SZCQ139901_253_FP-102_Addendum2.pdf

PDF 326 KB Posted

Attached to
ADAL Two Existing Hangars to Accommodate the New KC46 Tanker
Solicitation number
W912TF15R0500
Issued by

About this file

SZCQ139901_253_FP-102 Addendum2

View the file

Other files

File Type Posted
15R0500-Site_visit_attendees_3-4.21.15.pdf PDF
RFI_answers_FBO_posting_4.20.15.pdf PDF
W912TF-15-R-0500-0008_Amendment_8.pdf PDF
SCZQ139904_LS-101_ADDEDNDUM_2.pdf PDF
NHANG_Bldg_254_Specifications_4.9.15.pdf PDF
NHANG_Bldg_254_Plans_4.9.15.pdf PDF
SZCQ139901_253_FP-101_Addendum2.pdf PDF
SZCQ139904_Plans_Addendum_1.pdf PDF
SZCQ139904_FP-101_addendum2.pdf PDF
SZCQ139904_FP-102_addendum2.pdf PDF
NHANG_Bldg_253_Plans_4.9.15.pdf PDF
SCZQ139901_LS-101_ADDEDNDUM_2.pdf PDF
SZCQ139901_Plans_Addendum_1.pdf PDF
SZCQ139901_253_FA-102_Addendum2.pdf PDF
SZCQ139904_FA-102_addendum2.pdf PDF
SZCQ139904_Specs_Addendum_1.pdf PDF
NHANG_Bldg_253_Specifications_4.9.15.pdf PDF
W912TF-15-R-0500-0007_Amendment_7.pdf PDF
SZCQ139901_Specs_Addendum_1.pdf PDF
W912TF-15-R-0500-0006_Amendment_6.pdf PDF
W912TF-15-R-0500-0005_Amendment_5.pdf PDF
Consolidated_RFI_answers_FBO_posting_3.31.15.pdf PDF
W912TF-15-R-0500-0003_Amendment_4.pdf PDF
RFI_answers_FBO_posting_3.27.15.pdf PDF
259000__BUILDING_MANAGEMENT_SYSTEM_(BMS)_B253.pdf PDF
259000_-_BUILDING_MANAGEMENT_SYSTEM_(BMS)_B254.pdf PDF
BLD_253-SK-S-1__FALL_PROTECTION_SUPORT_FRAMING_SKETCH.pdf PDF
BLD_254-SP-301-FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
260536_-_CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
BLD254-_ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-110_-_SUPPORT_AREA_POWER_AND_SYSTEMS_PLAN.pdf PDF
BLD_253-260536_-CABLE_TRAYS_FOR_ELECTRICAL_SYSTEMS.pdf PDF
028200_-_Asbestos_Abatement_2015-03-14.pdf PDF
BLD_253-SP-301_-_FUSELAGE_FALL_PROTECTION_SECTION.pdf PDF
BLD_253-ED-102-ELECTRICAL_POWER_AND_SIGNAL_DEMO_PLAN.pdf PDF
BLD_254-E-602_-_PANEL_SCHEDULES.pdf PDF
BLD_253-E-602-PANEL_SCHEDULE.pdf PDF
BLD_254-E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
BLD_253-E-002_-_ELECTRICAL_SITE_PLAN.pdf PDF
RFI_answers_FBO_posting_3.20.15.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Maint_Hangar.pdf PDF
011400_-_Work_Restrictions_Rev_031715_Fuel_Cell.pdf PDF
254-_E-603_-_PANEL_SCHEDULES.pdf PDF
254-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
SECTION_087100_-_DOOR_HARDWARE-Rev.pdf PDF
254-_E-503_-_ELECTRICAL_DETAILS.pdf PDF
253-_263543_-_400_HZ_Solid_State_Frequency_Converter.pdf PDF
W912TF-15-R-0500-0003_Amendment_3.pdf PDF
253-_E-108_-_NORTH_HANGAR_AREA_POWER_ _SYSTEMS_PLAN_REV.pdf PDF
253-_E-601_-_SINGLE_LINE_DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A'

B'

C'

14' 15'12'10'

D'

E'

F'

G'

9'8'7'5'3'2' 6'4' 11' 13'

1 2 3 4 5 6 7

J

H

G

F

E

D

C

B

COMPOSITE

SHOP

SANDING

(DIRTY)

PREP

ROOM

PAINT

MIXING

TOOL

ROOM

OFFICE

SE

STORAGE

HANGAR

EXISTING

HANGAR

TR

WOMEN

RESTROOM

CLEAN

MEN

RESTROOM

CLEAN

MEN

LOCKER

CLEAN

WOMEN

LOCKER

CLEAN

WOMEN

RESTROOM

DIRTY

WOMEN

LOCKER

DIRTY

JANITOR

MEN

LOCKER

DIRTY

WOMEN

SHOWER

DIRTY

PAINT

STOR

MEN

RESTROOM

DIRTY

SPRINKLERS TO BE PROVIDED IN NEW TAIL DOCK ADDITION

MODIFY EXISTING

SPRINKLERS IN

RENOVATED AREA

MODIFY EXISTING

SPRINKLERS IN

RENOVATED AREA

SPRINKLER ZONE #1 SPRINKLER ZONE #2

SPRINKLER ZONE #1

SPRINKLER ZONE #3

EXISTING SPRINKLER SYSTEM

TO REMAIN AND BE EXPANDED

IN MAIN PORTION OF HANGAR

BAY. SEE NOTE # 5.

NEW DRAFT

CURTAIN

SPRINKLERS TO BE

PROVIDED BELOW

SUSPENDED CEILING

EXISTING

DRAFT CURTAIN

EXISTING DRAFT

CURTAIN

EXISTING DRAFT

CURTAIN

EXISTING

DRAFT CURTAIN

HANGAR AREA: SYSTEM PROVIDING A

DENSITY OF 0.20 GPM/SQFT. OVER DESIGN

AREA OF 5,000 SQUARE FEET

HC-2: SYSTEM PROVIDING A DENSITY OF 0.2

GPM/SQFT. OVER DESIGN AREA OF 2,500

SQUARE FEET

HC-1: SYSTEM PROVIDING A DENSITY OF 0.1

GPM/SQFT. OVER DESIGN AREA OF 1,500

SQUARE FEET

SPRINKLER DESIGN HATCH LEGEND

FIRE SUPPRESSION NOTES

EXPAND AND MODIFY THE EXISTING SPRINKLER SYSTEM OF THE HANGAR BAY

AS SHOWN ON THE DRAWINGS AND IN THE SPECIFICATIONS.

MODIFY THE EXISTING WET PIPE SPRINKLER SYSTEMS FOR THE SHOPS AND

OFFICES AS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS.

PROVIDE SPRINKLER GUARDS FOR SPRINKLERS WHERE THEY ARE INSTALLED

IN AREAS SUBJECT TO PHYSICAL DAMAGE, INCLUDING BUT NOT LIMITED TO,

MECHANICAL ROOMS, STORAGE, AND MAINTENANCE AREAS.

SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION NOT SHOWN

ON THE DRAWINGS.

PROVIDE DESIGN DENSTIY OF 0.20 GPM/SQFT OVER DESIGN AREA OF 5,000

SQUARE FEET FOR EXISTING SYSTEM IN MAIN PORTION OF HANGAR.

1.

2.

3.

4.

5.

A'

B'

C'

14' 15'12'10' 11' 13'

SPRINKLERS TO BE

PROVIDED AND

CONNECTED TO SUPPORT

AREA SYSTEM

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by No. Date

SheetAS SHOWN

Stamp

B-2 SUBMITTAL1 08/15/14

B-3 SUBMITTAL2 01/09/15

ADDENDUM 23 02/25/15

FP-102

FIRE SUPPRESSION ZONING PLAN

25 FEBRUARY 2015

M. AARON

S. BLOCK

M. MEADE

M. AARON

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

PLAN

NORTH

SCALE: 1/16" = 1'-0"

FIRE SUPPRESSION ZONING PLAN

0' 4' 8' 16' 32'

PLAN

NORTH

SCALE: 1/16" = 1'-0"

EQUIPMENT PLATFORM