SCZQ139901_LS-101_ADDEDNDUM_2.pdf
PDF 258 KB Posted
- Solicitation number
- W912TF15R0500
About this file
SCZQ139901 LS-101 ADDEDNDUM 2
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCCUPANT CALCULATION (Table 1004.1.2)
AIRCRAFT HANGAR (500 SF) 31,775 = 63 OCCUPANTS
INDUSTRIAL AREA (100SF) 7,775 = 38 OCCUPANTS
BUSINESS (100SF) 4,860 = 48 OCCUPANTS
TOTAL OCCUPANT LOAD = 149 OCCUPANTS
BUILDING INFORMATION & CODE REVIEW
APPLICABLE CODES:
UFC 4-211-01N, UFC 3-600-01, UFC 1-200-01
ENGINEERING TECHNICAL LETTER (ETL) 02-15
2012 NFPA 101 LIFE SAFETY CODE
2011 NFPA STANDARD ON AIR CRAFT HANGARS
2012 INTERNATIONAL BUILDING CODE (IBC)
OCCUPANCY TYPE: H-3 (IBC311.2)
CONSTRUCTION CLASSIFICATION: II-B
FULLY SPRINKLERED
HEIGHT AND AREA (TABLE 503 & SECTION 504):
NUMBER OF FLOORS ALLOWED 11 FLOORS
NUMBER OF FLOORS AS DESIGNED 1 FLOOR
HEIGHT ALLOWED Unlimited (503.1.1)
HEIGHT AS DESIGNED 86'-0"
AREA ALLOWED Unlimited (ETL 02-15)
AREA AS DESIGNED 44,869 SF
EXIT TRAVEL DISTANCE (NFPA 101: 40.6.1.2) 150' (Exterior Walls)
FIRE EXTINGUISHERS:
FIRE CLASS TYPE A
TRAVEL DISTANCE < 75 FT
CODE COMPLIANCE:
IBC 2009 - SECTION 412.4.6: FIRE SUPPRESSION
"AIRCRAFT HANGARS WITH A DOOR HEIGHT GREATER THAN 28 FEET SHALL BE PROVIDED
WITH
FIRE SUPPRESSION FOR A GROUP I HANGAR REGARDLESS OF MAXIMUM FIRE AREAS."
* HANGAR DOOR (AS DESIGNED) > 28 FEET = GROUP I HANGAR.
EXISTING DRAFT CURTAIN
NEW DRAFT CURTAIN
INDUSTRIAL
OCCUPANCY
BUSSINESS
OCCUPANCY
HANGAR (H-3)
OCCUPANCY
EX
IS
TI
NG
H
AN
GA
R
NE
W
T
AI
LD
OC
K
EX
TE
NS
IO
N
1 HOUR PARTITION WALL
BETWEEN HANGAR AND
SHOP AREA
1 HOUR PARTITION WALL
BETWEEN HANGAR AND
OFFICE AREA
FEC FEC
FEC
FEC
FE
C
FE
C
FE
CFE
C
FE
C
FE
C
FE
C
FEC
EXISTING DRAFT CURTAIN
EXISTING DOOR HEADER
(ABOVE) PROVIDES REQUIREMENTS
FOR DRAFT CURTAIN ELEMENT
LIFE SAFETY LEGEND
DRAFT CURTAIN
1 HOUR WALL
FIRE EXTINGUISHER CABINET FEC
EXIT LIGHT
RATE WALL 1 HOUR TO DECK
RE: 4/AE307
INDUSTRIAL
OCCUPANCY
INDUSTRIAL
OCCUPANCY
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by No. Date
SheetAS SHOWN
Stamp
B-2 SUBMITTAL1 08/15/14
B-3 SUBMITTAL2 01/09/15
ADDENDUM 23 02/25/15
LS-101
LIFE SAFETY PLAN
09 JANUARY 2015
G UECKER
E MOREHOUSE
R WENTE
Q REMY
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 1/16" = 1'-0"
LIFE SAFETY PLAN1
SCALE: 1/16" = 1'-0"
EQUIPMENT PLATFORM2
SCALE: 1/16" = 1'-0"
STORAGE MEZZANINE3
File details come from the government source that posted it. Updated .