE DETAIL ON S-502

TRUE

NORTH

PLAN

NORTH

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by No. Date

SheetAS SHOWN

Stamp

B-2 SUBMITTAL1 08/15/14

B-3 SUBMITTAL2 01/09/15

ADDENDUM 13 02/17/15

S-104

TAIL DOCK FOUNDATION PLAN

17 FEBRUARY 2015

JZ/RB

BRO

RB/BRO

JZ

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/8" = 1'-0"

1 TAIL DOCK FOUNDATION PLAN

KEY PLAN

SCALE: N.T.S.KP

8' 0

SCALE: 1/8" = 1'-0"

8' 16'

8' 9'

D'

E'

F'

G'

C'

B'

A'

7'5' 10' 12' 14' 15'3'2' 13' 4'

P-402

WASH

ROOM

COMPOSITE

SHOP

PREP

ROOM

COMPRESSED

AIR

AIRLOCK

SANDING

(DIRTY)

CTK

STRUCTURAL

OFFICE

142PAINT

MIXING

PAINT

STOR

COMMUNICATIONS

SE

STORAGE

P-401

P7

FPH

FPH

FPH

CA CA

CA

CA

W

CA

CA

W

W W

P10

P11

1/

4" ø

C A

1/

4" ø

C A

1 1/4"ø CA 1 1/4"ø CA

1/

2" ø

C A

1/

2" ø

C A

2 1/2"ø CA2 1/2"ø CA2 1/2"ø CA

AC-1

IWH-2 IWH-1

IWH-3

CA

BA

BA

BA

BA

BA

BA

AC-2

1"ø CA BA

2"ø CA BA

2 1/2"ø CA

2" ø

C A

B A

1" ø

C A

B A

1" ø

C A

B A

2"ø CA BA2"ø CA BA

1"ø CA BA

2" ø

C A

B A

2"ø CA BA

2"ø CA BA

2"ø CA BA 2"ø CA BA

CA

BA CABA

CABA

CABA

CA

P10

IWH-3

W

1 1/2"ø CW @ 100 PSI

1/

4" ø

C W

3"ø CW

1/

2" ø

C W

2 1/2"ø CW

1"ø CA BA 1 1/4"ø CA

2 1/2"ø CW

1/

2" ø

C W

3/4"ø CW

1/

2" ø

C W

2 1/2"ø CW 2 1/2"ø CW

2"ø CA BA

2" ø

C A

B A

1/

2" ø

C A

2"ø CA

2"ø CA BA

2"ø CA 2"ø CA BA

1 1/2"ø CA 1 1/2"ø CA BA

2 1/2"ø CA

1 1/4"ø CA 1"ø CA 1"ø CA BA

2 1/2"ø CA

2 1/2"ø CA

WD

WD

2 1/2"ø CW

4"ø G 5 PSI

4"ø G 5 PSI

4" ø

G

6"ø G

6" ø

G

6"ø G6"ø G6"ø G6"ø G 6"ø G 2 PSI

ERH-8

ERH-7

ERH-6

2 1/2"ø G 1 1/4"ø G 1"ø G1 1/4"ø G

1/

2" ø

G

1/ 2" ø G

1" ø

G

1"ø G

1" ø

G 1" ø G

1" ø

G

IWH-1 IWH-1

IWH-1

GRIEVE

OVEN

5 PSI TO 2 PSI REGULATOR

P-502

P-502

P-502

P-502

P-502 5

P-502

P-502

P-502

P-502

P-502

P-502 1

P-502

P-502

P-502

P-502

P-502

P-502

P-502

P-502

P-502

1-1/2" G UP (REFER TO P-403/

ENLARGED MEZZANINE

PLAN FOR CONTINUATION)

1-1/4" UP

4" G @ 5 PSI UP TIGHT

TO STRUCTURE

IWH- 1 TO BE MOUNTED

TO STRUCTURE ABOVE.

(TYPICAL OF 3)

2 1/2"ø CA

REFER TO P-403/

ENLARGED MEZZANINE

PLAN FOR CONTINUATION

1"ø CW @ 100 PSI 1 1/4"ø CW @ 100 PSI

1 1/4"ø CW @ 100 PSI

1"ø CW @ 100 PSI

1" ø

C W

P

S I

1"ø CW @ 100 PSI

2" CW UP TO PWP-1, 2" CW @ 100

PSI DOWN AND 1-1/4" CA (REFER

TO P-403/ ENLARGED MEZZANINE

PLAN FOR CONTINUATION)

P-404

CABA

CABA

1" ø

C A

B A

1" ø

C A

CA

P-502

CA

P-502

P-502

W

1-1/2" CW, HW, AND 3/4"

RECIRC. TO MECHANICAL

MEZZANINE

1 1/2"ø HW 3/4"ø HWR

3/ 4" ø H

W R

1/

2" ø

H W

1 1/2"ø HW 3/4"ø HWR 3/4"ø HWR

1 1/2"ø HW

3/ 4" ø H

W

1" @ 2 PSI TO GWH-1

(REFER TO P-404/ ENLARGED

EXISTING PLUMBING MEZZANINE

PLAN FOR CONTINUATION)

CTK

FUELS

SUPERVISOR

104A

STORAGE

103A

FUEL

SYSTEMS

P-503

HEF

105A

STORAGE

CORRIDOR

MEN

LOCKER

MECHANICAL

112 MEN

RESTROOM

LAUNDRY

109B

VESTIBULE

JANITOR

109A

WOMEN

RESTROOM

WOMEN

LOCKER

108A

CORRIDOR

103B

CORRIDOR

WARP

STORAGE

MECHANICAL

148 INVERTER

STORAGE

P-503

P-503

P-503 1

P-503

P-503

2 1/2"ø CA

1" CA UP (REFER TO

P-403/ ENLARGED

MEZZANINE PLAN

FOR CONTINUATION)

1" CA UP (REFER TO P-403/

ENLARGED MEZZANINE

PLAN FOR CONTINUATION)

1/2" IWH-1 CONDENSATE ROUTED TO

MEZZENINE FLOOR DRAIN(REFER TO

P-403/ ENLARGED MEZZANINE PLAN

FOR CONTINUATION)

1/2"ø CONDENSATE 1/2"ø CONDENSATE 1/2"ø CONDENSATE

P-503

P-503

P-503

P-503

P-503

P-504

1" UP

P-504

1/2" CA DOWN TO

PNEUMATIC FLOW

CONTROL MANIFOLD

2-1/2" GAS TO PAINT

BOOTH MAKE-UP AIR UNIT 2

1/ 2" ø G

EXISTING EMERGENCY SHOWER

/EYEWASH AND ASSOCIATED

PIPING TO BE REMOVED.

CONTRACTOR TO PATCH AND

SEAL WALLS TO MATCH.

HANGAR

EXISTING

GRIEVE

OVEN

1"ø G 5 PSI

MEZZANINE

P-403 MEZZANINE

EXISTING BREATHING AIR

COMPRESSOR, AIR PURIFIER,

AND ACCESSORIES SHALL

REMOVED BY GOVERNMENT.

CONTRACTOR TO PATCH AND

SEAL WALLS TO MATCH.

3/4" DOWN WITH RPBP TO

HUMIDIFIER

3/4"ø CW

3/4" WITH RPBP TO

HUMIDIFIER

SYMBOL LEGEND

SYMBOL ABRV. DESCRIPTION

WATER DROP

COMPRESSED AIR DROP

W

CA

BREATHING AIR DROPBA

1" WATER DROP WITH MANUALVALVE FOR TRENCH DRAIN

WASH OUTWD

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal P-101

PLUMBING PRESSURE PIPING NORTH FLOOR

PLAN

09 JANUARY 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 3/32" = 1'-0"

PLUMBING PRESSURE PIPING NORTH FLOOR PLAN1

0' 2' 4' 8' 16' 24'

KEY PLAN

SCALE: N.T.S.KP

TRUE

NORTH

PLAN

NORTH

1 REVISION 1 02/17/15

8' 9'

E'

F'

G'

C'

B'

A'

7'5' 10' 12' 14' 15'3'2' 13' 4'

P-402

CORRIDOR

COMMUNICATIONS

WASH

ROOM

COMPOSITE

SHOP

COMPRESSED

AIR

PREP

ROOM

SANDING

(DIRTY)

PAINT

MIXING

PAINT

STOR

CTK

STRUCTURAL

OFFICE

SE

STORAGE

P10

P11

P7

TD2

SLOPED

WITH FLOOR

4"ø SS 6"ø SS

JACKING POINT

JACKING POINT

YCO

P-401

TD2

TD2TD2

TOP OF GRATE ELEVATION ~95.51'

INVERT AT BOTTOM OF TRENCH

~94.67'

TOP OF GRATE ELEVATION ~94.93'

INVERT AT BOTTOM OF TRENCH

~94.09''

TOP OF GRATE ELEVATION ~94.93

INVERT AT BOTTOM OF TRENCH

~94.09''

TRANSITION TO 6" PRIOR

TO EXITING FACILITY

SLOPED

WITH FLOOR

P10

FD2

FD2WCO

FCO

3"ø SS

3" ø

S S

3" ø

S S

2"ø

SS

3" VTR

CTK

FUELS

SUPERVISOR

104A

STORAGE

103A

FUEL

SYSTEMS

CONTRACTOR TO RECONNECT TO EXISTING

SANITARY SEWER SERVICE.

STORAGE

INVERTER

MECHANICAL

HEF

105A

STORAGE

WARP

STORAGE

MEN

RESTROOM

MEN

LOCKER

VESTIBULE

WOMEN

RESTROOM

LAUNDRY

109B

MECHANICAL

CORRIDOR

103BWOMEN

LOCKER

108A

FD-2

3" ø

S S

HANGAR

INVERT @ 87.5' REFER TO

CIVIL DRAWINGS FOR

CONTINUATION

PROVIDE MINIMUM OF 3'-0"

CLEARANCE FROM

EXISTING FOOTER

P-403 MEZZANINE

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal P-103

PLUMBING SANITARY SEWER NORTH FLOOR

PLAN

09 JANUARY 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 3/32" = 1'-0"

SANITARY SEWER NORTH FLOOR PLAN1

0' 2' 4' 8' 16' 24'

KEY PLAN

SCALE: N.T.S.KP

TRUE

NORTH

PLAN

NORTH

1 REVISION 1 02/17/15

1 1

1 7

B

C

D

E

F

G

H

J

2 3 4 5 6

P11 P11

8"ø SS

SLOPED

WITH FLOOR

TD2

SLOPED

WITH FLOOR

SLOPED

WITH FLOOR

SLOPED

WITH FLOOR

SLOPE BOTTOM OF TRENCH @ 0.5% SLOPE BOTTOM OF TRENCH @ 0.5%

JACKING POINT

JACKING POINT JACKING POINT

TD2TD2TD2

TD2 TD2 TD2

TOP OF GRATE ELEVATION ~94.45'

INVERT AT BOTTOM OF TRENCH

~93.61

TOP OF GRATE ELEVATION ~94.45' TOP OF GRATE ELEVATION ~94.45'

TOP OF GRATE ELEVATION ~94.45'

INVERT AT BOTTOM OF TRENCH

~93.61'

TOP OF GRATE ELEVATION ~94.45'

INVERT AT BOTTOM OF TRENCH

~92.71'

REFER TO CIVIL DRAWINGS

FOR CONTINUATION

INVERT ~92.625'

SLOPE BOTTOM OF TRENCH @ 0.5%

INVERT AT BOTTOM OF TRENCH

~93.61'

INVERT AT BOTTOM OF TRENCH

~93.61'

HANGAR

CONTRACTOR SHALL INSTALL 2" CAST IRON DRAIN

PIPE WITH BACKWATER VALVE FROM MULLION PIT

TO PLUMBING TRENCH. REFER TO STRUCTURAL

DRAWING 2 ON S519A FOR ADDITIONAL DETAIL.

CONTRACTOR SHALL INSTALL 2" CAST IRON DRAIN

PIPE WITH BACKWATER VALVE FROM MULLION PIT

TO PLUMBING TRENCH. REFER TO STRUCTURAL

DRAWING 2 ON S519A FOR ADDITIONAL DETAIL.

INVERT AT BOTTOM OF TRENCH

~93.03'

INVERT AT BOTTOM OF TRENCH

~93.26'

INVERT AT BOTTOM OF TRENCH

~92.78'

INVERT AT BOTTOM OF TRENCH

~93.51'

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal P-104

PLUMBING SANITARY SEWER SOUTH FLOOR PLAN

09 JANUARY 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 3/32" = 1'-0"

SANITARY SEWER SOUTH FLOOR PLAN1

0' 2' 4' 8' 16' 24'

KEY PLAN

SCALE: N.T.S.KP

TRUE

NORTH

PLAN

NORTH

1 1 1

1 111

B'

A'

12'

A

13'

MEN

RESTROOM

CLEAN

135 MEN

LOCKER

CLEAN

MEN

RESTROOM

DIRTY

MEN

LOCKER

DIRTY

MEN

SHOWER

DIRTY

WOMEN

SHOWER

DIRTY

JANITOR

WOMEN

LOCKER

DIRTY

WOMEN

RESTROOM

DIRTY

WOMEN

LOCKER

CLEAN

WOMEN

RESTROOM

CLEAN

ALCOVE

135A P10

P4 P4 P4

P2P1

P3

P4P4P4

P1

P5

P1

P5 P2P1

P6

P6

1 1/4"ø CA 2 1/2"ø CA

1/

2" ø

C A

1 1/4"ø CA

1 1/2"ø CW1 1/4"ø CW

1"ø CW 1 1/2"ø CW 3/4"ø CW

1/ 2" ø C

W 1 1/4"ø CW

1"ø CW 1 1/4"ø CW

1/ 2" ø C

W

1/2"ø CW

3/4"ø CW

1/2"ø HW

3/4"ø HW

1/

2" ø

C W

2 1/2"ø CW

1/

2" ø

C W

2" ø

C W

CORRIDOR

CORRIDOR

CORRIDOR

ALCOVE

134A

2"ø CW

2" CW UP (REFER TO P-

403 FOR CONTINUATION)

2"ø CW @ 100 PSI

1/

4" ø

C W

P

S I

3/ 4" ø H

W

3/ 4" ø H

W R

1" ø

H W

3/ 4" ø H

W R

1"ø HW 3/4"ø HW

1 1/4"ø HW

3/4"ø HW

1/2"ø HW

3/4"ø HWR

FPH

BALANCING

VALVE

3/4"ø CW

HANGAR

3/4"ø CW

3/4"ø CW

B'

A'

12'

A

13'

WCO

MEN

RESTROOM

CLEAN

ALCOVE

135A

WOMEN

RESTROOM

CLEAN

WOMEN

LOCKER

CLEAN

MEN

LOCKER

CLEAN

MEN

SHOWER

DIRTY

WOMEN

SHOWER

DIRTY

WOMEN

LOCKER

DIRTY

WOMEN

RESTROOM

DIRTY

JANITOR

MEN

LOCKER

DIRTY

MEN

RESTROOM

DIRTY

P4 P4 P4

P1 P2

P3

P1

P5

P10

P1

P5 P2P1

P4 P4 P4

P6

P6

4"ø SS

FD1

FD1

WCO

WCO

FD1

FD1

WCO

3"ø SS

4"ø SS

2" ø

S S

2" ø

S S

4" ø

S S

4"ø

SS

4"ø

SS

4" ø

S S

4"ø SS

4"ø SS

4"ø SS

4"ø SS

4"ø SS

4"ø SS

4"ø SS 4"ø SS

4"ø SS

2"ø SS2"ø SS

2"ø SS

3"ø SS

3"ø SS

4"ø SS4"ø SS4"ø SS 3"ø SS

3"ø SS

TD1

TD1

CORRIDOR

CORRIDOR

ALCOVE

134A

CORRIDOR

3" VTR

FD1

FD1

FD1

FD1

3"ø SS

3"ø SS

4"ø SS 4"ø SS

3" ø

S S

3" SS UP TO

ABOVE CEILING

HANGAR

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal P-402

PLUMBING ENLARGED PLANS

09 JANUARY 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/4" = 1'-0"

ENLARGED RESTROOM DOMESTIC WATER PLAN1

0' 1' 2' 4' 8'

SCALE: 1/4" = 1'-0"

ENLARGED NEW RESTROOM SANITARY SANITARY SEWER FLOOR PLAN2

0' 1' 2' 4' 8'TRUE

NORTH

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MANUFACTURER

OR APPROVED EQUAL MODEL

CONNECTIONS

NOTES

CW HW WASTE VENT

P1 WATER CLOSET, WALL MOUNTED H.C. (1.28 GPF)

WITH WATER POWERED FLUSH VALVE KOHLER K-4325 1" - 4" 2" TOTO FLUSH VALVE: TET1N32#CP, KOHLER SEAT: K-4731-SC

P2 WATER CLOSET, WALL MOUNTED, (1.28 GPF) WITH

WATER POWERED FLUSH VALVE KOHLER K-4325 1" - 4" 2" TOTO FLUSH VALVE: TET1N32#CP,

KOHLER SEAT: K-4731-SC

P3 URINAL (0.125 GPF) WITH WATER POWERED FLUSH

VALVE KOHLER K-4904-ET 3/4" - 1-1/2" 1-1/2" TOTO FLUSH VALVE: TEU1UN12#CP

P4 COUNTER TOP LAVATORY, H.C. (0.5 GPM) WITH

WATER POWERED FAUCET KOHLER K-2196-1 1/2" 1/2" 1-1/2" 1-1/2" TOTO FAUCET: TEL5LI15#CP

P5 WALL MOUTED LAVATORY, H.C. (0.5 GPM) WITH

WATER POWERED FAUCET KOHLER K-2007 1/2" 1/2" 1-1/2" 1-1/2" TOTO FAUCET: TEL5LI15#CP

P6 SHOWER, H.C. (1.5 GPM) - - 3/4" 3/4" 1-1/2" 1-1/2" DELTA FAUCET: T13220-H2O

P7 2 COMPARTMENT SINK ADVANCE TABCO 94-42-48-24RL 3/4" 3/4" 1-1/2" 1-1/2" ADVANCE TABCO FAUCET: K-11

P8 ELECTRIC WATER COOLER ELKAY EZS4 1/2" - 1-1/2" 1-1/2" -

P9 SERVICE SINK KOHLER K-6710 3/4" 3/4" 3" 1-1/2" KOHLER FAUCET: K-8907, INCLUDE MOP

BRACKET AND HOSE

P10 EMERGENCY EYE/FACE WASH HAWS 7261-7271 - 1/2" 1-1/2" - PROVIDE 1/2" TEPID WATER FROM MIXING

VALVE, NOTE 3

P11 EMERGENCY EYE/FACE WASH AND SHOWER COMBO HAWS 8330-8309 - 1-1/4' 1-1/2" - PROVIDE 1-1/4" TEPID WATER FROM

MIXING VALVE, NOTE 3

FD1 FLOOR DRAIN ZURN ZN415B - - 3" 1-1/2" WITH TRAP GUARD

FD2 FLOOR DRAIN ZURN ZN550 - - 3" 1-1/2" WITH TRAP GUARD

TD1 4" SHOWER TRENCH DRAIN ZURN ZS880 - - 2" 1-1/2" WITH TRAP GUARD

TD2 MAIN HANGAR TRENCH DRAIN ZURN Z784 - - 8" - -

HB HOSE BIBB WILKINS 195-BFP-8 3/4" - - - WITH INTEGRAL VACUUM BREAKER

FPH FREEZE PROOF HYDRANT ZURN Z1300 3/4" - - - WITH INTEGRAL VACUUM BREAKER

WCO WALL CLEANOUT ZURN Z1441 - - - - -

FCO FLOOR CLEANOUT ZURN Z1400 - - - - -

YCO YARD CLEANOUT ZURN Z1400 - - - - -

HR-1 300' HOSE REEL COXREEL 1125 - - - - -

RPBP REDUCED PRESSURE BACKFLOW PREVENTER ZURN MODEL 375 3" - - - -

NOTES:

1. H.C. DENOTES HANDICAPPED, INSTALL PER ADA REQUIREMENTS.

2. PRODUCT BRANDS SHOWN ON DRAWINGS ARE FOR INFORMATIONAL PURPOSES ONLY AND SHALL NOT BE CONSTRUED AS THE ONLY PRODUCT AVAILABLE. OTHER BRAND SELECTED SHALL

MEET THE PERFORMANCE AND MATERIAL SPECIFICATIONS OF PRODUCTS LISTED.

3. PROVIDE AUDIBLE AND VISUAL EMERGENCY ALARM SYSTEM HAWS MODEL 9001EXP CONNECTED TO FIRE ALARM SYSTEM.

AIR COMPRESSOR SCHEDULE

MARK TYPE

MINIMUM

FREE AIR

DELIVERY

(CFM)

PRESSURE

(PSI)

ELECTRICAL TANK SIZE INTEGRATED REFRIGERATED AIR DRYER

SERVES REMARKS

HP RPM VOLTS PHASE GAL LENGTH WIDTH HEIGHT TYPE KW CONDENSER VOLT/

PHASE

AC-1 OIL FREE

ROTARY SCREW 186 125 50

TO

3,400

460 3 500 89" 54" 76" AIR

COOLED 5.0 - 460/3 TOOL AIR

SYSTEM 1, 2, 4, 5, 6

AC-2 BREATHING AIR

COMPRESSOR 112 100 25 3791 460 3 240 95" 36" 76.5" AIR

COOLED 2.1 - 460/3 BREATHING

AIR SYSTEM 2, 3, 4, 5, 6

REMARKS:

1. INGERSOLL RAND: H50A; WITH VARIABLE SPEED DRIVE, REFRIGERATED AIR DRYER: NVC200.

2. AIR COMPRESSOR SHALL HAVE A MINIMUM OF 3% IMPEDANCE SERIES REACTOR, PROVIDED BY AIR COMPRESSOR MANUFACTURER.

3. INGERSOLL RAND: UP6-25; 20 PSI DELIVERY AT BREATHING AIR DROPS; COMPRESSOR SHALL HAVE INTEGRAL AIR DRYER AND CO DETECTOR. AIR COMPRESSOR

SHALL HAVE 4 STAGE FILTRATION SYSTEM FOR BREATHING AIR BY MARTECH SERVICES MODEL:150-E SERIES. UPON ACTIVATION OF CO DETECTOR MNS SHALL

RECEIVE MESSAGE TO DISCONTINUE USE OF SYSTEM AND SEND SIGNAL TO CENTRAL STATION.

4. AIR COMPRESSOR SHALL MEET UNITIL REBATE CRITERIA.

5. UNITS SHALL BE PACKAGE UNITS WITH ALL ACCESSORIES TO BE INSTALLED.

6. CONTRACTOR SHALL COMPLY WITH ALL MANUFACTURER'S INSTALLATION REQUIREMENTS.

WATER HEATER SCHEDULE

MARK AREA SERVED AND

APPROXIMATE LOCATION

MINIMUM

STORAGE

CAPACITY

(GAL.)

MINIMUM

RECOVERY

(GPH)

DISCHARGE

TEMP. °F

TEMP.

RISE °F

ELECTRICAL NATURAL GAS

MANUFACTURER/MODEL

TOTAL KW VOLTS/

PHASE

NUMBER

OF

ELEMENTS

CFH PRESSURE FLUE SIZE

IWH-1 TEMPERED WASH

WATER N/A N/A 120° 55° N/A 120/1 N/A 125 11" W.C. 3" LOCHINVAR: WAN125PM

IWH-2

EMERGENCY

EYE/FACE WASH AND

SHOWER

N/A N/A 85° 55° N/A 120/1 N/A 200 11" W.C. 3" LOCHINVAR: WAN200PM

IWH-3 EMERGENCY

EYE/FACE WASH N/A N/A 85° 30° 16 277/1 N/A N/A N/A N/A EEMAX: EX160T2EE

GWH-1 FACILITIES 60 99 140° 55° N/A 120/1 N/A 120 14" WC 3" - 4" A.O. SMITH: BTH-120(A)

REMARKS:

1. INCLUDE MODBUS INTERFACE MODULE.

2. CONTRACTOR TO PROVIDE REGULATOR AT EACH GAS FIRED EQUIPMENT. REGULATOR TO SHALL BE SET AT 2 PSI TO

MANUFACTURED RECOMMENDED PRESSURE SETTING. PLEASE REFER TO DETAIL 4 ON P502 FOR INSTALLATION.

PRESSURE PUMP SCHEDULE

MARK MANUFACTURER / MODEL SERVICE TYPE GPM HEAD

(FT.) PSI

NP SH

REQ'D

(FT.)

RPM EFF.

ELECTRICAL

REMARKS

HP VOLTS � HZ.

PWP-1 BELL & GOSSETT /

V2VDC6G50B1CK

POTABLE WATER TO

WASH SYSTEM

VARIABLE SPEED

PUMP PACKAGE 90 219.5 141 5.6 3500 71.4 10 460 3 60 -

CIRCULATING PUMP SCHEDULE

MARK MANUFACTURER / MODEL GPM

TD

HEAD

IN FT.

ELECTRICAL

SERVING LOCATION REMARKS

HP V ɸ HZ

CP-1 GRUNDFOS /

UP-15-18SU 2 5 1/25 115 1 60 110° F RETURN MECH. RM -

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal P-601

PLUMBING SCHEDULES

09 JANUARY 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

W

W

IWH-1

P11

IWH-2

FPH

P7

IWH-2

P11

IWH-3

P10

FPH

FPH

IWH-3

P10

HB

IWH-1

IWH-2

P11

FPH

RPBP

GWH-1

CP-1

1" CW

1-1/4" CW

3/4" CW

3/4" CW

1-1/4" CW

1-1/4" CW

1-1/4" CW

1-1/4" CW

1" CW

3/4" CW 3/4" CW

1-1/4" CW

1-1/4" CW

3" CW

2-1/2" CW

1-1/4" CW

2-1/2" CW

3/4"

2-1/2" CW

2-1/2" CW

2-1/2" CW

2-1/2" CW

2-1/2" CW

2-1/2" CW

3" CW

'A'

'B'

1" CW

TYPE K COPPER ROUTED

BELOW SLAB TO TRENCH DRAIN

FOR WASH OUT

1" CW

1" CW

TYPE K COPPER ROUTED

BELOW SLAB TO TRENCH DRAIN

FOR WASH OUT

1" CW

TYPE K COPPER ROUTED

BELOW SLAB TO TRENCH DRAIN

FOR WASH OUT

1-1/4" CW

1-1/4" CW

1" CW

TYPE K COPPER ROUTED

BELOW SLAB TO TRENCH DRAIN

FOR WASH OUT

2-1/2" CW

3/4 HWR"

1-1/2 HW"

1-1/2" CW

2-1/2" CW

2-1/2" CW

1-1/2" HW

1-1/2" HW

3/4" HWR

3/4" HWR

3/4"

3/4"

1-1/2"

HW @ 120°

1-1/2"

HW @ 140°

TO EXISTING SOLAR

SUPPLY FEED

TO EXISTING FEED TO

RESTROOMS

3/4" HWR

1-1/2" CW

FIELD VERIFY SIZE

1-1/4" CW

3/4" CW

3/4" CW TO HUMIDIFIER

WITH RPBP

P4

P4

P4

P4

P4

P4

P1

P2

P3

P1

P2

P1

FPH

P5

P1

P10

P6

P6 P5

HB

2-1/2" CW

1-1/4" CW

2" CW

1/2"

1/2"

1/2"

1/2"

1/2" 1/2" 1"

1"

3/4" 3/4"

1"

1/2"

1/2" 1" CW

3/4"

3/4"

1"

1"

1/2" CW

1/2" CW

2-1/2" CW

2-1/2" CW

2-1/2" CW

2-1/2" CW

2-1/2" CW

2" CW

1-1/2" CW1-1/2" CW

2" CW

1-1/2" CW

1-1/2" CW

1-1/4" CW 1/2" HW

3/4" HW

1-1/4" CW

1-1/4"

CW

1/2" CW

1/2" CW 1" CW

3/4" CW

'A'

'B'

TO PWP-1 PUMP

SYSTEM

ON MECHANICAL

MEZZANINE

3/4"

3/4" HWR

1-1/2" HW

1/2" HW

1" HW

1-1/4" HW

3/4" HWR

3/4" HW

1" HW

1-1/4" HW

1" HW

3/4" HWR

#200

#100

#200

BALANCING VALVE

#100

#100

3/4" CW TO

HUMIDIFIER

WITH RPBP

SYMBOL LEGEND

SYMBOL ABRV. DESCRIPTION

WATER DROP

COMPRESSED AIR DROP

W

CA

BREATHING AIR DROPBA

1" WATER DROP WITH MANUALVALVE FOR TRENCH DRAIN

WASH OUTWD

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal P-901

DOMESTIC WATER RISER DIAGRAM

09 JANUARY 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE:NTS

DOMESTIC WATER RISER DIAGRAM - OVERALL1

SCALE:NTS

DOMESTIC WATER RISER DIAGRAM - RESTROOMS2

P-503

P-503

P-503

P-503

1 REVISION 1 02/17/15

8' 9'

D'

E'

F'

G'

C'

B'

A'

7'5' 10' 12' 14' 15'3'2'

1 7

B

A

C

D

E

F

G

H

J

2 3 4 5 6

13' 4'

ACCU-253-2

ACCU-253-1

UH-1

ERH-8

EF-19

HVU-1HVU-2

ERH-7

MAU-1

FCU-253-4

FCU-253-5

EF-23

FCU-253-2

ERH-5

CF-3

FCU-253-1

FH-1

FCU-253-3

B-3 B-2

B-1

EF-22

CF-5

HVU-4

HVU-3

DOAU-1

VFD-2 VFD-1

VFD-3

EF-24

EF-14

EF-11

EF-5

EF-20

ERH-3

ERH-4

ERH-2

ERH-1

EF-21

CF-4

ERH-6

CF-1 CF-2

RH-4

RH-3RH-2

RH-1

EF-15

EF-6

EF-7

EF-8

EF-10

EF-12

EF-13

EF-4

EF-2

EF-1

EF-16

CTK

FUEL

SYSTEMS

WASH

ROOM

HANGAR

COMPOSITE

SHOP

PREP

ROOM

SANDING

(DIRTY)

SE

STORAGE

MEN

RESTROOM

CLEAN

WOMEN

RESTROOM

CLEAN

COMMUNICATIONS

COMPRESSED

AIR

CCU-253-2

CCU-253-3

FCU-253-6

ACCU-253-4 ACCU-253-3

HEF

105A

STORAGE

WARP

STORAGE

CORRIDOR

103B

WOMEN

LOCKER

108A

WOMEN

RESTROOM

VESTIBULE

LAUNDRY

109B

MEN

RESTROOM

MECHANICAL

MEN

LOCKER

CORRIDOR

FUELS

SUPERVISOR

104A

STORAGE

103A

HWP-5

HWP-4

HWP-6 HWP-7

CO

CO

CO

CO

CO

CO

CO

AC-2

CO CO

HR-3

HR-1 HR-2

HANGAR

SF-3

HVU-5

AC-1

EF-25

HWP-3 HWP-2

HWP-1

ET-1

DIZ-T-5'-7'

DIZ-T-8'-9'

DIZ-T-9'-10'

DIZ-T-11'-12'

EF-17

NO2

NO2

NO2

NO2

NO2

NO2

NO2

NO2

EF-18

ACCU-253-5

EXISTING

OVEN

HR-6 HR-7

HR-4HR-5

HR-9 HR-8

HR-10HR-11

EF-26

DESPATCH

OVEN

SF-4

ACCU-253-6

H-1

H-2

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-100

OVERALL MECHANICAL HVAC FLOOR PLAN

09 JANUARY 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/16" = 1'-0"

OVERALL MECHANICAL HVAC FLOOR PLAN1

0' 4' 8' 16' 32'TRUE

NORTH

PLAN

NORTH

KEYED NOTES:

PROVIDE CARBON MONOXIDE DETECTORS SIMILAR TO "HONEYWELL E3POINT E3SB" SERIES WITH

E3SCO CO DETECTION CARTRIDGE. THE DETECTORS SHALL BE CAPABLE OF COMMUNICATING

WITH THE DDC BAS SYSTEM. DETECTOR SHALL BE PROVIDED WITH A HEAVY DUTY HINGED

ENCLOSURE AND SENSOR END OF LIFE INDICATION. THE CO DETECTOR SHALL HAVE A

MEASUREMENT RANGE OF 0-200 PPM. THE INITIAL SETTING SHALL BE 20 PPM. (ADJ.) MOUNT CO DETECTORS 5'-0" AFF. CO DETECTORS SHALL BE NO MORE THAN 80' STRAIGHT LINE DISTANCE

FROM EACH OTHER OR 40'-0" FROM THE TAIL OR NOSE ENDS OF THE HANGAR. ENTIRE

PERIMETER OF HANGAR SHALL BE COVERED. IF SENSORS DETECT CONCENTRATIONS

EXCEEDING 50 PPM (ADJ.) AN ALARM SHALL SOUND LOCALLY AND SHALL BE REPORTED

THROUGH THE FIRE ALARM CONTROL PANEL. TYPICAL.

PROVIDE NITROGEN DIOXIDE DETECTORS SIMILAR TO "HONEYWELL E3POINT E3SB" SERIES WITH

E3NO2 NO2 DETECTION CARTRIDGE. THE DETECTORS SHALL BE CAPABLE OF COMMUNICATING

WITH THE DDC BAS SYSTEM. DETECTOR SHALL BE PROVIDED WITH A HEAVY DUTY HINGED

ENCLOSURE AND SENSOR END OF LIFE INDICATION. THE NO2 DETECTOR SHALL HAVE A

MEASUREMENT RANGE OF 0-10 PPM. THE INITIAL SETTING SHALL BE 1 PPM. (ADJ.) MOUNT NO2 DETECTORS 5'-0" AFF. NO2 DETECTORS SHALL BE NO MORE THAN 80' STRAIGHT LINE DISTANCE

FROM EACH OTHER OR 40'-0" FROM THE TAIL OR NOSE ENDS OF THE HANGAR. ENTIRE

PERIMETER OF HANGAR SHALL BE COVERED. IF SENSORS DETECT CONCENTRATIONS

EXCEEDING 3 PPM (ADJ.) AN ALARM SHALL SOUND LOCALLY AND SHALL BE REPORTED THROUGH

THE FIRE ALARM CONTROL PANEL. TYPICAL.

LOCATE OUTSIDE AIR SENSOR FOR BMS SYSTEM IN PROTECTED LOCATION. PREFERRABLY IN

THE SHADE OF AN OVERHANG. ENSURE THAT SENSOR IS ACCESSIBLE FROM BELOW (BY LIFT OR

LADDER).

PROVIDE AN "EDWARDS SIGNALING" 95 SERIES (OR SIMILAR) ADAPTABEACON LIGHT DUTY

STROBE WITH 85 dB AUDIBLE/VISUAL SIGNAL ALARM TO BE ACTIVATED IF HANGAR DOORS ARE

OPEN FOR LONGER THAN 10 MINUTES AND HEATERS HAVE BEEN ACTIVATED DUE TO LOW

HANGAR TEMPERATURE. ALARM SHALL SOUND AND STROBE UNTIL HANGAR DOORS ARE

CLOSED. MOUNT IN A LOCATION VISIBLE FROM MOST LOCATIONS IN THE HANGAR AND 10 FEET

ABOVE THE FLOOR.

PROVIDE A LASER BREAK BEAM SENSOR THAT SHALL BE MOUNTED 40 FEET AFF (INTENT IS TO

DETECT THE TAIL OF THE PLANE BUT NO OTHER OBJECTS SUCH AS VECHILES). THE BREAK

BEAM SENSOR SHALL BE SUITABLE TO VIEW ACCURATELY ACROSS THE HANGAR AND SHALL

HAVE THE CAPABILITY OF PROVIDING A BINARY SIGNAL TO THE BMS SYSTEM. LOCATE BEAM

SENSOR SUCH THAT IT WILL NOT BE ACCIDENTLY TRIPPED BY OTHER HANGAR EQUIPMENT

SUCH AS FANS. PROVIDE THE COMPANION RECEIVER ON THE OPPOSITE SIDE OF THE HANGAR

AND ALIGN THE LASER SUCH THAT IT HITS THE RECEIVER TARGET.

UPON A SIGNAL FROM THE FIRE ALARM SYSTEM ALL MECHANICAL AIR MOVING SYSTEM SERVING

THE HANGAR SHALL SHUT DOWN, INCLUDING BUT NOT LIMITED TO CIRCULATION FANS,

RADIANT HEATERS, HEATING AND VENTILATION UNITS, AND MAINTENANCE FANS. TYPICAL.

9'

D'

E'

F'

G'

C'

B'

A'

10' 12' 14' 15'

A

4 5 6

13'

"x

"x

"x

78660L-14

4950L-15

"x

12"x12"

12"x14"47 "x

36"x10"

36"x10"

FCU-253-4

FCU-253-5FCU-253-2

VAV-1-2

VAV-1-3

VAV-1-4

B-3 B-2

B-1

HWP-3 HWP-2 HWP-1

39785L-12

M-301

20"x14"

20"x14"

16"ø16"ø

"ø

635SRC

18"x10"

635SRC

18"x10"

ERH-5

1500L-18

HVU-3

CF-3

12"x12"

10"x8" 12"x10"

12"x8"

"ø

AS-1

54"ø 48"x36"

345CDD 345CDD

-2

M-401

CLEARANCES TYPICAL

M

M M

M A

TC

H

LI

N

E C

O N

TI

N

U

ED

O N

S H

E

ET

M -1

MATCHLINE

CONTINUED ON

SHEET M-104

EQUIPMENT

PLATFORM

MECHANICAL

COMPOSITE

SHOP

PREP

ROOM

SANDING

DIRTY

M

VFD-1

VFD-2

VFD-3

ET-1

14"ø

14"ø

14"ø

14"ø

HVU-4 EF-22

CF-5

12"ø

635SRC

18"x10"

635SRC

18"x10"

M

"ø

EF-23

20"x20"

"x

20"x20"

50"ø

MAU-1

"ø

18"ø

"ø

6"ø

1318"x20"

"x

440CDE440CDE

6"ø

VAV-2-1

10"x8"

VAV-2-2

VAV-2-3

12"x12"

36"x34"

"x

"x

"x

"ø

12"x8"

12"x10"

12"x8"

6"ø

16"ø

4"ø

12"x12" BELOW

"ø

"ø

"ø

"ø

8"ø

6"ø

5"ø

SSU-1

"ø

GFU-1

EF-19

M-402

MM

20"x22"

54"x54"

20"x20"

22"x20"

22"ø

8"ø

8"ø

M-303

M-303

M

M

M

SE

STORAGE

HVU-5

18"x18" 18"x18"

"x

SF-3

BOB: 34' AFF

31' 2" AFF

18' 4" AFF

BOD: 25' - 3"

B O

D

3"

BOD: 28' - 11"

BOD: 26' - 10"

BOD: 36' - 9"

BOD: 35' - 7"

BOD: 34' - 2"

BOD: 27' - 9"

BOD: 24' - 11"

B O

D

9"

BOD: 21' - 2"

BOD: 21' - 3"

B O

D

7"

BOB: 23' 9" AFF

IWH-1

3"ø

"ø

BOD: 23' - 6"

BOD: 21' - 4"

BOD: 25' - 9"BOD: 19' - 0"

ERH-8

18"x16"

"x

EF-25

BOD: 34' - 6"BOD: 34' - 6"

8"ø 8"ø

DOAU-1

EF-26

16"x16" 400L-20

SF-4

400L-21

M

M

400SRC

RHC-2

10"ø

16"x16"

"x

500L-23

22"x14"

EF-18

7 7

M M

7 7

HR-10

HR-11

M M

HR-8

HR-9

12"ø

16"x16"

16"x16"

H-1

H-1

M

H-2

M

BOD: 20' - 5"

20"x14"20"x14"BOD: 35' - 9"

AC-4

AC-3

"ø

20"ø

20"ø

H-2

26 36"x24" 36"x24"

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-101

MECHANICAL HVAC CONCRETE DECK PLAN

09 JANUARY 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/8" = 1'-0"

CONCRETE DECK LEVEL1

0' 2' 4' 8' 16' 24'TRUE

NORTH

KEY PLAN

SCALE: N.T.S.KP

KEY NOTES:

MOTORIZED OPEN/CLOSE DAMPERS . DAMPERS CONNECTED TO OUTSIDE (INTAKE OR EXHAUST) SHALL BE LOW LEAKAGE CLASS 1A TYPE, PARALLEL BLADE. ACTUATOR SHALL BE CAPABLE OF CLOSING THE DAMPER IN 10 SECONDS OR LESS. CONNECT TO

BAS SYSTEM. TYPICAL.

EXISTING RADIANT HEATERS TO REMAIN.

DUCT STATIC PRESSURE SENSOR

RELOCATED EXISTING RH AND ASSOCIATED EXISTING GAS TRAIN ASSEMBLIES.

14" DIAMETER DUCT DOWN TO 26'-5" AFF. TURN TO THE HORIZONTAL AND CONNECT INTO COILED FLEXIBLE HOSE. BALANCE FOR

1000 CFM.

PAINT BOOTH EXHAUST DUCT SHALL BE ROUTED THROUGH EXTERIOR WALL DIRECTLY TO THE OUTSIDE. PROVIDE A STAINLESS

STEEL BIRD SCREEN AT THE DISCHARGE.

HOSE REEL FOR FUEL CELL PURGE. SEE SCHEDULES AND DETAILS.

SUPPORT MECHANICAL EQUIPMENT FROM CMU WALL. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL WALL STIFFENING

DETAILS. REFER TO "EQUIPMENT CANTILEVERED SUPPORT" DETAIL.

OPEN ENDED DUCT (OED) WITH WIRE MESH SCREEN (WMS).

OWNER PROVIDED MAKE-UP AIR UNIT. FINAL LOCATION SHALL BE COORDINATED WITH OWNER. CONTRACTOR SHALL COORDINATE DUCT ROUTING WITH PAINT BOOTH MANUFACTURER, EXISTING CONDITIONS AND ALL OTHER TRADES (DUCT ROUTING SHOWN IS FOR REFERENCE ONLY AND SHOULD ONLY BE USED AS GUIDANCE FOR PRICING).

EXHAUST PLENUM SHALL BE A MINIMUM OF 2 FEET DEEP. THE PAINT MIXING FUME HOOD EXHAUST SHALL DISCHARGE INTO THE TOP SECTION OF THE PLENUM AND THE GENERAL SPACE EXHAUST SHALL DISCHARGE INTO THE BOTTOM OF THE PLENUM.

MAKE-UP AIR SUPPLY DUCTWORK IS SHOWN AS TURNING DOWN AND TRANSITIONING TO A RECTANGULAR 120"x48" OPEN ENDED DUCT. INTENT IS TO DIRECT SUPPLY AIR IN FRONT OF THE PAINT BOOTH WHERE FILTER DOORS ARE LOCATED. BOTTOM OF SUPPLY DISCHARGE SHALL NOT OBSTRUCT THE OPENING OF THE ROLL UP DOORS. CONFIRM FINAL DUCT ROUTING/SIZING WITH

PAINT BOOTH MANUFACTURER.

DUCT DOWN TO FIRST FLOOR ELEVATIONS. REFER TO M-102 AND/OR M-401 FOR CONTINUATION.

BOILER COMBUSTION INTAKE: INCREASE TO ONE DUCT SIZE GREATER THAN THE BOILER CONNECTION. SLOPE HORIZONTAL DUCT AT 1/4" PER FOOT DOWNWARDS TOWARDS THE EXTERIOR WALL. ONCE DUCT HAS PENETRATED EXTERIOR WALL TURN DOWN WITH A LONG RADIUS ELBOW AND PROVIDE A STAINLESS STEEL BIRD SCREEN. INTAKE SHALL BE NO LESS THAN 4'-0" BELOW AND NO LESS THAN 3'-0" HORIZONTALLY FROM ANY BOILER FLUE EXHAUST TERMINATIONS. TYPICAL 3 PLACES.

BOILER EXHAUST: INCREASE TO ONE DUCT SIZE GREATER THAN THE BOILER CONNECTION. DUCT SHALL BE CONSTRUCTED OF STAINLESS STEEL. PENETRATE WALL WITH AN APPROVED WALL THIMBLE WITH AN AIR GAP BETWEEN FLUE AND WALL MATERIALS. EXHAUST SHALL TERMINATE NO LESS THAN 12" FROM EXTERIOR WALL SURFACE. PROVIDE A STAINLESS STEEL BIRD SCREEN. EXHAUST SHALL BE NO LESS THAN 4'-0" ABOVE AND NO LESS THAN 3'-0" HORIZONTALLY FROM ANY BOILER COMBUSTION

INTAKES. TYPICAL 3 PLACES.

CONTRACTOR SHALL CONNECT EXHAUST DUCTWORK AND TERMINATIONS TO NEW OVEN. PROVIDE NEW METAL-FAB IPIC-4 EXHAUST DUCT AND FITTINGS AS NECESSARY. INSTALL EXHAUST DUCT IN ACCORDANCE WITH MANUFACTURER INSTRUCTIONS.

PROVIDE INSULATED WALL THIMBLE AND TERMINATE WITH STANDARD VENT CAP. MAINTAIN MIN 10'-0" ABOVE GRADE. SEE DETAIL

ON SHEET M-402.

DUCT DROP TO AVOID STRUCTURAL TRUSSES. CONTRACTOR SHALL COORDINATE ROUTING WITH EXISTING STRUCTURE AND

ALL TRADES. TYPICAL.

INTAKE PLENUM SHALL BE A MINIMUM OF 4' DEEP.

COMBINE 3" COMBUSTION AIR INTAKE AND 3" VENT INTO ONE PENETRATION THROUGH ROOF USING MANUFACTURER'S PROVIDED

CONCENTRIC ADAPTER.

EF-25 SHALL BE INTERLOCKED WITH HVU-5 AND SHALL OPERATE AT MINIMUM SPEED (450 CFM) WHENEVER HVU-5 OPERATES DURING OCCUPIED HOURS. IF TEMPERATURE IN SPACE EXCEEDS 85 DEGREES SF-3 SHALL ENERGIZE AND BLOW MORE VENTILATION/COOLING AIR INTO THE MECHANICAL ROOM AND THE EF-25 SHALL INCREASE SPEED TO MAXIMUM. SUPPLY AND EXHAUST FAN AND DAMPERS SHALL CLOSE ON A SIGNAL FROM THE EMERGENCY SHUTDOWN SWITCH.

HVU SHALL MAINTAIN A MINIMUM OF 60 DEGREES IN THE SPACE. DURING UNOCCUPIED HOURS THE OUTSIDE AIR DAMPER SHALL BE CLOSED AND THE RETURN AIR DAMPER SHALL BE OPEN. DURING OCCUPIED HOURS THE RETURN AIR DAMPER SHALL BE CLOSED AND THE OUTSIDE AIR DAMPER SHALL BE OPEN. DURING OCCUPIED HOURS THE HVU SHALL RUN CONTINUOUSLY AND THE HOT WATER VALVE SHALL MODULATE TO MAINTAIN TEMPERATURE AT SET POINT. HVU-5 SHALL DE-ENERGIZE AND ALL

OUTSIDE AIR DAMPERS SHALL CLOSE ON A SIGNAL FROM THE EMERGENCY SHUTDOWN SWITCH.

TURN DOWN TIGHT TO WALL AND CONNECT INTO RESIN TABLE HOOD ON LEVEL BELOW. REFER TO M-102 FOR CONTINUATION.

TURN DUCT DOWN TO 12" BELOW THE FINISHED CEILING ELEVATION. CONNECT INTO A WALL MOUNTED SUPPLY REGISTER.

PROVIDE MOTORIZED DAMPERS THAT ARE CONNECTED TO EACH OF THE TWO HOSE REELS/BRANCH DUCT CONNECTIONS ASSOCIATED WITH THE FAN OR AC UNIT. THE MOTORIZED DAMPERS SHALL BE NORMALLY OPEN AND THE OPERATOR SELECTOR SWITCH SHALL CLOSE THE DAMPER OF THE HOSE REEL/BRANCH DUCT THAT THE OPERATOR DOES NOT WISH TO USE (OR BOTH CAN BE OPEN). THE MOTORIZED DAMPERS SHALL BE POWERED THROUGH THE EXHAUST FAN OR AC UNIT SWITCH SUCH THAT IF

THE EXHAUST FAN IS TURNED OFF THE DAMPERS SHALL SPRING TO OPEN.

BOTTOM TAP HVU SUPPLY DUCTWORK AND ROUTE TO INLET OF AC-3 AND AC-4

PLACE AC-3 AND AC-4 ON 6" CONCRETE HOUSEKEEPING PAD ON MEZZANINE CONCRETE DECK.

MOUNT HUMIDIFIER STEAM GENERATOR/CONTROL PANEL SUCH THAT THE CENTER OF THE CONTROL PANEL IS 48" ABOVE THE FINISHED FLOOR. STEAM PIPING SHALL BE ROUTED UP TO STEAM DISPERSION ASSEMBLY LOCATED IN THE SUPPLY DUCTWORK

OF AC-3 OR AC-4. REFER TO PIPING PLANS FOR STEAM AND DRAIN PIPING.

PLAN

NORTH

1 REVISION 1 02/17/15

9'

D'

E'

F'

G'

C'

B'

A'

10' 12' 14' 15'

A

4 5 6

13'

COMPRESSED

AIR

COMPOSITE

SHOP

PREP

ROOM

SANDING

(DIRTY)

AIRLOCK

6700RGA

ACCU-253-1

ACCU-253-2

36"x34"

M-301

UH-1

8"ø

-1

M-401

NEW DESPATCH

OVEN

MATCHLINE

CONTINUED ON

SHEET M-104

M A

TC

H

LI

N

E C

O N

TI

N

U

ED

O N

S H

E

ET

M -1

T

CF-3 (SEE M-101)

CO2

CO2

CO2T

T

T

H

H

H

10"Ø DUCT UP

TO CONCRETE

DECK LEVEL

TS

CF-5

12"ø

50"ø

62"x32"

2000L-19

42"x30"

MEF-24

T

100CDA

6"ø

ACCU-253-3

T

M-303

ET-1

TR

EN

C H

D R

A

IN

ACCU-253-4

SE

STORAGE

BOD: 2' - 11"

HOUSEKEEPING PAD

(TYP OF 5)

WORK

TABLE

HANGAR

HVU-4

12"ø

DIZ-T-8'-9'

DIZ-T-9'-10'

DIZ-T-11'-12'

17 17

TS

ERH-8

TS

ERH-5

LOCATE SUMP PIT AS FAR AS POSSIBLE

FROM THE PAINT BOOTH WITHOUT

CONFLICTING WITH STRUCTURAL FOOTINGS.

COORDINATE WITH STRUCTURAL.

ACCU-253-6

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-102

MECHANICAL HVAC NORTH EAST FIRST FLOOR

PLAN

09 JANUARY 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

TRUE

NORTH 0' 2' 4' 8' 16'

KEY PLAN

SCALE: N.T.S.KP

SCALE: 1/8" = 1'-0"

HVAC NORTH EAST FIRST FLOOR PLAN1

GENERAL NOTES:

PAINT BOOTH - OWNER PROVIDED (INCLUDES 24,000 CFM EXHAUST FAN).

BLAST BOOTH - OWNER PROVIDED (INCLUDES 9,0000 CFM EXHAUST FAN).

EMERGENCY OUTSIDE AIR / EXHAUST AIR DAMPER AND FAN SHUTOFF SWITCH. PROVIDE A HINGED

PLASTIC COVER TO PREVENT INADVERTANT OPERATION.

UNDERGROUND "DUCT" WILL BE A 8" ROUND STAINLESS STEEL SCHEDULE 10 PIPE.

DUCT ROUTED UP TO CONCRETE DECK LEVEL. CONTINUED ON M-101.

MOUNT LOW ELEVATION CEILING FAN TEMPERATURE SENSOR 4'-0" AFF AND MOUNT HIGH

ELEVATION CEILING FAN TEMPERATURE SENSOR AT SAME ELEVATION AS FAN.

RELOCATED DUST COLLECTOR COORDINATE FINAL LOCATION WITH OWNER.

RELOCATED DUST COLLECTION FAN, COORDINATE FINAL LOCATION WITH OWNER. RE-USE

EXISTING DUCTWORK FROM FAN DISCHARGE TO DUST COLLECTOR AND PROVIDE ADDITIONAL

DUCTWORK TO MATCH EXISTING AS REQUIRED TO COORDINATE WITH FINAL LOCATIONS. RE-USE

EXISTING DUCTWORK FROM FAN SUCTION (INCLUDING FLEXIBLE DUCTWORK AND SUPPORT ARM)

TO TO THE WORK TABLE AND PROVIDE ADDITIONAL EXISTING DUCTWORK TO MATCH EXISTING AS

REQUIRED TO COORDINATE WIITH FINAL LOCATIONS.

DUCT TURNS UP TO ELEVATION ABOVE. REFER TO M-101 FOR CONTINUATION. TYPICAL.

INCREASE SIZE OF EXISTING OPENING FOR NEW LOUVER. MOUNT NO LESS THAN 10' ABOVE

GRADE. ENSURE BOTTOM OF LOUVER IS ABOVE DOOR.

OWNER PROVIDED 24,000 CFM MAKE-UP AIR UNIT. COORDINATE FINAL LOCATION WITH OWNER.

COORDINATE DUCTWORK WITH MAU LOCATION, EXISTING CONDITIONS, AND ALL OTHER TRADES

50" DIA DUCT TRANSITION IN VERTICAL TO 62x32. TURN TO THE HORIZONTAL NEAR THE FLOOR AND

CONNECT INTO THE OUTSIDE AIR INLET CONNECTION OF MAKE-UP AIR UNIT.

REFER TO M-401 FOR CONTINUATION.

48" DIA DUCT DOWN TO PAINT BOOTH 24,000 CFM EXHAUST FAN. COORDINATE WITH BOOTH

MANUFACTURER AND PROVIDE NECESSARY DUCT TRANSITIONS TO MATE WITH EXHAUST FAN. 48" DUCT CONTINUES UP AND IS ROUTED TO EXHAUST LOUVER LOCATED IN THIS ROOM. REFER TO M-

101 FOR CONTINUATION.

PATCH WALL USING LIKE MATERIALS FROM THE REMOVAL OF EXISTING EXHAUST FAN.

PROVIDE NEW 48X12 DUCT DOWN TO HOOD AND TRANSITION IN VERTICAL TO A 12" ROUND. ROUTE 12" ROUND UP TO CONCRETE DECK LEVEL (CONT'D ON M-101) TO EXHAUST FAN EF-26. LOCATE

FAN SWITCH NEXT TO RESIN TABLE.

PROVIDE A MINIMUM OF A 24"x24" (REFER TO DETAIL, SUMP MAY BE WIDER TO INCORPORATE

MULTIPLE PIPES, CONDUIT ETC) TO ALLOW ACCES TO TRENCH/DOWNSPOUT HYDRONIC HEATING

PIPING (PROVIDE LOW POINT DRAINS FROM PIPING INTO SUMP). CONCRETE SUMPS SHALL NOT

INTERFERE WITH EXISTING OR NEW FOOTINGS. PROPOSED CONCRETE SUMP LOCATIONS ARE

BASED ON EXISTING FOOTING SIZES AND LOCATIONS INDICATED ON AS-BUILT DRAWINGS.

CONTRACTOR SHALL VERIFY EXISTING FOOTING SIZES AND LOCATIONS IN FIELD AND ADJUST SUMP

LOCATION ACCORDINGLY. LOCATE SUMP AS CLOSE TO TRENCH DRAINS AND DOWNSPOUTS AS

POSSIBLE WITHOUT INTERFERING WITH NORMAL FOOT/VEHICLE TRAFFIC.

REFER TO ELECTRICAL GROUNDING PLAN FOR GROUNDING REQUIREMENTS PERTAINING TO

MECHANICAL DUCTWORK PENETRATIONS THRU HAZARDOUS CLASSIFIED AREAS.

PLAN

NORTH

8'

E'

F'

G'

C'

B'

A'

7'5'3'2'

A

2 3

4'

WASH

ROOM

"x

6700RGA

HVU-1

33500L-11

HVU-2

"ø

"ø

"ø

20"x14"

20"x14"

101200L-13

8" ø

116"x36"

ERH-7

ERH-6

CF-4

8"ø

14"ø14"ø

11200SRA

11200SRA

11100SRA

SS

MM

M A

TC

H

LI

N

E C

O N

TI

N

U

ED

O N

S H

E E

T M

-1

,1

MATCHLINE

CONTINUED ON

SHEET M-104

T

CF-4

EF-12 & AC-44

M

8"ø

M-302

12"ø

TR

EN

C H

D R

A

IN

108"x138"

104"x40"

6" x3 6"

CO EXHAUST

EF-21

EF-20

EF-19

CTK

FUEL

SYSTEMS

CCU-253-2

FCU-253-6

CCU-253-3

FUELS

SUPERVISOR

104A

STORAGE

103A

14"x14"

14"x12" 10"x12"

12"ø

20"x16"

6"x10"

BOD: 24' - 1"

WARP

STORAGE

STORAGE

HEF

105A

CORRIDOR

CORRIDOR

103B

MEN

LOCKER

MEN

RESTROOM

MECHANICAL

LAUNDRY

109B

VESTIBULE

WOMEN

RESTROOM

XFMR

(EX)

XFMR

(EX)

T

T

T

AC-2

T

INVERTER

MECHANICAL

BOD: 30' - 5"

BOD: 26' - 0"

BOD: 0' - 4"

TRENCH DRAIN

IWH-1

3"ø

IWH-1

IWH-1

133"ø

3"ø

IWH-1

3"ø

ERH-8

18' 4" AFF

DIZ-T-5'-7'

DIZ-T-8'-9'

195CDC

TYP-4

100CDA

8"ø 6"x10"

100RGD

390RGD

TYP-2

8"ø

10 CFM

10 CFM

CAR-7

8"ø

8"ø

6"ø 4"ø 4"ø

90 CFM

HR-3

HOSE REEL

OPERATOR

SWITCH

HANGAR

14 EF-17

22"x14"

500L-22

EF-11 & AC-3

TS

ERH-6&7

ACCU-253-5

EXISTING

OVEN

16 16

HR-4

HR-5 BOD: 27' - 0"M M

BOB: 34'-5"

16 16

HR-7

HR-6

BOD: 27' - 0"M M

8"ø

BOD: 21' - 3"

36"x34"

MOUNTED HIGH ON

WALL ABOVE DOORS

BOD: 35' - 9"

BOD: 36' - 9"

BOD: 26' - 10"

20"x14"BOD: 35' - 9"

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-103

MECHANICAL HVAC NORTH WEST FLOOR PLAN

09 JANUARY 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/8" = 1'-0"

HVAC NORTH WEST PLAN1

0' 2' 4' 8' 16'TRUE

NORTH

KEY PLAN

SCALE: N.T.S.KP

KEYNOTES:

MOUNT LOW ELEVATION CEILING FAN TEMPERATURE SENSOR 4'-0" AFF AND MOUNT HIGH ELEVATION

CEILING FAN TEMPERATURE SENSOR AT SAME ELEVATION AS FAN.

EMERGENCY OUTSIDE AIR / EXHAUST AIR DAMPER AND FAN SHUTOFF SWITCH. PROVIDE A HINGED PLASTIC COVER TO PREVENT INADVERTANT OPERATION. COORDINATE FINAL LOCATION WITH OWNER.

FUEL CELL OPERATION MODE SWITCH. COORDINATE FINAL LOCATION WITH OWNER. SWITCH SHALL SEND SIGNAL TO BAS TO SIGNAL THE INCREASE OF EXHAUST AND MAKEUP AIR TO THE HANGAR AND TO ENABLE

THE TRENCH DRAIN EXHAUST FANS.

FAN/AC UNIT OPERATOR SWITCH. (SHOWN FOR REFERENCE ONLY, COORDINATE FINAL LOCATION WITH OWNER.) NEXT TO EACH FAN/AC UNIT SWITCH PROVIDE TWO ADDITIONAL SWITCHES FOR MOTORIZED

DAMPERS THAT ARE CONNECTED TO EACH OF THE TWO HOSE REELS/BRANCH DUCT CONNECTIONS

ASSOCIATED WITH THE FAN OR AC UNIT. THE MOTORIZED DAMPERS SHALL BE NORMALLY OPEN AND THE SWITCH SHALL CLOSE THE DAMPER OF THE HOSE REEL/BRANCH DUCT THAT THE OPERATOR DOES NOT WISH TO USE (OR BOTH CAN BE OPEN). THE MOTORIZED DAMPERS SHALL BE POWERED THROUGH THE FAN OR AC UNIT SWITCH SUCH THAT IF THE FAN OR AC UNIT IS TURNED OFF THE DAMPERS SHALL SPRING

TO OPEN.

EXISTING RADIANT HEATERS. EXISTING CONTROLS TO REMAIN.

14" DIAMETER DUCT DOWN TO 27'-0" AFF. TURN TO THE HORIZONTAL AND CONNECT INTO COILED FLEXIBLE

HOSE. BALANCE FOR 1000 CFM.

INTAKE LOUVERS SHALL BE NO LESS THAN 10'-0" ABOVE GRADE. CONNECT INTO LOUVERS WITH FULL SIZE

PLENUM WITH A MINIMUM 2'-0" DEPTH. TYPICAL.

ROUTE INTAKE DUCT FROM PLENUM DOWN INTO THE INTAKE OF HVU

8" DIAMETER DUCT DOWN TO 15'-0" AFF. TURN TO THE HORIZONTAL AND CONNECT INTO COILED CO

EXHAUST FLEXIBLE HOSE.

CO EXHAUST COIL. REFER TO DETAILS.

UNDERGROUND "DUCT" WILL BE A 8" ROUND STAINLESS STEEL SCHEDULE 10 PIPE.

COMBINE 3" COMBUSTION AIR INTAKE AND 3" VENT INTO ONE PENETRATION THROUGH ROOF USING

MANUFACTURER'S PROVIDED CONCENTRIC ADAPTER.

COMBINE 3" COMBUSTION AIR INTAKE AND 3" VENT INTO ONE PENETRATION THROUGH WALL USING

MANUFACTURER'S PROVIDED CONCENTRIC ADAPTER.

PROVIDE A MINIMUM OF A 24"x24" (REFER TO DETAIL, SUMP MAY BE WIDER TO INCORPORATE MULTIPLE PIPES, CONDUIT ETC) TO ALLOW ACCES TO TRENCH/DOWNSPOUT HYDRONIC HEATING PIPING (PROVIDE LOW POINT DRAINS FROM PIPING INTO SUMP). CONCRETE SUMPS SHALL NOT INTERFERE WITH EXISTING OR NEW FOOTINGS. PROPOSED CONCRETE SUMP LOCATIONS ARE BASED ON EXISTING FOOTING SIZES AND LOCATIONS INDICATED ON AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY EXISTING FOOTING SIZES AND LOCATIONS IN FIELD AND ADJUST SUMP LOCATION ACCORDINGLY. LOCATE SUMP AS CLOSE TO TRENCH DRAINS AND DOWNSPOUTS AS POSSIBLE WITHOUT INTERFERING WITH NORMAL FOOT/VEHICLE TRAFFIC.

EXISTING GRIEVE OVEN TO REMAIN.

HOSE REEL FOR FUEL CELL PURGE. SEE SCHEDULES AND DETAIL.

FAN OPERATOR SWITCH. (SHOWN FOR REFERENCE ONLY, COORDINATE FINAL LOCATION WITH OWNER.)

PROVIDE CONTROL BOX STARTER COMPATIBLE WITH EXHAUST FAN WITH HAND-OFF-AUTO SWITCH AND

RESET BUTTON.

REFER TO ELECTRICAL GROUNDING PLAN FOR GROUNDING REQUIREMENTS PERTAINING TO MECHANICAL

DUCTWORK PENETRATIONS THRU HAZARDOUS CLASSIFIED AREAS.

PLAN

NORTH

9'

D'

E'

F'

G'

C'

B'

A'

10' 12' 14' 15'

A

4 5 6

13'

M-301

HVU-3

B-3 B-2 B-1

HWP-1

HWP-2

HWP-3

AS-1

FCU-253-2

FCU-253-5

FCU-253-4

8"ø

8"ø

4"ø

RS AND RL

REFRIGERANT

RS AND RL DOWN TO

FIRST FLOOR.

RS AND RL DOWN TO

FIRST FLOOR.

RS AND RL DOWN TO FIRST FLOOR.

1"Ø HW SUPPLY AND RETURN

DOWN TO FIRST FLOOR.

1 1/4"Ø COND

LINE DOWN TO

FIRST FLOOR.

1 1/4"Ø COND

1"Ø COND

ET-1

4"ø

M A

TC

H

LI

N

E C

O N

TI

N

U

ED

O N

S H

E

ET

M -1

HVU-4

1"ø

1" ø

6"Ø HWR

6"Ø HWS

GFU-1

1 1/4"ø

SSU-1

1 1/2"ø

1 1/2"ø

RS

RL

M-303

COMPOSITE

SHOP

PREP

ROOM

SANDING

DIRTY

MECHANICAL

RL

RS

HWP-5

HWP-6 HWP-7

RS AND RL

RS AND RL

M-403

HVU-5 1"ø

1"ø 1 1/4"ø

1/2"ø 1/2"ø

1 1/2"ø 1 1/2"ø

1 1/2"ø1 1/2"ø

1 1/2"ø 1 1/2"ø

ELEV: 30' - 3" ELEV: 30' - 3"

ELEV: 30' - 5"

ELEV: 17' - 11"

ELEV: 17' - 10"

ELEV: 17' - 5"

ELEV: 21' - 0"

ELEV: 20' - 5"

ELEV: 30' - 3"

ELEV: 30' - 5"

ELEV: 30' - 7"

ELEV: 30' - 7"

E

LE

V :1

6' -7

E

LE

V :1

6' -7

ELEV: 30' - 3"

ELEV: 30' - 5"

ELEV: 16' - 7" ELEV: 16' - 7" E

LE

V :2

0' -1

1" E

LE

V

:2 1'

-0

E

LE

V :2

1' -9

E

LE

V :2

0' -1

1" E

LE

V

:2 1'

-0

E

LE

V :2

5' -8

E

LE

V

:2 5'

-6

ELEV: 21' - 7"

ELEV: 21' - 5"

ELEV: 22' - 5"

ELEV: 21' - 10"

E

LE

V :1

6' -6

E

LE

V

:1 7'

-0

E

LE

V :3

0' -3

RHC-2

3/4"ø

3/4"ø HWS

HWR

HANGAR

RS AND RL

E

LE

V :2

9' -8

E

LE

V

:2 9'

-1

RS AND RL

H-1

H-1

ELEV: 25' - 7"

1 1/2"Ø STEAM

LINE DOWN TO

FIRST FLOOR

DOAU-1

1 1/4"Ø COND LINE

DOWN TO FIRST FLOOR

H-2

H-2

1 1/2"Ø STEAM

LINE DOWN TO

FIRST FLOOR

3/4"ø

3/4"ø

3/4" COND DN

TO FIRST FLOOR

ELEV: 36' - 6"

1 1/2"ø 1 1/2"ø

HWR

HWS

1" HWS&R

DN TO AC UNIT

TYP-2

AC-4

AC-3

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-105

MECHANICAL PIPING EAST CONCRETE DECK

PLAN

09 JANUARY 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/8" = 1'-0"

MECHANICAL PIPING CONCRETE DECK LEVEL - EAST1

TRUE

NORTH

0' 2' 4' 8' 16' 24'

KEY PLAN

SCALE: N.T.S.KP

PLAN

NORTH

KEYNOTES:

ROUTE PIPING THROUGH TRUSSES AT AN ELEVATION NO LESS THAN 30'-0"

AFF TO ALLOW PIPING TO BE ROUTED OVER THE CLEARANCE OF AIRCRAFT

BYPASS CONTROL VALVE

HOT WATER SUPPLY UP TO ROOF/GUTTER/DOWNSPOUT/TRENCH DRAIN DE-

ICING MANIFOLD (REFER TO RISER DIAGRAM).

HOT WATER RETURN FROM ROOF/GUTTER/DOWNSPOUT/TRENCH DRAIN DE-

ICING MANIFOLD (REFER TO RISER DIAGRAM).

9'

D'

E'

F'

G'

C'

B'

A'

10' 12' 14' 15'

A

5 6

13'

ACCU-253-1

ACCU-253-2

UH-1

CCU-253-1

FCU-253-3

RS AND RL UP TO

CONCRETE DECK

LEVEL.

RL AND RS

REFRIGERANT

1 1/4"Ø COND LINE UP

TO CONCRETE

DECK LEVEL.

1"Ø COND

1"Ø COND

1" HWS/R

UP

1"ø 1"ø

1 1/4"Ø COND

1 1/4"Ø COND

FCU-253-1

ET-1

1 1/2"ø UP TO

CONCRETE

DECK LEVEL

ACCU-253-3

ACCU-253-4

COMPRESSED

AIR

COMPOSITE

SHOP

PREP

ROOM

SANDING

(DIRTY)

PAINT

MIXING

PAINT

STOR

CTK

STRUCTURAL

OFFICE

SE

STORAGE

WOMEN

LOCKER

DIRTY

WOMEN

RESTROOM

DIRTY

WOMEN

LOCKER

CLEAN

WOMEN

RESTROOM

CLEAN

134ALCOVE

134A

ALCOVE

135A

CORRIDOR

COMMUNICATIONS

MEN

RESTROOM

CLEAN

MEN

LOCKER

CLEAN

MEN

SHOWER

DIRTY

WOMEN

SHOWER

DIRTY

JANITOR

MEN

LOCKER

DIRTY

MEN

RESTROOM

DIRTY

CORRIDOR

AC-1

DIZ-T-8'-9'

DIZ-T-9'-10'

DIZ-T-11'-12'

STORAGE

M A

TC

H

LI

N

E C

O N

TI

N

U

ED

O N

S H

E

ET

M -1

RHC-1

1/2"ø

1/2"ø

RS AND RL UP TO

CONCRETE DECK

LEVEL.

E

LE

V :1

3' -1

0"

ELEV: 14' - 4"

E

LE

V :1

1' -2

ELEV: 10' - 1"

E

LE

V :1

3' -1

0"

E

LE

V :1

3' -5

E

LE

V :1

3' -2

ELEV: 12' - 9"

ELEV: 11' - 11"

HANGAR

ACCU-253-67

H-1

1 1/2"Ø STEAM UP

TO CONCRETE

DECK LEVEL

3/4"Ø COND WITH 1" AIR

GAP DN TO

CONDENSATE PUMP

1 1/4"ø

1 1/4"Ø COND

1 1/4"Ø

COND UP TO

CONCRETE

DECK LEVEL

E

LE

V :1

1' -6

H-2

1 1/2"Ø STEAM UP

TO CONCRETE

DECK LEVEL

COND

UP

3/4"ø

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-106

MECHANICAL PIPING FIRST FLOOR PLAN

09 JANUARY 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

TRUE

NORTH

0' 2' 4' 8' 16' 24'

GENERAL NOTES:

UNDERGROUND REFRIGERANT PIPING SHALL BE INSTALLED BELOW 48",

AND SHALL BE ROUTED THROUGH A PROTECTIVE SCHEDULE 40 PVC CARRIER PIPE.

PIPING SHALL BE INSULATED IN ACCORDANCE WITH THE SPECIFICATIONS FOR ABOVE GROUND

OUTDOOR PIPING. THE CARRIER PIPE SHALL EXTEND 6" ABOVE GRADE AND SHALL BE SEALED TO

PREVENT WATER FROM ENTERING THE CARRIER PIPE.

PROVIDE A 6" HOUSE KEEPING PAD FOR EXPANSION TANK.

WALL MOUNTED AC UNIT: MOUNT 5'-0" ABOVE FLOOR. ROUTE REFRIGERANT AND CONDENSATE PIPING

UP THROUGH WALL CAVITY AND ABOVE THE FINISHED CEILING.

1 1/4"Ø CONDENSATE DOWN TO SERVICE SINK WITH 2"AIR GAP

PROVIDE A MINIMUM OF A 24"x24" (REFER TO DETAIL, SUMP MAY BE WIDER TO INCORPORATE

MULTIPLE PIPES, CONDUIT ETC) TO ALLOW ACCES TO TRENCH/DOWNSPOUT HYDRONIC HEATING

PIPING (PROVIDE LOW POINT DRAINS FROM PIPING INTO SUMP). CONCRETE SUMPS SHALL NOT

INTERFERE WITH EXISTING OR NEW FOOTINGS. PROPOSED CONCRETE SUMP LOCATIONS ARE

BASED ON EXISTING FOOTING SIZES AND LOCATIONS INDICATED ON AS-BUILT DRAWINGS.

CONTRACTOR SHALL VERIFY EXISTING FOOTING SIZES AND LOCATIONS IN FIELD AND ADJUST SUMP

LOCATION ACCORDINGLY. LOCATE SUMP AS CLOSE TO TRENCH DRAINS AND DOWNSPOUTS AS

POSSIBLE WITHOUT INTERFERING WITH NORMAL FOOT/VEHICLE TRAFFIC. SEE STRUCTURAL DETAIL

ON S-519.

RS AND RL UP TO CONCRETE DECK LEVEL

RS AND RL DN TO BELOW GRADE.

PROVIDE A HARTELL A2-SA-115 OR SIMILAR CONDENSATE PUMP. PUMP SHALL BE RATED FOR 212 °F

WATER AND SHALL BE CAPABLE OF 12 FEET OF HEAD AT 4 GPM. ROUTE DRAIN PIPING FROM

HUMIDIFIER UNITS (H-1 AND H-2) INTO CONDENSATE PUMP RESERVOIR. PUMPED CONDENSATE SHALL BE ROUTED TO THE UNDERSIDE OF THE CONCRETE DECK LEVEL AND SHALL SLOPE BY GRAVITY TO

THE CONDENSATE MAIN.

SCALE: 1/8" = 1'-0"

MECHANICAL PIPING FIRST FLOOR PLAN - EAST1PLAN

NORTH

KEY PLAN

SCALE: N.T.S.KP

E'

F'

G'

C'

B'

A'

7'5'3'2'

A

2 3

4'

DIFFERENTIAL

PRESSURE SENSOR

4"Ø HW SUPPLY AND RETURN

DOWN TO HVU-1 ON FIRST FLOOR.

4"Ø HW SUPPLY AND RETURN

DOWN TO HVU-2 ON FIRST FLOOR.

6"Ø HWR

4"Ø HWR

4"Ø HWSEXISTING

SOLAR

HOT

WATER

STOAGE

TANK

M A

TC

H

LI

N

E C

O N

TI

N

U

ED

O N

S H

E

ET

M -1

6"ø

6"ø

6"Ø HWS

4"Ø HWR

4"Ø HWS

5"Ø HWS

5"Ø HWR

RL

RS

RL

RS

HWP-4

ELEV: 30' - 3"

ELEV: 30' - 7"

ELEV: 30' - 7"

ELEV: 30' - 5"

ELEV: 22' - 10"

ELEV: 22' - 10"

ELEV: 18' - 2"

ELEV: 18' - 2"ELEV: 21' - 2"

ELEV: 22' - 5"

E

LE

V :2

2' -1

0" E

LE

V

:2 2'

-1 0"

E

LE

V :1

6' -8

E

LE

V :1

7' -0

HANGAR

AC-4

E

LE

V :3

0' -1

1" E

LE

V

:3 0'

-1 1"

E

LE

V :3

8' -5

E

LE

V

:3 8'

-0

H-2

H-2

1 1/2"ø

ELEV: 38' - 6"

STEAM

ELEV: 36' - 5"

INSTALL DRIP TEE.

SEE DETAIL.

1 1/4"ø

3/4"ø

COND

COND WITH

1" AIR GAP

ELEV: 32' - 3"

ELEV: 33' - 1"

3/4"Ø COND

WITH 1" AIR GAP

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-107

MECHANICAL PIPING WEST CONCRETE DECK

PLAN

09 JANUARY 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/8" = 1'-0"

MECHANICAL PIPING CONCRETE DECK LEVEL - WEST1

KEY PLAN

SCALE: N.T.S.KP

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

KEYNOTES:

CONNECT NEW HOT WATER PIPING INTO EXISTING HOT WATER PIPING

COORDINATE WITH EXISTING FIELD CONDITIONS.

PIPING ROUTED DOWN TO LOWER ELEVATION IN HANGAR 101. REFER TO M-108

FOR CONTINUATION.

E'

F'

G'

C'

B'

7'5'3'2'

A

4'

M-302

HVU-1

HVU-2

CTK

WASH

ROOM

FUEL

SYSTEMS

FUELS

SUPERVISOR

104A

STORAGE

103A

ELEV: 9' - 5"

HEF

105A

WARP

STORAGE

STORAGE

WOMEN

RESTROOM

VESTIBULE

LAUNDRY

109B

MEN

RESTROOM

MECHANICAL

MEN

LOCKER

CORRIDOR

103B

CORRIDOR

MECHANICAL

INVERTER

AC-2

XFMR

(EX)

XFMR

(EX)

RL

RS

RL

RS

RL

RS

ELEV: 10' - 10"

ELEV: 10' - 10"

ELEV: 9' - 7"

ELEV: 9' - 5"

ELEV: 9' - 7"

ELEV: 9' - 7"

ELEV: 9' - 5"

ELEV: 11' - 5"

ELEV: 11' - 8"

DIZ-T-5'-7'

DIZ-T-8'-9'

M A

TC

H

LI

N

E C

O N

TI

N

U

ED

O N

S H

E

ET

M -1

CCU-253-2

CCU-253-3

FCU-253-6

HANGAR

ELEV: 1' - 6"

ELEV: 1' - 7"

ACCU-253-5

1 1/4"Ø COND

TO SINK DRAIN.

SEE DETAIL.

COND

COND

COND

COND

COND

COND

3/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-108

MECHANICAL PIPING WEST FIRST FLOOR PLAN

09 JANUARY 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/8" = 1'-0"

MECHANICAL PIPING FIRST FLOOR PLAN - WEST1

KEY PLAN

SCALE: N.T.S.KP

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

KEYED NOTES:

ROUTE PIPING UP TO HIGHER ELEVATION IN HANGAR 101. REFER TO M-107 FOR

CONTINUATION.

AIR COOLED CONDENSING UNIT MOUNTED ON GRADE. PROVIDE A 6" CONCRETE PAD

FOR CONDENSING UNIT AND PROVIDE COOPER B-LINE "DURABLOCK" EQUIPMENT

SUPPORTS TO ELEVATE CONDENSING UNIT AN ADDITIONAL 12" ABOVE PAD.

DURABLOCKS SHALL BE ANCHORED TO CONCRETE PAD.

WALL MOUNTED AC UNIT: MOUNT 8'-0" ABOVE FLOOR. ROUTE REFRIGERANT PIPING UP

THROUGH WALL CAVITY AND ABOVE THE FINISHED CEILING.

CEILING CASSETTE UNIT: MOUNT FLUSH TO FINISHED CEILING. COORDINATE WITH

EXISTING LIGHTS AND CEILING GRID AND LOCATE AS CLOSE TO THE CENTER OF THE

ROOM AS POSSIBLE.

ROUTE REFRIGERANT PIPING DOWN THEN MAKE AN APPROVED PENETRATION

THROUGH THE EXTERIOR WALL TO THE CONDENSING UNIT ON GRADE.

PROVIDE A COOPER B-LINE DURA BLOCK PIPE SUPPORT BETWEEN CONDENSING UNIT

AND WALL PENETRATION.

PROVIDE A MINIMUM OF A 24"x24" (REFER TO DETAIL, SUMP MAY BE WIDER TO

INCORPORATE MULTIPLE PIPES, CONDUIT ETC) TO ALLOW ACCES TO

TRENCH/DOWNSPOUT HYDRONIC HEATING PIPING (PROVIDE LOW POINT DRAINS FROM

PIPING INTO SUMP). CONCRETE SUMPS SHALL NOT INTERFERE WITH EXISTING OR NEW

FOOTINGS. PROPOSED CONCRETE SUMP LOCATIONS ARE BASED ON EXISTING

FOOTING SIZES AND LOCATIONS INDICATED ON AS-BUILT DRAWINGS. CONTRACTOR

SHALL VERIFY EXISTING FOOTING SIZES AND LOCATIONS IN FIELD AND ADJUST SUMP

LOCATION ACCORDINGLY. LOCATE SUMP AS CLOSE TO TRENCH DRAINS AND

DOWNSPOUTS AS POSSIBLE WITHOUT INTERFERING WITH NORMAL FOOT/VEHICLE

TRAFFIC. SEE STRUCTURAL DETAIL ON S-519.

5'1 2

4'

1 21.5

20"x14"

12"ø

8"øFPH

54"ø 28"x72"

6700SRB

EF-13

16"x16"

"x

M

M

FINISHED FLOOR

0'-0"

EXISTING MEZZANINE

20'-8"

CLEAR AT EXISTING DOORS

30'-0 1/4"

D' E'C'B'A

EQUIPMENT PLATFORM

15'-4"

LOWER CATWALK

44'-0"

FINISH FLOOR

0' - 0"

A C' D' E' E-F'D-E'

HVU-2

HVU-1

"x

6"

46"ø

54"ø

CF-4

14"x20"

20"x12"

54"ø

11200SRA

11200SRA

11100SRA

6700RGA

"x

ERH-7 33500L-11

14"ø 14"ø

20"x14"

ERH-6

DIZ-E-5.5'-6'

DIZ-G-5'-6'-2

DIZ-T-5'-7'

HWP-4

BOD: 30' - 5"

BOD: 24' - 1"

BOD: 10' - 8"

BOD: 3' - 5"

LOW LEVEL EXHAUST GRILLES.

PLACE BOTTOM OF GRILLE AT 2" AFF

W/ 2" THICK HOUSKEEPING PAD (TYP.)

HR-4

HR-7

AC-4

"x

H-2

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

08/15/141 B-2 Submittal

01/09/152 B-3 Submittal M-302

MECHANICAL SECTIONS