Consolidated RFI answers_FBO posting 3.31.15

View the file

Other files

File Type Posted
15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139901_253_FP-101_Addendum2.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FP-102_Addendum2.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
SZCQ139904_FP-102_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FA-102_Addendum2.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
253-_E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pease KC46 Hangar Project

PROJECT SZCQ139901 & SZCQ139904

SOLICITATION No. W912TF-15-R-0500

RFI Question/Answers: 1-225

NOTE: This is a consolidated list of all RFI Questions and Answers that have been previously post.

01. Q. Please confirm that the Offeror may use Subcontractor's project experience to show technical experience and capability, as long as Exhibit B is included with Exhibits A and C.

A- Yes, as long as you show the teaming agreement; Exhibit B

02. Q. 00100,2.0 has established 4 February 2015 for a pre-proposal conference. As the solicitation was issued on 28 January 2015 (one week prior) we request that a second site visit be scheduled approximately 3 weeks later (+/-25 February 2015) to permit inspection of the site and buildings after having sufficient time to become familiar with the project.

A- 19 Feb 2015 10:00am EST

03. Q. Subject: per Volume 2, Part 1 (3.4.2.1.1) Subfactor 1: Will the Government allow the proposers to use projects that are 6 years old? This would allow for a greater number of bidders to propose on this project and potentially provide a much more competitive bid environment.

A- No, 5 years is the maximum.

04. Q. Please provide Exhibits A, B, C and D.

A- Contact Amanda Bogue or Scott Ballweg if you are having trouble download exhibits from FBO/ASFI.

05. Q. Section 00110, 3.4.3.1 states: "Past/Present Performance includes current /on-going performance that is complete to 70% or greater." Section 00110, 3.4.3.6 states: "To be considered, the performance must have been completed during the past five (5) years."

Question: please clarify if ongoing projects complete to 70% or greater can be used for present/past performance?

A- Yes, as long as it within the last 5 years as stated in Section 00110, 3.4.3.1

06. Q. Can Exhibit C – Reference Packages be submitted as a scanned pdf by Owners to Amanda Bogue and Scott Ballweg via email in place of mailing a hard copy, or must a hard copy also be submitted?

A- Yes. As long as they come from the owners.

07. Q. Will we be able to confirm with Amanda Bogue and Scott Ballweg prior to the March 11th proposal due date that individual Exhibit C’s have been received from Owners?

A- No. The Gov will not let offerors know if they have been received or not.

08. Q. Does the 25 page maximum for Volume 2 – Part One mean 25 double-sided actual pages (totaling 50 pages) or 12.5 double-sided actual pages (totaling 25 pages)?

A- Twenty-five (25) pages are defined as twenty-five (25) pages of text. This may be provided as 12.5 double-side printed sheets of paper or 25 single-side printed sheets of paper (8.5"x11") or a combination thereof.

09. Q. Bldg. 253 plan shows z794 angle iron and grate only no integral modular trench drain plan pages s-519 and s519a but plumbing page asks for z784, which is a modular trench drain with grate. On the bldg. 254 plan pages s-519 and s519a also calls out for z794 angle iron & grate only, and on plan page p-601 asks for the z794 not the z784.

A- The projects require a DIN19580 / EN1433 Load Class F trench system within the aircraft hangar bays. The contractor may install either a modular or cast-in-place type trench system to meet the required inverts and load classification.

10. Q. Section 221319 spec page 6 2.8a says zurn zs880 as td1 (its only 4”wide) which is stainless, and I believe you want it in the showers. Yet on plan page p103 and p104 for hanger trench drain bldg. 253 it asks for td1; please clarify.

A- TD-1 shall be installed as designated in the showers. Revise the trench designation for the aircraft hangar area to the designation TD-2 per Section 221319, Paragraph 2.8.B. TD-2 is a 12" Load Class F trench system.

11. Q. Is the GC responsible for picking up the equipment and delivering it to the hangers as per Specification section 01100, Part 1.5, or just installing the equipment once delivered to the hangers?

A- A- SZCQ139901 (253) 0111001.5.C The Government will furnish the following materials, equipment or labor:

1. N/A.

SZCQ139904 (254) 0111001.5.C The Government will furnish the following materials or equipment:

1. HEF Foam generators: Contractor shall salvage two (2) Ansul foam generators from Building 251 for use on this project. The contractor shall coordinate removal from 251 with the Government, and shall not remove generators until immediately prior to commissioning of foam system in Building 254. Cap pipe at removal locations. Contractor also responsible for relocation.

2. All of the following equipment furnished by the Government, contractor to disconnect, relocate, and reinstall. See E-110 and E-111.

a. Air Frame Repair 15: Utility Shear, Box & Pan Brake, Carlton Drill Press, Slip Roller, Box & Pan Machine, Dimpler Machine, Band Saw, Belt Sander, Buffing Machine, Table Saw, Drum Sander, Drill Press, Shrink & Stretch Machine, Hydraulic Shear, Flaring Machine, Rotary Punch, Rivet Freezer, 1 electrical plug-in bus duct.

b. Wheel & Tire Shop 17: CNC Mill, Hydraulic Press, Bridge Port, Panel LP-36 and associate transformer, Pedestal Grinders (3), Surface Grinder, Colchester Lathe, Lablond Lathe, Arbor Press, 2 electrical plug-in bus ducts. Government will provide technician to supervise disconnection and reconnection of CNC lathe, as well as perform start-up/commissioning services for CNC lathe.

c. Metal Shop 18: Vertical Bandsaw, Horizontal Bandsaw, 1 electrical plug-in bus duct

d. Hangar 42: Work Bench (2), Tube Bender, Compressor, Arbor Press

12. Q. Please provide corner guard locations for both buildings.

A- Provide corner guards at outside corners of gypsum board construction. Refer to attached locations.

13. Q. The lockers that are specified are double tier 66" high on 4" concrete base. Lockers are manufactured as either 60" or 72". Please clarify the intent.

A- Provide 60" lockers with concrete base.

14. Q. Are the counter length mirrors one piece units or can they be divided in halves?

A- It is acceptable for mirrors to be divided into three (3) equal smaller sections. Locate joints between lavatories.

15. Q. Sheets P103 and P104 for Building 253 calls for TD-1. P111 and P112 for Building 254 calls for TD-2. Please confirm that this is the intent.

A- See response to RFI #9 & 10.

16. Q. Building 254's Keynote 1 on AD-202 mentions relocating of the vertical lift fabric door and operating equipment. Please provide more information clarifying the intent of this note as we cannot find any additional notes in the drawings and specifications showing any relocation of the doors and equipment.

A- The existing vertical lift fabric doors are to be salvaged for use on another hangar outside the scope of this project. Salvage existing doors and related equipment. Transport the salvaged components to nearby Building (Hangar) 252. Coordinate storage of salvaged doors with contracting officer.

17. Q. Building 253's Keynote 6 on AD-201 mentions relocating of the rolling steel door and operating equipment. Please provide more information clarifying the intent of this note as we cannot find any additional notes in the drawings and specifications showing any relocation of the doors and equipment.

A- The existing rolling steel doors are no longer being relocated. Revise SZCQ139901 AD-102 Keynote 2 and AD-201 Keynote 6 to read: "DEMOLISH EXISTING ROLLING STEEL DOORS AND ATTACHED OPERATING EQUIPMENT". Refer to note 2 on AD-102.

18. Q. Advantor is the sole source for the intrusion detection system. The plans and specifications are calling for a fiber optic cable from building 257 to each hangar. Could the base elaborate on where the trenching will be installed for the installation of this cable? Please also provide the location where in building 257 the fiber optic cable will be terminated.

A- There is not intent for a new fiber optic cable between the hangars and Building 257, and indication of such is not apparent in the project documents (Please more precisely identify where it is believed this requirement is shown). Provide communication cabling to Advantor panel per Telecommunications Wiring Diagram on sheet E-503 and location on E-108 for both hangars.

19. Q. On bid option 5 for Hangar 254 (sheet AF-603), the door schedule says replace door leafs only. However, the hardware sets are called out. Please clarify if this alternate is for the doors only, or if we should provide new hardware as well.

A- CLIN 0011 SZCQ139904 Bldg 254 Bid Option 5 is to replace door leaf and hardware.

20. Q. Is the general contractor responsible for the LEED certification? Specification section 018133 clarifies the general requirements and procedures for compliance, but is not clear as to who is responsible for the certifying of the project.

A- General Contractor is responsible for LEED services including; credit documentation, submittal review, submittals, responding to USGBC questions and associated submission/review fees to USGBC for credits outlined in specification 01833 Sustainable Design Requirements.

21. Q. To allow for greater competition could specification section 051200 be amended to include structural steel fabricators and installers that are not AISC Certified Plants and Erectors but do participate in the AISC Quality Certification program?

A- No. AISC Certified fabricators and erectors are required for a structure of this scope and complexity.

22. Q. Spec Section 028200 Asbestos Abatement includes a list of asbestos containing materials to be removed under the base bid in Table 1 on Page 028200-2. Table 2 on Page 028200-3 includes asbestos containing materials to be removed at Building 253 under an "optional line item". Please confirm that this cost is to be included as part of Bid Option 0002 which covers the removal and replacement of the metal roof at Building 253.

A- Yes, it is confirmed that the cost for removal of the ACM identified as to be removed under an "optional line item" on Table 2 on Page 028200-3 is to be included with CLIN 0002 SZCQ139901 Bldg 253 Bid Option 1.

23. Q. Can you confirm that Bid Option 0008, removal and replacement of the standing seam metal roof at Building 254 does not require any asbestos abatement at the roof similar to that of Building 253?

A- CLIN 0008 SZCQ139904 Bldg 254 Bid Option 2 also includes removal of asbestos containing insulating board, similar to CLIN 0002 SZCQ139901 Bldg 253 Bid Option 1. The asbestos containing insulating board is assumed to be present based on historic plans, and is to be confirmed by the contractor. If testing shows the insualting board to be non-ACM, and equitable adjustment will be made.

24. Q. Would you please confirm that Bid Option Item No. 0001 is a total of Bid Option Items No. 0001AA and 0001AB? The reason for this question is because the description of work under Bid Option Item No. 0001 only mentions the "renovation" of Buildings 253 and 254. It does not mention demolition, additions, site work, etc.

A- CLIN 0001 is the total of Sub-CLIN 0001AA and Sub-CLIN 0001AB (Price for Sub- CLIN 0001AA plus price for Sub-CLIN 0001AB equals price for CLIN 0001). CLIN 0001 includes all of the work described in Sub-CLIN 0001AA (SZCQ139901 KC-46A ADAL FUEL CELL BUILDING 253) and Sub-CLIN 0001AB (SZCQ139904 KC-46A ADAL MAINTENANCE HANGAR BUILDING 254), it is the enitrety of the base bid work for the plans and specifications of both projects. CLIN 0001 and its Sub-CLINs are not identified as Options in the Solicitation, Options begin with CLIN 0002.

25. Q. Please confirm or clarify the following items discussed at the site walk: Another walk-thru has been scheduled for February 19th from 10:00 am to 11:30 am. GC's, subs and suppliers still have to follow the pre-registration requirements of emailing Scott Ballweg and Amanda Bogue at least 48 hours prior to that date.

A- Yes, pre-registration requirements must be followed for the second site visit.

26. Q. Please confirm or clarify the following items discussed at the site walk: Building 253 will be completed first and it will be vacant during construction.

A- The required sequence is shown in Solicitation Section 00110 3.4.2.1.2 and 00120

2.2.4.1. Bldg 253 will be vacant during construction, except that the hangar bay could be occupied once complete and fully functional, even if other areas of 253 are not yet completed.

27. Q. Please confirm or clarify the following items discussed at the site walk: Building 254 will be completed second and it will be occupied during construction.

A- The required sequence is shown in Solicitation Section 00110 3.4.2.1.2 and 00120

2.2.4.1. Bldg 254 will be partially occupied throughout the duration of the project.

28. Q. Please confirm or clarify the following items discussed at the site walk: The Construction Schedule MUST include a line item for O&M's and As-Builts at the end of each phase because these items are considered to be part of the contract work and not an afterthought.

A- The period of performance includes pre-final and final inspections, punch list work, as-builts, providing of manuals and all other close out work as identified in the Solicitation and Specifications. Offerors must take this into consideration in their proposed schedules, i.e. a schedule showing construction work right to the end of the period of performance without sufficient time for closeout would not meet the intent of the requirement. Solicitation Section 00110 3.4.2.1.2 and 00120 2.2.4.1. are amended to add sub-paragragraph i): "i) Active construction tasks and the pre-final inspection shall be scheduled to occur not later than 840 days from start of the performance period, and completion of all closeout requirements identified in the project documents shall be shown to be complete not later than 900 days from the start of the performance period."

29. Q. Can the Gov’t please provide the Site Visit sign in/attendance log?

A- The Site Visit sign-in/attendance sheet has been posted to ASFI but will be uploaded to AMRDEC for those who do not have access to the files on ASFI.

30. Q. Please clarify the format required for applications for payment. The procedures for progress payments indicate the use of the AF Forms 3064 and 3065 for both schedules and payment, while section 013300B.4 indicates the use of the AIA G702/G703 for Applications for Payment.

A- Contractors are required to submit a Payment Application Form for payment, a form based on the AIA Form G-702. AF Form 3065, Contract Progress Report, and AF form 3064, Contract Progress Schedule are attached as supporting documentation.

31. Q. Section 013201, 3.6 indicates the requirement for a schedule meeting monthly with requirements that a computer and projector be available for use during this meeting. Is the project scheduler required to be present at this meeting? Please clarify/confirm these requirements.

A- Specification 013201-3.6 clearly states "The Contractor's Project Manager and Authorized Scheduler shall attend the meeting".

32. Q. Please provide a list of the rooms where the steel is to receive the Fireproofing Intumescent Coating and what the hour-rating should be.

A- The steel is NOT required to be rated per IBC 2012, Table 601 for Type IIB Construction. ETL 02-15 also states that no rating above that established by IBC is required with an approved fire suppression system.

33. Q. Specification section 083416.20 part 2.8 states that personnel doors are not required in the Hangar Doors. However the elevation view and note 15 on sheet AE-201 for Building 254 and note 4 on sheet AE-201 for Building 253, clearly note personnel doors in the hanger doors.

Please verify the intent.

A- Disregard Spec section 083416.20 part 2.8 paragraph 1. Personnel doors are required to meet the intent of NFPA 101, 2012, 40.6.2. Install personnel per Spec section 083416.20 part

2.8 paragraph 2 and as indicated on drawings.

34. Q. Please provide more information for the glazing systems such as the Building Category, Standoff Distances, Explosive Weights, Level of Protection, etc to be applied to the UFC 4-010-01 as per specification section 088100 part 1.3 for the blast design.

A- 254 - Building category = primary gathering, Standoff Distance = 26', Applicable Expolsive Weight = II, Level of protection = Low

35. Q. In Volume II, 3.4.2.1.1 Subfactor 1, you mention "specified Building Management Systems". Could you provide clarification as to what these "specified Building Management Systems" are?

A- The "specified Building Management System" is described in Specification Section 259000 Building Management System (for each project).

36. Q. In Volume II, 3.4.2.1.1 Subfactor 1, among your key construction personnel, you ask for "site engineering personnel". As this title covers a broad array of roles, can you specify what kinds of site engineering personnel you are looking for information about?

A- "Site engineering personnel" includes, as examples: third-party personnel such as special inspectors as identified in Specification Section 014535 and 033000, geotechnical engineers as identified in Specification Section 312000, and surveyors as identified in Specification Section 321311, "Site engineering personnel" also includes any other personnel the Contractor may employ in the completion of the work whose duties and/or training / education is commensurate with that of an engineer, engineering technician, or inspector, versus that of a tradesperson or manager.

37. Q. Reference: Section 00100 Instructions , Conditions and Notices to Offerors, Section

2.1.6 Question: Will the minutes of last week’s Pre-Proposal mtg. be posted soon and will they address the additional Site Meeting planned for February 19, 2015 as discussed during the February 4, 2015 Pre-Proposal meeting?

A- The slides from the first site visit have been posted to FBO through ASFI. All questions were formally submitted by means of RFI and answers are posted to FBO through

ASFI.

38. Q. Question: If there is another Pre-Proposal Meeting planned for February 19, 2015, what is the latest Business Day in which we can register our attendees?

A- Please reference answer to RFI #2. Please provide names of attendees no later than 18 February.

39. Q. Per the intrusion detection system question on the RFI response: Advantor is requiring a fiber optic cable to be installed from building 257 to each hangar. The drawings and specs do not call for a fiber cable to be installed. We have attached document for a reference.

Please clarify.

A- Fiber to building 257 is available from the comm room in each building. Category 6 cabling is required to the Advantor panel from the comm room. Advantor has included media converters in their proposal to convert the Category 6 cabling to a usable connection with their equipment.

40. Q. We ask for you to amend specification section 321311 part 2.9.1.a to include batching and mixing plants at a greater distance from the project. 10 miles as currently constituted is very restrictive and giving a wider geographic radius will help us provide the NHANG with the best value.

A- The restriction is based on design standards in Specification Section 321311 “Concrete Pavement for Airfields and Other Heavy Duty Pavements” that require a short transport duration. Comply with Section 321311 as written.

41. Q. We ask for you to amend specification section 321311 part 2.9.b to include Massachusetts and Maine DOT certified plants. Such expansion will help us provide the NH ANG with the best value.

A- Plants lacking NHDOT (or NRMCA) certification required by the Specification are unlikely to comply with the distance restriction. Comply with Section 321311 as written.

42. Q. Confirm past experience referenced in Vol 2 Part 1 is not limited to past five years.

A- Projects must be within the past five (5) years to be considered.

43. Q. Define "site engineering personnel" where the term is used in the instructions for key construction personnel.

A- See response to RFI #36

44. Q. Experience and Capability proposal is limited under 3.4.2.1 on page 17 of 75 to 25 pages. On page 23 of 75 in 2.2.3 it is limited to 15 pages.

A- 3.4.2.1. Volume 2 Part 1 is obtained for the purposes of evaluating an offeror’s technical capability. The technical capability proposal (Volume 2 Part 1) is limited to 25 pages excluding tabs, indexes, and resumes. Sub factor one of the technical capability proposal is Experience which can be no more than 15 single pages.

45. Q. LEED is limited to 5 pages in 2.2.5 page 24 of 75 but not limited in the instructions section.

A- Page limit on LEED is five (5) pages.

46. Q. Would Sarnafil 60 Mil white PVC be acceptable as an equal to the White EPDM specified?

A- 60 Mil white PVC is acceptable. Specific manufacturer and product is subject to approval. Follow all manufacturer instructions and recommendations for installation. Do not install roofing system when air temperature is below 40 degrees F, during any form of precipitation, including fog, or when there is ice, frost, moisture, or any other visible dampness on the roof deck.

47. Q. Ref. Drawing Sheet C-102; Regarding site access points and desired travel ways;

Current FOD (Foreign Object Debris) fence and SF (Silt Fence) is shown southwest of the access road between Building 253 and 254. Is it the intent that all project deliveries must enter from the Nemarket St. extension, northwest of Bldg. 256, traveling past Bldg. 256, then left behind Bldg.

254, then right between Bldg’s. 254 and 253 to access the concrete apron (Hangar Door side of Hangar 253? Is this the only allowable access point or can an access entry point be established off of Nashua Ave. to the concrete apron? If there are other routes available, can you define the alternatives?

A- Primary truck access to be off Nashua Ave with a stabilized construction entrance per Detail 1 / C-501, that provides access to the front and rear of BLDG 253. This will avoid construction traffic through the parking lot.

Other alternative access points may be considered subject to the approval of the Base Civil Engineer and Contracting Officer. Submit a traffic routing and site utilization plan for approval by BCE and CO that meets the requirements of Specification Section 311000.1.7 “Site Clearing”, Section 312000.1.8 “Earth Moving”, and any relevant requirements in the General Conditions sections of the Specification.

48. Q. Please reference sheet AE-105 at the intersection of lines 14 and C for Building 253.

The plan shows a CMU wrap around the column at that point. Plan detail 6 on AE-501 shows a metal stud and drywall wrap at that location. Please confirm the intent.

A- Plan detail on AE-501 is correct. Column is to be wrapped with stud and gyp.

49. Q. Please provide the quantity and locations for the Seat Cover Dispenser, Towel Hooks, Sanitary Napkin Dispenser and Sanitary Napkin Disposal units.

A- Seat Cover Dispensers were removed from project. No sanitary napkin dispensers. See attached sketches for other locations.

50. Q. Are any shower curtains and rods required in Building 253’s rooms 131 and 137?

A- No shower curtains or rods are required in Rooms 137 or 131 in 253

51. Q. Please confirm if the General Contractor must apply for any pay for the Building Permit. Specification section 013000 Part 1.4.A is not clear.

A- A Building Permit (as would commonly be obtained from a municipality for a commercial project) is not applicable to this project as it is a Federal project on Federal property.

As such, there is no fee associated with said permit.

52. Q. Please confirm if there are any fees that the General Contractor is responsible for regarding the permit list in specification section 013000 Part 1.4.C.

A- The Permit for NHDES Alteration of Terrain is attached to the specifications. There typically is no fee for NPDES General Construction Permit (See EPA.Gov website for instructions). There is also typically no fee for the FAA 7460-1 Permit (See FAA.gov/forms for instructions).

53. Q. Sealant joints for the hangar refers to "Section 321372 Concrete Paving Joint Sealants". The spec is not included in the package that I can find.

A- We didn’t find the reference to Section 32 13 72. If it exists, change to read Section 321373 “Concrete Paving Joint Sealants”.

54. Q. Some of the rooms that receive epoxy have carpet and tile on the floors. Cannot see where the demo talks about those materials being removed.

A- Note 5 on AD-104 calls for the removal of carpet, also refer to General note A on

AD-001 "THE ARCHITECT HAS IDENTIFIED, AS COMPLETELY AS POSSIBLE, IN THE

DRAWINGS AND SPECIFICATIONS, EXISTING ITEMS OF EQUIPMENT AND

CONSTRUCTION THAT ARE REQUIRED TO BE REMOVED OR OTHERWISE

DEMOLISHED SO AS TO ALLOW THE EXECUTION OF NEW WORK. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH SPACE AND

FULFILL THE INTENT OF THE WORK BY THE CONTRACT DOCUMENTS. THE

INFORMATION PROVIDED IN NO WAY INTENDS TO MEAN THAT DEMOLITION IS

LIMITED ONLY TO THOSE ITEMS SPECIFICALLY IDENTIFIED. IT IS THE GENERAL

CONTRACTOR'S RESPONSIBILITY TO EXECUTE DEMOLITION WORK, AS

REQUIRED, TO ALLOW THE EXECUTION OF NEW WORK. REMOVE ALL EXTERIOR

AND INTERNAL EXISTING ITEMS OF CONSTRUCTION AND EQUIPMENT WITHIN

AREA INDICATED ON DEMOLITION PLAN(S), WHETHER SHOWN OR NOT,

INCLUDING, BUT NOT LIMITED TO FLOOR MATERIAL, BASE, WALLS, CEILINGS,

DOORS, DOOR FRAMES, CASEWORK, ELECTRICAL, MECHANICAL, PLUMBING

FIXTURES AND SYSTEMS, AS REQUIRED TO ACCOMMODATE NEW

CONSTRUCTION. ANY EXISTING WORK TO REMAIN, IF DAMAGED BY ANY TRADE

OR NEW CONSTRUCTION, SHALL BE PATCHED, REPAIRED OR REPLACED TO

MATCH EXISTING. COMPLY WITH APPLICABLE CODES AND REGULATION"

55. Q. The hangar floors have areas that will have existing epoxy and joint sealant. Will this remain and just a recoat done?

A- Hangar floor is to be completely redone with specified epoxy finish system.

56. Q. Does the existing sealants in the hangar floor expansion and control joints need to be removed?

A- Replace damaged or failing sealants as required to provide a sealed floor system.

57. Q. Can we get a cut through the trench drains to show if sealant is required between the concrete and drain?

A- Sections of the trenches are indicated on structural detail drawings.

Sealant shall be required only around all drains entering and exiting formed concrete trench.

58. Q. Floor schedule list EXG, I assume that means they are left alone even though items are being relocated. No patching.

A- Patch the floor finish or repair as required to perform new work. Refer to general notes A (see response to RFI #54) and Note J on AD-001 "WHERE HOLES IN FLOORS OR

FLOOR OPENINGS ARE UNCOVERED OR CREATED BY SELECTIVE DEMOLITION

WORK, THE CONTRACTOR MUST DO ONE OF THE FOLLOWING:

-WHERE OPENINGS ARE ACCESSIBLE TO FOOT TRAFFIC, EXPOSED TO VIEW, OR

ARE GREATER THAN 6", THE OPENING MUST BE FILLED WITH A CONCRETE

SYSTEM SIMILAR TO EXISTING.

-AREAS NOT EXPOSED TO VIEW, CONCEALED BY CONSTRUCTION, OR WHERE

THAT OPENING IS LESS THAN 6", THE OPENING MUST BE FILLED WITH AN UL

DESIGN SYSTEM AS REQUIRED."

59. Q. Does the existing epoxy in room 17 "Metals Technology" need to be removed?

A- Epoxy floor in Metals Technology is to remain. Patch or repair as required prior to relocated equipment being installed.

60. Q. I believe room 17 is labeled as "Men's Shower" when 17 is "Metals Technology" correct?

A- On the Room Finish Schedule the finishes for Room 17 Men's Showers are intended for the Mens Showers NOT Metals Technology

61. Q. Could the as-built drawings for the existing fire protection systems in Buildings 253 and 254 be provided to assist in bid preparation? FPD-101 mentions existing as-built drawings are provided as an attachment, but I don't see them in the drawing files.

A- The record shop drawings for the fire protection systems are attached. These drawings are provided for information only, accuracy is not guaranteed.

62. Q. Could you please provide additional information on the 2 existing HEF generators in Hangar 251 that are to be salvaged for Hangar 254? Hangar 251 was not part of the walkthrough. Are the existing HEF generators identical to those in Hangar 254? Is the Hangar 251 system active? Should the supports be salvaged? Are the supports similar to those in the other Hangars? Can they be removed from Hangar 251 when needed or do they need to be removed at a specific time and stored until needed? How high are the Hagar 251 foam generators?

A-The foam generators in Hangar 251 are the same Ansul Jet-X-15A model as those of Hangar 254. Hangar 251 will be converted to a different use under a separate project and the foam system will no longer be required, however it is currently an active hangar. See sequencing requirements listed in Solicitation Section 3.4.2.1.2.e). The supports of the existing foam generators in Hangar 251 are roughly similar to those in Hangar 254. None of the existing supports in any of the hangars are to be salvaged for reuse. Heights of the foam generators in Hangar 251 vary with the roof heights from 20'7" to 38'1". Contractor has the option which two are removed for use in 254. Photos attached.

63. Q. AE-507 detail shows damp proofing section 071113 in the masonry cavity wall.

There is an avb/weather barrier spec 072500 calling out ABAA. Which do you want in the masonry walls?

A- Bituminous damproofing is to be used at masonry locations. AVB/weather barrier is to be used at exterior stud wall locations.

64. Q. Bldg 254 sheet IN-101 Floor striping shows room 40 getting Grey polycrete, sheet AF-601 says room 40 "EXG" which I believe means remains the same. Which is it?

A- Grey Polycrete is specified to match existing floors in the hangar and shops. The floor in Room 40 will be demolished to accommodate new footings per the Structural Drawings, and new floor will need to be finished to match existing. Provide consistent finish throughout the shop.

65. Q. Bldg 253 sheet IN-101 Floor Striping shows room 143 getting grey polycrete, sheet AF-601 says room 143 "EXG" again which is it?

A- Continue epoxy flooring from Composite shop 120 into Compressed Air 143

66. Q. Bid Option 7 states 60 mil EPDM but Spec Section 075323 states 90 mil EPDM.

Please clarify which is correct.

A- Install EPDM at specified 90 mil thickness per UFC 3-110-03.

67. Q. The roof plan for Bldg 254 (Sheet AE131) does not show all of the existing roof curbs. Are these curbs to remain and be flashed or be eliminated?

A- AE-130 General Note C REMOVE AND FILL ANY UNNECESSARY/

ABANDONED OR UNUSED ROOF PENETRATIONS, TO PROVIDE A WATER TIGHT

SEAL. REPLACE FLASHING OR BOOTS AT PENETRATIONS TO REMAIN TO

PROVIDE WATER TIGHT SEAL. PROVIDE SNOW GUARDS AND GUY WIRES AT ALL

ROOF PENETRATIONS. AE-131 NOTE: "IMAGES SHOWN ARE REPRESENTATIVE OF

EXISTING ROOF PENETRATIONS AND ROOF MOUNTED EQUIPMENT, AND ARE

NOT INTENDED TO SHOW ALL CONDITIONS. CONTRACTOR SHALL FIELD VERIFY

ALL NEW AND EXISTING ROOF PENETRATIONS AS WELL AS ROOF MOUNTED

EQUIPMENT (INCLUDING, BUT NOT LIMITED TO MECHANICAL, PLUMBING AND

ELECTRICAL). RE: MEP” AE-131 Keynote 3 "EXISTING ROOF PENETRATION, CONTRACTOR TO FIELD VERIFY ALL EXISTING PENETRATIONS. TYP. REPLACE

EXISTING PENETRATION BOOT AND PROVIDE WEATHER TIGHT SEAL AT ALL

EXISTING PENETRATIONS. PROVIDE GUY WIRE TIE BACK AND SNOW GUARDS."

Existing curbs that are to remain shall be re-flashed to provide weather tight seal. Unnecessary or abandoned curbs are to be removed and filled/roofed over. Contractor is to field verify ALL roof penetrations and equipment.

68. Q. Keynote 2 on sheet AE131 does not list the protection board listed in section 072200

2.2. Is this protection board required?

A-Cover board is specified to be used understanding seam roof of the base bid. Cover board is not required under the low sloped roof of the bid option

69. Q. Will walk pads be required? If so please designate where or how many.

A- Provide walk pads per the Roofing Manufacturer's recommendations from the roof access to and around roof mounted equipment.

70. Q. Is there a foundation under the vertical lift fabric doors across the front of bldg. 254 and also across the front of 253.

A- Record drawings are attached. These drawings are provided for information only, accuracy is not guaranteed. Also, see detail 2 on S-519A.

71. Q. Can we get weight of trusses in tail dock section of bldg.254 or as built plans?

A- The weight of the trusses has not been calculated; however record drawings of tail addition are attached. These drawings are provided for information only, accuracy is not guaranteed.

72. Q. Do block walls slated for demo contain vermiculite?

A- Destructive testing of block walls was not conducted during the inspection. Available building plans did not indicate the presence of vermiculite in block walls, assume it is not present. Contractor should assess the block cavities for vermiculite prior to full scale wall demolition.

73. Q. Can we get drawings on lift door million pits slated for demo?

A- Record drawings are attached to show mullion pit constuction. These drawings are provided for information only, accuracy is not guaranteed. Field verify actual dimensions and conditions.

74. Q. Is Fundamental Commissioning referenced under Prerequisite 1 to be carried in the base bid? Will Enhanced Commissioning referenced under Credit 3 be priced as an Option? If Enhanced Commissioning is required as an Option price, will a new Bid Form Item be provided?

Reference: Prerequisite 1 “Fundamental Commissioning of Building Energy Systems” Notes;

“Will be Accomplished”, page 2 of 9.; Reference: Credit 3 “Enhanced Commissioning” Notes;

“ANG Recommended….A/E must evaluate feasibility of project achieving this point as base bid item or option.” With a sub note; (Project is pursuing), page 4 of 9.

A- Enhanced commissioning as related to construction will be in the base bid for the contractor. The CxA is A-E firm scope.

75. Q. What Mil thickness is to be carried in Bid Option 0007? Reference: Bid Option 0007 “Remove and Replace Membrane Roof BLD 254” states “…60 mil fully adhered, light colored EPDM roof membrane system…”, yet Specification “Section 075323, pg. 9, Section 2.1.1 EPDM Sheet calls out 0.090 inch nominal thickness” or 90 Mil.

A- Install EPDM at specified 90 mil thickness per UFC 3-110-03.

76. Q. Should contractors follow Keynotes #3 “ Replace existing penetration boot and provide weather tight seal at all existing penetrations” Or will some of the existing penetrations be eliminated per the plan view? Reference: Bldg. 254, Drawing AE131; Aerial photograph shows roof mounted equipment and vents that are not indicated on adjacent “1 Roof Plan Bid Option” A- AE-130 General Note C REMOVE AND FILL ANY UNNECESSARY/

ABANDONED OR UNUSED ROOF PENETRATIONS, TO PROVIDE A WATER TIGHT

SEAL. REPLACE FLASHING OR BOOTS AT PENETRATIONS TO REMAIN TO

PROVIDE WATER TIGHT SEAL. PROVIDE SNOW GUARDS AND GUY WIRES AT ALL

ROOF PENETRATIONS. AE-131 NOTE: "IMAGES SHOWN ARE REPRESENTATIVE OF

EXISTING ROOF PENETRATIONS AND ROOF MOUNTED EQUIPMENT, AND ARE

NOT INTENDED TO SHOW ALL CONDITIONS. CONTRACTOR SHALL FIELD VERIFY

ALL NEW AND EXISTING ROOF PENETRATIONS AS WELL AS ROOF MOUNTED

EQUIPMENT (INCLUDING, BUT NOT LIMITED TO MECHANICAL, PLUMBING AND

ELECTRICAL). RE: MEP” AE-131 Keynote 3 "EXISTING ROOF PENETRATION, CONTRACTOR TO FIELD VERIFY ALL EXISTING PENETRATIONS. TYP. REPLACE

EXISTING PENETRATION BOOT AND PROVIDE WEATHER TIGHT SEAL AT ALL

EXISTING PENETRATIONS. PROVIDE GUY WIRE TIE BACK AND SNOW GUARDS."

Existing curbs that are to remain shall be re-flashed to provide weather tight seal. Unnecessary or abandoned curbs are to be removed and filled/roofed over. Contractor is to field verify ALL roof penetrations and equipment.

77. Q. Is the protection board required? Reference: Bldg. 254, Drawing AE131; Keynotes #2; Does not list the protection board listed in Specification section 072200, section 2.2 Protection Board.

A- Cover board is specified to be used understanding seam roof of the base bid. Cover board is not required under the low sloped roof of the bid option.

78. Q. Will walk pads be required and if so, can you provide specification and location required? Reference Bldg. 254, Drawing AE131; there are no walk pads indicated on the roof plan nor in any of the keynote items nor in any specification A-Provide walk pads per the Roofing Manufacturer's recommendations from the roof access to and around roof mounted equipment.

79. Q. Pay rate question.Caulkers appear to be in the $51.00 range, painters in the $16.00 range. Which trade does the epoxy floors come under, both the application and the floor prep?

Our crews sometimes do the prep, caulking and epoxy floors.

A- Please be advised; no response has been received from DOL. Rate to be used is up to the discretion of the contractor until further notice

80. Q. Would it be acceptable to provide an average R-36 in lieu of the minimum R-36?

The thickness would change to 3” at the roof drains and 15” at the high points (perimeter edges) and minimize the amount of re-work necessary at the perimeter and curbs. Please advise.

Reference: Bid Option 0007 “Remove and Replace Membrane Roof BLDG. 254 A- R-36 must be provided, calculate thicknesses using ASHRAE paper LV-11-9 per specifications. Spec 072200 2.1.4 Insulation Thickness As necessary to provide a thermal resistance (R value) of 36 or more for average thickness of tapered system. Thickness shall be based on the "R" value for aged insulation. Insulation over steel decks shall satisfy both specified R value and minimum thickness for width of rib opening recommended in insulation manufacturer's published literature. Minimum thickness must meet energy code regulations. Use the ASHRAE paper, LV-11-9 Determining the Average R-Value of Tapered Insulation.

81. Q. Spec section 078101, FIREPROOFING/INTUMESCENT COATING; The drawings do not indicate the location nor thickness of the spray on fireproofing and intumescent coating.

Please provide the drawings and details that identify the extent of the fireproofing and intumescent systems.

A- The steel is NOT required to be rated per IBC 2012, Table 601 for Type IIB Construction. ETL 02-15 also states that no rating above that established by IBC is required with an approved fire suppression system.

82. Q. Drawing LS-101 shows the location of the new draft curtain but no details show the height of the curtain nor attachment details. Please provide these details.

A- Install draft curtains in accordance with ETL 02-15 "Extend draft curtains down from the roof (or ceiling) not less than one-eighth of the distance from the roof (or ceiling) to the floor.

When roof structural supports extend below the roof or ceiling, suspend draft curtains to the lowest member of the structural supports, or one eighth the distance from the roof or ceiling, whichever is greater." Attachments will be per the specifications and manufacturer's recommendations as indicated in Section 07 83 00.

83. Q. Can you provide a description of the intended use for the cantilevered area running alongside the fuselage indicated in the illustration below?

A- The cantilevered framing from the new tail dock addition is used to support the wing fall protection system, so the additional loads from the fall protection system to existing 1952 hangar can be minimized.

84. Q. What is the intended elevation of the same cantilevered areas running alongside the fuselage? Is the elevation to be the same as the wing system or the fuselage system?

A- The cantilevered framing shall be above aircraft clearance envelope.

85. Q. Is the intent to have two (2) separate systems running above the fuselage with a separation between the new addition and the existing structure as indicated in the illustration below? Reference: Pertaining to both Building 253 and 254, Drawings SP301.

A- Yes. It is intent to have two separate system running above the fuselage. See note 1 on SP-101 for more information.

86. Q. Does this break require a connected (Not including Truss Supports) to the other member in any way, via expansion coupling or some other means? Reference: Pertaining to both Building 253 and 254, Drawings SP301.

A- The current design is not connected. Workers must connect and disconnect between I-beams to pass between the structures. Alternative design satisfing the requirements may be submitted to the contracting officer for approval.

87. Q. Is a break required at Line A’ & B, in the systems that run parallel to the fuselage per the illustration below (similar to the fuselage system)? Reference: Pertaining to both Building 253 and 254, Drawings SP101.

A- Assuming this is regarding "The cantilevered framing" on SP-101: There is NO break in the cantilevered framing. The cantilevered framing from the new tail dock addition is used to support the wing fall protection system.

88. Q. Drwgs. S-102 and S-103 indicate floor elevation control points with cross hairs or an X at the desired floor points. The X’s (control elevations) next to the floor trench drains appears to indicate that the control point occurs at the outer edge of the trench drain wall, indicated on Drwg. S-519, Detail 1. Are we to assume that the top of the trench drain walls, shown in Drwg.

S-519, Detail 1 are flat in cross section, with the pitch following the direction of the drain flow?

Reference: Pertaining to both Buildings 253 and 254, Drawings S-519, Detail 1, Typical Trench Detail, in conjunction with Bldg. 253 and 254, Drawings S-102 and S103, Enlarged Floor Plans.

A-Correct, the X's (control elevations) next to the floor trench drains indicates that the control point occurs at the outer edge of the trench drain wall. The intent is to have the cross section close to flat, only enough pitch to get water into the grate. The pitch will follow the direction of the drain.

89. Q. Bldg 253/Bldg 254 - Specification Section 028200, 1.4A indicates 1,400 SF of gray caulking as ACM. Should this unit of measure be LF? Please clarify.

A- The base bid includes removal of 1,400 square feet of corrugated siding to which the asbestos containing caulking is applied. The 1400 SF referes to the siding to be removed.

90. Q. At the pre-proposal conference the pre-proposal slides indicated that Volume 2 Part 1 is limited to ten pages excluding tabs, indexes and resumes, however, the solicitation (page 17, 3.4.2) indicates a page limit of 25 pages. Please clarify the page limitation for Volume 2 Part 1.

A- Please see answer to questions 8 and 24.

91. Q. Bldg 253 – Drawing C-102, Note 24 indicates removal of existing abandoned conduits to facilitate new construction in the general area to the northeast of the building, however no quantities or other information are available with which to delineate the extent of the work. Please clarify.

A-Refer to C-101 for existing conditions and subsequent sheets for required work that necessitates the partial removals to accommodate new work.

92. Q. Bldg 253 – Drawing C-103, Note 1 indicates that we are to “re-grade existing sub-grade and provide asphalt paving”, however, the note refers to Detail 2 on C-502 which indicates the inclusion of a new 12” sub-base and 8” base below new asphalt. Please clarify.

A- As indicated on drawing C-103, intent is to reconstruct the pavement surface in existing paved areas. Existing base and subase materials may remain in place and may be reused, if they comply with specified requirements, otherwise dispose of them and provide compliant materials as indicated on Detail 2 on C-502.

93. Q. Bldg 253 - Regarding Sanitary Sewer Piping – Drawing C-105 shows runs of piping identified as “SS”, which we take to mean sanitary sewer, however, no pipe type/product specifications appear to be indicated in the specifications or on the drawings. Please clarify.

A- "SS" is indeed "Sanitary Sewer" as defined by Keynote 2 on C-105, which refers to detail 4/C-504. See specification section 22 13 13 "Facility Sanitary Sewers" for related piping requirements; note that materials differ based on application.

94. Q. Bldg 253 and Bldg 254 – will the Government or the Contractor be responsible for engaging and paying for the services of an environmental consultant/PQP?

A- The Contractor will be responsible for engaging and paying for the services of an environmental consultant/PQP.

95. Q. Bldg 253/Bldg 254 – Specification Section 071113 indicates how bituminous dampproofing is to be applied to concrete surfaces, but the drawings don’t appear to identify where dampproofing is to be applied. Please clarify locations.

A- Bituminous dampproofing is to be used on the exterior side of all new or modified exterior CMU walls, between the CMU and exterior finishes.

96. Q. Bldg 253 – Bid Option 1, Reroof Bldg 253: Does the Gov’t anticipate that the contractor will completely remove the existing roof and steel deck in such a manner that results in a weather tight condition at the end of each day, or will the contractor be permitted to remove the roof in total, followed by complete removal and replacement of the metal deck? Specification Section 028200, 1.5, indicates the expectation that all metal roofing panels and associated mastics and caulking are to be removed during the abatement phase prior to the start of general construction, thus rendering the building exposed to the elements for an extended period of time.

Please advise as to the Gov’ts expectation.

A- Government's expectation is for existing facility to be protected from exposure to the elements. Contractor to propose a phasing plan for the removal and replacement of the roof under the bid option. Coordinate phasing with contracting officer.

97. Q. Bldg 253 – Spec Section 074213, Metal Wall Panels: Please advise on finish of the metal wall panels. Are they to be a custom color or to be chosen from the manufacturer’s standard range?

A- Metal wall panels are to match existing or per finish schedules in the drawings.

98. Q. Bldg 253 – Spec Section 259000, 1.4H, indicates that the BMS contractor is to be a first tier subcontractor to the prime. Does the Gov’t have a similar requirement for the testing, adjusting and balancing consultant, or can this service be a second tier vendor?

A- The testing and balancing agency is typically contracted by the mechanical contractor.

This allows the TAB and Mechanical contractor to efficiently correct any deficincies in the field together. We have no objection to the TAB agency being a second-tier contractor.

99. Q. Bldg 254 – Bid Option 006 and 007, Reroof Bldg 254: Does the Gov’t anticipate that the contractor will completely remove the existing roof and steel deck in such a manner that results in a weather tight condition at the end of each day, or will the contractor be permitted to remove the roof in total, followed by complete removal and replacement of the metal deck?

Specification Section 028200, 1.5, indicates the expectation that all metal roofing panels and associated mastics and caulking are to be removed during the abatement phase prior to the start of general construction, thus rendering the building exposed to the elements for an extended period of time. Please advise as to the Gov’ts expectation.

A- Bid option for reroofing EPDM over existing admin spaces is to remove roofing and material to the structural roof deck. Existing roof deck is to remain in this area. in this case the roof will need to be weather tight at the end of each day. For the Standing Seam Bid Option, Contractor to purpose a phasing plan for the removal and replacement of the roof under the bid option. Coordinate phasing with contracting officer.

100. Q. Bldg 254 – Drawing AD-104, Note 14 indicates to remove existing lockers. Please confirm that this note includes all lockers within this room.

A- All lockers must be removed to preform new work. Per note coordinate storage of lockers with contracting officer and reinstall after new finishes have been applied.

101. Q. Bldg 254 – Drawing C-106, Note 2, indicates the removal of asphalt pavement, however, no thickness is indicated. Please provide the depth of pavement if possible.

A- Depth is unknown. For bidding purposes, assume asphalt is 4 inches thick.

102. Q. Bldg 254 – Hardware Schedule per drawing AF-602 shows inconsistencies with spec section 087100, 3.6, Door Hardware Sets. Door Schedule indicates door 19 as having hardware set 10, however, the specification section does not show Door 19 under Hardware set 10, rather in hardware set 1. Also, a number of doors listed in the Hardware Sets (spec section 087100, 3.6) do not appear on the door schedule on drawing AF-602. Does the scope of work include replacing hardware on specific doors that are existing to remain? If so, which ones?

A- Install hardware per the specification (revised specification attached, modified hardware sets have been highlighted). Doors that appear in the Hardware Spec are covered on AF-602 (Base Bid) and AF-603 (Bid Option).

103. Q. Bldg 254 – Item 011 (Bid Option 10, Replace Office Doors): Please clarify which doors are to be included in this Bid Option.

A- Doors for bid option are identified on AE-108 FLOOR PLAN BID OPTION, and AF-

603 DOOR SCHEDULE AND ELEVATIONS - BID OPTION 5

104. Q. RFI Response 32, regarding Fireproofing Intumescent Coatings: please confirm that neither Bldg 253 or Bldg 254 require fireproofing per specification section (s) 078101, and that this specification is removed from the documents.

A- Confirmed. Remove intumescent coatings spec.

105. Q. Subfactor 2, Construction Schedule: Please provide a tentative or anticipated Notice to Proceed date to be used in preparing the preliminary schedule and the offer.

A- Notice to Proceed (NTP) is anticipated to be May 15, 2015; Reference: 3.4.1.

VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS, 3.4.1.7

106. Q. Specification 09 97 13.00 40 Steel Coatings indicates in 3.2.1 General Requirements indicates to "Coat all structural steel in the hangar addition and any additional items damaged due to the demolition and/or construction." Section 3.1.1 Surface Preparation, General, indicates to provide "faying surfaces that will become inaccessible after installation shall be abrasive blasted and coated with inorganic zinc only, prior to installation, surfaces that are part of the slip-critical joints shall be faying mechanically cleaned coated with inorganic zinc prior to installation, and all welding shall be completed before painting…