BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf
PDF 327 KB Posted
- Solicitation number
- W912TF15R0500
About this file
BLD 253-E-002 - ELECTRICAL SITE PLAN
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
P1
W1
W1
W1 8' A.F.G.
W1
W1 W1
PANEL HP-3
HP-3:44
VIA LIGHTING RELAY PANEL
HP-3:46
VIA LIGHTING
RELAY PANEL2#10, #10(GND), 3/4"C
SEE NOTES B & C
FIRE PUMP
FP-1
FIRE PUMP
FP-2 350
HP-3:44
VIA LIGHTING RELAY PANEL
W2 W2 W2 W2
SEE NOTE D
(TYPICAL OF 2)
W2
FIRE PUMP
CONTROLLER
(TYPICAL OF 2)
PROPOSED 1000 KVA
TRANSFORMER, SEE
DETAIL 3/E-002.
SECTIONALIZING
CABINETS
EXISTING MCC
NEW PANEL E
SEE ONE-LINE DIAGRAM
FOR WIRE AND CONDUIT
SIZE. SEE 5/C-504 FOR
DUCT BANK DETAIL.
W1
NEW HANDHOLE, SEE CIVIL DETAIL 10/C-502.
PROVIDE HS-20 HANDHOLE WITH CAST IRON
FRAME AND COVER.
TO FUSED
DISCONNECT
TO RPD-1
Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
SheetAS SHOWN
Stamp
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD
09 JANUARY 2015
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SZCQ139901
MGD
MGD
WAP
LDC
B-3 Submittal
B-2 Submittal
01/09/15
08/15/14 E-002
ELECTRICAL SITE PLAN
0' 10' 20' 40' 80'
GENERAL NOTES
A. SPECIAL CARE SHALL BE TAKEN TO AVOID DAMAGING
ANY EXISTING UTILITIES (WATER, SEWER, POWER, GAS
PROVIDE EXCAVATION AS REQUIRED FOR INSTALLATION
COMMUNICATION, ETC.) LOCATED BELOW GROUND.
REFER TO CIVIL PLANS FOR LOCATION OF UTILITIES.
OF NEW UNDERGROUND CONDUITS AT THE EXTERIOR.
REPLACE FILL MATERIAL AND COMPACT TO WITHIN 2%
B.
OF ORIGINAL.
PARKING LOT LIGHTING INSTALLATION SHALL BE
PRICED UNDER THIS SCOPE OF WORK AS BID OPTION #4.
C.
1"
2' -0
(6)#6
2' -0
#2 CU. BARE
4000 PSI CONCRETE TYPICAL
3" COVER (TYP)
3'-0"
GROUND CLAMP
HANDHOLE WITH COVER
24"
2' -6
7'
-6
FINISHED GRADE FINISHED GRADE
GROUND LUG INSIDE AND
BONDED TO POLE
3/4" X 10' COPPER
CLAD STEEL GROUND
ROD - 1 PER HOLE
INSULATED THROAT, GROUNDING
TYPE BUSHING
#3 ROUND TIES
AT 12" O.C.
1" X 36" ANCHOR
BOLTS BY POLE
MANUFACTURER
4 REQUIRED
MFG TO PROVIDE
TEMPLATE FOR ANCHOR
BOLT SET
CONDUIT AS REQUIRED
SEE PLAN FOR SIZE AND
QUANTITIES.
FIRE PUMPS SERVING BUILDINGS 253 AND 254 SHALL BE
INSTALLED IN BUILDING 254 UNDER THIS PROJECT.
D.
SEE DETAIL 5 ON SHEET C-504 FOR DUCT BANK DETAILSE.
RELATED TO THE FIRE PUMP CONDUITS.
(2)#3 ROUND TIES @ 1" OC
AT TOP OF COLUMN
CLASS-A
LAP
M
IN
HAPCO RTA25F8B4-01BA OR EQUAL
POLE - P1: PROVIDE ALUMINUM ARM MOUNT AND
ACCESSORIES AS NECESSARY FOR DIRECT
ARM MOUNT LUMINAIRE
POLE - P2: PROVIDE ALUMINUM ARM MOUNTS AND
ACCESSORIES AS NECESSARY FOR 2@180 DEGREES
DIRECT ARM MOUNT LUMINAIRES
BOLT COVER
KEYNOTES
1 PROVIDE 1" CONDUIT STUBBED OUT 2' FROM CONCRETE
PAD FOR FUTURE POLE CONNECTION POINT. PROVIDE
NYLON PULL STRING IN CONDUIT.
REMOVE 300KVA FIRE PUMP TRANSFORMER AND2
SEE SHEET E-110 FOR ELECTRICAL CONNECTION(S)
TO NEW MECHANICAL EQUIPMENT.3
SEE SHEET E-108 FOR ELECTRICAL CONNECTION(S)
TO NEW MECHANICAL EQUIPMENT.4
RETURN TO GOVERNMENT. PROVIDE NEW HANDHOLE
AT LOCATION OF CONDUIT TURNUPS FLUSH WITH GRADE,
PULL POINT FOR PROPOSED 1000KVA TRANSFORMER
PRIMARY CONDUCTORS TO SECTIONALIZING CABINET.
SECONDARY COMPARTMENT
CONCRETE PAD
GRADE
TERMINATIONS
LOW VOLTAGE CABLE
SECONDARY CIRCUIT#4/0 BARE
MIN
2'-0"
PAD. MIN 18" BELOW FINISHED GRADE.
ENCIRCLING ENTIRE CONCRETE
#4/0 BARE COPPER GROUND LOOP
#4/0, 600V INSULATION
CORNER OF PAD.
OF 4, 1 AT EACH
GROUND ROD, TYP
GROUND PAD (TYP OF 2)
#4/0, 600V
INSULATION
PRIMARY CIRCUIT
CONNECTOR
LOAD BREAK
PRIMARY NEUTRAL
BUSHING INSERT
BREAK OIL SWITCH
2 POSITION LOAD
COOPER CBUC15125C100(2) OR EQUAL
OIL-IMMERSED CURRENT-LIMITING FUSES,
PRIMARY COMPARTMENT
ARRESTERS
SURGE
TRANSFORMER
BUSHING WELL
X0
BAYONET OIL-IMMERSED EXPULSION FUSES,
COOPER 4000358C14M OR EQUAL
FOR 1000KVA:
COPPER GROUNDING CONDUCTORS
CABLE WELL
SEE CIVIL DETAIL 10/C-502. HANDHOLE TO BE USED AS
FOR 1000KVA:
BAYONET OIL-IMMERSED EXPULSION FUSES,
REMOVE 500KVA BLDG 253, 480V TRANSFORMER AND
RETURN TO GOVERNMENT. PROVIDE NEW HANDHOLE
AT LOCATION OF CONDUIT TURNUPS FLUSH WITH GRADE,
PULL POINT FOR PROPOSED 750KVA TRANSFORMER
PRIMARY CONDUCTORS TO SECTIONALIZING CABINET.
SEE CIVIL DETAIL 10/C-502. HANDHOLE TO BE USED AS
PROPOSED 750 KVA TRANSFORMER, SEE DETAIL
3/E-002. FINAL TRANSFORMER LOCATION SHALL BE
A MINIMUM OF 5' AWAY FROM ADJACENT ELECTRICAL
LINE. SEE SITE UTILITY PLAN, C-105 FOR LOCATION
OF GAS LINE.
GEAR AND AVOID BEING PLACED ON EXISTING GAS
POWER FOR FIRE ALARM CONTROL
PANEL AND FOAM SYSTEM CONTROL
PANEL HAS BEEN MOVED TO PROJECT
NUMBER: SZCQ139904
NOTE:
1 REVISION 1 02/17/15
2 REVISION 2 03/03/15
FOR 750KVA:
COOPER 4038361C04CB OR EQUAL
FOR 750KVA:
COOPER CBUC15180D100 OR EQUAL
OIL-IMMERSED CURRENT-LIMITING FUSES,
File details come from the government source that posted it. Updated .