BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf
PDF 228 KB Posted
- Solicitation number
- W912TF15R0500
About this file
BLD254- ED-102-ELECTRICAL POWER AND SIGNAL DEMO PLAN
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
8'
9'
D'
E'
F'
G'
C'
B'
A'
7'5'
10' 12' 14' 15'
3'2'
1 2 3 4 5 6 7
A
B
C
D
E
F
G
H
J
13'11'
6'
4'
H'
J'
K'
L'
M'
N'
1' 1.3' 1.7' 1.8'
1.9' 2.8' 4.1'
4.4' 5.8' 6.7' 7.2' 7.9'
E.3'
D.3'
C.1'
B.7'
A.2'
Z.9'
Y'
X'
DOOR CONTROLS 480V; CONTROLS
9 MOTORS & 14 LIMIT SWITCHES
SALVAGE ALL CONTROLS AND
ASSOCIATED COMPONENTS. TURN
OVER TO GOVERNMENT.
REMOVE
DISCONNECT
RELOCATE
37.5 KVA
480:208/120V
REMOVE
DOOR
MOTOR
RELOCATE
LP-36
AMXS
READY
ROOM
AMXS
READY
ROOM
11A
RELOCATE
BUS DUCT
TO ROOM 17
RELOCATE
BUS DUCT
TO ROOM 17
9-4
9-3
9-1 9-2
9-6
9-5
9-29 9-7
9-9
RELOCATE EQUIPMENT
TO ROOM 17, SEE
EQUIPMENT SCHEDULE
ON SHEET E-111
INVERTER
ROOM
43A
RELOCATE DISCONNECT
FOR AIR COMPRESSOR
TO INVERTER ROOM.
REMOVE
DISCONNECTS
REMOVE
DISCONNECT
REMOVE
DISCONNECTS
REMOVE
DOOR
MOTOR
REMOVE DISCONNECT
FOR DEMOLISHED AIR
COMPRESSOR.
MEN'S
RESTROOM
16A
REMOVE 400HZ CONVERTER, 400HZ
CABLE, 480V FEEDER AND ASSOCIATED
DISCONNECT. SALVAGE AND TURN
OVER CONVERTER AND 400HZ CABLE
TO GOVERNMENT.
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ Pe as e
AF
B
H an ga rs
\D ra w in gs \A ut oC
AD
R ef er en ce
SZ
C Q
-G
-B
SA
R C
1.
dw g gu ec ke r
AS SHOWN
Stamp
08/15/141 B-2 Submittal
11/21/142 B-3 Submittal
12/31/143 B-3 Resubmittal
ED-102
ELECTRICAL POWER AND SIGNAL DEMOLITION PLAN
31 DECEMBER 2014
MDG
CMD
WAP
LDC
SZCQ139904
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 1" = 20'-0"
POWER AND SIGNALS DEMOLITION PLAN1
GENERAL NOTES:
A. ELECTRICAL EQUIPMENT SHOWN DASHED SHALL
BE REMOVED OR RELOCATED AS INDICATED.
B. MACHINE ROOM EQUIPMENT SHOWN IN ROOM 9
SHALL BE RELOCATED BY OTHERS.
C. COORDINATE WITH MECHANICAL DRAWINGS
FOR REMOVAL OF WIRE AND CONDUIT
ASSOCIATED WITH MECHANICAL REMOVAL
WORK. REMOVE WIRE AND CONDUIT BACK
TO SOURCE PANEL.
D. WHERE DEMOLITION OF A PORTION OF AN
EXISTING CIRCUIT RENDERS DOWNSTREAM
EQUIPMENT INOPERATIVE, PROVIDE A NEW
CIRCUIT TO REESTABLISH SERVICE.
E. SEE SHEET E-112 FOR POWER REQUIREMENTS
TO RTU-2, RTU-4, RTU-6, RTU-7, AND RTU-9.
MECHANICAL TO REPLACE UNIT. ELECTRICAL
SHALL PROVIDE CONNECTION UTILIZING EXISTING
WIRE AND DISCONNECT.
F. FOR DEMOLITION OF IS EQUIPMENT SEE SHEET
E-109.
0' 3' 10' 20' 40'
PLAN
NORTH
TRUE
NORTH
2 REVISION 2 03/03/15
File details come from the government source that posted it. Updated .