NHANG_Bldg_254_Specifications_4.9.15.pdf
PDF 22 MB Posted
- Solicitation number
- W912TF15R0500
About this file
NHANG_Bldg 254_Specifications 4.9.15
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KC-46A ADAL
MAINTENANCE HANGAR,
BUILDING 254
PEASE AIR NATIONAL GUARD BASE
PROJECT NO. SZCQ139904
April 09, 2015
PREPARED FOR
UNITED STATES PROPERTY AND FISCAL OFFICER
NEW HAMPSHIRE NATIONAL GUARD
CONCORD NH 03301
NEW HAMPSHIRE AIR NATIONAL GUARD
HEADQUARTERS 157TH AIR REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
NEW HAMPSHIRE AIR NATIONAL GUARD HEADQUARTERS 157TH REFUELING WING
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
PROJECT APPROVALS 000001 - 1
NEW HAMPSHIRE AIR NATIONAL GUARD
157TH CIVIL ENGINEER SQUADRON
302 NEWMARKET STREET - PEASE ANGB - NH 03803-0157
PROJECT APPROVAL SHEET
OFFICE APPROVAL SIGNATURE DATE
Base Commander
Base Civil Engineer
Contracting
Customer
Anti-Terrorism
Bio Environmental
Communications
Environmental
Fire Prevention
Information Protection
Real Property
Safety
Security Forces
ACT Representative
State Supervisor
Resource Protection
Electronic Security System
NEW HAMPSHIRE AIR NATIONAL GUARD HEADQUARTERS 157
TH
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
TABLE OF CONTENTS 000110 - 1
TABLE OF CONTENTS
CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 COVER PAGE
00 00 01 PROJECT APPROVALS
00 00 10 SPECIFICATION SEALS
00 01 10 TABLE OF CONTENTS
00 01 15 CONTRACT DRAWINGS AND SPECIFICATIONS
00 22 13 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 10 GENERAL ERRATA
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 26 63 CHANGE ORDERS
01 29 73 SCHEDULE OF VALUES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 19 PROJECT MEETINGS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 40 ENVIRONMENTAL MANAGEMENT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 73 29 CUTTING AND PATCHING
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 77 19 CLOSEOUT REQUIREMENTS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 36 WARRANTIES
01 78 39 PROJECT RECORD DOCUMENTS
01 81 33 SUSTAINABLE DESIGN REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 HAZARDOUS AND REGULATED MATERIAL REMOVAL AND DISPOSAL
02 82 00 ASBESTOS ABATEMENT
02 83 19 LEAD SAFE WORK PRACTICES
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
TABLE OF CONTENTS 000110 - 2
DIVISION 03 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 – METALS
05 12 00 STRUCTURAL STEEL FRAMING
05 21 00 STEEL JOIST FRAMING
05 31 00 STEEL DECKING
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 19 FOAMED-IN-PLACE INSULATION
07 22 00 ROOF AND DECK INSULATION
07 25 00 WEATHER BARRIERS
07 42 13 METAL WALL PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 83 00 FABRIC DRAFT CURTAIN
07 84 00 FIRESTOPPING
07 91 00 PREFORMED JOINT SEALS
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 13 METAL ROLLING COUNTER DOORS
08 34 16.20 VERTICAL LIFT FABRIC DOORS
08 41 13 ALUMINUM-FRAMED STOREFRONTS AND SERVICE WINDOWS
08 45 23 INSULATED TRANSLUCENT FIBERGLASS WALL PANEL ASSEMBLIES
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
TABLE OF CONTENTS 000110 - 3
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 – FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE
09 51 00 ACOUSTICAL CEILINGS
09 67 23.13 STANDARD RESINOUS FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
09 97 13.00 40 STEEL COATINGS
DIVISION 10 – SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 13 CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 73 13 OVERHEAD SUPPORTED ALUMINUM CANOPY
DIVISION 11 – EQUIPMENT
11 24 29 RIGID TROLLEY BEAM RAIL FALL PROTECTION SYSTEM
DIVISION 12 – FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 31 01 STAINLESS STEEL CASEWORK
12 36 00 COUNTERTOPS
12 93 00 SITE FURNISHINGS
DIVISION 21 - FIRE SUPPRESSION
21 13 00 FIRE SUPRESSION SPRINKLER SYSTEM
21 13 40 HEF FOAM FIRE PROTECTION
DIVISION 22 – PLUMBING
22 05 13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
22 05 16 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING
22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
22 05 18 ESCUTCHEONS FOR PLUMBING PIPING
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
TABLE OF CONTENTS 000110 - 4
22 05 19 METERS AND GAGES FOR PLUMBING PIPING
22 05 23.12 BALL VALVES FOR PLUMBING PIPING
22 05 23.14 CHECK VALVES FOR PLUMBING PIPING
22 05 23.15 GATE VALVES FOR PLUMBING PIPING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND
EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 16 PLUMBING EQUIPMENT INSULATION
22 07 19 PLUMBING PIPING INSULATION
22 11 13 FACILITY WATER DISTRIBUTION PIPING
22 11 16 DOMESTIC WATER PIPING
22 11 19 DOMESTIC WATER PIPING SPECIALTIES
22 11 23.13 DOMESTIC-WATER PACKAGED BOOSTER PUMPS
22 13 13 FACILITY SANITARY SEWERS
22 13 16 SANITARY WASTE AND VENT PIPING
22 13 19 SANITARY WASTE PIPING SPECIALTIES
22 15 13 GENERAL-SERVICE COMPRESSED-AIR PIPING
22 15 19 GENERAL-SERVICE PACKAGED AIR COMPRESSORS AND RECEIVERS
22 33 00 ELECTRIC, DOMESTIC-WATER HEATERS
22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS
22 42 13.13 COMMERCIAL WATER CLOSETS
22 42 13.16 COMMERCIAL URINALS
22 42 16.13 COMMERCIAL LAVATORIES
22 42 16.16 COMMERCIAL SINKS
22 42 23 COMMERCIAL SHOWERS
22 45 00 EMERGENCY PLUMBING FIXTURES
22 47 13 DRINKING FOUNTAINS
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 16 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
23 05 17 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
23 05 18 ESCUTCHEONS FOR HVAC PIPING
23 05 19 METERS AND GAGES FOR HVAC PIPING
23 05 23.11 GLOBE VALVES FOR HVAC PIPING
23 05 23.12 BALL VALVES FOR HVAC PIPING
23 05 23.13 BUTTERFLY VALVES FOR HVAC PIPING
23 05 23.14 CHECK VALVES FOR HVAC PIPING
23 05 23.15 GATE VALVES FOR HVAC PIPING
23 05 23.16 PLUG VALVES FOR HVAC PIPING
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 13 DUCT INSULATION
23 07 19 HVAC PIPING INSULATION
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
TABLE OF CONTENTS 000110 - 5
23 08 00 COMMISSIONING OF HVAC
23 11 23 FACILITY NATURAL-GAS PIPING
23 21 13 HYDRONIC PIPING
23 21 16 HYDRONIC PIPING SPECIALTIES
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 31 13 METAL DUCTS
23 33 00 AIR DUCT ACCESSORIES
23 34 17 CEILING MOUNT CIRCULATION FANS
23 34 23 HVAC POWER VENTILATORS
23 36 00 AIR TERMINAL UNITS
23 37 13 DIFFUSERS, REGISTERS, AND GRILLES
23 37 23 HVAC GRAVITY VENTILATORS
23 52 16 CONDENSING BOILERS
23 55 23.13 LOW-INTENSITY, GAS-FIRED, RADIANT HEATERS
23 73 13 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 83 16 RADIANT-HEATING HYDRONIC PIPING
DIVINSION 25 – INTEGRATED AUTOMATION
25 90 00 - BUILDING MANAGEMENT SYSTEM (BMS)
DIVISION 26 – ELECTRICAL
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 36 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND
CABLING
26 05 48.16 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 09 23 LIGHTING CONTROL DEVICES
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 29 23 VARIABLE-FREQUENCY MOTOR CONTROLLERS
26 35 43 400 HZ SOLID STATE FREQUENCY CONVERTER
26 36 00 TRANSFER SWITCHES
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 51 16 FLUORESCENT INTERIOR LIGHTING
26 51 19 LED INTERIOR LIGHTING
26 52 19 EMERGENCY AND EXIT LIGHTING
26 56 13 LIGHTING POLES AND STANDARDS
26 56 19 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
TABLE OF CONTENTS 000110 - 6
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS
27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 44 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND
CABLING
27 15 00 COMMUNICATIONS HORIZONTAL CABLING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 16 00 INTRUSION DETECTION
28 31 00 FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 – EARTHWORK
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
32 13 11 CONCRETE PAVEMENTS FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
32 13 73 CONCRETE PAVING JOINT SEALANTS
32 92 00 TURF AND GRASSES
DIVISION 33 – UTILITIES
33 41 00 STORM UTILITY DRAINAGE PIPING
END OF TABLE OF CONTENTS
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
CONTRACT DRAWINGS AND SPECIFICATIONS 000115 - 1
SECTION 00 01 15 – CONTRACT DRAWINGS AND SPECIFICATIONS
PART 1 - GENERAL
1.1 CONTRACT DRAWINGS AND SPECIFICATIONS (Ref. DFARS 252.236-7001 AUG 2000)
A. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
B. The Contractor shall—
1. Check all drawings furnished immediately upon receipt;
2. Compare all drawings and verify the figures before laying out the work;
3. Promptly notify the Contracting Officer of any discrepancies;
4. Be responsible for any errors that might have been avoided by complying with this paragraph
(B); and
5. Reproduce and print contract drawings and specifications as needed.
C. In general--
1. Large-scale drawings shall govern small-scale drawings; and
2. The Contractor shall follow figures marked on drawings in preference to scale measurements.
D. Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
E. The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title Drawing No.
Cover Sheet G-000 Index of Drawing-Sheet 1 of 3 G-001 Index of Drawing-Sheet 2 of 3 G-002 Index of Drawing-Sheet 3 of 3 G-003 Civil Legend, Notes, and Abbreviations C-001 Existing Conditions Site Plan C-101 Demolition Site Plan C-102 Site Plan C-103 Site Grading and Drainage Plan C-104 Site Utility Plan C-105 Demolition Site Plan – Bid Option Parking Lot C-106 Site Plan – Bid Option #3 Parking Lot C-107 Grading Plan – Bid Option #3 Parking Lot C-108
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
CONTRACT DRAWINGS AND SPECIFICATIONS 000115 - 2
Title Drawing No.
Site Layout and Grading Plan C-401 Site Details C-501 Site Details C-502 Site Details C-503 Site Details C-504 Site Details C-505 Site Details C-506 Site Details C-507 Landscape Plan L-101 Soil Boring Logs B-101 Soil Boring Logs & Test Pits B-102 Floor Slab/Foundation Demolition Plan SD-101 Existing Fall Protection Demolition Plan SD-102 Existing HEF Generator Support Demolition Plan Existing Demolition Details – Sheet 1 of 2
SD-103
SD-501
Existing Demolition Details – Sheet 2 of 2 SD-502 Room 17A Demolition Details SD-503 Structural Notes and Legend – Sheet 1 of 2 S-001 Structural Notes and Legend – Sheet 2 of 2 S-002 Roof Component Wind Pressure Diagram S-003 Floor Slab Plan S-101 Enlarged Floor Slab Plan – Sheet 1 of 2 S-102 Enlarged Floor Slab Plan – Sheet 2 of 2 S-103 Tail Dock Foundation Plan S-104 Tail Dock Bottom Chord Plan S-105 Tail Dock Top Chord Plan S-106 Vertical Lift Fabric Door Support Framing Plan S-107 Tool Room Foundation Plan S-108 Downspout Support Foundation Plan S-109 Tool Room Plan S-110 Endwall Bracing-Grid 1 and 7 S-301 Interior Sway Bracing-Grid 2 and 6 S-302 Interior Sway Bracing-Grid 3 and 5 S-303 Interior Sway Bracing-Grid 4 S-304 Interior Sway Bracing at Intermediate Grids S-305 Truss Section - Grid B S-306 Truss Section - Grid C S-307 Truss Section - Grid D S-308 Truss Section - Grid E S-309 Truss Section - Grid F S-310 Truss Section - Grid G S-311 Truss Section - Grid H S-312
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
CONTRACT DRAWINGS AND SPECIFICATIONS 000115 - 3
Title Drawing No.
Truss Section - Grid J S-313 Tail Dock Foundation Details – Sheet 1 of 4 S-501 Tail Dock Foundation Details – Sheet 2 of 4 S-502 Tail Dock Foundation Details – Sheet 3 of 4 S-503 Tail Dock Foundation Details – Sheet 4 of 4 S-504 Endwall Connection Details – Sheet 1 of 2 S-505 Endwall Connection Details – Sheet 2 of 2 S-506 Sway Bracing Connection Details – Sheet 1 of 2 S-507 Sway Bracing Connection Details – Sheet 2 of 2 S-508 Truss Section Connection Details – Sheet 1 of 2 S-509 Truss Section Connection Details – Sheet 2 of 2 S-510 Horizontal Bracing Connection Details – Sheet 1 of 2 S-511 Horizontal Bracing Connection Details – Sheet 2 of 2 Typical Tail Dock Connection Details
S-511A S-512
Vertical Lift Fabric Door Details – Sheet 1 of 2 S-513 Vertical Lift Fabric Door Details – Sheet 2 of 2 S-514 Door Girt Post and Jamb Post Connection Details S-515 Tail Dock Wall Opening Framing Details S-516 Roof Deck And Floor Deck Details S-517 Typical Slab Details – Sheet 1 of 3 S-518 Typical Slab Details – Sheet 2 of 3 S-519 Typical Slab Details – Sheet 3 of 3 Typical CMU Wall Details – Sheet 1 of 3
S-519A S-520
Typical CMU Wall Details – Sheet 2 of 3 S-521 Typical CMU Wall Details – Sheet 3 of 3 S-522 Gutter and Downspout Connection Details S-523 Miscellaneous Details S-524 Tool Room Details S-525 Tool Room Connection Details S-526 Existing Truss Modification – Sheet 1 of 3 SE-501 Existing Truss Modification – Sheet 2 of 3 SE-502 Existing Truss Modification – Sheet 3 of 3 SE-503 Bid Option 2 – Existing Roofing Replacement Partial Roof Plan and Detail SE-504 Existing Shed Modification SE-505 Room 17A Modification Details SE-506 Fire Suppression Framing Plan and Sections SF-101 Loads at Endwall Bracing – Grids 1 and 7 SL-301 Loads at Interior Sway Bracing – Grids 2 and 6 SL-302 Loads at Interior Sway Bracing – Grids 3 and 5 SL-303 Loads at Interior Sway Bracing – Grid 4 SL-304 Loads at Interior Sway Bracing at Intermediate Grids SL-305 Loads at Truss Section – Grid B SL-306
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
CONTRACT DRAWINGS AND SPECIFICATIONS 000115 - 4
Title Drawing No.
Loads at Truss Section – Grid C SL-307 Loads at Truss Section – Grid D SL-308 Loads at Truss Section – Grid E SL-309 Loads at Truss Section – Grid F SL-310 Loads at Truss Section – Grid G SL-311 Loads at Truss Section – Grid H SL-312 Loads at Truss Section – Grid J SL-313 Fall Protection Plan SP-101 Fuselage Fall Protection Section Wing Fall Protection Support Framing Section
SP-301
SP-302
Demolition General Notes AD-001 Overall Demolition Plan AD-101 Overall Demolition Plan AD-102 Tail Dock Addition Demolition Plan AD-103 Demolition Plans AD-104 Demolition Elevations AD-201 Demolition Elevations AD-202 Legends, Abbreviations, and General Notes AE-001 Partitions/Wall Types AE-002 Overall Floor Plan AE-101 Enlarged Plan AE-102 Enlarged Plans AE-103 Enlarged Plans AE-104 Enlarged Plans AE-105 Enlarged Plans AE-106 Floor Plan Bid Option 5 AE-108 Overall Reflected Ceiling Plan AE-120 Reflected Ceiling Plans AE-121 Roof Plan Base Bid AE-130 Roof Plan Bid Option 1 & 2 AE-131 Building Elevations AE-201 Building Elevations AE-202 Building Sections AE-301 Wall Sections AE-302 Wall Sections AE-303 Wall Sections AE-304 Wall Sections AE-305 Plan Details AE-501 Section Details AE-502 Section Details AE-503 Roof Details AE-504 Roof Details AE-505
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
CONTRACT DRAWINGS AND SPECIFICATIONS 000115 - 5
Title Drawing No.
Hangar Door Details AE-506 Door Details AE-507 Door Details AE-508 Window Elevations and Details AE-510 Window Elevations and Details AE-511 Details AE-512 Finish Material List AF-001 Room Finish Schedule AF-601 Door Schedule and Elevations – Base Bid AF-602 Door Schedule and Elevations – Bid Option 5 AF-603 ABA Interior Elevations AI-201 Interior Elevations AI-202 Interior Elevations AI-203 Millwork Details AI-501 Millwork Details AI-502 Life Safety Plan LS-101 Overall Signage Plan IG-101 Enlarged Admin Signage Plan IG-102 Enlarged Hangar Signage Plan IG-103 Northeast Mezzanine Signage Plan IG-104 Northwest Mezzanine Signage Plan IG-105 Sign Types IG-501 Sign Schedule Floor Striping Plan
IG-502
IN-101
Fire Suppression Demolition – Retention Plan FPD-101 Fire Pump Room Demolition – Retention Sections FPD-301 Fire Pump Room Demolition – Retention Plan FPD-401 Fire Suppression Plan FP-101 Fire Suppression Zoning Plan FP-102 Fire Pump Room Sections FP-301 Fire Pump Room Enlarged Plan FP-401 Fire Alarm Demolition – Retention Plan FAD-101 Fire Alarm and Mass Notification Lower Plan FA-101 Fire Alarm and Mass Notification Upper Plan FA-102 Fire Alarm and Mass Notification Riser FA-201 Fire Alarm and Mass Notification Input/Output Matrix FA-202 Foam System Control Input/Output Matrix FA-203 Plumbing Legend and Notes P-001 Plumbing Demolition Plan Overall Plumbing Pressure Piping Floor Plan
P-101 P-102
North Restroom & Lockers & Metal Technology Pressure Piping Floor Plans P-103
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
CONTRACT DRAWINGS AND SPECIFICATIONS 000115 - 6
Title Drawing No.
North Hangar Pressure Piping Floor Plan P-104 South Hangar Addition Pressure Piping Floor Plan P-105 South Shop Area and Northeast Pressure Piping Plan P-106 West Office Area Plumbing Plans P-107 Overall Sanitary Sewer Floor Plan P-108 South Shop Area Sanitary Sewer Floor Plan P-109 North Restroom & Lockers Sanitary Sewer Floor Plan P-110 North Hangar Sanitary Sewer Floor Plan P-111 South Hangar Addition Sanitary Sewer Floor Plan P-112 Enlarged Plumbing Floor Plans P-401 Enlarged Plumbing Floor Plans P-402 Plumbing Details P-501 Plumbing Details P-502 Plumbing Details P-503 Plumbing Schedules P-601 Domestic Water Riser Diagram P-901 High Pressure Water Riser Diagram P-902 Compressed Air Riser Diagram P-903 Sanitary Sewer Riser Diagram P-904 Gas Piping Riser Diagram P-905 Mechanical Legend and Notes M-001 Mechanical HVAC Demolition Floor Plan MD-101 Mechanical HVAC Demolition Floor Plans MD-102 Mechanical HVAC Demolition Roof Plan MD-103 Overall Mechanical HVAC Plan M-101 Mechanical HVAC North Floor Plan M-102 Mechanical HVAC West Floor Plan M-103 Mechanical HVAC South Floor Plan M-104 Mechanical HVAC Hangar Floor Plan M-105 Mechanical HVAC Hangar Floor Plan M-106 Mechanical HVAC Hangar Floor Plan M-107 Mechanical HVAC Roof Plan M-108 Mechanical Sections M-301 Mechanical Sections M-302 Mechanical Enlarged Plans M-401 Mechanical Details M-501 Mechanical Details M-502 Mechanical Details M-503 Mechanical Details M-504 Mechanical Details M-505 Mechanical Details Mechanical Details
M-506 M-507
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
CONTRACT DRAWINGS AND SPECIFICATIONS 000115 - 7
Title Drawing No.
Mechanical Schedules M-601 Mechanical Schedules M-602 Mechanical Schedules M-603 Mechanical Controls M-901 Mechanical Controls M-902 Mechanical Controls M-903 Mechanical Controls M-904 Mechanical Controls M-905 Mechanical Controls M-906 Mechanical Controls M-907 Mechanical Controls M-908 Mechanical Controls M-909 Mechanical Controls M-910 Mechanical Controls M-911 Electrical Legend and Notes E-001 Electrical Lighting Demolition Plan ED-101 Electrical Power and Signal Demolition Plan ED-102 Electrical Grounding Demolition Plan ED-103 Lightning Protection Demolition Plan Electrical Site Plan
ED-104
E-002
Hazardous Location Plan E-003 Hazardous Location Isometric E-004 Overall Electrical Lighting Plan E-101 Partial Hangar North Lighting Plan Base Bid E-102 Partial Hangar South Lighting Plan Base Bid E-103 Partial Hangar North Lighting Plan Bid Option E-104 Partial Hangar South Lighting Plan Bid Option E-105 Support Area Lighting Plans E-106 Overall Electrical Power and Systems Plan E-107 North Hangar Area Power and Systems Plans E-108 South Hangar Area Power and Systems Plans E-109 Support Area Power and Systems Plans E-110 Shop Area Power and Systems Plan E-111 Roof Power and Systems Plan E-112 Grounding Plan E-113 Lighting Protection Plan E-201 Electrical Details E-501 Electrical Details E-502 Electrical Details E-503 Electrical Details E-504 Electrical Details E-505 Electrical One-Line Diagrams E-601
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
CONTRACT DRAWINGS AND SPECIFICATIONS 000115 - 8
Title Drawing No.
Panel Schedules E-602 Panel Schedules E-603
F. Reference Documents:
1. Geotechnical Report titled “Geotechnical Engineering Services – Proposed ADAL to
Maintenance Hangar Building 254 Pease Air National Guard Base Newington, New Hampshire” dated February 13, 2014, prepared by S.W.Cole.
2. Hazardous Materials Inspection Report titled “Asbestos Containing Materials, Lead-Based Paint, and Hazardous Materials Inspection K-46A Maintenance Hangar, Building 254 Pease Air National Guard Base Portsmouth, New Hampshire” dated Revised March 28, 2014, prepared by Tetra Tech.
3. Fire piping asbuilts titled “Repair Fire Suppression System Hangar 254” dated September 28, 2007, prepared by Eastern Fire Protection.
PART 2 - PRODUCTS
2.1 NOT USED
PART 3 - EXECUTION
3.1 NOT USED
END OF SECTION
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS 002213 - 1
SECTION 00 22 13 – SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
PART 1 - GENERAL
1.1 TOUR OF JOB SITE:
A. Prospective offerors are required to attend the scheduled site visit at the time indicated in the solicitation documents.
1.2 PERFORMANCE:
A. Submission of Offer shall constitute prima facie evidence that the Contractor has examined the drawings and specifications and has satisfied himself/herself as to the nature, scope, and location of the work and other matters which could affect the work or cost thereof. Failure of the Contractor to acquaint himself/herself with available information, including a physical examination and survey of the proposed work area, will not relieve him/her from providing a complete and usable project.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
Not used.
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
GENERAL ERRATA 010010 -1
SECTION 01 00 10 - GENERAL ERRATA
PART 1 - GENERAL
1.1 DESCRIPTION OF CONTENT
A. Correct contents of the technical specification sections and drawings as described in this section.
1.2 EXTENT OF CORRECTIONS
A. The corrections described herein do not alter the uncorrected parts of the technical specification sections or drawings.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
3.1 CORRECTIONS
A. Wherever terms “owner”, “architect” or “engineer”, without regard to case, appear in the technical specifications or on drawings, replace them with “Contracting Officer”, capitalized, (or abbreviated as KO) indicating the Contracting Officer, or his/her deputy designated for each specific project, who is the sole contractual authority.
1. Note that the Contracting Officer’s Representative (COR) is a technical advisor to the Contracting Officer and she/he can not be deputized as Contracting Officer.
B. Wherever terms “Authority Having Jurisdiction” or “AHJ”, without regard to case, appear in the technical specifications or on drawings, replace them with “Base Civil Engineer”, capitalized, (or abbreviated as BCE) indicating the Base Civil Engineer, or his/her deputy designated for each specific project, who is the sole code enforcement authority for projects on Pease Air National Guard Base.
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
SUMMARY OF WORK 011100 - 1
SECTION 01 11 00 – SUMMARY OF WORK
PART 1 - GENERAL
1.1 LOCATION
A. The location of the work is inside the cantonment area of the Pease Air National Guard Base, Newington, New Hampshire.
B. Building 254 and adjacent site.
1.2 DESCRIPTION OF WORK
A. The work consists of furnishing labor, plant, materials, and equipment, and performing work necessary to provide a complete and functional installation as described below:
1. General: The General Maintenance Hangar, Building 254, project will consist of the construction of approximately 18,972 square feet eyebrow, the remodeling of approximately 10,755 square feet of the existing building and minor touch up and repair of the remaining approximate 71,210 square feet. The total remodeled/repaired area is approximately 81,965 square feet and the total building area is approximately 100,912 square feet. The building will be added to and altered to have character compatible with the surrounding community of buildings utilizing similar form, style, material and details. The ADAL hangar will be designed for general maintenance functions requiring jacking of new aircraft. In order to accommodate the expanded hangar required to accommodate the larger aircraft the buildings heating, fire suppression and detection systems, life safety systems, electrical systems and structural systems will repaired or upgraded.
B. Bid Options
1. DEFINITION: A Bid Option is a cost proposal by bidders and stated on the Bid Form that will be added to the Base Bid amount if the Government accepts a corresponding addition in scope of work, products, materials, equipment, systems or installation methods described herein. Bid Option prices shall be valid for 90 days from Bid Due Date.
2. COMPLETENESS OF PROPOSALS: Include in each Bid Option proposal the cost of making the work under the Bid Option complete, including the cost of coordination and modifying and adjusting related Base Bid work affected by the acceptance of work under Bid Option, and of miscellaneous and incidental devices, such as anchors, fasteners, and the like, that are reasonably inferred and necessary for complete installation of the work.
3. NOTIFICATION: Immediately following award of Contract, prepare and distribute to each party affected, notification of the status of each Bid Option, indicating whether each Bid Option has been accepted, or rejected. If work descriptions under any Bid Options have been modified through negotiations, include complete description of such modifications.
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
SUMMARY OF WORK 011100 - 2
4. ACCEPTANCE: The Government reserves the right to accept Bid Options at the time of the award of Contract, with or without negotiated price adjustments, and adjust the Contract award amount accordingly, or reject any or all of the Bid Options.
5. LISTING OF OPTIONS:
a. Bid Option (BO) 1: Remove and Replace Membrane Roof:
1) Base Bid: n/a
2) BO: Reroof low slope roofs above administrative and shop areas that will include removing the existing membrane roof and all of its associated flashings and materials to the existing roof deck and replace with new insulation and roof membrane. Build up tapered insulation to slope to roof drains. Cricket as required all curbs and equipment. Cover tapered insulation with 60mil fully adhered, light colored EPDM roof membrane system, and flashing to create weather/water tight envelope.
b. BO 2 – Remove and Replace Standing Seam Metal Roof (SSMR).
1) Base Bid: n/a
2) BO: Remove flashing, lighting protection, roofing, insulation and corrugated metal deck, to structural framing, and install metal roof deck, insulation, and standing seam roof to match new addition, and replace the existing soffits.
c. BO 3 – Reconstruct Parking Lot:
1) Base Bid: Accessible and energy efficient vehicle parking improvements.
2) BO: The existing asphalt passenger-vehicular parking lot to the northeast of building 254 that serves this facility will be reconfigured to improve AT/FP, traffic circulation, accessible and energy efficient vehicle parking, and increase parking capacity from 203 vehicles to 216 vehicles. Work includes site demolition paving, curbing, striping, landscaping, and signage.
d. BO 4 – LED Lighting in Hangar:
1) Base Bid: High bay 8 or 10-lamp, high efficiency suspended fluorescent luminaires utilizing T8 linear fluorescent lamps to match existing fixtures in hangar bay.
2) BO: Install LED lighting on a one-to-one replacement of the fluorescent lighting design in hangar bay.
e. BO 5 – Replace Doors:
1) Base Bid: n/a.
2) BO: Remove existing personnel doors in office areas and replace with insulated metal doors with vision panes. Existing door frames will remain in-place.
f. BO 6 – Replace aggregate base below hangar floor slabs:
1) Base Bid: Existing aggregate base will remain in-place to support new hangar aircraft floor slabs. Contractor-engaged Geotechnical engineer shall determine suitability of material to remain. Provide a leveling base course and fine grade.
2) BO: Remove existing aggregate base material below existing hangar floor and aircraft pavements to be removed. Provide 35 inch thickness base course aggregate below new slabs.
1.3 PRINCIPAL ELEMENTS:
A. The work to be performed includes the following principal elements:
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
SUMMARY OF WORK 011100 - 3
The work includes site work, utility work and paving. General building work consists of selective demolition, hangar slab on grade floor, steel framing, fall protection, siding, hangar doors, roof, snow guards, interior walls and doors, overhead doors, casework, finishes, HVAC, plumbing, HEF fire protection system, electrical and communications work, and AT/FP improvements. Options listed under paragraph 1.2.B.5 may apply.
1.4 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
A. The contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the contractor receives notice to proceed, (b) prosecute the work diligently, and (c) see solicitation for required duration of work.
B. Completion of work is defined as final acceptance. Date of Substantial Completion or use/possession prior to Final Acceptance (Beneficial Occupancy) is not relevant to the completion date. The indicated performance period includes winter months and runs continuous.
1.5 GOVERNMENT PERFORMED WORK
A. If applicable, the Government will furnish the materials and equipment for installation by the Contractor pursuant to contract clause FAR 52.245-2, Government Property (Fixed Price Contracts).
Notify the Contracting Officer in writing at least 15 calendar days before the materials and equipment are required. Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at the prevailing rate. The Contracting Officer will specify the location of materials and equipment and the delivery location.
B. The Government will perform the following:
1. The Contracting Officer will establish the boundary of Contractor’s work area including staging area, and the Government will limit its activities inside the work area to a minimum during the time the Contractor is at work.
The Government will furnish the following materials or equipment:
HEF Foam generators: Contractor shall salvage two (2) Ansul foam generators from Building 251 for use on this project. The contractor shall coordinate removal from 251 with the Government, and shall not remove generators until immediately prior to commissioning of foam system in Building 254. Cap pipe at removal locations. Contractor also responsible for relocation.
2. All of the following equipment furnished by the Government, contractor to disconnect, relocate, and reinstall. See E-110 and E-111.
a. Air Frame Repair 15: Utility Shear, Box & Pan Brake, Carlton Drill Press, Slip Roller, Box & Pan Machine, Dimpler Machine, Band Saw, Belt Sander, Buffing Machine, Table Saw, Drum Sander, Drill Press, Shrink & Stretch Machine, Hydraulic Shear, Flaring Machine, Rotary Punch, Rivet Freezer, 1 electrical plug-in bus duct.
b. Wheel & Tire Shop 17: CNC Mill, Hydraulic Press, Bridge Port, Panel LP-36 and associate transformer, Pedestal Grinders (3), Surface Grinder, Colchester Lathe, Lablond Lathe, Arbor Press, 2
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
SUMMARY OF WORK 011100 - 4
electrical plug-in bus ducts. Government will provide technician to supervise disconnection and reconnection of CNC lathe, as well as perform start-up/commissioning services for CNC lathe
c. Metal Shop 18: Vertical Bandsaw, Horizontal Bandsaw, 1 electrical plug-in bus duct
d. Hangar 42: Work Bench (2), Tube Bender, Compressor, Arbor Press
1.6 NOT USED
PART 2 - EXECUTION
2.1 NOT USED
KC-46A ADAL MAINT. HANGAR, BLDG 254 PROJECT NO. SZCQ139904
WORK RESTRICTIONS 011400 - 1
SECTION 01 14 00 – WORK RESTRICTIONS
PART 1 - GENERAL
1.1 REQUIREMENTS INCLUDED
A. All Contractor employees, including subcontractors, and subcontractors’ employees, suppliers, and suppliers’ employees shall be required to comply with the Installation Security Requirements regarding personnel, vehicle, and equipment security passes and access the jobsite. Nothing in the contract shall be construed in any way to limit the authority of the Commanding Officer to prescribe new, or to enforce existing security regulations governing the admission or exclusion of persons and the conduct of persons while on base, including but not limited to, the rights of search of all persons or vehicles on base.
B. Contractor Personnel: Provide the Contracting Officer the name(s) of the supervisory person(s) authorized to act for the Contractor. Provide, and update as required, a list of personnel for the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency.
C. Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner. Any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of National Security shall be removed from the site.
D. The Contractor is expected to become fully acquainted with, and strictly adhere to Base regulations affecting the performance of this Contract. Parts of the regulations pertaining to fire prevention, driving safety, restricted areas, sanitation, disposal of debris and pollution control may apply to this project. A detailed briefing of applicable regulations will be conducted during the Pre-Construction Conference. If required by the Contracting Officer, visit one or more of the following Base personnel:
1. Base Civil Engineer (Bldg 151): To review traffic and parking regulations and, if the project involves excavation, digging permits.
2. Base Fire Prevention Officer (Bldg 243): To review fire safety requirements, burning permits, welding permits and any operation that may affect routing of fire apparatus.
3. Base Pass & ID Office (Bldg 244): To receive or inquire about vehicle and personnel passes. Office hours are Monday – Friday 0730 – 1130 & 1230 – 1530, no exceptions.
E. Refer to FAR 52.204-9 Personal Identity Verification of Contractor Personnel.
1.2 MISSION-ESSENTIAL NATURE OF THE BASE
A. In order to maintain the National Defense, Mission Essential nature of the operations at the Base, the Contractor shall coordinate the work and scheduling with the Contracting Officer.
B. The Government may order suspension of construction activities due to essential defense activities including real and practice alerts, security checks and the like. These suspensions shall not constitute reason for Contractor’s claim for extra compensation or extension of
KC-46A ADAL MAINT. HANGAR, BLDG 254 PROJECT NO. SZCQ139904
WORK RESTRICTIONS 011400 - 2
contract time unless cumulative delay during any 30-day period is longer in duration than 8 hours and the Contractor can demonstrate actual monetary damage or delay in construction schedule.
1.3 COORDINATION
A. Coordinate with the Contracting Officer for specific security and access requirements.
B. Access to Buildings/ Occupied Buildings: The Contractor may work in or around existing occupied buildings. The Contractor is responsible, via the Contracting Officer, to obtain access to building and facilities and arrange for them to be opened and closed. Do not enter the building(s) without prior approval of the Contracting Officer. Keep the existing buildings and their contents secure at all times. Provide temporary closures as required to maintain security.
Contract personnel will not be permitted in security-regulated buildings or areas unless cleared by the Security Officer.
1.4 ACCESS TO WORK SITE
A. The use of base roads will be subject to base regulations including speed limits, requirement to wear seat belts, prohibition on the use of hand-held telephones by drivers, and wear of protective equipment by motorcycle operators.
B. The Contractor shall at all times conduct its Work to maintain the flow of pedestrian and vehicular traffic and prevent inconvenience to the Owner and residents in the vicinity of the Work, and to insure protection of persons and property. Fire hydrants on and adjacent to the Work shall be kept accessible to firefighting equipment at all times. Temporary provisions shall be made to ensure the unimpeded use of sidewalks. Gutters, storm water systems, drainage ditches, and culverts shall not be obstructed.
C. The Contractor will be responsible for the prompt repair of all damage to base pavement surfaces due to his/her operations. The Contractor shall keep the base pavements cleaned of material spilled from vehicles.
D. The Contractor shall submit a traffic routing and site utilization plan for approval to Base Engineer and Contracting Officer that meets the requirements of Specifications 311000 1.7 “Site Clearing”, Section 312000 1.8 “Earth Moving” and any relevant requirements in the General Conditions section of the Specifications
1.5 OCCUPIED BUILDINGS
A. If the Contract involves work in occupied building(s) where the portions of the building outside of the area of work under this Contract are in normal operation during the performance of this Contract, observe the following to prevent interference with each other’s activities:
B. Coordinate the schedule of work under this Contract with the Contracting Officer to mutually avoid interference with each other’s operation.
C. Confine construction activities, including storage of material, to areas designated by the
KC-46A ADAL MAINT. HANGAR, BLDG 254 PROJECT NO. SZCQ139904
WORK RESTRICTIONS 011400 - 3
Contracting Officer.
D. Use of existing toilet rooms will not be permitted.
E. Use of Government telephone system will not be permitted.
F. The officer in charge of the operation within the building may, in case of mission emergency, order construction work to be suspended. Follow such orders and immediately contact the Contracting Officer for further instructions.
1.6 CONTRACTOR ENTRY CONTROL PROCEDURES
A. Contractor employees and representatives performing work under this contract are required to be either United States citizens or documented legal residents. All Contractor employees (including subcontractors) are required to obtain the required contractor identification. Each employee shall wear the Government issued identification over the front of the outer clothing.
Failure to obtain security and base access passes shall not be a cause for contract performance time extension. The process for obtaining base access passes is as follows:
1. The Contractor submits in writing, on a form prescribed by the Contacting Officer, a request for issuance of badges. Employees shall complete questionnaires and other forms as required by security. Allow 10 business days for background checks and processing.
The list shall contain the following information:
a) Prime contractor and subcontractor contact information
b) Name, Social Security Number, and Date of Birth of employee
c) Copy of disclaimer/authorization/release signed by employee
d) Clear color image of Driver’s License or Non-Driver Identification Card
B. Denial or revocation of any official base authorized access pass may be made if the individual:
1. Is listed in the National Terrorist Watch List.
2. Is not a U.S. Citizen and is illegally present in the U.S. or whose U.S. Citizenship, Immigration status, or Social Security Number cannot be verified.
3. Is subject to an outstanding criminal warrant of any type.
4. Whose business/contractor pass application contains false or fraudulent information, or any of the offenses listed below.
5. Is a registered sex offender regardless of the date of the criminal offense.
6. Has a felony conviction within the last 10 years.
7. Has obtained any Conviction that includes the following types of criminal offenses:
a) Offenses of the sexual nature.
b) Offenses of Violence.
c) Offenses related to gang activity, supremacist, or extremist behavior.
d) Crimes resulting from the possession, use, manufacture, introduction, or distribution of any illegal drug listed in the Comprehensive Drug Abuse Prevention & Control Act of 1970, schedules I through V.
e) Offenses in which weapon instrumentality (e.g., firearm, knife or other bladed instrument, club, brass knuckles) was used either as a means of violence, or a threat of violence.
8. Whose military active duty was terminated by the receipt of a dishonorable discharge or bad conduct discharge.
9. Has been issued a barment order and is currently banned from military installations.
KC-46A ADAL MAINT. HANGAR, BLDG 254 PROJECT NO. SZCQ139904
WORK RESTRICTIONS 011400 - 4
10. Has exhibited characteristics, traits or other indications that cause concern for the health, safety or welfare of personnel and/or residents aboard the base; or that cause concern for the physical security or environment of the base.
C. Contractors can call Base Pass & ID at 603-430-2605 during regular office hours to determine if an employee is approved for base access. In the event an employee is denied base access, the reason for the denial will not be provided.
D. Badges are valid for one year, however, background checks will be repeated every six months.
E. Employees who do not have a valid, current base access badge, or have a current badge but are not on the project list, will not be allowed to enter the base. Employees who have been approved, but need to report to Base Pass & ID to pick up their badge, must do so during Base Pass & ID office hours, and must be escorted by a badged contract employee directly to Base Pass & ID Bldg 244.
F. The Contractor shall immediately turn in all terminated employee’s badges to the issuing office.
1.7 CONTRACTOR VEHICLES
A. All vehicles shall display a valid state license plate and safety inspection sticker, if applicable, and shall be maintained in good repair. The company name shall be displayed in a clearly visible manner and size on each Contractor vehicle used in the course of work. Registration and proof of insurance shall be kept in the vehicle, and drivers shall be properly licensed.
1.8 SECURITY REQUIREMENTS:
A. All security requirements apply to all subcontractors and suppliers associated with this contract.
Comply with the following:
1. Do not publicly disclose any information concerning any aspect of the materials or services relating to this contract, without prior written approval of the Contracting Officer.
2. Do not disclose or cause to be disseminated any information concerning the operations of the activity’s security or interrupt the continuity of its operations.
3. Do not disclose any information to any person not entitled to receive it. Failure to safeguard any classified information that may come to the Contractor or any person under his control, may subject the Contractor, his agents or employees to criminal liability under 18 U.S.C., Sections 793 and 798.
4. Direct to the Contracting Officer for resolution all inquiries, comments or complaints arising from any matter observed, experienced, or learned as a result of or in connection with the performance of this contract, the resolution of which may require the dissemination of official information.
5. Coordinate photography requirements with the Contracting Office. Some areas restrict or prohibit photographing Government property.
6. Deviations from or violations of any of the provisions of this paragraph, will, in addition to all other criminal and civil remedies provided by law, subject the Contractor to immediate termination for default and withdrawal of the Government’s acceptance and approval of employment of the individuals involved.
1.9 RESTRICTED AND CONTROLLED AREAS
KC-46A ADAL MAINT. HANGAR, BLDG 254 PROJECT NO. SZCQ139904
WORK RESTRICTIONS 011400 - 5
A. Do not enter areas marked as “Restricted” or “Controlled” without authorization. Do not cross red painted lines delineating restricted areas without authorization. Do not approach aircraft without authorization, including entrance into hangar bays when aircraft are present.
B. Do not enter the flightline areas, which include aircraft parking aprons, taxiways, and the runway, on foot or by vehicle without authorization. Entrance onto non-NHANG airport property (Pease Development Authority) requires wearing of badges issued by the Pease Development Authority or escort.
1.10 WORK SCHEDULE:
A. Schedule normal work by Contractor and Subcontractor personnel between the hours of 0700 and 1630, Monday through Friday, excluding Federal holidays. Note any contract employees or subcontractor needing to obtain base access passes will not be allowed on base until 0730 when the Base Pass & ID office opens in Bldg 244. If the Contractor desires to work during periods other than above, submit a written request (e-mail is acceptable) for each such occurrence to the Contracting Officer at least five working days in advance of the proposed event, so that the Government may make special inspection and/or security arrangements. The Contracting Officer may decline approval. Contractor may have to work outside the normal work schedule in order to make utility connects; when this occurs, contractor shall adjust the work schedule or pay overtime. There will be no change associated with the change in schedule.
1.11 IDENTIFICATION OF CONTRACTOR PERSONNEL
A. All Contractor personnel, including subcontractors, will wear a brightly colored reflective safety vest (ANSI Class 1 or better) while at the job site or visiting other areas of the base as may be required to complete the work.
1. Contractor’s project management personnel are not required to wear a vest when visiting the Base Civil Engineer’s or Contracting Officer’s office.
1.12 PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254 PROJECT NO. SZCQ139904
PRICE AND PAYMENT PROCEDURES 012000 - 1
SECTION 01 20 00 - PRICE AND PAYMENT PROCEDURES
PART 1 - GENERAL
1.1. SUMMARY
A. DESCRIPTION
1. Measurement and payment of all items of the Work shall be as specified in this section.
1.2. RELATED SECTIONS
A. Submittal Procedures, Section 013300.
B. Schedule of Values, Section 012973.
1.3. LUMP SUM
A. Payment of Price: Government shall pay the Contractor the contract price as provided in this contract.
B. Progress Payments: Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
C. Reference FAR 52.232-5 for further requirements.
1.4. CONTRACT PRICES AND BIDDING SCHEDULES
A. Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor
1. Furnishing all plant, labor, equipment, appliances, and materials.
2. Performing all operations required to complete the work in conformity with the drawings and specifications.
3. Reference DFARS 252-236-7008 for further requirements.
B. Contractor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .