BLD 253-E-002 - ELECTRICAL SITE PLAN

View the file

Other files

File Type Posted
15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139901_253_FP-101_Addendum2.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FP-102_Addendum2.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
SZCQ139904_FP-102_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FA-102_Addendum2.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
Consolidated_RFI_answers_FBO_posting_3.31.15.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
253-_E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

P1

W1

W1

W1 8' A.F.G.

W1

W1 W1

PANEL HP-3

HP-3:44

VIA LIGHTING RELAY PANEL

HP-3:46

VIA LIGHTING

RELAY PANEL2#10, #10(GND), 3/4"C

SEE NOTES B & C

FIRE PUMP

FP-1

FIRE PUMP

FP-2 350

HP-3:44

VIA LIGHTING RELAY PANEL

W2 W2 W2 W2

SEE NOTE D

(TYPICAL OF 2)

W2

FIRE PUMP

CONTROLLER

(TYPICAL OF 2)

PROPOSED 1000 KVA

TRANSFORMER, SEE

DETAIL 3/E-002.

SECTIONALIZING

CABINETS

EXISTING MCC

NEW PANEL E

SEE ONE-LINE DIAGRAM

FOR WIRE AND CONDUIT

SIZE. SEE 5/C-504 FOR

DUCT BANK DETAIL.

W1

NEW HANDHOLE, SEE CIVIL DETAIL 10/C-502.

PROVIDE HS-20 HANDHOLE WITH CAST IRON

FRAME AND COVER.

TO FUSED

DISCONNECT

TO RPD-1

Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

SheetAS SHOWN

Stamp

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD

09 JANUARY 2015

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SZCQ139901

MGD

MGD

WAP

LDC

B-3 Submittal

B-2 Submittal

01/09/15

08/15/14 E-002

ELECTRICAL SITE PLAN

0' 10' 20' 40' 80'

GENERAL NOTES

A. SPECIAL CARE SHALL BE TAKEN TO AVOID DAMAGING

ANY EXISTING UTILITIES (WATER, SEWER, POWER, GAS

PROVIDE EXCAVATION AS REQUIRED FOR INSTALLATION

COMMUNICATION, ETC.) LOCATED BELOW GROUND.

REFER TO CIVIL PLANS FOR LOCATION OF UTILITIES.

OF NEW UNDERGROUND CONDUITS AT THE EXTERIOR.

REPLACE FILL MATERIAL AND COMPACT TO WITHIN 2%

B.

OF ORIGINAL.

PARKING LOT LIGHTING INSTALLATION SHALL BE

PRICED UNDER THIS SCOPE OF WORK AS BID OPTION #4.

C.

1"

2' -0

(6)#6

2' -0

#2 CU. BARE

4000 PSI CONCRETE TYPICAL

3" COVER (TYP)

3'-0"

GROUND CLAMP

HANDHOLE WITH COVER

24"

2' -6

7'

-6

FINISHED GRADE FINISHED GRADE

GROUND LUG INSIDE AND

BONDED TO POLE

3/4" X 10' COPPER

CLAD STEEL GROUND

ROD - 1 PER HOLE

INSULATED THROAT, GROUNDING

TYPE BUSHING

#3 ROUND TIES

AT 12" O.C.

1" X 36" ANCHOR

BOLTS BY POLE

MANUFACTURER

4 REQUIRED

MFG TO PROVIDE

TEMPLATE FOR ANCHOR

BOLT SET

CONDUIT AS REQUIRED

SEE PLAN FOR SIZE AND

QUANTITIES.

FIRE PUMPS SERVING BUILDINGS 253 AND 254 SHALL BE

INSTALLED IN BUILDING 254 UNDER THIS PROJECT.

D.

SEE DETAIL 5 ON SHEET C-504 FOR DUCT BANK DETAILSE.

RELATED TO THE FIRE PUMP CONDUITS.

(2)#3 ROUND TIES @ 1" OC

AT TOP OF COLUMN

CLASS-A

LAP

M

IN

HAPCO RTA25F8B4-01BA OR EQUAL

POLE - P1: PROVIDE ALUMINUM ARM MOUNT AND

ACCESSORIES AS NECESSARY FOR DIRECT

ARM MOUNT LUMINAIRE

POLE - P2: PROVIDE ALUMINUM ARM MOUNTS AND

ACCESSORIES AS NECESSARY FOR 2@180 DEGREES

DIRECT ARM MOUNT LUMINAIRES

BOLT COVER

KEYNOTES

1 PROVIDE 1" CONDUIT STUBBED OUT 2' FROM CONCRETE

PAD FOR FUTURE POLE CONNECTION POINT. PROVIDE

NYLON PULL STRING IN CONDUIT.

REMOVE 300KVA FIRE PUMP TRANSFORMER AND2

SEE SHEET E-110 FOR ELECTRICAL CONNECTION(S)

TO NEW MECHANICAL EQUIPMENT.3

SEE SHEET E-108 FOR ELECTRICAL CONNECTION(S)

TO NEW MECHANICAL EQUIPMENT.4

RETURN TO GOVERNMENT. PROVIDE NEW HANDHOLE

AT LOCATION OF CONDUIT TURNUPS FLUSH WITH GRADE,

PULL POINT FOR PROPOSED 1000KVA TRANSFORMER

PRIMARY CONDUCTORS TO SECTIONALIZING CABINET.

SECONDARY COMPARTMENT

CONCRETE PAD

GRADE

TERMINATIONS

LOW VOLTAGE CABLE

SECONDARY CIRCUIT#4/0 BARE

MIN

2'-0"

PAD. MIN 18" BELOW FINISHED GRADE.

ENCIRCLING ENTIRE CONCRETE

#4/0 BARE COPPER GROUND LOOP

#4/0, 600V INSULATION

CORNER OF PAD.

OF 4, 1 AT EACH

GROUND ROD, TYP

GROUND PAD (TYP OF 2)

#4/0, 600V

INSULATION

PRIMARY CIRCUIT

CONNECTOR

LOAD BREAK

PRIMARY NEUTRAL

BUSHING INSERT

BREAK OIL SWITCH

2 POSITION LOAD

COOPER CBUC15125C100(2) OR EQUAL

OIL-IMMERSED CURRENT-LIMITING FUSES,

PRIMARY COMPARTMENT

ARRESTERS

SURGE

TRANSFORMER

BUSHING WELL

X0

BAYONET OIL-IMMERSED EXPULSION FUSES,

COOPER 4000358C14M OR EQUAL

FOR 1000KVA:

COPPER GROUNDING CONDUCTORS

CABLE WELL

SEE CIVIL DETAIL 10/C-502. HANDHOLE TO BE USED AS

FOR 1000KVA:

BAYONET OIL-IMMERSED EXPULSION FUSES,

REMOVE 500KVA BLDG 253, 480V TRANSFORMER AND

RETURN TO GOVERNMENT. PROVIDE NEW HANDHOLE

AT LOCATION OF CONDUIT TURNUPS FLUSH WITH GRADE,

PULL POINT FOR PROPOSED 750KVA TRANSFORMER

PRIMARY CONDUCTORS TO SECTIONALIZING CABINET.

SEE CIVIL DETAIL 10/C-502. HANDHOLE TO BE USED AS

PROPOSED 750 KVA TRANSFORMER, SEE DETAIL

3/E-002. FINAL TRANSFORMER LOCATION SHALL BE

A MINIMUM OF 5' AWAY FROM ADJACENT ELECTRICAL

LINE. SEE SITE UTILITY PLAN, C-105 FOR LOCATION

OF GAS LINE.

GEAR AND AVOID BEING PLACED ON EXISTING GAS

POWER FOR FIRE ALARM CONTROL

PANEL AND FOAM SYSTEM CONTROL

PANEL HAS BEEN MOVED TO PROJECT

NUMBER: SZCQ139904

NOTE:

1 REVISION 1 02/17/15

2 REVISION 2 03/03/15

FOR 750KVA:

COOPER 4038361C04CB OR EQUAL

FOR 750KVA:

COOPER CBUC15180D100 OR EQUAL

OIL-IMMERSED CURRENT-LIMITING FUSES,

File details come from the government source that posted it. Updated .