J
J
J
J
J J
J
J
J
J
J
J J J
J
J
J J
J
J
J
J
J
J
J J
J
J
8' 9'
D'
E'
F'
G'
C'
B'
A'
7'5' 10'3'2'
A
2 3 4 5 6
4'
RDP-1:19,21,23
RDP-1:14,16,18
4#3,#8,1 1/4"C
4#3,#8,1 1/4"C
3 100
NF
3 100
NF
2#12,#12,3/4"C
E
HVU-1
HVU-2
IWH-1
3 30
NF
HP-3:20,22,24
3#12,#12,3/4"C
LP-3:8
2#12,#12,3/4"C LP-3:10
3#10,#10,3/4"C
LP-3:4
2#12,#12,3/4"C
LP-3 LP-4ECU
CF-4 CF-3
LP-3:19,21,23
3#12,#12,3/4"C
FMCP
E LP-E:1
2#12,#12,3/4"C
FSCP E
LP-E:3
2#12,#12,3/4"C
EF-19
1/3
LP-3:29
2#12,#12,3/4"C
2#12,#12,3/4"C
LP-3:11
HWP-4
LP-3:35,37
2#12,#12,3/4"C
HWP-5
NF
NF
AC-2
NF
E
LP-3:31,33
CCU-253-2
FCU-253-6
CCU-253-3
LP-3:32,34
2#12,#12,3/4"C
CLASS L
HP-3:32,34,36
4#3,#8,1 1/4"C
MCC
C
MS
B
REFER TO SHEET
E-110 FOR ELECTRICAL
WORK IN THIS AREA
GFI/48"
GFI/48"
2#12,#12,3/4"C
LP-3:36
ACCU-253-5
E LP-2:47,49
2#12,#12,3/4"C
NF3R
RPD-1
LP-E
LP-3:5
1/3
EF-17 EF-18
HR-8HR-9
HR-11 HR-10
HR-7HR-6
HR-5 HR-4
HR-3
LP-3:24
3#10,#10,3/4"C
B
B
B
B
B
B
B
B
MS
INF
INF PS
KP
OH OH
MS
MS
B
KP
MS
MS
B
KP
MS
MS
MSMS
MS
OH OH
MS
B
SEE SHEET E-109
TO INF
TO INF
SEE SHEET E-109
3/4" CONDUIT
1" CONDUIT
1" CONDUIT
1" CONDUIT
1" CONDUIT
1 1/4" CONDUIT
1 1/4" CONDUIT
1 1/4" CONDUIT 1 1/4" CONDUIT
1 1/4" CONDUIT
1 1/4" CONDUIT
1 1/4"CONDUIT
1" CONDUIT
1" CONDUIT
1" CONDUIT
1" CONDUIT
1" CONDUIT
1" CONDUIT
3/4" CONDUIT
3/4" CONDUIT
1" CONDUIT
LP-2:55
2#12,#12,3/4"C 5
1/2
1/2 1/2
1/2 1/2
1/2 1/2
1/21/2
LP-3:48
LP-3:46
LP-3:42
LP-3:44
LP-3:30
LP-3:28
LP-3:26 LP-3:24
2#12,#12,3/4"C
2#12,#12,3/4"C
2#12,#12,3/4"C
2#12,#12,3/4"C
2#12,#12,3/4"C 2#12,#12,3/4"C
2#12,#12,3/4"C
E
E
E
3 30
NF
C
C
B
MS
HP-31
2#12,#12,3/4"C
NEW 180 KVA 400 HZ
CONVERTER.
16 1
KC-46 EXTERNAL POWER
PANEL AND ACCESS PANEL2
KC-135 EXTERNAL
POWER PANEL AND
ACCESS PANEL
HP-4:19,21,23
M
TURN CABLE TRAY
DOWN WALL AND
SUPPORT CABLE
3#12,#12,3/4"C
M
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P ea se
A
FB
H an ga rs
\D ra w in gs \A ut oC
AD
R ef er en ce
SZ
C Q
-G
-B
SA
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
08/15/141 B-2 Submittal
01/09/152 B-3 Submittal E-108
NORTH HANGAR AREA POWER AND SYSTEMS
PLAN
09 JANUARY 2015
MGD
CMD
WAP
LDC
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
KEYNOTES:
CLASS 1, DIVISION 1 DUPLEX RECEPTACLE ON 100' CORD REEL TO MATCH
EXISTING, APPLETON ECC2013 OR EQUAL.
NOT USED.
PROVIDE 2-2"C FOR TELECOMMUNICATIONS AND 1-2"C FOR A/V CABLING.
TERMINATE CONDUITS AT RESPECTIVE BACKBOARDS IN ROOMS.
SEE DETAILS ON SHEET E-503 FOR CABLING REQUIREMENTS.
CLASS 1, DIVISION 1 GFI RECEPTACLES MOUNTED AT 48" A.F.F.
TELEPHONE/DATA 18" U.O.N. 4 CAT 6 RJ-45 DATA DROPS. SEE DETAIL
6/E-503.
WALL PHONE 48" 1 CAT 6 RJ-45 DATA DROP. SEE DETAIL 6/E-503.
ENCELIUM ENERGY CONTROL UNIT. CATALOG #ECU-100. SEE DETAIL 1,
SHEET E-501 FOR TAIL DOCK EXTENSION LIGHTING CONTROL. WALL
MOUNT 48" A.F.F. CIRCUIT TO PANEL LP-3:17 VIA 2#12,#12(GND),
3/4" CONDUIT.
LIGHTING RELAY PANEL FOR EXTERIOR LIGHTING
CIRCUITS, SEE DETAIL 3/E-501.
PROVIDE 3/4" EMPTY CONDUIT WITH PULL STRING TO COMMUNICATIONS
RM 140 OR AS DIRECTED BY CONTRACTING OFFICER.
CONTACTOR PANEL FOR NON-EXPLOSION PROOF HANGAR BAY RECEPTACLES.
PROVIDE SIGNAGE PLAQUE ABOVE DUPLEX RECEPTACLE THAT STATES:
"RECEPTACLE FOR USE ONLY WHEN GVAC SYSTEM IN MAINTENANCE MODE.
" ROUTE RECEPTACLE CIRCUIT THRU CONTACTOR PANEL LOCATED ADJACENT
TO PANEL LP-3.
JUNCTION BOX AT CEILING FOR NORTHWEST TELE/COMM CABLING. SEE DETAIL
6/E-503 FOR CONDUIT REQUIREMENTS.
JUNCTION BOX FOR SOUTHEAST HANGAR TELE/COMM CABLING. SEE DETAIL
6/E-503 FOR CONDUIT REQUIREMENTS.
PROVIDE (2) 115/200Y, 400 HZ POWER CABLES WITH ONE CABLE PER HOIST TO
REACH EXTERNAL POWER PANEL ON KC-46 AIRCRAFT. ONE CABLE SHALL BE
PROVIDED WITH ADDITIONAL LENGTH TO REACH EXTERNAL POWER PANEL ON
KC-135 AIRCRAFT. VERIFY FINAL LOCATION WITH GOVERNMENT CONTRACTING
OFFICER. PROVIDE 4" ALUMINUM CONDUIT SLEEVE THRU INVERTER ROOM WALL
FOR CABLE PULLING.
NEW SERVICE ENTRANCE RATED FUSED DISCONNECT SWITCH. SEE ONE-LINE
DIAGRAM FOR SIZING. SEE ELECTRICAL SITE PLAN FOR CONTINUATION TO
UTILITY TRANSFORMER.
1 CAT 6 RJ-45 DATA DROP AND PULL STRING FOR WIRELESS ACCESS POINT
CONNECTION. SEE DETAIL 6/E-503. VERIFY MOUNTING HEIGHT WITH
GOVERNMENT REPRESENTATIVE PRIOR TO INSTALLATION.
ALUMINUM 12" X 4" CABLE TRAY AT APPROXIMATELY 30' AFF.
CABLE HOST ASSEMBLY (AMERIBRIDGE 100A HOIST 2104100 AMB OR EQUAL) IN
THE UP POSITION. PROVIDE ONE CABLE PER HOIST. CABLE SHALL BE ROUTED
THROUGH HOIST. CABLE AND CONNECTOR SHALL BE A MINIMUM OF 7'-0" AFF.
CABLE TRAY TURNOUT. PROVIDE CABLE RESTRAINT TO SUPPORT WEIGHT OF
EACH CABLE.
REMOTE DISPLAY/CONTROL PANEL FOR 400 HZ CONVERTER PROVIDE CAT 6
CABLE IN 3/4"C TO CONVERTER CONTROL PANEL PER MANUFACTURER'S
REQUIREMENTS.
HOIST PUSH BUTTON STATION. PROVIDE 4#14, 3/4"C (OR AS REQUIRED BY HOIST
MANUFACTURER) TO HOIST CONTROLLER.
0' 2' 4' 8' 16' 24'
PLAN
NORTH
SCALE: 3/32" = 1'-0"
NORTH HANGAR AREA POWER AND SYSTEMS PLAN1
TRUE
NORTH
KEY PLAN
SCALE: N.T.S.KP
IDS NOTES:
A. IDS SYSTEM SHALL BE DESIGNED, FURNISHED,
AND INSTALLED BY ADVANTOR UNDER THIS
CONTRACT. DETECTION DEVICES AND EQUIPMENT
SHOWN ARE FOR REFERENCE ONLY. ELECTRICAL
CONTRACTOR SHALL PROVIDE DEVICE BOXES AND
CONDUIT SYSTEM.
B. JUNCTION BOXES SHALL BE SIZED IN ACCORDANCE
WITH NEC 314.16.
C. EXISTING IDS EQUIPMENT (SHOWN DASHED)
SHALL BE REMOVE AND TURNED OVER TO
GOVERNMENT AS DIRECTED BY THE CONTRACTING
OFFICER. REMOVE ALL CONDUIT, WIRE AND DEVICE
BOXES ASSOCIATED WITH EXISTING IDS SYSTEM.
D. COORDINATE ROUGH IN OF IDS EQUIPMENT WITH
ADVANTOR SHOP DRAWINGS.
1 REVISION 1 02/17/15
2 REVISION 2 03/03/15