BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf

PDF 147 KB Posted

Attached to
ADAL Two Existing Hangars to Accommodate the New KC46 Tanker
Solicitation number
W912TF15R0500
Issued by

About this file

BLD 253-SP-301 - FUSELAGE FALL PROTECTION SECTION

View the file

Other files

File Type Posted
15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139901_253_FP-101_Addendum2.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FP-102_Addendum2.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
SZCQ139904_FP-102_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FA-102_Addendum2.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
Consolidated_RFI_answers_FBO_posting_3.31.15.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
253-_E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

FINISH FLOOR

0' - 0"

A HGFEDCB

A'B'C'D'E'

FUSELAGE FALL

PROTECTION LINE AT

THE NEW ADDITION

FUSELAGE FALL

PROTECTION LINE

AT THE EXISTING

1952 HANGARBOTTOM OF SWAY

FRAMING ALONG

FUSELAGE FALL

PROTECTION LINE IS

ABOUT 36'-6"

CONTRACTOR TO

VERITY ELEVATIONS

EXISTING TRUSS

BEYOND CLEARANCE

AIRCRAFT

CLEARANCE

SEE SE-502 FOR

MODIFICATION TO

INTERMEDIATE FRAME

T.O.S. SUPPORT*

45' - 1 1/4"

T.O. ANGLE 3

60' - 4"

EXISTING SWAY

FRAMING

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by No. Date

SheetAS SHOWN

Stamp

B-2 SUBMITTAL1 08/15/14

B-3 SUBMITTAL2 01/09/15

REVISION 33 03/13/15

SP-301

FUSELAGE FALL PROTECTION SECTION

13 MARCH 2015

JZ/RB

BRO

RB/BRO

JZ

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/8" = 1'-0"

1 FUSELAGE FALL PROTECTION SECTION

8' 0

SCALE: 1/8" = 1'-0"

8' 16'