Pease KC46 Hangar Project
PROJECT SZCQ139901 & SZCQ139904
SOLICITATION No. W912TF-15-R-0500
RFI Question/Answers: 74, 79, 134 & 145-199
NOTE: All RFIs should be submitted No Later Than Wednesday, March 25th, 12:00 PM EST to ensure answers are provide back to contractors prior to the proposal due date.
74. Q. Is Fundamental Commissioning referenced under Prerequisite 1 to be carried in the base bid? Will Enhanced Commissioning referenced under Credit 3 be priced as an Option? If Enhanced Commissioning is required as an Option price, will a new Bid Form Item be provided?
Reference: Prerequisite 1 “Fundamental Commissioning of Building Energy Systems” Notes;
“Will be Accomplished”, page 2 of 9.; Reference: Credit 3 “Enhanced Commissioning” Notes;
“ANG Recommended….A/E must evaluate feasibility of project achieving this point as base bid item or option.” With a sub note; (Project is pursuing), page 4 of 9.
A- REVISION: Enhanced commissioning as related to construction will be in the base bid for the contractor. The CxA is A-E firm scope.
79. Q. Pay rate question.
Caulkers appear to be in the $51.00 range, painters in the $16.00 range. Which trade does the epoxy floors come under, both the application and the floor prep? Our crews sometimes do the prep, caulking and epoxy floors.
A- Please be advised; no response has been received from DOL. Rate to be used is up to the discretion of the contractor until further notice
134. Q. Section 00110, 3.4.2.1.2 – Part 1, Subfactor 2 requires the submission of a construction schedule "to allow the Government to determine if offeror had a comprehensive understanding of the project's requirements and construction sequence." Specification section 01 32 01 - Project Schedule, paragraph 3.3.B outlines the "Level of Detail Required" for the project schedule. does the "Level of Project Detail" requirements of 01 32 01,3.3.B apply to the proposal schedule (i.e. no non-procurement activities with durations greater than 20 work days/30 calendar days)??
A- REVISION: The level of detail in Specification 01 32 01, 3.3B does NOT apply to the proposal. Reference the following sections for the level of detail required: 3.4.2.1.2; 3.4.2.1.2.1;
3.4.2.1.2.2.
145. Q. Section 259000-4 Section C states all software will have an ATO. The application for use on this project does not have a current ATO. Is the ANG responsible for the obtaining the ATO? If not, will the ANG be sponsoring the ATO effort?
A- PENDING
146. Q. Section 259000-4 Section B states the system is to be compliant to AF ETL 11-1. Our understanding of AF ETL 11-1 is that the controls to be applied are the same controls as under a normal DIACAP just not as many. How does this work together with Section 259000-4 Section C (see item 1 above)? Will AF ETL 11-1 be sufficient for obtaining ATO?
A- PENDING
147. Q. Section 259000-7 Section J. 3: How will the Air Force Standard Desktop Configuration (SDC) be provided? Our goal would be to receive a SDC virtual image for both the client and server systems.
A- PENDING
148. Q. Who is responsible for updates to the new BAS system and for what duration? If a system update is applied, after commissioning and the ANG takes ownership, and BAS functionality is lost due to the system update, who is responsible for repair?
A- PENDING
149. Q. If the BAS contractor is responsible for system updates and lifecycle maintenance of the ATO, how long is the lifecycle period?
A- PENDING
150. Q. Will the BAS contractor be able to complete the network installation for commissioning purposes, without connecting the network to NIPR? NIPR connection of system will only occur after issuance of ATO.
A- PENDING
157. Q. Regarding warranties, what is the government’s expectation related to implementation dates? Considering that the Government will be taking beneficial occupancy of certain areas well prior to the contract performance/completion date of on or about 840-900 calendar days from NTP, warranties for those turned over areas would typically go into effect at the time of beneficial occupancy, however, the solicitation, Page 18, 3.4.2.1.2.2 indicates the inclusion of FAR 52.236-11. If the government’s expectation is that the warranties will commence upon final inspection of the last area, please advise accordingly, as this will require additional warranty costs with all manufacturers.
A- The warranty period(s) begin when the government takes beneficial occupancy.
158. Q. Due to the nature of this project being phased and also being LEED Silver, how will the process of enhanced commissioning be handled at the turnover of each phase/area? Also, will the government fully accommodate the contractor in the process of building flush-out to meet Indoor Air Quality (IEQ) credits? When performing building flush-out in industrial/warehouse facilities, it can be difficult to achieve satisfactory levels with the ongoing presence of things like jet fuel and other maintenance solvents/solutions. Please advise.
A- The enhanced Cx will have to be done in each phase but the project will be filed with USGBC just one time. Contractor to provide adequate notice to Government to schedule indoor air quality tests on a day when no maintenance operations are being performed, which could be on the weekend.
159. Q. Regarding the existing equipment to be relocated by the contractor: is there adequate storage/staging space within the building to temporarily locate these items while work is being completed in Rooms 40, 17, and 9? Essentially, is there swing space for the contractor to utilize?
A- It is anticipated there will be adequate swing space within Bldg 254
160. Q. On Building 254, drawing P103 they call for a shunt trip valve linked to foam fire system. We cannot find anything in the specs specifying this valve.
A- See Section 23 11 23, Part 2.5 for gas shunt valve requirements.
161. Q. On P-106 Bldg 254 there is a cold water drop going to a fixture tagged P-12 however there is no P-12 on plumbing fixture schedule. Please advise.
A- Fixture P-12 shall be an Emergency eye/face wash Haws model 7261-7271 with 1/2 inch hot water connection and 1-1/2 inch Sanitary connection. Provide tepid water from instantaneous water heater IWH-3. And audible/visual emergency system Haws model 9001EXP shall be connected to fire alarm system.
162. Q. Reference: Hangar 253 & 254 Drawing SP-301 Fall Protection Plan. The drawing shows two dark lines located within the existing building truss above the fuselage at grid lines C’ and B’. No details of this modification are shown. Please provide additional information regarding this modification to the existing truss A-See revised Plan Sheet SP-301 for each project.
165. Q. Please provide a sketch detailing the cantilevered framing described in the answers to questions 83 and 84.
A- See attached Sketch SK-S-1 FALL PROTECTION SUPPORT FRAMING SKETCH
168. Q. Specification section 018133,1.6.C.3 indicates the contractor is to submit LEED Documentation related to the Fundamental and Enhanced Commissioning. As the specifications do not provide a specification that reflects Enhanced Commissioning is the Government contracting with the Commissioning Agent directly and the contractor provides the documentation to support the Government's Commissioning Agent?
A- Yes the Government is contracting with the CxA directly and the contractor is required to support the Governments Commissioning Agent.
169. Q. Regarding the standing seam metal roof: The roofing manufacturer does not require or recommend a “slip sheet” as mentioned in Bldg. 253 & Bldg. 254 specs. (Steel Standing Seam Roofing spec section 076114.0020, 2.3, b) and also shown on the drawings (AE-502., etc.).
Please confirm if this is required.
A- Bid Roof Assembly per plans.
170. Q. Regarding the insulated metal wall panels: Bldg. 253 & Bldg. 254 specs. (Fabricated Wall Panel Assemblies spec section 074263, 2.1.1, c, 1 & 2) states that the “panels shall be capable of spanning the distances provided on the construction drawings” and that the panels should have a “smooth, flat surface texture”. The max length panels with a “flat” profile can be produced with a “smooth, un-embossed” finish is 16’-0”. Will a standard embossed surface texture be acceptable?
A- Provide a "planked" surface pattern. Panel lengths are available up to 48 feet
171. Q. It is possible for a spec or more information to be provided on the “seismic seal expansion joint” shown on drawings AE-501 and AE-502?
A- See Section 07 91 00 for seismic seal expansion joint requirements.
172. Q. Regarding the roof assembly: Can a “basis of design” be provided for the requested vapor barrier that is shown installed on top of the 5/8” sheathing? This is mentioned in spec section 072200, 3.2.
A- Firestone V-Force vapor barrier membrane was used as the Basis of design.
173. Q. Reference: Building 254; Sheet FA-101 indicates new fire alarm system components throughout the building including the shops and offices. Note that this affects fifty percent of all the existing walls and all of the existing ceilings. Please address the design intent of incorporating the components and wiring into the existing construction of the shops and offices.
a. Question: Is all conduit to be EMT or will (flexible whips be allowed - with retro-fit wall boxes) within the existing wall cavities?
b. Question: If the conduit is to be EMT, can it be surface mounted to the walls?
c. Question: If the conduit is to be EMT and needs to be concealed, how is it to be installed in the walls? Are the walls to be slotted and repaired or will larger sections need to be opened up?
d. Question: What is the wall construction throughout the building? Is it a combination of CMU and drywall? Please provide details.
e. Question: Depending on the answers to the above, what are the requirements to repaint the rooms? (Please provide Specification).
f. Question: What is the ceiling construction throughout?
g. Question: What are the requirements to repair, paint, and/or replace ceilings due to the installation of conduits? (Please provide requirements and specifications if not already included by reference within the contract documents).
A- a. See Section 28 31 00, Parts 2.23 and 3.3.
b. See Section 28 31 00, Parts 2.23 and 3.3.
c. See Plan Sheet AD-001, General Notes F and K.
d. Yes, there is a combination of CMU and Drywall construction throughout the building. Field verify conditions.
e. See Plan Sheet AD-001, General Notes F and K.
f. Majority of ceilings are either ACT or exposed. Field verify specific ceiling conditions.
g. See Section 28 31 00, Parts 3.3 and Plan Sheet AD-001, General Notes F and K.
174. Q. Reference: Building 253: Please address the same questions for Building 253 recognizing that the conduit is specified as rigid in some areas.
A- Responses to #173 apply in kind to Building 253 bid documents.
175. Q. Proposal Inquiry: Regarding Building Management System, specification section 259000,1.4.E and F; This amount of information to be provided with the bid proposal seems to be excessive, further the RFP section 00110 - "Submission Requirements and Instructions" do not mention the submission of this information and with the stated page limitations would not permit this quantity of information to be included in the proposal. Please clarify the building management system information required to be submitted with our bid.
A- See response to RFI #154
176. Q. How are HEF generators to be mounted to structure? Per existing conditions and provided plans the existing generators seem to be supported from structure by threaded rod.
Specifications indicated threaded rods are not permitted for mounting HEF generators.
A- See Plan Sheet SF-101 for details.
177. Q. Regarding the Fabricated Wall Panel Assemblies (Insulated metal wall panels):
Please confirm what panel widths are required. On the drawings the panels scale to around 30” but the width is not called out in the specs (07 42 63). Standard panel widths for “flat” profile panels are 24”, 30” or 36”.
A- 30-inch wall panels are acceptable
178. Q. Regarding snow guards on Building 253 & 254: Please confirm if the snow guards shown at the existing roof area on drawings AE-130 are existing or should be included in the base bid. If new snow guards are to be installed, please confirm how the ANG anticipates that they will be attached. Typically with an exposed fastener roof panel the snow guard brackets have to be attached by screwing through the roof panel into structure.
A- Snow guards on the existing building will be new and installed as part of this project, to handle the increased loads of the additions. Install snow guards in accordance with the specifications and manufacturer's shop drawings.
179. Q. Bldg 253/Bldg 254: Regarding the Geotechnical Reports made available via FBO: the reports indicate several items/concepts that SW Cole “recommends” be incorporated into the design/construction of the project, however, the drawings and specifications do not clearly show these items being incorporated into the work. For example:
a. Underdrain Detail at foundation footings – not clearly indicated on the drawings as being required. Refer to SW Cole SK drawing and section 4.10 Foundation Drainage.
b. Backfill of exterior sides of foundation walls – Refer to SW Cole report section 4.7, Structural Fill. The recommendation for placing Structural Fill on the exterior side of foundations does not appear to be indicated on the drawings or specifications.
Please confirm that these “recommendations” are to be implemented, and identify specific locations in the construction, or if the drawings take precedence please indicate so.
A- a. Foundation footing under-drains are not required for this project.
b. Base Course material (NHDOT Item 304.3 Crushed Gravel) is an acceptable material to place in lieu of Structural Fill on the exterior side of foundations.
180. Q. Bldg 253/Bldg 254: The structural drawings do not appear to indicate a haunched slab or foundation wall for frost protection across the new Tail Dock addition front. Please advise were this detail can be found or if 4’-0” frost protection is not required at these locations.
A- 4'-0" Frost protection is provided through 13-inch slab and 35-inch base course.
181. Q. Bldg 253: Hazardous Materials Building Inspection Report – Section 3.2, Previous Inspection Reports, indicates the presence of cement asbestos board within the existing hangar doors. This section also indicates that the writer understands that the hangar doors are to remain.
Drawing AD-101 indicates the removal and disposal of the hangar doors by the contractor, but no mention in specification section 028200 as to this being an asbestos containing material.
Please clarify the scope of work, as it is unlikely that the door sections can be disposed of whole, and regardless, they would have to be disposed of as asbestos containing waste. Please advise.
A- See revised Section 02 82 00, Parts 3.6 A and 3.6 B.
Please note the Hazardous Materials Building Inspection Report is provided for information only.
182. Q. Without any clear construction details of the existing 1952 hangar, we surmise that once the corrugated metal roofing with asbestos containing caulking and the asbestos containing insulation board is removed, the existing fiberglass insulation will be exposed. Is it reasonable to expect that the fiberglass will become contaminated with asbestos dust during removals of the adjacent asbestos containing insulation board, if it hasn’t already been contaminated. What is the Government’s design intentions and expectations in this regard?
A- The intent is to remove the corrugated roofing, including associated caulking, along the insulation board without impacting the interior of the building. This may require protective barriers to isolate the roof work from the building interior. If the fiberglass insulation cannot be isolated from the asbestos containing roof components being removed, depending on contractors methods of removal, it will have to be disposed of as asbestos contaminated material.
183. Q. If the fiberglass insulation currently is or becomes contaminated, will the contractor be required to remove the insulation as asbestos contaminated material; seal, treat, monitor, clean, and test the entire 1952 hangar as an abatement site; and install new vinyl faced fiberglass insulation?
A- See response to #182
184. Q. Reference Answer to RFI #74 regarding enhanced commissioning: The first line of the answer states that the contractor is to include the cost of enhanced commissioning in his base bid but the second line states the Government will engage and pay for the agent (CxA). The agent’s fee is the primary cost of enhanced commissioning and under LEED requirements, must be employed by the Owner. Please clarify.
A- See revised answer to RFI #74
185. Q. Reference Answer to RFI #102 regarding door hardware: The answer references a revised door hardware specification as being attached to the RFI response. It is not attached;
please provide.
A- Attachment provided
186. Q. Reference J&A, DDC. Requirements in solicitation specification section BUILDING MANAGEMENT SYSTEM 259000 – 3 (page 1396 of Bldg 253). Question: Is this section not redundant if you have specified the DDC as Control Technologies? Can it omitted without Paragraph I applying?
A- Specification Section 259000 is a requirement and necessary for both projects. The J&A posted inadvertently indicated the existing control system (Tridium Niagra R2 with associated JACEs, Vykon software, and Schneider Electric TAC I/A devices) and vendor/installer (Control Technologies Inc) as is presently in use in the buildings. Under these projects, however, a new control system is to be installed as is indicated in the Specifications (Schneider Electric StruxureWare / SmartStruxure and TAC I/A devices). There is no sole source sole source requirement for the vendor/installer of this new system.
187. Q. Proposal Inquiry: Response to question #154 states in part "The information indicated at 259000 1.4.F.1, 1.4.F.2 and 1.4.F.3 is limited to a combined total of 5 pages." The response does not address paragraph 1.4.F.4. Is the information outlined in paragraph 1.4.F.4 required? If the paragraph 1.4.F.4 is required is it to be provided within the 5 page limit stated for paragraphs 1.4.F.1, 1.4.F.2 and 1.4.F.3 A- Correction to the 3rd paragraph in the response to Question #164 (last reference to 1.4.F.3 should have been 1.4.F.4) - Information indicated to be submitted at 259000 1.4.F. is not included in the 15 page limit identified in the Solicitation. The system architecture diagram indicated at 259000 1.4.F.3 may be on fold-out 11"x17" pages and is not subject to page limitation. The information indicated at 259000 1.4.F.1, 1.4.F.2, and 1.4.F.4 is limited to a combined total of 5 pages.
188. Q. There is still confusion over the bid options scopes of work for removing the metal roofing system. Items # 0002 and #0008 on the bid form calls for the existing metal roofing and all associated flashings and materials to be removed down to the existing roof deck. The existing roof deck is to remain. Drawing A131 for both Bldg 253 & 254, General Note A calls for the removal of the metal deck. Please advise if the existing metal roof deck is to be removed as part of Bid Form Items #0002 and #0008.
A- Building 254 - there are two roofing bid options. One bid option (AE131 General Note A), to replace the membrane roof over the shops and admin space, requires the removal of roofing down to the deck. The deck in this option is to remain. The second bid option (AE131 General note B) replaces the existing corrugated metal roof over the existing hangar. This bid option requires the removal of the roof down to the structural framing and replacing the roof deck. Building 253 - Has one bid option for the roof: replace the corrugated metal roof over the existing hangar (AE131 General note A), which removes the roof to the structural framing and replaces the roof deck
189. Q. Q&A #94 questioned who was responsible for the services of an environmental consultant/PQP. Where in the documents is this requirement referenced?
A- The responses provided in this document should be treated as part of the contract documents.
190. Q. Q&A #102 stated that a revised hardware specification was attached to the Q&A responses, none was found. Please provide the revised hardware specification.
A- Revised Hardware Specification has now been provided
191. Q. Q&A #74 response regarding the Enhanced Commissioning stated “Enhanced Commissioning is required and should be priced in the base bid. The Government will engage and pay for a qualified CxA. Please confirm that the Commissioning Agent will be employed and paid for by the Government and the Contractor is only provided commissioning support for the Government’s Commissioning Agent.
A- See revised answer to RFI #74
192. Q. Reference the following:
• Drawings AF-601 (B/253) and AF-601 (B/254) Finish Schedule. For each of the areas designated as “Hangar” the ceiling finish is indicated as “exposed” and painted per system P-6.
The Hangar consists of the newly constructed portion and an existing previously painted portion.
• Specification section 099000,1.10.1 “Painting Included” states: “Existing coated surfaces that are damaged during performance of the work.”
• Specification section 099000,1.10.1.2 “Interior Painting” states: “Includes new surfaces of the buildings and appurtenances…”
Question:
a) Is the existing coating on the exposed structure of the existing portion of the Hangar painted as indicated on the Finish Schedule?
b) If the exposed structure of the existing portion of the Hanger does get painted does the insulation facing that is exposed get painted to match the steel?
A- a) Yes, paint the existing structure of the existing hangar per the specifications.
Specification is intended to include specific items, but does not limit painting to just the items listed. Part 1.10.2 lists items that are excluided from paint.
b) Do NOT paint the insulation facing.
193. Q. Reference the following:
• Drawings AF-601 (B/253) and AF-601 (B/254) Finish Schedule. For each of the areas designated as “Hangar” the wall finish is indicated as “varies” and painted per system P-6/P-7.
The Hangar consists of the newly constructed portion and an existing previously painted portion.
• Specification section 099000,1.10.1 “Painting Included” states: “Existing coated surfaces that are damaged during performance of the work.”
• Specification section 099000,1.10.1.2 “Interior Painting” states: “Includes new surfaces of the buildings and appurtenances…”
Question:
a) Is the existing coating on the wall surfaces of the existing portion of the Hangar painted as indicated on the Finish Schedule?
A- Yes, paint the existing walls of the existing hangar per the specifications.
Specification is intended to include specific items, but does not limit painting to just the items listed. Part 1.10.2 lists items that are excluded from paint. P-7 is removed from the project all painted walls and ceilings in the hangar are to be P-6
194. Q. Reference specification section 099000,1.10.3.1 states: “Clean, pretreat, prime and paint new fire extinguishing sprinkler systems…
Question:
a) With the exception of the sprinkler piping that is modified, please confirm that the existing sprinkler piping in the Hangar area is not painted under this contract.
b) Does paragraph 1.10.3.1 apply to the HEF Foam Fire Protection piping?
A- The existing sprinkler system is painted, paint new to match.Touch up existing as required where paint is damaged. Yes the HEF Piping is included per spec section 21 13 40
195. Q. Reference specification section 099000,1.10.3 “Mechanical and Electrical Painting” states: “Includes field coating of interior and exterior new surfaces Question:
a) With the exception of the mechanical and electrical systems that are modified, please confirm that the existing mechanical and electrical systems in the Hangar area is not painted under this contract.
A- Existing electrical and mechanical items that are to remain in the ceiling or along walls (ductwork, conduit, etc.) are to be painted to match new finishes. Mechanical/electrical items that are "prefinished' (panels, power units, etc.) or specifically excluded in the specification are not required to be painted.
196. Q. Reference Specification Section 09 67 23.15 – Fuel Resistive Resinous Flooring, 3- Coat System. Is the resinous flooring system to be a Smooth or Textured finish system?
A- Textured finish system
197. Q. Reference Specification Section 09 67 23.15 – Fuel Resistive Resinous Flooring, 3- Coat System, paragraph 1.3.2.2, Flooring System Applicator Qualifications. Q&A #115 revised the applicator past installation qualifications from 2 years and 200,000 sf to 5 years and 100,000
sf. Response from local applicators indicate that they will have difficulty meeting this past installation requirement due to the limited use of the fuel resistive coatings in the area.
Question:
a) Would the Government consider allowing the applicator qualifications be validated through a manufacturer confirmation letter similar to Specification 09 67 23.13,1.4.1?
A- Modify 09 67 23.15 as follows: 1.3.2.2 Flooring System Applicator Qualifications:
Minimum requirements for the installation contractor are as follows: Submit a listing of at least three product installations for Fuel Resistive Resinous Flooring that have been in successful service for at least ten years. Submit documentation listing location of work, point of contact at job site, total square footage of applied materials, listing of both materials and equipment used, and validation from coating manufacturer documenting quantity of materials purchased per job.
In addition to the above requirements, be certified by the material manufacturer(s) to install the submitted coatings and sealant. Submit copy of certificates.
198. Q. Based on the response to Q&A #106 there appears to be conflicting requirements related to the painting of the structural steel, specification section 05 12 00.
Question:
a) Based on the response to Q&A #106 should the reference to Specification sections 099000 and 099713.0040 surface preparation and priming requirements in paragraph 05 12 00,1.2.B.3 be disregarded as there are specific primer material, preparation and application requirements specified in specification section 05 12 00?
b) Based on the response to Q&A #106 should the reference to Specification sections 099000 and 099713.0040 primer material requirements in paragraph 05 12 00,2.4.B be disregarded as there are specific primer material requirements specified in specification section 05 12 00,2.4.C, D and E?
c) The response to Q&A #106 indicates that primer areas damaged during construction are to be repaired per 09 97 13.00 40,3.3. Primer repair due to damage during construction is also specified in 05 12 00,3.6.B. Would not the primer repair specified in 05 12 00,3.6.B be more appropriate than the primer repair specified in 09 97 13.00 40,3.3 as the 09 97 13.00 40 method requires the application to be inspected by a NACE inspector per 09 97 13.00 40,3.5?
d) Specification section 05 12 00,3.6 has conflicting Touchup Painting requirements between paragraphs 3.6.B and 3.6.C. Please clarify relative to the answers to the above listed questions.
A- a) Spec section 05 12 00 part 1.2.B3 is a reference to 09 90 00 and 09 97 13.00 40, not an instruction. Do NOT disregard.
b) section 05 12 00 part 2.4 A-F is a list of acceptable primers for the structural steel, 2.4B is a reference to 09 90 00 and 09 97 13.00 40 and the requirements in those sections.
Do NOT disregard.
c) Section 09 97 13 00.40 part 3.5 is a requirement for inspection of all protective coatings and is required for both off-site and on-site work. Touch ups are required to be inspected as part of on-site work.
d) There is no conflict between 3.6B and 3.6C. 3.6B lists SSPC-PA 1 (a requirement for the application of paint) and SSPC-SP2 / SP3 (requirements for the tools used to clean and prepare the surfaces). 3.6C References the touchup requirements in 09 97 13.00 40 which states that touch ups must conform to the manufacturer’s instructions and gives specific instruction for inorganic zinc, galvanized, and epoxy.
199. Q. The painting specifications list paint systems for interior structural steel surfaces in two different specifications sections, as follows:.
• Specification section 09 97 31.00 40,3.2.1 states: “Coat all structural steel in the hangar addition …”
• Specification section 09 90 00,1.10.1.2 “Interior Painting” states: “Includes new surfaces of buildings…”. Sub-paragraph a. states: “Exposed columns, girders, beams and metal deck;”
• Specification section 09 90 00,3.10.2, Division 5 “Interior Metal, Ferrous and Non-ferrous Paint Table”; “Interior Steel/Ferrous Surfaces”, paragraph A (page 22) lists paint systems for interior metal surfaces.
Please clarify the specification section that is to be used for the field painting of the structural steel.
The painting specifications list paint systems for interior structural steel surfaces in two different specifications sections, as follows:.
• Specification section 09 97 31.00 40,3.2.1 states: “Coat all structural steel in the hangar addition …”
• Specification section 09 90 00,1.10.1.2 “Interior Painting” states: “Includes new surfaces of buildings…”. Sub-paragraph a. states: “Exposed columns, girders, beams and metal deck;”
• Specification section 09 90 00,3.10.2, Division 5 “Interior Metal, Ferrous and Non-ferrous Paint Table”; “Interior Steel/Ferrous Surfaces”, paragraph A (page 22) lists paint systems for interior metal surfaces.
Please clarify the specification section that is to be used for the field painting of the structural steel A- 09 97 13.00 40 is for protective steel coatings. 09 90 00 is finish paint coatings.
09 90 00 part 1.10.1.2 includes items to be painted under the specification (includes but does not limit, unless specifically excluded under part 1.10.2) 09 90 00 part 3.10.2 Div 5 lists the characteristics of the paints used (finishes) on interior steel/ferrous surfaces.
Both specs are to be used.
| Pease KC46 Hangar Project |
| PROJECT SZCQ139901 & SZCQ139904 |