This document is a Draft Performance Work Statement (PWS) for Naval Undersea Warfare Center (NUWC) Tenant Support, dated June 2025. The PWS outlines comprehensive support services for NUWC facilities, including environmental management, fire support, security, communications, custodial services, facilities maintenance, refuse disposal, calibration, material handling equipment provision, and employee coverall services.

Key service requirements include first response environmental accident support, hazardous waste disposal, standby fire support, on-site security, telephone and mail services, custodial maintenance for specific buildings, utilities and facility repairs for multiple buildings, trash collection, equipment calibration, and providing various material handling equipment like forklifts. The contractor must also provide industrial-grade protective coveralls for up to 20 employees, including weekly laundry service, measurement, and maintenance of the coveralls. The document is marked as a draft and appears to be associated with a broader Hawthorne Army Depot operational contract opportunity.

View the file

Other files

File Type Posted
B01 - HWAD Industry Day 4 QA2.pdf PDF
HWAD Industry Day 4 QA1.pdf PDF
Attachment 0018-0019 - Updated Draft Price Matrix.xlsx XLSX spreadsheet
HWAD Industry Day 4 Attendance.pdf PDF
HWAD Two-Phase QA.pdf PDF
B01 - Attachment 0001 - Draft PWS 1 SDO .pdf PDF
Attachment 0020 - Draft Project Reference Template.pdf PDF
Attachment 0007 - Draft PWS 7 Occupational Health and Industrial Hygiene.pdf PDF
Attachment 0013 - Draft PWS 13 DLA Tenant Support.pdf PDF
Attachment 0010 - Draft PWS 10 Information Technology.pdf PDF
Attachment 0005 - Draft PWS 5 Property.pdf PDF
Attachment 0003 - Draft PWS 3 Maintenance .pdf PDF
Attachment 0016 - Draft PWS 16 Housing.pdf PDF
Draft Solicitation W519TC-25-R-A005 .pdf PDF
Attachment 0017 - Draft Self-Scoring Matrix.xlsx XLSX spreadsheet
Attachment 0015 - Draft PWS 15 Transition.pdf PDF
Attachment 0014 - Draft PWS 14 ARMS.pdf PDF
Attachment 0006 - Draft PWS 6 Safety.pdf PDF
Attachment 0001 - Draft PWS 1 SDO .pdf PDF
Attachment 0002 - Draft PWS 2 Demilitarization .pdf PDF
Exhibit A - Draft CDRLs.pdf PDF
Attachment 0004 - Draft PWS 4 Installation Security Antiterrorism.pdf PDF
Attachment 0009 - Draft PWS 9 Environmental.pdf PDF
Attachment 0011 - Draft PWS 11 Utilities and Energy.pdf PDF
Attachment 0008 - Draft PWS 8 Fire and Emergency Services.pdf PDF
HWAD Industry Day 4 Individual Registration Form Due 17 July 2025.pdf PDF
HWAD Industry Day 4 Company Registration Form Due 17 July 2025.pdf PDF
HWAD Base Access NCIC III Form Due 17 July 2025.pdf PDF
HWAD Industry Day 3 QA.pdf PDF
HWAD Industry Day 3 Slides.pdf PDF
HWAD Industry Day 3 Attendance List.pdf PDF
HWAD ID2 and Draft Self-Scoring Matrix QA.pdf PDF
HWAD Draft RFP W519TC-25-R-A005 Sections L and M.pdf PDF
HWAD Phase I Self-Scoring Matrix - 20250605.xlsx XLSX spreadsheet
HWAD Draft Phase One Self-Scoring Matrix.xlsx XLSX spreadsheet
Wage Determination 2015-5597.pdf PDF
HWAD Industry Day 2 Slides.pdf PDF
Draft RFP QA 1.pdf PDF
HWAD Industry Day 2 Attendance List.pdf PDF
Draft Solicitation W519TC-25-R-A005 Section L Oral Presentations Information.pdf PDF
Attachment 0021 - Draft Small Business Participation Plan.pdf PDF
PIEE Solicitation Module Vendor Access Instructions.pdf PDF
Attachment 0018-0019 - Draft Price Matrix.xlsx XLSX spreadsheet
Attachment 0003 - Draft PWS 3 Maintenance.pdf PDF
Attachment 0006 - Draft PWS 6 Housing.pdf PDF
Attachment 0005 - Draft PWS 5 Installation Security Antiterrorism.pdf PDF
Draft Solicitation W519TC-25-R-A005.pdf PDF
Attachment 0020 - Draft Past Performance Questionnaire.pdf PDF
Attachment 0009 - Draft PWS 9 Occupational Health.pdf PDF
Attachment 0001 - Draft PWS 1 SDO.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

NAVAL UNDERSEA WARFARE CENTER TENANT SUPPORT

PERFORMANCE WORK STATEMENT (PWS) 12

June 2025

Objective: Provide tenant support to the Naval Undersea Warfare Center (NUWC) for all elements depicted below.

Note: All base facilities PWS requirements shall apply to tenants as well. Any requirements above and beyond the base facilities PWS requirements shall be stated within the tenant support PWS.

1. Environmental:

1.1. The contractor shall provide first response support for all environmental accidents and shall provide clean up services for spills/releases. The contractor shall work with each tenant in advance to assess the potential for environmental accidents and their likelihood/severity.

1.2. The contractor shall pick up from tenant, receive, label, store, and dispose of all hazardous wastes generated by tenant when requested/as needed. The contractor shall provide to the tenant the final disposal documentation for all disposed waste. (CDRL M001). Hazardous waste disposal costs shall be borne by the tenant.

2. Fire Support:

2.1. The contractor shall provide standby fire support on-site when requested by the tenant. The contractor shall work with each tenant in advance to assess the potential for fire and explosive hazards and their likelihood/severity.

3. Security:

3.1. The contractor shall provide security support on-site at tenant buildings.

3.2. The contractor shall maintain/maintenance all key control, keys, locks, locking devices, and provide custody to the tenant of locks and keys as needed to secure all tenant permitted NUWC facilities.

4. Communications:

4.1. The contractor shall provide local and long-distance telephone service, including installing and maintaining telephone lines and instruments in locations identified by the tenant.

4.2. The contractor shall provide daily (Monday to Thursday) NUWC U.S. Mail (United States Postal Service) pickup, security screening, and delivery to tenant at building 104-14.

5. Custodial:

5.1. The contractor shall provide routine/weekly custodial services to administrative office spaces and restrooms in buildings 49-31, 50-40, 104-3, 104-5, 104-8 and 104-14.

6. Facilities:

6.1. The contractor shall provide & pay utilities and perform all routine periodic maintenance/painting/repairs on all tenant permitted facilities including: 49-1, 49- 2, 49-3, 49-4, 49-5, 49-6, 49-7, 49-9, 49-11, 49-12, 49-13, 49-14, 49-15, 49-16, PERFORMANCE WORK STATEMENT (PWS) 12

49-17, 49-1, 49-19, 49-20, 49-21, 49-30, 49-31, 50-15, 50-27, 50-40, 50-41, 75- 11, 104-1, 104-3, 104-4, 104-5, 104-6, 104-7, 104-8, 104-11, 104-12, 104-13, 104-14, 105-20A, 49-32, 50-8, 50-9, 50-10, 50-11, 50-14(a), 50-16, 50-17, 50-18, 50-28, 50-30, 50-31, 50-32, 50-34, 50-36, 50-50, 50-51, 50-54, 110-36, 110-37, 104-10, and 112- 069.

6.2. Separately Priced Work: The Navy tenant may require a wide variety of additional facility management services including additional labor, construction, equipment repair, environmental, design, and/or other related maintenance/repair services in addition to the specific requirements within this PWS. In such cases, the tenant will request a specific quote for such work and provide the contractor with the scope of work which will be separately priced and funded by the tenant.

6.3. The contractor shall provide and maintain compressed “plant” air systems, compressors and air lines, including filters/regulators/oilers, to and within buildings 49-9, 104-1, 104-3, 104-4, 104-5, and 104-8.

7. Refuse Disposal and Landfill:

7.1. The contractor shall provide dumpsters, trash collection and disposal services to occupied facilities, and empty trash on-call/as needed for all tenant occupied buildings.

7.2. The contractor shall provide use of depot permitted landfills.

8. Calibration:

8.1. The contractor shall provide calibration services for equipment and instruments as listed in a tenant provided equipment spreadsheet.

8.2. Note: The estimate for calibration items per year is 100 items. The list of equipment includes (but is not limited to) oscilloscopes, torque wrenches, micrometers, calipers, scales, capacitors, weights for scales, gages, and meters.

9. Material Handling Equipment (MHE), Truck, Weight Handling Equipment (WHE)

(Crane) and Lifting/Handling Equipment:

9.1. Upon request, the contractor shall provide crane and container handling support equipment on-site, including operators and rigger(s), at tenant buildings.

9.2. The contractor shall provide and maintain 14 electric (or suitable substitute)

Electric -E-rated not for use in an environment that is not classified as hazardous (EE) and/or Electric -X-rated Specifically tested and classified for use in explosive locations (EX) rated forklifts of at least 4,000 pounds to 6,000-pound capacity, at tenant designated magazines and buildings. Tenants will specify location placement for each forklift prior to delivery. The Navy tenant will provide licensed operators.

9.3. The contractor shall provide and maintain two (2) all-terrain extendable boom forklifts for the Navy tenant. The contractor shall also provide and maintain one

(1) diesel (or suitable substitute) forklift of a least 15,000-pound capacity, at building 104-5, inside the 104 compounds. This unit is in addition to the para 9.2 requirement. The Navy tenant will provide licensed operators.

9.4. Upon tenant request, the contractor shall provide one (1) 25k Forklift with 60” minimum forklifting tines, onsite, at tenant designated buildings, when requested

PERFORMANCE WORK STATEMENT (PWS) 12

for special projects. The estimated usage for this request is one (1) week every three (3) months, or four (4) times per year as requested. The Navy tenant will provide licensed operators.

10. Provision of Coveralls and Related Services:

10.1. The contractor is to provide industrial grade protective coveralls for each employee and establish a routine laundry service to ensure employee safety and industrial hygiene requirements are achieved. This also outlines the comprehensive services required to manage and maintain coveralls for up to 20 employees in a way that ensures the cleanliness and hygiene of administration areas, while also adhering to industry standards and practices.

10.2. The contractor shall provide 9 sets of full body coveralls for each employee (180 total) designed for industrial environments and consistent with safety and hygiene standards required in the recycling/reclamation industry. Each set of coveralls shall have tags with individual employee last name. Names will be provided by Government at time of employee measurements.

10.3. The contractor shall take measurements of each employee to determine appropriate coverall size. Coveralls shall fit employee in a manner that prevents hazards such as tripping and becoming trapped in rotating machinery.

10.4. Measurements shall be completed within 30 days after contract award. When a new employee is hired, measurements shall be completed within 30 days after the employee start date.

10.5. Coveralls shall be made of durable, breathable material, capable of withstanding frequent laundering while providing adequate protection against industrial contaminants.

10.6. The contractor shall provide laundry and delivery services as follow:

10.6.1. Pick up soiled coveralls and deliver clean coveralls on a weekly basis before 1500 PST. Delivery and pickup points will be located within buildings 49-31, 104-3, 104-5, and 104-8. These locations are subject to change, prior notice will be provided to the contractor.

10.6.2. Perform laundry operations to ensure coveralls are clean, dried, folded/hung, and free from pre-existing contaminates, grease, and other soils. Use industrial-grade cleaning and sanitizing agents consistent with industry standards to remove all forms of industrial contaminants. Apply fabric softeners and conditioners to maintain the integrity and comfort of the coveralls over time.

10.6.3. Provide one durable laundry basket at each pick up location for the collection and transport of soiled coveralls.

10.6.4. Tenant will be responsible for inspections of coveralls and will report to the contractor when repairs are needed. PCO approval shall be provided prior to taking corrective actions that require additional funding.

10.7. The contractor shall comply with all Federal, State and local

PERFORMANCE WORK STATEMENT (PWS) 12

environmental, safety and health regulations.

PERFORMANCE WORK STATEMENT (PWS) 12

DOCUMENT SUMMARY LIST

The contractor shall work with the Hawthorne Army Depot (HWAD) Procuring Contracting Officer (PCO) to identify any changes to the references or any applicable regulations or laws, which may affect process, cost, and/or schedule.

The PCO will review and provide implementation guidance.

The Contractor shall adhere to the most recent version of the Army Regulations (AR) cited in this PWS. Chapter and page numbers are provided for convenience, but do not absolve the Contractor of complying with all other applicable parts of the AR. If the ARs are updated during performance, the Contractor is responsible for meeting the new requirements as they take effect. Any such Army Regulation changes during the contract period shall be incorporated.

Navy AA&E Security Procedures (Section 4.2 of PWS):

OPNAVINST5530.13C

https://www.secnav.navy.mil/doni/Directives/05000%20General%20Manageme nt%20Security%20and%20Safety%20Services/05- 500%20Security%20Services/5530.13C.pdf

Navy Physical Security/Law Enforcement Procedures (Section 4.1 of

PWS):

OPNAVINST5530.14E

https://www.secnav.navy.mil/doni/Directives/05000%20General%20Manage me nt%20Security%20and%20Safety%20Services/05- 500%20Security%20Services/5530.14E%20W%20CH-3.PDF