Attachment 0009 - Draft PWS 9 Environmental.pdf
PDF 267 KB Posted
- Solicitation number
- W519TC-25-S-HWAD
About this file
This document is a Draft Environmental Performance Work Statement (PWS) for the Hawthorne Army Depot (HWAD) dated June 2025. The PWS outlines comprehensive environmental management requirements for the contractor, including developing and implementing multiple environmental plans within 120 days of contract award. These plans include an Integrated Pest Management Plan, Stormwater Pollution Prevention Plan, Spill Prevention and Countermeasure Plan, Hazardous Materials/Waste Contingency Plan, Noise Management Plan, Wildland Fire Management Plan, Green Procurement Plan, and Integrated Solid Waste Management Plan.
Key environmental compliance requirements include maintaining operational compliance with Federal Acquisition Regulation, Federal, State, and Local regulations, and Army Regulations. The contractor must manage facility operations to minimize hazardous materials and waste generation, ensure proper waste handling, prohibit ozone-depleting chemicals, conduct quarterly environmental quality control meetings, perform environmental assessments, maintain detailed reporting and documentation, and support various environmental management systems. The PWS also covers specific operational requirements such as landfill management, cultural and natural resource protection, and unexploded ordnance sweeps, with an emphasis on comprehensive environmental stewardship and regulatory compliance.
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Environmental Performance Work Statement (PWS) 9
June 2025
1. OBJECTIVE:
1.1. The contractor shall assign appropriately trained and certified personnel and establish and maintain a published environmental program that ensures compliance with Federal Acquisition Regulation (FAR), including Part 23 and Part 7 as well as Federal, State, and Local regulations, ordinances and codes. The contractor shall comply with Executive Orders (EOs), Army Regulations (AR) 200- 1, December 2007 and AR 700-90, Chapter 5-8, June 2018, AR 420-1, Department of Defense (DOD) environmental policies, Operation Orders (OPORDs), and Execution Orders (EXORDs) which includes establishing, maintaining and implementing permits, policies, objectives, priorities, and operating procedures to provide environmental management and maintain compliance. The contractor shall comply with AR 200-1, AR 420-1, and AR 700-90.
1.2. The contractor shall maintain all files and records required throughout this
Performance Work Statement (PWS) until completion of the contract, at which time they will be turned over and become property of the government. Any intellectual, real or personal property created or procured under this PWS shall be the property of the government.
1.3. The contractor shall ensure all subcontracts, Army Retooling and Manufacturing
Support agreements, and leases issued comply with the intent of the FAR, including Part 23 and Part 7, and Federal, State, and Local regulations, ordinances and codes. The contractor shall observe and comply with all OPORDs and EXORDs, to include but not limited to, AR 200-1, AR 420-1, and AR 700-90 with emphasis on Chapter 5; Commercial Use of Government-owned Industrial Installations.
1.4. The contractor shall manage facility operations and methods of all DOD operations to minimize the use of hazardous materials and the generation of hazardous and/or toxic wastes as defined in Title 40 Code of Federal Regulation (CFR) Protection of Environment. Wastes not defined as a Hazardous Waste (HW) in 40 CFR are also routinely handled in this contract and shall be properly managed in accordance with (IAW) state regulations and as directed under 42 USC 116.
(CDRL J009).
1.5. The contractor shall not procure any Class I Ozone Depleting Chemicals (ODCs) as listed under Section 602 (a) of the Clean Air Act, nor any Class II ODCs after 2009 as listed under Section 602(b) of the Clean Air Act.
2. General Requirements:
2.1. The contractor shall develop the following plans IAW with AR 200-1 and submit to the government within 120 days after contract award: an Integrated Pest Management Plan (IPMP), a Stormwater Pollution Prevention Plan, a Spill Prevention, Control and Countermeasure Plan, a Hazardous Materials/Waste Contingency Plan, a Noise Management Plan, a Wildland Fire Management Plan, Installation Level Green Procurement Plan, and an Integrated Solid Waste
Performance Work Statement (PWS) 9
June 2025
Management Plan.
2.1.1. Integrated Pest Management Plan (IPMP)
2.1.1.1. The contractor shall develop and implement an IPMP consistent with 7 USC 6, 16 USC 670, and 42 USC 116, and submit to the PCO within 120 days after contract award. (CDRL J001). The IPMP shall define the pest management goals and shall explain how each goal will be met through implementation of the IPMP IAW with State, DODI 4150.07, Department of Defense Manual (DODM) 4150.07, and ARs. The contractor’s IPMP shall include the following: purpose, authority, program objective, responsibilities, strategies, principles (mechanical, physical, cultural, biological, and chemical control), outliers, pesticide reduction strategies, pest management operations (noxious/invasive plants, real property pests, bees/wasps, common pest in/around buildings, disease vector/medically important pests, animal pests, ornamental/lawn pests, quarantine/regulated pests, and self-help pest control), health/safety considerations (medical surveillance, protection plant equipment, fire, equipment, storage, mixing, applications, and disposal), environmental considerations (public, sensitive areas, endangered species, critical habitats, pesticide spills and remediation, pollution prevention, prohibited areas), administration (operations, contracts, agricultural out leases, aerial application, interservice support agreements, resources, reports/records, training and certification, quality assurance/quality control, design/new construction, coordination with agencies, sale and distributions of pesticides, and pesticide management references. The contractor shall maintain daily records (DD1532) of all pest management activities, to include but not limited to, sub-contractor’ activities, surveillance, bait applications, and pesticide applications. Records shall be made available to the Government as requested. The contractor shall be responsible for pesticide/herbicide use and input into the Department of the Army reporting method.
Applicators that apply pesticides or supervise pesticide applications shall have the appropriate State of Nevada certifications. The Contractor shall report this information formally via the HQ AEP WEBCASS IPM application and coordinate all data input with HWAD Environmental Staff. The Contractor shall submit an annual Pest Control Summary Report to the
PCO. (CDRL J002).
2.1.2. Stormwater Pollution Prevention Plan
2.1.2.1. The contractor shall develop and implement a Stormwater Pollution
Prevention Plan and submit to the PCO within 120 days after contract award (CDRL J003). The plan shall include the following: facility inspections, contact information/responsible parties, identification of the Storm Water Pollution Prevention Team, industrial activities and associated pollutants, spills and leaks, storm water sampling data, non-storm water discharge documentations, control measures (good housekeeping, preventative maintenance, spill prevention and response, inspections and reports, employee training, record keeping, and sediment and erosion controls), management of runoff, site specific plans (per building).
Performance Work Statement (PWS) 9
June 2025
2.1.3. Spill Prevention, Control and Countermeasure Plan
2.1.3.1. The contractor shall develop and implement a Spill Prevention, Control and Countermeasure Plan and submit to the PCO within 120 days after contract award (CDRL J004). The plan shall include the following:
management endorsement engineer certification, containers not covered by plan, navigable waters, training, spill history, security, record keeping, potential spill response volumes and rates, containment and diversion structures, demonstration of practicability, facility drainage, bulk storage tanks, transfer operations, pumping, in-plant processes, tank car and truck loading/unloading rack, inspections, records, spill response procedure, off-plant damages and pollution control, hazardous substances, emergency response team, equipment list/materials (location and amount) available for spill, inventory of oil sites (site number, location, underground storage tanks), drainage map, electrical pad mounted transformer list, inspection records, current permit, and facility diagram (to include tank locations).
2.1.4. Hazardous Materials/Waste Contingency Plan
2.1.4.1. The contractor shall develop and implement a Hazardous
Materials/Waste Contingency Plan and submit to the PCO within 120 days after contract award (CDRL J005). The plan shall include the following:
installation hazardous waste management board, hazardous waste generation, hazardous waste generators, hazardous waste storage and treatment facilities, operating procedures, classification of wastes, hazardous waste categories, container/labels, collection of hazardous wastes, hazardous waste sampling, hazardous waste disposal (category I, II, and III), hazardous waste treatment (category IV), waste minimization, spill prevention and control, technical information, current permits, special handling instructions, and waste analysis plans (land disposal restrictions, analytical procedures, and waste streams).
2.1.5. Noise Management Plan
2.1.5.1. The contractor shall develop and implement a Noise Management Plan and submit to the PCO within 120 days after contract award (CDRL J006).
2.1.6. Wildland Fire Management Plan
2.1.6.1. The contractor shall develop and implement a Wildland Fire Management and submit to the PCO within 120 days after contract award (CDRL J007). The plan shall include the following: fire prevention definitions, benefits, safety concerns, policies, permits, controlled burn opportunities and goals, reporting requirements, training, and fire sources.
2.1.7. Installation Level Green Procurement Plan
2.1.7.1. The contractor shall develop and implement an Installation Level Green
Procurement Plan and submit to the PCO within 120 days after contract award (CDRL J008). The plan shall include a procurement plan for green products and services to facilitate compliance with Affirmative Procurement requirements for recovered materials and biobased items IAW 40 CFR 247 and EO 13423.
2.1.8. Integrated Solid Waste Management Plan
2.1.8.1. The contractor shall develop and implement an Integrated Solid Waste
Performance Work Statement (PWS) 9
June 2025
Management Plan and submit to the PCO within 120 days after contract award (CDRL J009). The plan shall include waste management practices;
current and future needs based on mission, size, and economic and environmental considerations; identification of required resources;
provisions for measuring and reporting annual solid waste generation and diversion activities, strategies to reduce the volume of waste generated onsite, and implementation of recycling plans.
3. COMMUNICATIONS, SUPPORT, DOCUMENTATION AND PERMITS:
3.1. Upon discovery of a reportable (per state, federal, and/or Army regulations) hazardous substance, HW or “oil” discharge, the contractor shall immediately (within 15 minutes) notify the HWAD Environmental Government Staff (via phone call or email) IAW the contractor’s approved Emergency Response Plan. For this requirement, the definition of a discharge includes, but is not limited to, any spilling, leaking, pouring, pumping, emitting, emptying, dumping, or seepage into the environment. The contractor shall investigate the facts of each discharge and provide a written spill report to the government within 24-hours of each discharge incident (CDRL J010). In addition, any releases over state established thresholds shall be reported to the appropriate state agency. The report shall include:
• Date
• Time
• Source and location
• Amount discharged (to include the amount, width, length & depth of slick)
• Type of material discharged
• Personnel Injuries and/or Property Loss
• Indicate whether samples were taken and if so, results of such
• On-scene weather and wind conditions
• Movement of the substance
• Areas threatened or damaged (specifically identify by name) (e.g., navigable waters, groundwater, land surface, surface water, drinking water supply, or ambient air)
• Potential impacts/dangers
• Cause
• Describe actions taken to prevent future occurrences of this type
• Was assistance required and if so from who
• Point of contact on scene
• Notifications made and verification that the notifications to outside agencies were coordinated and reported through the HWAD Government Environmental staff (to include name of agency and person contacted and report #s)
• Remedial action taken
• Remedial action planned
• Anticipated date of remedial action completion
Performance Work Statement (PWS) 9
June 2025
• Date formal report is due to what agency.
If soil removal was performed, the contractor shall include the measurements of the excavation (e.g., depth, width, height, etc.) and the yards of soil removed in the written report. Photos shall be taken when the spill is discovered, recovered, and after corrective action and cleanup have been completed. Notifications to outside agencies shall be coordinated and reported through the HWAD Government Environmental Staff. Soil shall not to be replaced/backfilled without coordination with the HWAD Government Environmental Staff.
3.2. The contractor shall coordinate with the HWAD Government Staff on all written communications and negotiations with regulatory agencies. All official correspondence pertaining to regulatory matters affecting HWAD shall go out under the HWAD Commander’s, Commander Representative’s or designated representative’s signature and letterhead. Should the contractor receive official correspondence on matters pertaining to a regulatory matter affecting HWAD (i.e., all correspondence from the Nevada Division of Environmental Protection (NDEP), the contractor shall provide the correspondence to the Procuring Contracting Officer (PCO) and Commander or Commander’s Representative within 15 minutes.
All other correspondence with NDEP shall be provided to the HWAD Government Environmental Staff and the PCO 5 days before submittal for review, coordination, and signing of cover letters.
3.3. The contractor shall submit all new, to include Operating Permits to Construct, and renewal permit applications to the PCO 15 days prior to required submission deadline IAW applicable regulations, permit conditions, and/or regulatory directions/directives (CDRL J011). All permits shall be applied for in the name of the contractor as the operator and the Army as the owner and both the contractor’s general manager or authorized representative and the HWAD Commander or Commander’s Representative shall sign. The contractor shall manage and maintain operational compliance with permits issued by all Federal, State and local agencies; sign all applications, reports, and certifications required by law, regulation, or permit, including those required for operators and generators; and terminate unneeded environmental permits with coordination and approval by the HWAD Government Environmental Staff and HWAD Commander or Commander Representative. Copies of all final permits shall be provided to the PCO within 5 business days.
3.3.1. The contractor shall assist U.S. Army personnel and support external audit teams and provide access to contractor areas. The contractor shall perform an installation-wide environmental assessment every three years.
3.4. The contractor shall conduct quarterly Environmental Quality Control Committee meetings with the HWAD government staff. The contractor shall document and
Performance Work Statement (PWS) 9
June 2025 maintain meeting minutes within 7 calendar days after each meeting with tasks identified by owner and suspense date.
3.5. The contractor shall identify and document within 60 days of discovery any known environmental deficiencies associated with existing Federal, State, and Local statutory regulations, FAR requirements, including Part 23 and Part 7, and ordinances and codes. Identification and discovery documentation as well as subsequent corrective action plans shall be submitted to the PCO. (CDRL J012).
3.6. With respect to environmental training and certification, within 90 days of operational control, the contractor shall develop an environmental training matrix and training plan that shall be followed for the life of the contract that details the environmental training requirements for each environmental point of contact. The training plan shall be maintained and made available to the government upon request. The training matrix shall be developed and updated, taking into consideration individual work assignments and inherent environmental aspects to include, but not limited to, specialized environmental training consisting of such items as 29 CFR 1910.120 - HAZWOPER, 49 CFR 172.704 - DOT Hazardous Materials Training, 40 CFR 262 - Hazardous Waste Generator Regulatory training, etc. The contractor shall prepare, arrange, maintain and conduct environmental training for the contractor’s staff. The contractor shall also maintain records of annual HAZWOPER recertification training IAW requirements of 29 CFR 1910.120 and hazard communication training IAW with 29 CFR1910.120.
3.7. The contractor shall assist in the defense and negotiation of Notices of Violation, Notices of Deficiency, Administrative Orders, citizen's suits, etc., which address or are related to environmental deficiencies (alleged or otherwise). The contractor shall manage and maintain operational compliance with regulatory notices/orders which address deficiencies in compliance. Responses to inquiries from state/regulators shall be coordinated through the HWAD Government Environmental Staff and the PCO no later than (NLT) 14 business days before the due date. The contractor shall bear all expenses associated with any non-compliance resulting from contractor action or inaction and all expenses necessary to maintain compliance with regulatory requirements. If the government is assessed a monetary fine for violations caused by the contractor’s performance, actions, or inactions, the contractor shall reimburse the government for the amount of that fine and other costs incurred in resolving the contractor’s violation.
3.8. The government reserves the right to fund National Environmental Policy Act
(NEPA) analysis for projects initiated outside of the operating contract. The operating contractor shall initiate and complete all other required environmental documentation (e.g., environmental assessments, findings of no significant impact environmental impact statements, records of environmental consideration, etc.)
Performance Work Statement (PWS) 9
June 2025 required for compliance with Public Law 91-190, NEPA, 32 CFR Part 651, Environmental Analysis of Army Actions, and AMC NEPA Policy. All efforts shall be coordinated through the HWAD Government Environmental Staff.
3.9. The contractor shall comply with all environmental reporting as outlined in the
Federal, State, and Local regulations, the FAR including Part 23 and Part 7, ordinances and codes; observe and comply with EOs, ARs to include AR200-1, AR 420-1, and AR 700-90, DOD environmental policies. The contractor shall provide a copy of all reports to the HWAD Government Staff (CDRL J013) 14 business days prior to submission to the regulators. The contractor shall consult with the HWAD Government Environmental Staff 30 business days in advance of report submission when any report identifies a non- compliance/alleged non-compliance situation or contains issues anticipated to be controversial.
3.10. Within 18 months of operational control, the contractor shall establish and maintain a fence line to fence line Emergency Management System IAW AR 200-1. The EMS shall include all tenants, subcontractors, lessees, and the HWAD Government Staff.
3.11. The contractor shall prepare and execute corrective action plans to address audit and environmental assessment findings. Corrective action plans shall identify a timeline for correction, review and verification of corrective actions. The contractor shall assist the U.S. Army in responding to all findings and recommendations provided as a result of any inspection and/or audit report issued by regulatory agencies, the DoD, other Federal, State, or local agencies. The contractor shall be responsible for inputting regulatory actions and associated corrective actions into the specified Department of the Army reporting method.
3.12. The contractor shall establish and maintain an internal and external Environmental
Performance Assessment Survey (EPAS) auditing program that conforms with the EPAS requirement found under AR 200-1 and AR 420-1, chapter 16-1. Results shall be documented in Web Compliance Assessment & Sustainment System (WEBCASS) EPAS (or Army equivalent website) or if WEBCASS EPAS is not accessible, the contractor shall share the results with the HWAD Government Environmental Staff. EPAS auditing plans shall be coordinated through the HWAD Government Environmental Staff. The contractor shall participate and support external EPAS audits following the specified [Removed]/JMC guidance via WEBCASS and respond to any nonconformances identified by the government (to include Corrective Action Requests) as a result of the audit. The contractor’s response shall include a root cause analysis and corrective action plan(s) with completion dates. The contractor shall conduct annual internal EPAS audits and upload data into WEBCASS. The contractor shall review previous assessments as necessary, manage corrective actions through to completion/implementation, Performance Work Statement (PWS) 9
June 2025 assess new regulatory requirements, and address all findings in compliance areas specified by higher commands. WEBCASS access will be granted upon contract award.
3.13. The contractor shall notify the HWAD Government Environmental Staff within 15 minutes of any visit/ inspection by local, State, or Federal representatives, announced or unannounced. Visits shall not proceed without a HWAD Government Staff representative present. No later than 24-hours after completion of the visit, the contractor shall provide a written report of the visit to the PCO. (CDRL J014). The report shall include date and time; name of visitor and agency represented;
requirements and purpose of visit; results; name and telephone of the government representative present, and a list of action items, task list, and compliance plan with a projected completion date. A copy of all material requested and/or supplied to the visitors shall be submitted with the report. The contractor shall coordinate all inquiries (telephone calls, correspondence, etc.) regarding HWAD’s environmental matters with the HWAD Government Environmental Staff in a timely manner.
When possible, the contractor shall include the HWAD Government staff in planned contact with regulatory personnel; and when not possible, shall notify the HWAD Government Environmental Staff within 15 minutes of the outcome of the regulatory contact.
3.14. The Contractor shall report all solid waste to include waste collected from depot housing as follows: solid waste annual reporting (SWARWeb) or otherwise specified Department of the Army reporting method is the online reporting system utilized to report solid waste and recycling data to the Office of Secretary of Defense (OSD) and Environmental Protection Agency (EPA). The contractor shall respond to the quarterly data-call sent by the Assistant Chief of Staff for Installation Management (ACSIM), complete all entries into the SWARWeb system, and meet suspense dates established by the HWAD Environmental Staff. The ACSIM sustains SWARWeb to meet mandates established by law (Resource Conservation and Recovery Act). SWARWEB access will be granted upon contract award.
3.15. The contractor shall comply with AR 115-13, by supporting requests for environmental geospatial information as required. Geospatial information submitted shall meet SDSFIE DoD Standards for incorporation.
3.16. The contractor shall provide information and support for all environmental taskers received from the government.
3.17. The contractor shall, at the request of the government, provide verification sampling of suspect and/or spill areas. Areas to be addressed will be those discovered in random inspections of the facility. Approximately 50 samples shall be
Performance Work Statement (PWS) 9
June 2025 required each calendar year. All samples collected shall at a minimum conform to EPA SW846 and/or National Institute for Occupational Safety and Health (NIOSH) Manual of Analytical Methods and be analyzed by a laboratory meeting National Environmental Laboratory Accreditation Program certification or equivalent.
3.18. The contractor shall on a regular basis, not less than quarterly, provide sweeps and removal of unexploded ordnance from all areas of potential public access including the waters of Walker Lake and the Naval Inshore Operational Training Center or Freedom Ranges, IAW NDEP, 25 June 1991 Finding of Alleged Violation and Order. These clearances shall be accomplished IAW AR 385-63, Range Safety;
AR 385-10, Army Safety Program, Department of the Army Pamphlet (DA PAM) 385-63, Range Safety; AR 350-19 Army Sustainable Range Program. A quarterly report shall be provided to the PCO NLT the 15th day following the quarterly calendar period, i.e., January 15th for activities from October through December (CDRL J015). The report shall include areas covered by the sweep, photos of items found, description of procedures used to conduct the sweep, global positioning system points where munitions were found, dates the sweeps occurred, dates of destruction, a map of where items requiring disposal by detonation and those not requiring detonation were taken for storage, and a drawing/map of affected areas utilizing the Army’s Geographic Information System IAW Department of Defense Instruction (DODI) 8130.01.The contractor shall take steps to prevent entry to the Walker Lake Test Range/Navy Beach area via waterborne access from the north.
The contractor shall ensure adequate signage complying with the bi-lingual requirements of 40CFR 264.14 are provided at the public boat access and perimeter fencing that surrounds the range, warning the public of the dangers that exist at the south end of Walker Lake.
3.19. The Contractor is responsible for Per- and Polyfluoroalkyl Substances sampling and reporting per EPA and OSD sampling policies as directed under 15 USC 115 and 40 CFR 705.
4. PRE-EXISTING ENVIRONMENTAL CONDITIONS:
4.1. To the extent that this clause does not vary the terms of the attachments therein, the Government shall retain the risk and responsibility for all pre-existing environmental contamination at HWAD, including but not limited to remediation and corrective actions under Federal and State environmental statutes, regulations, orders and permits.
5. STORAGE:
5.1. The contractor shall prohibit the storage and disposal of non-defense owned toxic and hazardous material on HWAD IAW the provisions of 10 U.S.C. 2692. Material brought into HWAD that shall be consumed or incorporated into products within a
Performance Work Statement (PWS) 9
June 2025 reasonable time frame (no longer than 1-year) and removed from HWAD upon completion of the manufacturing process is not considered to have been "stored".
Any exceptions must be obtained from the Secretary of the Army prior to non-defense toxic and hazardous materials being stored or disposed of at HWAD. This request for exception shall be prepared by the contractor and forwarded through command channels for routing and approval.
6. CULTURAL RESOURCES and NATURAL RESOURCES:
6.1. The contactor shall support HWAD government’s Integrated Cultural Resources
Management Plan and HWAD government’s Integrated Natural Resource Management Plan. The contractor shall ensure personnel are trained and prepared for specific situations (e.g. finding human remains or artifacts), demonstrate compliance with all cultural and historic laws, including but not limited to, management of Native American artifacts and human remains and consultations with federally recognized tribal governments and other Native American organizations. The contractor shall assist the government in preparation of correspondence to the Nevada State Historical Preservation Office (NVSHPO), to include justification, Scope of Work, maps delineating the area of potential effect, architectural resource assessment, photographs, etc.
7. LANDFILL OPERATION:
7.1. The contractor shall operate 2 landfills on HWAD, the class III construction and debris landfill, located adjacent to the Property Reutilization Office (PRO) in the north magazine area, and the class III treated wood and asbestos landfill, located in the central magazine area southeast of pad 2. All material destined for either landfill shall be identified, weighed, and recorded daily on the landfill monthly log sheet. This log sheet and intake paperwork shall be maintained on site for review by NDEP as required. This information shall be used to compile the monthly report for both landfills.
7.2. The class III construction and debris landfill shall be operated IAW NDEP solid waste Permit # SWW-339. Waste deposited in the landfill shall consist of inert and non-hazardous solid wastes, no liquids or Petroleum Oil Lubricants shall be deposited. The contractor shall ensure that no industrial recyclable (brass, lead, aluminum, etc.) materials are placed in the landfill.
7.3. The Class III Treated Wood and Asbestos Landfill shall be operated IAW Permit #
SW1209702. Waste deposited shall only consist of petrochlorophenol treated wood, cresol-treated wood, and properly encapsulated [Removed]. No other types of solid wastes shall be accepted, and liquid wastes are prohibited. Separate monofill units shall be dedicated to the disposal of each of these wastes.
Performance Work Statement (PWS) 9
June 2025
7.4. The contractor shall not place recyclable items recovered from industrial processes in the HWAD on-site landfills without coordination and approval from the government. The contractor shall adhere to AR 200-1, Chapter 10-2a (3), Solid Waste Minimization Requirements when disposing of office waste (e.g. aluminum cans, plastic bottles, etc.).
Performance Work Statement (PWS) 9
June 2025
Document Summary List
The contractor shall work with the HWAD PCO to identify any changes to the references or any applicable regulations or laws, which may affect process, cost, and/or schedule.
The PCO will review and provide implementation guidance.
The Contractor shall adhere to the most recent version of the Army Regulations (AR) cited in this PWS. Chapter and page numbers are provided for convenience, but do not absolve the Contractor of complying with all other applicable parts of the AR. If the ARs are updated during performance, the Contractor is responsible for meeting the new requirements as they take effect. Any such Army Regulation changes during the contract period shall be incorporated.
AR 200-1; Environmental Protection and Enhancement 12/13/2007 https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=2232 CAA Section 602(a & b); https://www.gpo.gov/fdsys/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm
AR 420-1 Army Facilities Management https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=841
DODI 4150.07-M; Pest Management Training and Certification https://www.esd.whs.mil/directives/initiatives/dodi
DODI 4150.07-P; Certification of Pesticide Applicators https://www.esd.whs.mil/directives/initiatives/dodi
AR 200-1; Pollution Prevention https://armypubs.mil
29 CFR 1910.120; OSHA and Hazardous Waste Operations https://www.gpo.gov/fdsys/search/search.action?na=&se=&sm=&flr=&ercode=&dateBro wse=&govAuthBrowse=&collection=&historical=false&st=29+CFR+1910.120&=32+cfr+6 51&psh=&sbh=&tfh=&originalSearch=&fromState=&sb=re&ps=10&sb=re&ps=10
AR 700-90 Chapters 5 through 8;
https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=1004054
10 U.S.C. 2692.
https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=2&cad=rja&uact=8 &ved=2ahUKEwj2rcfmnubeAhVzKH0KHbb3BswQFjABegQIABAB&url=https%3A%2F% 2Fwww.gpo.gov%2Ffdsys%2Fgranule%2FUSCODE-2010-title10%2FUSCODE-2010-title10-subtitleA-partIV-chap159-sec2692&usg=AOvVaw3NIOtf4pg8q_VxgQFaKmLu
AR 115-13 Installation Geospatial Information Services (IGI&S);
https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=1000978 https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=2232 https://www.gpo.gov/fdsys/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm https://www.gpo.gov/fdsys/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm https://www.esd.whs.mil/directives/initiatives/dodi https://www.esd.whs.mil/directives/initiatives/dodi https://armypubs.mil/ https://www.gpo.gov/fdsys/search/search.action?na&se&sm&flr&ercode&dateBrowse&govAuthBrowse&collection&historical=false&st=29%2BCFR%2B1910.120&=32%2Bcfr%2B651&psh&sbh&tfh&originalSearch&fromState&sb=re&ps=10&sb=re&ps=10 https://www.gpo.gov/fdsys/search/search.action?na&se&sm&flr&ercode&dateBrowse&govAuthBrowse&collection&historical=false&st=29%2BCFR%2B1910.120&=32%2Bcfr%2B651&psh&sbh&tfh&originalSearch&fromState&sb=re&ps=10&sb=re&ps=10 https://www.gpo.gov/fdsys/search/search.action?na&se&sm&flr&ercode&dateBrowse&govAuthBrowse&collection&historical=false&st=29%2BCFR%2B1910.120&=32%2Bcfr%2B651&psh&sbh&tfh&originalSearch&fromState&sb=re&ps=10&sb=re&ps=10 https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=1004054 https://www.google.com/url?sa=t&rct=j&q&esrc=s&source=web&cd=2&cad=rja&uact=8&ved=2ahUKEwj2rcfmnubeAhVzKH0KHbb3BswQFjABegQIABAB&url=https%3A%2F%2Fwww.gpo.gov%2Ffdsys%2Fgranule%2FUSCODE-2010-title10%2FUSCODE-2010-title10-subtitleA-partIV-chap159-sec2692&usg=AOvVaw3NIOtf4pg8q_VxgQFaKmLu https://www.google.com/url?sa=t&rct=j&q&esrc=s&source=web&cd=2&cad=rja&uact=8&ved=2ahUKEwj2rcfmnubeAhVzKH0KHbb3BswQFjABegQIABAB&url=https%3A%2F%2Fwww.gpo.gov%2Ffdsys%2Fgranule%2FUSCODE-2010-title10%2FUSCODE-2010-title10-subtitleA-partIV-chap159-sec2692&usg=AOvVaw3NIOtf4pg8q_VxgQFaKmLu https://www.google.com/url?sa=t&rct=j&q&esrc=s&source=web&cd=2&cad=rja&uact=8&ved=2ahUKEwj2rcfmnubeAhVzKH0KHbb3BswQFjABegQIABAB&url=https%3A%2F%2Fwww.gpo.gov%2Ffdsys%2Fgranule%2FUSCODE-2010-title10%2FUSCODE-2010-title10-subtitleA-partIV-chap159-sec2692&usg=AOvVaw3NIOtf4pg8q_VxgQFaKmLu https://www.google.com/url?sa=t&rct=j&q&esrc=s&source=web&cd=2&cad=rja&uact=8&ved=2ahUKEwj2rcfmnubeAhVzKH0KHbb3BswQFjABegQIABAB&url=https%3A%2F%2Fwww.gpo.gov%2Ffdsys%2Fgranule%2FUSCODE-2010-title10%2FUSCODE-2010-title10-subtitleA-partIV-chap159-sec2692&usg=AOvVaw3NIOtf4pg8q_VxgQFaKmLu https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=1000978
Performance Work Statement (PWS) 9
June 2025
DODI 8130.01 (IGI&S)
https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=5&cad=rja&uact=8 &ved=2ahUKEwjxuMCPoObeAhXSFTQIHUB7C_AQFjAEegQIAhAC&url=https%3A%2F %2Farmypubs.army.mil%2Fepubs%2FDR_pubs%2FDR_a%2Fpdf%2Fweb%2FARN161 4_AR115-13_Web_FINAL.pdf&usg=AOvVaw18Ouy4mJv8FsoL7lrjvHoK
AR 385-63 Range Safety https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=3240
AR 385-10 Army Safety Program https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=1002884
DA PAM 385-63 Range Safety https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=79965 https://www.google.com/url?sa=t&rct=j&q&esrc=s&source=web&cd=5&cad=rja&uact=8&ved=2ahUKEwjxuMCPoObeAhXSFTQIHUB7C_AQFjAEegQIAhAC&url=https%3A%2F%2Farmypubs.army.mil%2Fepubs%2FDR_pubs%2FDR_a%2Fpdf%2Fweb%2FARN1614_AR115-13_Web_FINAL.pdf&usg=AOvVaw18Ouy4mJv8FsoL7lrjvHoK https://www.google.com/url?sa=t&rct=j&q&esrc=s&source=web&cd=5&cad=rja&uact=8&ved=2ahUKEwjxuMCPoObeAhXSFTQIHUB7C_AQFjAEegQIAhAC&url=https%3A%2F%2Farmypubs.army.mil%2Fepubs%2FDR_pubs%2FDR_a%2Fpdf%2Fweb%2FARN1614_AR115-13_Web_FINAL.pdf&usg=AOvVaw18Ouy4mJv8FsoL7lrjvHoK https://www.google.com/url?sa=t&rct=j&q&esrc=s&source=web&cd=5&cad=rja&uact=8&ved=2ahUKEwjxuMCPoObeAhXSFTQIHUB7C_AQFjAEegQIAhAC&url=https%3A%2F%2Farmypubs.army.mil%2Fepubs%2FDR_pubs%2FDR_a%2Fpdf%2Fweb%2FARN1614_AR115-13_Web_FINAL.pdf&usg=AOvVaw18Ouy4mJv8FsoL7lrjvHoK https://www.google.com/url?sa=t&rct=j&q&esrc=s&source=web&cd=5&cad=rja&uact=8&ved=2ahUKEwjxuMCPoObeAhXSFTQIHUB7C_AQFjAEegQIAhAC&url=https%3A%2F%2Farmypubs.army.mil%2Fepubs%2FDR_pubs%2FDR_a%2Fpdf%2Fweb%2FARN1614_AR115-13_Web_FINAL.pdf&usg=AOvVaw18Ouy4mJv8FsoL7lrjvHoK https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=3240 https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=1002884 https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=79965
| 1. OBJECTIVE: |
| 1.1. The contractor shall assign appropriately trained and certified personnel and establish and maintain a published environmental program that ensures compliance with Federal Acquisition Regulation (FAR), including Part 23 and Part 7 as well as Fede... |
| 1.2. The contractor shall maintain all files and records required throughout this Performance Work Statement (PWS) until completion of the contract, at which time they will be turned over and become property of the government. Any intellectual, real o... |
| 1.3. The contractor shall ensure all subcontracts, Army Retooling and Manufacturing Support agreements, and leases issued comply with the intent of the FAR, including Part 23 and Part 7, and Federal, State, and Local regulations, ordinances and codes.... |
| 1.4. The contractor shall manage facility operations and methods of all DOD operations to minimize the use of hazardous materials and the generation of hazardous and/or toxic wastes as defined in Title 40 Code of Federal Regulation (CFR) Protection of... |
| 1.5. The contractor shall not procure any Class I Ozone Depleting Chemicals (ODCs) as listed under Section 602 (a) of the Clean Air Act, nor any Class II ODCs after 2009 as listed under Section 602(b) of the Clean Air Act. |
| 2. General Requirements: |
| 2.1. The contractor shall develop the following plans IAW with AR 200-1 and submit to the government within 120 days after contract award: an Integrated Pest Management Plan (IPMP), a Stormwater Pollution Prevention Plan, a Spill Prevention, Control a... |
| 2.1.1. Integrated Pest Management Plan (IPMP) |
| 2.1.1.1. The contractor shall develop and implement an IPMP consistent with 7 USC 6, 16 USC 670, and 42 USC 116, and submit to the PCO within 120 days after contract award. (CDRL J001). The IPMP shall define the pest management goals and shall explain... |
| 2.1.2. Stormwater Pollution Prevention Plan |
| 2.1.2.1. The contractor shall develop and implement a Stormwater Pollution Prevention Plan and submit to the PCO within 120 days after contract award (CDRL J003). The plan shall include the following: facility inspections, contact information/responsi... |
| 2.1.3. Spill Prevention, Control and Countermeasure Plan |
| 2.1.3.1. The contractor shall develop and implement a Spill Prevention, Control and Countermeasure Plan and submit to the PCO within 120 days after contract award (CDRL J004). The plan shall include the following: management endorsement engineer certi... |
| 2.1.4. Hazardous Materials/Waste Contingency Plan |
| 2.1.4.1. The contractor shall develop and implement a Hazardous Materials/Waste Contingency Plan and submit to the PCO within 120 days after contract award (CDRL J005). The plan shall include the following: installation hazardous waste management boar... |
| 2.1.5. Noise Management Plan |
| 2.1.5.1. The contractor shall develop and implement a Noise Management Plan and submit to the PCO within 120 days after contract award (CDRL J006). |
| 2.1.6. Wildland Fire Management Plan |
| 2.1.6.1. The contractor shall develop and implement a Wildland Fire Management and submit to the PCO within 120 days after contract award (CDRL J007). The plan shall include the following: fire prevention definitions, benefits, safety concerns, polic... |
| 2.1.7. Installation Level Green Procurement Plan |
| 2.1.7.1. The contractor shall develop and implement an Installation Level Green Procurement Plan and submit to the PCO within 120 days after contract award (CDRL J008). The plan shall include a procurement plan for green products and services to facil... |
| 2.1.8. Integrated Solid Waste Management Plan |
| 2.1.8.1. The contractor shall develop and implement an Integrated Solid Waste Management Plan and submit to the PCO within 120 days after contract award (CDRL J009). The plan shall include waste management practices; current and future needs based on ... |
| 3. COMMUNICATIONS, SUPPORT, DOCUMENTATION AND PERMITS: |